UNITED
STATES
SECURITIES
AND EXCHANGE COMMISSION
Washington,
D.C. 20549
Form 6-K
REPORT
OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR
15d-16 UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the
month of February 2024
Commission
File Number 001-35297
Fortuna
Silver Mines Inc.
(Translation
of registrant’s name into English)
200 Burrard
Street, Suite 650, Vancouver, British Columbia, Canada V6C 3L6
(Address
of principal executive office)
Indicate by check mark whether
the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
FORM 20-F
¨ FORM 40-F
x
Indicate by check mark if
the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T
Rule 101(b)(1): ¨
Indicate by check mark if the
registrant is submitting the Form 6-K in paper as permitted by Regulation S-T
Rule 101(b)(7): ¨
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934,
the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
|
Fortuna Silver Mines Inc. |
|
(Registrant) |
|
|
Date: February 16, 2024 |
By: |
/s/ “Jorge Ganoza Durant” |
|
|
Jorge Ganoza Durant |
|
|
President and CEO |
Exhibits:
Exhibit 99.1
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report
Effective
Date: December 31, 2023
Prepared by |
|
Eric Chapman |
|
|
Senior Vice President of Technical Services - Fortuna Silver Mines Inc. |
|
|
|
|
|
Paul Weedon |
|
|
Senior Vice President of Exploration - Fortuna Silver Mines Inc. |
|
|
|
|
|
Raul Espinoza |
|
|
Director of Technical Services - Fortuna Silver Mines Inc. |
|
|
|
|
|
Mathieu Veillette |
|
|
Director, Geotechnical, Tailings and Water - Fortuna Silver Mines Inc. |
|
|
|
|
|
Patricia Gonzalez |
|
|
Director of Operations – Compania Minera Cuzcatlan S.A. de C.V. |
Suite 650, 200 Burrard
Street, Vancouver, BC, V6C 3L6 Tel: (604) 484 4085, Fax: (604) 484 4029
|
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Contents |
|
1 Summary |
14 |
1.1 |
Introduction |
14 |
1.2 |
Property description, location and access |
14 |
1.3 |
Mineral tenure, surface rights and royalties |
14 |
1.4 |
History |
15 |
1.5 |
Geology and mineralization |
15 |
1.6 |
Exploration, drilling and sampling |
16 |
1.7 |
Data verification |
18 |
1.8 |
Mineral processing and metallurgical testing |
18 |
1.9 |
Mineral Resources |
19 |
1.10 |
Mineral Reserves |
20 |
1.11 |
Mining methods |
22 |
1.12 |
Processing and recovery methods |
22 |
1.13 |
Project infrastructure |
23 |
1.14 |
Market studies and contracts |
23 |
1.15 |
Environmental studies and permitting |
24 |
1.16 |
Sustaining capital and operating costs |
24 |
1.17 |
Economic analysis |
26 |
1.18 |
Conclusions |
26 |
1.19 |
Risks, and opportunities |
26 |
1.20 |
Recommendations |
27 |
|
1.20.1 Exploration |
27 |
|
1.20.2 Technical and operational studies |
27 |
|
|
|
2 Introduction |
29 |
2.1 |
Report purpose |
29 |
2.2 |
Qualified Persons |
29 |
2.3 |
Scope of personal inspection |
29 |
2.4 |
Effective dates |
30 |
2.5 |
Previous technical reports |
30 |
2.6 |
Information sources and references |
31 |
2.7 |
Acronyms |
31 |
|
|
|
3 Reliance on Other Experts |
33 |
|
|
4 Property Description and Location |
34 |
4.1 |
Mineral tenure |
34 |
|
4.1.1 Mining claims and concessions |
34 |
4.2 |
Surface rights |
38 |
December 31, 2023 | Page 2 of 213 |
| |
|
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
4.3 |
Royalties |
39 |
4.4 |
Environmental aspects, permits and social considerations |
40 |
|
4.4.1 Mine closure |
40 |
4.5 |
Comment on Section 4 |
40 |
|
|
|
5 Accessibility, Climate, Local Resources, Infrastructure and Physiography |
41 |
5.1 |
Access |
41 |
5.2 |
Climate |
41 |
5.3 |
Topography, elevation and vegetation |
41 |
5.4 |
Infrastructure |
41 |
5.5 |
Sufficiency of surface rights |
41 |
5.6 |
Comment on Section 5 |
42 |
|
|
|
6 History |
43 |
6.1 |
Ownership history |
