TIDMPOW

RNS Number : 1524I

Power Metal Resources PLC

12 April 2022

12 April 2022

Power Metal Resources PLC

("Power Metal" or the "Company")

Gold Exploration Update - Victoria Goldfields

Power Metal Resources PLC (LON:POW), the London listed exploration company seeking large-scale metal discoveries across its global project portfolio, announces an update in relation to the ongoing exploration programme being carried out by joint-venture subsidiary New Ballarat Gold Corporation plc ("NBGC") focused in the Victorian Goldfields of Australia.

NBGC is a joint-venture held between Power Metal (49.9%) and its partner, London-listed Red Rock Resources plc (50.1%). NBGC has a 100% interest in Red Rock Australasia Pty Ltd ("RRAL").

RRAL Exploration Director Mr David Holden commented:

"After drilling a combined 860m at the O'Loughlin's and Mt Bute prospects, drilling has now paused in order to allow for the receipt of outstanding assays results - the results of which will allow for further geological interpretations to be made prior to additional drill targeting. At the O'Loughlin's prospect have already encountered high-grade gold from the initial assays we have received - with assays from an additional three holes still pending.

At the Mt Bute prospect the anomalous molybdenum (Mo) and bismuth (Bi) results initially identified by XRF test work suggests the possibility of an intrusive-related component to mineralisation. We believe this implies the potential for larger and deeper gold-molybdenum-tungsten targets at Mt Bute - which has been substantiated by rock chips sampled here that returned notable gold results.

As we plan for a listing of the Victorian Goldfields interests, these initial drilling results combined with the progress of the important Daylesford exploration license towards grant, are important steps that will enable us to list NBGC with immediately prospective projects that possess the potential grade and scale that we seek."

Highlights:

   --    First phase of diamond drilling at Mt Linton and O'Loughlin's prospects now complete. 

-- Initial results received confirm that two gold-bearing lode structures have been intersected at the O'Loughlin's Prospect, including 0.4 m at 12.34 g/t Au from 75.7m downhole, and 0.5m at 1.44 g/t Au from 50.6m downhole from hole OL21D002. (Note - As further explained below: Due to low core recovery across select areas, up to several meters or core across the main mineralised zones were not recovered. The core that was captured and available to be sampled is thought to be highly under-representative of the nature and width extent of the mineralized zone.)

-- To date, the O'Loughlin's Prospect extends for over 2km along strike with a width of 500m; a size comparable to the nearby Ballarat Gold Mine.

-- Investigation of structural and geological complexities from recent core drilling underway, with additional drilling at the O'Loughlin's Prospect planned following completion of the analysis.

-- Preliminary X-Ray Fluorescence (XRF) analysis of Mt Bute drill core returned anomalous Molybdenum (Mo) and Bismuth (Bi) which suggest that models incorporating new concepts for larger targets of intrusive related gold ("IRG") mineralization may be more applicable to the Victorian gold deposits than first thought.

-- Extensive soil sampling campaign planned over the remaining granted tenures throughout NBGC's landholding within the Victorian Goldfields - with the goal of identifying additional target zones.

-- The Daylesford exploration licence application (EL7330) covering the historical Ajax mine is a step closer to grant, having successfully passed through the objection phase and native title assessment.

Drilling Overview - O'Loughlin's

NBGC has now completed diamond drilling at two of its advanced prospects including Mt Bute and O'Loughlin's, which are located approximately 30km and 20km from the town of Ballarat respectively. The intention of the drilling was to allow for detailed geological investigation of various mineralised structures seen within historical narrow workings which are otherwise not visible at surface. At both prospects, mineralised quartz reef structures were successfully intersected.

Whilst assays for the first two holes at the O'Loughlin's Prospects have been received, the remainder are due back before the end of Q2 2022. Laboratory delays have been experienced due to a high demand for analytical work across the region coupled with staff shortages due to the COVID pandemic. This has resulted in excessive wait times for the sample assays.