43 |
6.2 |
Exploration history |
43 |
6.3 |
Production history |
44 |
|
6.3.1 Compania Minera Arcata |
44 |
|
6.3.2 Bateas |
44 |
|
|
|
7 Geological Setting and Mineralization |
46 |
7.1 |
Regional geology |
46 |
7.2 |
Local geology |
47 |
|
7.2.1 Yura Group |
48 |
|
7.2.2 Tacaza Group |
49 |
|
7.2.3 Tertiary volcanic deposits |
49 |
|
7.2.4 Recent clastic deposits |
49 |
|
7.2.5 Intrusive igneous rocks |
49 |
7.3 |
Project geology |
49 |
|
7.3.1 Structural setting |
51 |
|
7.3.2 Alteration |
51 |
|
7.3.3 Mineralization |
51 |
|
7.3.4 Silver veins |
52 |
|
7.3.5 Polymetallic veins |
54 |
|
7.3.6 Oxidation |
57 |
7.4 |
Geologic sections |
57 |
7.5 |
Comment on Section 7 |
57 |
|
|
|
8 Deposit Types |
58 |
8.1 |
Mineral deposit type |
58 |
8.2 |
Comment on Section 8 |
59 |
December 31, 2023 | Page 3 of 213 |
| |
|
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
9 Exploration |
60 |
9.1 |
Exploration conducted by Compania Minera Arcata |
60 |
9.2 |
Exploration conducted by Bateas |
60 |
|
9.2.1 Geophysics |
60 |
|
9.2.2 Surface channel sampling |
60 |
|
9.2.3 Geological mapping of major structures |
62 |
|
9.2.4 Geological mapping of exploration targets |
63 |
9.3 |
Exploration potential |
67 |
9.4 |
Comment on Section 9 |
68 |
|
|
|
10 Drilling |
69 |
10.1 |
Drilling conducted by Compania Minera Arcata |
69 |
10.2 |
Drilling conducted by Bateas |
69 |
|
10.2.1 Drilling by vein |
72 |
|
10.2.2 Drilling since the Mineral Resource database cut-off date |
78 |
10.3 |
Diamond drilling methods |
79 |
10.4 |
Geological and geotechnical logging procedures |
79 |
10.5 |
Drill core recovery |
80 |
10.6 |
Extent of drilling |
81 |
10.7 |
Drill hole collar surveys |
81 |
10.8 |
Downhole surveys |
81 |
10.9 |
Drill Sections |
81 |
10.10 |
Sample length versus true thickness |
87 |
10.11 |
Example drill intercepts |
87 |
10.12 |
Comment on Section 10 |
88 |
|
|
|
11 Sample Preparation, Analyses, and Security |
89 |
11.1 |
Sample preparation prior to dispatch of samples |
89 |
|
11.1.1 Channel chip sampling |
89 |
|
11.1.2 Core sampling |
90 |
|
11.1.3 Bulk density determination |
90 |
11.2 |
Dispatch of samples, sample preparation, assaying and analytical procedures |
90 |
|
11.2.1 Sample dispatch |
90 |
|
11.2.2 Sample preparation |
91 |
|
11.2.3 Assaying of silver, lead, copper and zinc |
91 |
|
11.2.4 Assaying of gold |
92 |
11.3 |
Laboratory accreditation |
92 |
11.4 |
Sample security and chain of custody |
92 |
11.5 |
Quality control measures |
93 |
|
11.5.1 Certified reference material |
93 |
|
11.5.2 Blanks |
94 |
December 31, 2023 | Page 4 of 213 |
| |
|
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
|
11.5.3 Duplicates |
95 |
|
11.5.4 Quality control measures employed by CMA |
96 |
11.6 |
Comment on Section 11 |
97 |
|
|
|
12 Data Verification |
98 |
12.1 |
Introduction |
98 |
|
12.1.1 Compania Minera Arcata |
98 |
|
12.1.2 Bateas |
98 |
12.2 |
Database |
98 |
12.3 |
Collars and downhole surveys |
99 |
12.4 |
Geologic logs and assays |
99 |
12.5 |
Geotechnical and hydrology |
100 |
12.6 |
Metallurgical recoveries |
100 |
12.7 |
Mineral Resource Estimation |
100 |
12.8 |
Mineral Reserve estimation |
101 |
12.9 |
Mine reconciliation |
102 |
12.10 |
Comment on Section 12 |
102 |
|
|
|
13 Mineral Processing and Metallurgical Testing |
104 |
13.1 |
Metallurgical tests |
104 |
13.2 |
Deleterious elements |
107 |
13.3 |
Comments on Section 13 |
107 |
|
|
|
14 Mineral Resource Estimates |
108 |
14.1 |
Introduction |
108 |
14.2 |
Disclosure |
108 |
|
14.2.1 Known issues that materially affect Mineral Resources |
108 |
14.3 |
Assumptions, methods and parameters |
109 |
14.4 |
Supplied data, data transformations and data validation |
110 |
|
14.4.1 Data transformations |
110 |
|
14.4.2 Software |
110 |
|
14.4.3 Data preparation |
110 |
|
14.4.4 Data validation |
111 |
14.5 |
Geological interpretation and domaining |
111 |
14.6 |
Exploratory data analysis |
112 |
|
14.6.1 Compositing of assay intervals |
112 |
|
14.6.2 Statistical analysis of composites |
113 |
|
14.6.3 Sub-domaining |
116 |
|
14.6.4 Extreme value treatment |
116 |
|
14.6.5 Boundary conditions |
117 |
|
14.6.6 Data declustering |
118 |
December 31, 2023 | Page 5 of 213 |
| |
|
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
|
14.6.7 Sample type comparison |
118 |
14.7 |
Variogram analysis |
118 |
|
14.7.1 Continuity analysis |
118 |
|
14.7.2 Variogram modeling |
119 |
14.8 |
Modeling and estimation |
120 |
|
14.8.1 Block size selection |
120 |
|
14.8.2 Block model parameters |
121 |
|
14.8.3 Sample search parameters |
122 |
|
14.8.4 Grade interpolation |
123 |
14.9 |
Bulk density |
124 |
14.10 |
Model validation |
126 |
|
14.10.1 Cross validation |
126 |
|
14.10.2 Global estimation validation |
127 |
|
14.10.3 Local estimation validation |
129 |
|
14.10.4 Mineral Resource reconciliation |
129 |
|
14.10.5 Mineral Resource depletion |
130 |
14.11 |
Mineral Resource classification |
130 |
|
14.11.1 Geological continuity |
130 |
|
14.11.2 Data density and orientation |
131 |
|
14.11.3 Data accuracy and precision |
131 |
|
14.11.4 Spatial grade continuity |
131 |
|
14.11.5 Estimation quality |
132 |
|
14.11.6 Classification |
132 |
14.12 |
Mineral Resource reporting |
133 |
|
14.12.1 Reasonable prospects for eventual economic extraction |
133 |
|
14.12.2 Mineral Resource statement |
134 |
|
14.12.3 Mineral Resources by key geologic attributes |
135 |
|
14.12.4 Comparison to previous estimate |
138 |
14.13 |
Comment on Section 14 |
138 |
|
|
|
15 Mineral Reserve Estimates |
139 |
15.1 |
Mineral Resource handover |
139 |
15.2 |
Mineral Reserve methodology |
139 |
15.3 |
Key Mining Parameters |
140 |
|
15.3.1 Mining Recovery |
140 |
|
15.3.2 Dilution |
140 |
|
15.3.3 Metal prices, metallurgical recovery and NSR values |
142 |
15.4 |
Cut-off grade determination |
143 |
15.5 |
Mineral Reserves |
143 |
15.6 |
Comments on Section 15 |
145 |
December 31, 2023 | Page 6 of 213 |
| |
|
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
16 Mining Methods |
146 |
16.1 |
Overview |
146 |
16.2 |
Hydrogeology |
146 |
16.3 |
Mine geotechnical |
147 |
16.4 |
Mining methods |
147 |
|
16.4.1 Mechanized cut-and-fill |
147 |
|
16.4.2 Semi-mechanized cut-and-fill |
148 |
|
16.4.3 Conventional cut-and-fill |
148 |
|
16.4.4 Sublevel Longhole Stoping (SLS) |
148 |
16.5 |
Mine production schedule |
149 |
|
16.5.1 Stope design |
150 |
16.6 |
Underground mine model |
150 |
|
16.6.1 Mine layout |
150 |
|
16.6.2 Lateral development |
150 |
|
16.6.3 Raising requirements |
151 |
16.7 |
Development schedule |
151 |
16.8 |
Equipment, manpower, services, and infrastructure |
152 |
|
16.8.1 Contractor development |
152 |
|
16.8.2 Mining equipment |
152 |
|
16.8.3 Mine manpower |
152 |
|
16.8.4 Production drilling |
152 |
|
16.8.5 Ore and waste handling |
153 |
|
16.8.6 Mine ventilation |
153 |
|
16.8.7 Backfill |
154 |
|
16.8.8 Mine dewatering system |
154 |
|
16.8.9 Maintenance facilities |
154 |
|
16.8.10 Electrical power distribution |
155 |
|
16.8.11 Other services |
155 |
16.9 |
Comments on Section 16 |
156 |
|
|
|
17 Recovery Methods |
157 |
17.1 |
Processing plant design |
157 |
17.1.1 |
Crushing and milling circuits |
157 |
17.2 |
Metallurgical treatment |
159 |
17.2.1 |
Lead-silver flotation circuit |
159 |
17.2.2 |
Zinc flotation circuit |
159 |
17.2.3 |
Concentrates thickening and filtration |
160 |
17.2.4 |
Tailings disposal |
160 |
17.3 |
Requirements for energy, water, and process materials |
160 |
17.4 |
Comment on Section 17 |
161 |