Drilling Summary (to date):

 
             No of      Total                                                                                Lab 
 HOLEID       samples    Depth(m)   Azimuth   dip   Easting(m)   Northing(m)   Elevation(m)                  status 
            ---------  ----------  --------  ----  -----------  ------------ 
 OL21D001    79         80.2        280       -70   755592       5819620       352.8          returned 
            ---------  ----------  --------  ----  -----------  ------------  -------------  ------------------------- 
 OL21D002    112        88.7        278       -85   755593       5819620       352.8          returned 
            ---------  ----------  --------  ----  -----------  ------------  -------------  ------------------------- 
 OL22D001    88         122.1       88        -74   755539       5819638       354            In progress 
            ---------  ----------  --------  ----  -----------  ------------  -------------  ------------------------- 
 OL22D002    77         143.5       71        -60   755539       5819638       354            In progress 
            ---------  ----------  --------  ----  -----------  ------------  -------------  ------------------------- 
 OL22D003    34         91.5        300       -65   755623       5819692       349            In progress 
            ---------  ----------  --------  ----  -----------  ------------  -------------  ------------------------- 
 MB22D001    149        119.2       284       -55   723996       5821769       389            In progress 
            ---------  ----------  --------  ----  -----------  ------------  -------------  ------------------------- 
 MB22D002    187        119.3       300       -55   723996       5821769       389            In progress 
            ---------  ----------  --------  ----  -----------  ------------  -------------  ------------------------- 
 MB22D003    150        101.5       265       -55   723996       5821769       389            In progress 
            ---------  ----------  --------  ----  -----------  ------------  -------------  ------------------------- 
 

Note datum is MGA2020 Zone 54 and azimuth is magnetic north

Drilling Results (to date):

 
            HOLEID                 FROM                 TO                  ASSAY NOTES* 
                       -------------------  ------------------ 
            OL21D001                30.55m              31.00m              0.45m@0.38g/t core loss 31.0m - 31.8m 
                                                                            (0.8m) 
                       -------------------  ------------------  ------------------------------------------------------ 
            OL21D002               50.65m               52.00m              1.35m@0.62g/t incl. 0.5m@1.44g/t core loss 
                                                                            52.0m 
                                                                            - 53.1m (1.1m) 
                       -------------------  ------------------  ------------------------------------------------------ 
            OL21D002               70.40m               70.80m              0.4m@0.21g/t. core loss 70.8m - 75.7m 
                                                                            (4.9m) 
                       -------------------  ------------------  ------------------------------------------------------ 
            OL21D002               75.70m               76.10m              0.4m@12.32 g/t 
                       -------------------  ------------------  ------------------------------------------------------ 
 

*All intervals are presented as apparent widths as measured in the drill core. Where possible, core has been oriented using Boart Longyear TruShot TM V7R7 downhole orientation tool.

All HQ diameter diamond drilling was completed by Trimac Drilling out of Buninyong, Victoria. Assaying was competed on half-core samples which were selected based on geological observations made by on-site geological staff.

All half-core samples were sent to MinAnalytical Laboratory Services Australia located in Western Australia. Gold assays were determined using photon assay within drillhole OL22D001, and traditional fire-assay for the remaining holes. NBGC has also requested a 34-element suite assay be completed on all samples utilising a four-acid digest with an ICP-OES finish which will give further insights into the geochemical signature of the mineralised zones intersected.

Comparison of gold results determined using photon assay vs fire assay will be completed once all assays have been received. Standards were submitted at a rate of 1 in approximately 30 samples and duplicate assaying via an alternate laboratory will be done on selected samples once initial assays are returned to further assist in the QA/QC validation process.