December 31, 2023 | Page 7 of 213 |
| |
|
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
18 Project Infrastructure |
162 |
18.1 |
Overview |
162 |
18.2 |
Roads |
162 |
18.3 |
Tailing storage facilities |
163 |
18.4 |
Mine waste stockpiles |
163 |
18.5 |
Ore stockpiles |
163 |
18.6 |
Concentrate production and transportation |
163 |
18.7 |
Power generation |
164 |
18.8 |
Communications systems |
164 |
18.9 |
Water supply |
164 |
18.10 |
Comments on Section 18 |
164 |
|
|
|
19 Market Studies and Contracts |
165 |
19.1 |
Market studies |
165 |
19.2 |
Commodity price projections |
165 |
19.3 |
Contracts |
166 |
|
19.3.1 Lead concentrate |
166 |
|
19.3.2 Zinc concentrate |
166 |
|
19.3.3 Operations |
166 |
19.4 |
Comments on Section 19 |
166 |
|
|
|
20 Environmental Studies, Permitting and Social or Community Impact |
167 |
20.1 |
Regulation and permitting |
167 |
|
20.1.1 Environmental legislation |
168 |
|
20.1.2 Environmental obligations |
171 |
20.2 |
Environmental baseline |
171 |
|
20.2.1 Location and access routes |
171 |
|
20.2.2 Climatology |
172 |
|
20.2.3 Air quality |
172 |
|
20.2.4 Water quality |
172 |
|
20.2.5 Hydrology |
173 |
|
20.2.6 Soil science |
173 |
|
20.2.7 Fauna and flora |
174 |
|
20.2.8 Ecosystem characterization |
174 |
|
20.2.9 Identification of protected areas |
175 |
|
20.2.10 Archaeology |
175 |
|
20.2.11 Environmental risks |
175 |
|
20.2.12 Environmental management plan |
179 |
|
20.2.13 Operation and management |
181 |
20.3 |
Community relations |
182 |
|
20.3.1 Social management approach |
183 |
December 31, 2023 | Page 8 of 213 |
| |
|
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
|
20.3.2 Framework convention management committee |
184 |
|
20.3.3 Social investment |
185 |
20.4 |
Mine closure |
185 |
|
20.4.1 Legal requirements |
185 |
|
20.4.2 Closure objectives |
189 |
|
20.4.3 Closure criteria |
189 |
|
20.4.4 Stakeholder identification |
190 |
|
20.4.5 Post-closure maintenance and monitoring |
190 |
|
20.4.6 Post-closure maintenance activities |
191 |
|
20.4.7 Closure costs |
191 |
20.5 |
Comment on Section 20 |
192 |
|
|
|
21 Capital and Operating Costs |
193 |
21.1 |
Sustaining capital costs |
193 |
|
21.1.1 Mine development |
193 |
|
21.1.2 Equipment and infrastructure |
194 |
|
21.1.3 Mine closure and rehabilitation |
194 |
21.2 |
Operating costs |
194 |
21.3 |
Comment on Section 21 |
194 |
|
|
|
22 Economic Analysis |
195 |
22.1 |
Economic analysis |
195 |
22.2 |
Comments on Section 22 |
195 |
|
|
|
23 Adjacent Properties |
196 |
|
|
|
24 Other Relevant Data and Information |
197 |
|
|
|
25 Interpretation and Conclusions |
198 |
25.1 |
Mineral tenure, surface rights, water rights, royalties and agreements |
198 |
25.2 |
Geology and mineralization |
198 |
25.3 |
Exploration, drilling and analytical data collection in support of Mineral Resource estimation |
198 |
|
25.3.1 Data verification |
199 |
25.4 |
Metallurgical testwork |
200 |
25.5 |
Mineral Resource estimation |
200 |
25.6 |
Mineral Reserve estimation |
201 |
25.7 |
Mine plan |
202 |
25.8 |
Recovery |
202 |
25.9 |
Infrastructure |
202 |
25.10 |
Markets and contracts |
203 |
25.11 |
Environmental, permitting and social considerations |
203 |
December 31, 2023 | Page 9 of 213 |
| |
|
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
25.12 |
Capital and operating costs |
204 |
25.13 |
Economic analysis |
204 |
25.14 |
Risks and opportunities |
204 |
|
|
|
26 Recommendations |
206 |
26.1 |
Overview |
206 |
26.2 |
Exploration |
206 |
26.3 |
Technical and operational |
206 |
|
|
|
27 References |
207 |
|
|
Certificates |
209 |
December 31, 2023 | Page 10 of 213 |
| |
|
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Tables |
|
Table 1.1 Mineral Resources as of December 31, 2023 |
20 |
Table 1.2 Mineral Reserves as of December 31, 2023 |
21 |
Table 1.3 Summary of projected major capital costs for the LOM |
25 |
Table 1.4 Life-of-mine operating costs |
26 |
Table 2.1 Acronyms |
31 |
Table 4.1 Mining concessions owned by Bateas |
35 |
Table 4.2 Surface rights for operations held by Bateas at Caylloma |
38 |
Table 6.1 Exploration by drill hole and channels conducted by CMA |
43 |
Table 6.2 Production figures during CMA management of Caylloma |
44 |
Table 6.3 Production figures during Bateas management of Caylloma (2006-2023) |
44 |
Table 10.1 Exploration drilling conducted by CMA |
69 |
Table 10.2 Exploration drilling conducted by Bateas |
69 |
Table 10.3 Drill intervals encountered post data cut-off date |
79 |
Table 10.4 Example of representative drill results at the Caylloma Mine |
87 |
Table 11.1 Terminology employed by Fortuna for duplicates |
95 |
Table 14.1 Drill holes and channels available for geologic interpretation |
110 |
Table 14.2 Metal prices used to define mineralized envelopes |
112 |
Table 14.3 Composite length by vein |
112 |
Table 14.4 Univariate statistics of undeclustered composites by vein |
114 |
Table 14.5 Topcut thresholds by vein |
117 |
Table 14.6 Variogram model parameters |
119 |
Table 14.7 Caylloma block model parameters by vein |
121 |
Table 14.8 Estimation method by vein |
123 |
Table 14.9 Density statistics by vein |
125 |
Table 14.10 Density assigned in the 2023 block models |
125 |
Table 14.11 Cross validation results by vein |
126 |
Table 14.12 Global validation statistics of Measured Resources at a zero cut-off grade (COG) |
127 |
Table 14.13 Global validation statistics of Indicated Resources at a zero COG |
128 |
Table 14.14 Global validation statistics of Inferred Resources at a zero COG |
128 |
Table 14.15 Depletion codes stored in the resource block model |
130 |
Table 14.16 Parameters used in NSR estimation |
133 |
Table 14.17 Mineral Resources exclusive of Mineral Reserves |
134 |
Table 14.18 Mineral Resources inclusive of Mineral Reserves |
135 |
Table 14.19 Mineral Resources inclusive of Mineral Reserves (Oxide) |
136 |
December 31, 2023 | Page 11 of 213 |
| |
|
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Table 14.20 Mineral Resources inclusive of Mineral Reserves (Sulfide) |
137 |
Table 15.1 Average dilution factors for wide and narrow veins |
142 |
Table 15.2 Metal prices |
142 |
Table 15.3 Metallurgical recoveries |
142 |
Table 15.4 NSR values |
143 |
Table 15.5 Operating costs by mining method |
143 |
Table 15.6 Mineral Reserves |
144 |
Table 16.1 Classification of rock mass |
147 |
Table 16.2 Caylloma life-of-mine production schedule |
149 |
Table 16.3 Caylloma life-of-mine production schedule |
149 |
Table 16.4 Summary of lateral development requirements for LOM |
150 |
Table 16.5 Summary of vertical development requirements for LOM |
151 |
Table 16.6 LOM development schedule |
151 |
Table 16.7 Planned mining equipment |
152 |
Table 19.1 Long-term concensus commodity price projections |
165 |
Table 20.1 Environmental factors |
175 |
Table 20.2 Mine closure budget |
192 |
Table 21.1 Summary of projected major capital costs for the LOM |
193 |
Table 21.2 Life-of-mine operating costs |
194 |
December 31, 2023 | Page 12 of 213 |
| |
|
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Figures |
|
Figure 4.1 Map showing the location of the Caylloma Mine |
34 |
Figure 4.2 Location of mining concessions at the Caylloma Mine |
37 |
Figure 7.1 Location map of the Caylloma District |
46 |
Figure 7.2 Local geologic map of Caylloma District |
47 |
Figure 7.3 Stratigraphic column of Caylloma District |
48 |
Figure 7.4 Geology map of Caylloma Mine showing major vein systems |
50 |
Figure 7.5 Long section of Animas vein showing sulfide/oxide/zinc oxide zones |