Given the soft nature of the shale/slate/sandstone wall rock, in contrast to the hard quartz comprising the veins within the main mineralized lodes at the O'Loughlin's Prospect, core recovery has been low; and across select areas up to several meters of the main mineralised zone were not recovered. The core that was captured and available to be sampled is thought to be highly underrepresenting the nature and width extent of the mineralized zone. A link to core photos highlighting the core loss through select mineralised zones can be viewed at the link below. https://www.powermetalresources.com/wp-content/uploads/2022/04/22-04-08-O-Loughlins-Prospect-Select-Core-Photo.pdf

Assays from drillhole OL21D002 confirm that coarse nuggety gold is present and good continuity of mineralisation within the structure is present. Discussions with drilling contractors as to more suitable methods to increase core recovery are in progress prior to the commencement of any further drilling.

Mt Bute Prospect

At Mt Bute, a similar genesis model to the O'Loughlin's Prospect was originally targeted, however preliminary XRF results of selected core intervals returned highly anomalous molybdenum and bismuth results. The XRF results are subject to assay confirmation however this suggests a possible relationship to the nearby Mt Bute I-type granite and opens the possibility for additional types of mineralisation at the prospect. This includes intrusion related mineralisation which may be of a more recent age than previously thought.

Considering the differing geological model now postulated, NBGC is undergoing further investigations before additional drilling, as the recent results demonstrate the possibility that a more substantial target may be present at depth. These include additional mineralogical studies, as well as reinvestigation of induced polarisation (IP), aeromagnetic and gravity data over Mt Bute.

O'Loughlin's Prospect

Drilling at the O'Loughlin's Prospect is targeting 'Ballarat-style' gold hosted quartz veins hosted within high-angle shear zones. The north-south oriented zone encountered in the drilling completed there to date has similarities to mineralised structures observed underground at the nearby Ballarat Gold Mine. Once all assays are received, NBGC will undertake further geological interpretations integrating the assay results and geological core observations, with the intention of identifying further structurally hosted targets at the prospect.

Daylesford Exploration Licence Application (Ajax Mine) - EL7330

NBGC recently received confirmation that the exploration licence application has progressed through the native title assessment and is back to Earth Resource Regulation Licensing for final approval. It is expected that this licence will progress by mid-2022. The progress so far does not guarantee that NBGC will be granted the license, which remains a decision for the regulator acting in accordance with the relevant legislation. The Ajax mine is on the western margin of the extensive Daylesford gold camp and falls within exploration licence application EL7330.

The Ajax mine comprises numerous shafts and workings found over a strike of several kms, which was historically mined to over 400m vertically. Historical production continued up in to the 1930's producing over 300,000 ounces Au at an average grade of approximately 12-15 g/t Au. The down dip and along strike extensions to the main ore zones remains untested. Minor diamond drilling completed in the 1990s intersected multiple lode structures with results up to 5.3m of 15.2g/t Au, demonstrating the continuity in lode structure and associated gold grades. The mine shaft itself has been backfilled and is currently not accessible.

Further information in respect of the Ajax mine may be viewed the project report available on the Power Metal website through the following link:

https://www.powermetalresources.com/wp-content/uploads/2020/10/2020-09-16-4499-EL007330-Daylesford.pdf

Work is currently under way to digitise the old workings, stope and geology into a 3D computer model, in advance of a planned diamond drilling campaign which is expected to commence following grant of the license application.

New Ballarat Gold Corporation Overview

NBGC holds a strong land position comprising eleven (11) granted exploration licences for a total area of 1,501 km(2) within the gold fields of Victoria, Australia, principally around the mining centre of Ballarat.

Eight (8) licences covering 827 km(2) await grant. The company has carefully assembled its portfolio of properties comprising a broad range from robust exploration targets to near term resource potential, all of which remain largely undeveloped by modern explorers.

With the first tenements granted only in 2021, NBGC has already conducted detailed exploration of its initial targets, including a diamond drill test of two prospects starting in December 2021.

520m of drilling has been carried out at O'Loughlin's and 340m has been carried out at Mt Bute, with samples sent to MinAnalytical Laboratory Services in Perth, WA, for laboratory assay testing.

Granted Licences

The eleven (11) granted licences cover high priority areas covering 1,501 km(2) as outlined below.

 
   Licence Number     Project Name        Area (km(2) 
                                               ) 
                        Buninyong 
      EL007271          (renamed)             133 
                     --------------  -------------------- 
      EL007281          Blue Chip             74 
                     --------------  -------------------- 
      EL007282          Blue Sky              489 
                     --------------  -------------------- 
      EL007285         Blue Ribbon             8 
                     --------------  -------------------- 
      EL007327           Dereel               60 
                     --------------  -------------------- 
      EL007385          Sardinia                        4 
                     --------------  -------------------- 
      EL007329           Kilmore              484 
                     --------------  -------------------- 
                       Pitfield/Mt 
      EL007301             Bute               85 
                     --------------  -------------------- 
                       Blue Yonder 
                        (Announced 
      EL007328            today)              164 
                     --------------  -------------------- 
     State land             -                 [9] 
   within EL007271 
      EL007505 
                     --------------  -------------------- 
     State land             -                 [9] 
   within EL007271 
      EL007506 
                     --------------  -------------------- 
                Total                       c 1,501 
              (Excluding 
              State land 
           above including 
             in EL007271) 
                                     -------------------- 
 

Licence Applications

RRAL has applications in process for eight other new gold exploration licence areas covering approximately 827km(2) in the Victoria Goldfields of Australia including:

 
 License Application     Project Name     Area (km(2) 
        Number                                 ) 
       EL007294            Red Queen          129 
                       ----------------  ------------ 
                          Daylesford 
       EL007330            (renamed)          202 
                       ----------------  ------------ 
       EL007460          Kilmore West         325 
                       ----------------  ------------ 
      State land 
    within EL007271 
                                               [8] 
       EL007507 
                       ----------------  ------------ 
      EL007540* 
     (3 competing 
     applications)      Outer Ballarat        142 
                       ----------------  ------------ 
       EL007756            Monmouth           22 
                       ----------------  ------------ 
       EL007799           Dereel (2)           3 
                       ----------------  ------------ 
       EL007826          Ballarat East         4 
                       ----------------  ------------ 
                  Total                      c 827 
                (Excluding 
                State land 
             above including 
               in EL007271) 
                                         ------------ 
 

* Balmaine Gold Pty Ltd, Mercator Gold Australia Pty Ltd, and Loddon Gold Pty Ltd have put in competing applications the same day as RRAL for the ground covered by EL007540. The application considered to have greatest merit will eventually be given priority.

The following applications have been made in Western Australia.

 
 EL45/5859        Paterson        227 
 EL45/5885    Pilbara/Paterson    70 
             ------------------  ---- 
 

COMPETENT PERSON STATEMENT

The technical information relating to exploration in this report is compiled by David Holden, BSc, MBA, MEM, who is a member of the Australian Institute of Geoscientists and a director of NBGC, and the Exploration Director of RRAL. He is a member of a recognized professional organization and has sufficient relevant experience to qualify as a qualified person as defined in the Guidance Note for Mining, Oil and Gas Companies published by AIM. Mr Holden consents to the inclusion of the information in the form and context in which it appears.

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 ("MAR"), and is disclosed in accordance with the Company's obligations under Article 17 of MAR.

For further information please visit https://www.powermetalresources.com/ or contact:

 
Power Metal Resources plc 
Paul Johnson (Chief Executive Officer)                +44 (0) 7766 465 617 
 
SP Angel Corporate Finance (Nomad and Joint Broker) 
Ewan Leggat/Charlie Bouverat                          +44 (0) 20 3470 0470 
 
SI Capital Limited (Joint Broker) 
Nick Emerson                                          +44 (0) 1483 413 500 
 
First Equity Limited (Joint Broker) 
David Cockbill/Jason Robertson                        +44 (0) 20 7330 1883 
 
 
 
 

NOTES TO EDITORS

Power Metal Resources plc - Background

Power Metal Resources plc (LON:POW) is an AIM listed metals exploration company which finances and manages global resource projects and is seeking large scale metal discoveries.