57 |
Figure 8.1 Idealized section displaying the classification of epithermal and base metal deposits sourced |
58 |
Figure 9.1 Plan map showing principal exploration targets |
61 |
Figure 9.2 Plan map showing surface geology and geochemistry of Cerro Vilafro |
64 |
Figure 9.3 Plan map showing surface geology and geochemistry of Cailloma 6 |
66 |
Figure 9.4 Plan map showing the location of exploration targets |
67 |
Figure 10.1 Map showing surface drill hole collar locations |
72 |
Figure 10.2 Graph of core recovery of Animas/Animas NE vein |
80 |
Figure 10.3 Plan map showing orientation of geologic sections |
82 |
Figure 10.4 Geologic interpretation of Animas & Nancy vein (Section A) |
83 |
Figure 10.5 Geologic interpretation of Animas vein (Section B) |
84 |
Figure 10.6 Geologic interpretation of Animas vein (Section C) |
85 |
Figure 10.7 Geologic interpretation of Animas NE vein (Section D) |
86 |
Figure 14.1 Slice validation plot of the Animas NE vein |
129 |
Figure 14.2 Longitudinal section showing Mineral Resource classification for the Animas vein |
133 |
Figure 15.1 Conceptual diagram of operational dilution |
141 |
Figure 15.2 Longitudinal section showing Proven and Probable Reserves, Mineral Resources exclusive of reserves and stope design for the Animas vein |
145 |
Figure 16.1 Schematic showing mechanized mining sequence |
148 |
Figure 17.1 Crushing and milling circuits at the Caylloma processing plant |
158 |
Figure 18.1 Plan view of mine infrastructure |
162 |
December 31, 2023 | Page 13 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Fortuna
Silver Mines Inc. (Fortuna) has compiled a Technical Report (the Report) on the Caylloma Mine (the Caylloma Project or Project) located
in the Caylloma District, Peru.
The Caylloma
Mine ownership is 100 % held by Fortuna.
The mineral
rights of the Caylloma Mine are held by Compania Minera Bateas S.A.C. (Bateas). Bateas is a Peruvian subsidiary that is 100 % indirectly
owned by Fortuna and is responsible for running the underground silver-lead-zinc mine.
The Report
discloses updated Mineral Resource and Mineral Reserve estimates for the Project.
Costs
are in US dollars (US$) unless otherwise indicated.
| 1.2 | Property
description, location and access |
The Caylloma
Mine is located in the Puna region of Peru at an altitude of between 4,300 and 5,000 meters above sea level (masl). Surface topography
is generally steep with vegetation being primarily comprised of grasses and small shrubs common at high altitudes. The mine facilities
are located at approximately 4,400 masl.
Access
to the Caylloma Mine is by a combination of sealed and gravel road. The mine is located 225 road kilometers from Arequipa, a city of
approximately a million people that includes an international airport and requires a trip of approximately five hours by vehicle. Access
is available to all concessions via a network of unsealed roads.
The Caylloma
Mine is an operating underground mine located in the Caylloma Mining District, 14 km northwest of the town of Caylloma at the UTM grid
location of 8192263E, 8321387N, (WGS84, UTM Zone 19S).
| 1.3 | Mineral
tenure, surface rights and royalties |
The Caylloma
Project consists of mineral rights for 74 mining concessions for a total surface area of 35,622 hectares (ha) and one beneficiation concession
comprising 91.12 ha. Tenure is held in the name of Bateas with all mining concessions having an expiry date beyond the expected
mine life.
Bateas
has signed 22 surface right or easement contracts covering a total of 8,311 ha with landowners to cover the surface area needed for the
operation and tailings facilities.
The Caylloma
Mine is not subject to any back-in rights, liens, payments or encumbrances.