The Company has a principal focus on opportunities offering district scale potential across a global portfolio including precious, base and strategic metal exploration in North America, Africa and Australia.

Project interests range from early-stage greenfield exploration to later-stage prospects currently subject to drill programmes.

Power Metal will develop projects internally or through strategic joint ventures until a project becomes ready for disposal through outright sale or separate listing on a recognised stock exchange thereby crystallising the value generated from our internal exploration and development work.

Value generated through disposals will be deployed internally to drive the Company's growth or may be returned to shareholders through share buy backs, dividends or in-specie distributions of assets.

Power Metal Exploration Programmes Underway/Results Awaited

Power Metal has exploration programmes completed or underway, with results awaited, as outlined below:

 
    Project       Location      POW          Work Completed               Results Awaited 
                                  %            or Underway 
 
 Alamo Gold          USA      Earn-in    Excavation of             Field and assay results 
  Project                      to 75%     multiple test             from on-site work programme. 
                                          pits and mapping 
                                          & sampling. 
                 ----------  ---------  ------------------------  ------------------------------ 
 Athabasca         Canada       100%     Data compilation          Define next steps of 
  Uranium                                 across uranium            exploration. 
                                          properties 
                 ----------  ---------  ------------------------  ------------------------------ 
 Authier           Canada     Earn-in    Soil & rock sampling      Technical Review of 
  North Lithium                to 100%    completed                 exploration results 
                                                                    & define next exploration 
                                                                    steps. 
                 ----------  ---------  ------------------------  ------------------------------ 
 Ditau Project    Botswana      50%      Drill programme           Field updates and receipt 
                                          focused on key            & review of laboratory 
                                          targets notably           assay results. 
                                          drilling of potential 
                                          carbonatites and 
                                          targeting rare-earth 
                                          elements. 
                 ----------  ---------  ------------------------  ------------------------------ 
 Kalahari         Botswana      50%      Exploration programme     Field programme findings 
  Copper Belt                             underway across           and defined drill targets 
                                          the South Ghanzi          for near term drilling. 
                                          Project and further 
                                          exploration at 
                                          the more recently 
                                          acquired South 
                                          Ghanzi Extension 
                                          and Mamuno licence 
                                          areas 
                 ----------  ---------  ------------------------  ------------------------------ 
 Molopo Farms     Botswana      53%      Review of recent          Determine next exploration 
                                          exploration findings.     steps and action plan. 
                 ----------  ---------  ------------------------  ------------------------------ 
 Haneti Project   Tanzania      35%      Diamond drill             Receipt & review of 
                                          programme completed       laboratory assay results. 
                 ----------  ---------  ------------------------  ------------------------------ 
 Victoria         Australia    49.9%     Diamond drill             Receipt & review of 
  Goldfields                              programme Phase           laboratory assay results 
                                          I complete                and target investigation 
                                                                    for next phase of drilling. 
                 ----------  ---------  ------------------------  ------------------------------ 
 Paterson         Australia    83.33%    Preparations advanced     Findings from multiple 
  Projects                                for Heritage Clearance    work programmes including 
                                          Survey at Wallal          final approvals and 
                                          Project underway.         preparations for planned 
                                          (For Phase I drill        deep diamond drilling. 
                                          programme.) 
                                          Review of historical 
                                          data and target 
                                          generation for 
                                          Ripon Hills & 
                                          Braeside West 
                                          projects. 
                 ----------  ---------  ------------------------  ------------------------------ 
 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

DRLGPUPGCUPPGPP

(END) Dow Jones Newswires

April 12, 2022 09:00 ET (13:00 GMT)

Grafico Azioni African Battery Metals (LSE:ABM)
Storico
Da Mar 2024 a Apr 2024 Clicca qui per i Grafici di African Battery Metals
Grafico Azioni African Battery Metals (LSE:ABM)
Storico
Da Apr 2023 a Apr 2024 Clicca qui per i Grafici di African Battery Metals