There
are royalties attached to the mineral concessions, however, the only royalties that affect the Mineral Reserves and have been considered
in the economic analysis are:
| · | A
2 % royalty on silver production to Nueva Granada Gold Ltd. (formerly Lemuria Royalties Corp.). |
| · | A
1 % royalty or an effective rate based on operating profit (whichever is greater) to the
Peruvian Government has been taken into account in predicting cash flows. |
| | |
| · | A Special Tax on Mining based on the quarterly operating profit of
the mining concession holder. |
December 31, 2023 | Page 14 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
The earliest
documented mining activity in the Caylloma District dates back to that of Spanish miners in 1620. English miners carried out activities
in the late 1800s and early 1900s. Numerous companies have been involved in mining the district of Caylloma but limited records are available
to detail these activities.
The Caylloma
Mine was acquired by Compania Minera Arcata S.A. (CMA), a wholly owned subsidiary of Hochschild Mining plc in 1981. Fortuna acquired
the mine from CMA in 2005.
CMA focused
exploration on identifying high-grade silver vein structures. Exploration was concentrated in the northern portion of the district and
focused on veins including Bateas, El Toro, Paralela, San Pedro, San Cristobal, San Carlos, Don Luis, La Plata, and Apostles.
Production
prior to 2005 came primarily from the San Cristobal vein, as well as from the Bateas, Santa Catalina and the northern silver veins (including
Paralela, San Pedro, and San Carlos) with production focused on silver ores and no payable credits for base metals. While under CMA management
production parameters fluctuated during the late 1990s, as reserves were depleted. Owing to low metal prices, funds were not available
to develop the Mineral Resources at depth or extend along the strike of the veins. Ultimately this resulted in production being halted
in 2002.
Production
under Bateas management focused on the development of polymetallic veins producing lead and zinc concentrates with silver and gold credits.
Total production since October 2006 through December 31, 2023, is estimated at 23.4 Moz of silver, 36 koz of gold, 193 kt of
lead, and 272 kt of zinc.
| 1.5 | Geology
and mineralization |
The mine
is within the historical mining district of Caylloma, northwest of the Caylloma caldera complex and southwest of the Chonta caldera complex.
Host rocks at the Caylloma Mine are volcanic in nature, belonging to the Tacaza Group. Mineralization is in the form of low to intermediate
sulfidation epithermal vein systems.
Epithermal
veins at the Caylloma Mine are characterized by minerals such as pyrite, sphalerite, galena, chalcopyrite, marcasite, native gold, stibnite,
argentopyrite, and silver-bearing sulfosalts (tetrahedrite, polybasite, pyrargyrite, stephanite, stromeyerite, jalpite, miargyrite and
bournonite). These are accompanied by gangue minerals, such as quartz, rhodonite, rhodochrosite, johannsenite (manganese-pyroxene) and
calcite.
There
are two different types of mineralization at Caylloma; the first is comprised of silver-rich veins with low concentrations of base metals
and includes the Bateas, Bateas Piso, Bateas Techo, La Plata, Cimoide La Plata, San Cristobal, Pilar, Patricia, San Pedro, San Carlos,
Paralela, Ramal Piso Carolina, and Don Luis II veins. The second type of vein is polymetallic in nature with elevated lead, zinc, copper,
silver and gold grades and includes the Animas, Animas NE, Comoide ASNE, Ramal Techo ASNE, Rosita, Nancy Santa Catalina, Silvia and Soledad
veins.
Underground
operations are presently focused on mining the Animas, Animas NE, Nancy and associated splay veins.
December 31, 2023 | Page 15 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
| 1.6 | Exploration,
drilling and sampling |
CMA implemented
a series of exploration programs to complement their mining activities prior to the closure of the operation in 2002. There is no reliable
information available to detail the exploration conducted by CMA at the Caylloma Mine. Bateas were able to recover and validate information
on 47 diamond drill holes totaling 8,177.67 m drilled by CMA between 1981 and 2003 at the Caylloma Mine.
Since
Fortuna took ownership of the property in 2005, the principal exploration conducted at the deposit has been surface and underground drilling,
to explore the numerous vein structures identified through surface mapping or geophysical surveys conducted by Bateas, or for infill
purposes to increase the confidence level of the Mineral Resource estimates.
As of
June 30, 2023, Bateas had completed 1,658 drill holes on the Caylloma Project totaling 283,593.30 m since the company took ownership
in 2005 and represents all data compiled as of the data cut-off date used for Mineral Resource estimation. All holes are diamond drill
holes and include 565 from the surface totaling 160,521.80 m, and 1,093 from underground totaling 123,071.50 m. It is important to note
that not all the holes presented encountered mineralization and only drill holes in areas where reasonable geological continuity of mineralized
structures could be established were used in defining and ultimately estimating Mineral Resources.
Bateas
has used a number of different drilling contractors to carry out exploration and definition drilling since it took ownership of the mine
in 2005. Both HQ (63.5 mm) and NQ (47.6 mm) diameter core were obtained, depending on the depth of the hole. Ground conditions are generally
good with core recovery averaging 94 % and higher in mineralized zones.
Proposed
surface and underground drill hole collar coordinates, azimuths and inclinations were designed based on the known orientation of the
veins and the planned depth of vein intersection using geological plan maps and sections as a guide. For surface holes, the location
of the collar is located in the field using differential global positioning system (GPS) instruments. The drill pad is then prepared
at this marked location. Upon completion of the drill hole, a survey of the collar is performed using Total Station equipment, with results
reported in the collar coordinates using reference Datum WGS84, UTM Zone 19S. For underground drill holes, once the drill station has
been established, the location of the collar is located using Total Station instruments based on previously surveyed control points.
The geologist
in charge of drilling is responsible for orienting the azimuth and inclination of the hole at the collar using a compass clinometer.
Downhole surveys are completed by the drilling contractor using survey equipment such as a Flexit or Reflex tool at approximately 50
m intervals for all surface drill holes and for underground drill holes greater than 100 m in length. Bateas assesses the downhole survey
measurements as a component of data validation.
Drill
holes are typically drilled on sections spaced 40 to 60 m apart along the strike of the vein with surface drilling focusing on exploring
the extents of the Animas, Animas NE, Bateas and Nancy veins and underground drilling used for a mix of exploration and resource definition.
The extent of drilling varies for each vein with those having the greatest coverage having drill holes extending over 3 km of the vein’s
strike length (Animas/Animas NE), to exploration prospects having only a few drill holes extending over just 50 m (Antimonio).
December 31, 2023 | Page 16 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
The relationship
between the sample intercept lengths and the true width of the mineralization varies in relation to the intersect angle between the steeply
dipping zone of mineralized veins and the inclined nature of the diamond core holes. Calculated estimated true widths (ETWs) are always
reported together with actual sample lengths by taking into account the angle of intersection between drill hole and the mineralized
structure.
In 2018,
all logging became digital, being incorporated daily into the Maxwell Datashed database system. Data were recorded initially with Excel
templates, and later with the Maxwell LogChief application using essentially the same structure. Both input methods used picklists and
data validation rules to ensure consistency between loggers. Separate pages were designed to capture, lithology, alteration,
veins, sulfide-oxide zones, minerals, structure (contacts, fractures, veins, and faults with attitudes to core axis), magnetic susceptibility,
and special data (samples collected for geochemistry, thin section examinations, the core library, density, etc.). Intensity of
alteration phases was recorded using a numeric 1 to 4 scale (weak, moderate, strong, very strong); abundance of veins and most other
minerals were estimated in volume percent.
Geotechnical
logging is conducted prior to cutting of the core and involves the collection of drill core recovery and rock-quality designation (RQD)
data. Information is recorded in the field using the Maxwell LogChief application.
The sampling
methodology, preparation, and analyses differ depending on whether it is drill core or a channel sample. All samples are collected by
geological staff of Bateas with sample preparation and analysis being conducted either at the onsite Bateas Laboratory or transported
to the ALS Global preparation facility in Arequipa prior to being sent on for analysis at their laboratory in Lima.
The Bateas
Laboratory operated by Bateas is not independent and does not hold an internationally recognized accreditation.
ALS Global
is an independent, privately-owned analytical laboratory group. The preparation laboratory in Arequipa and the analytical laboratory
in Lima are supported by a Quality Management System (QMS) framework which is designed to highlight data inconsistencies sufficiently
early in the process to enable corrective action to be taken in time to meet reporting deadlines. The QMS framework follows the most
appropriate ISO Standard for the service at hand i.e. ISO 9001:2015 for survey/inspection activity and ISO 17025:2005 UKAS ref 4028 for
laboratory analysis.
Channel
samples are collected from the faces of underground workings. The entire process is carried out under the geology department’s
supervision. Sampling is carried out at 2 m intervals within the drifts of all veins and 3 m intervals in stopes (except for
Bateas and Soledad, where due to the thickness of the vein, sampling is carried out every 2 m in stopes). The channel lengths and orientations
are identified using paint in the underground working and by painting the channel number on the footwall. The channel is between 20 cm
to 30 cm wide and approximately 2 cm deep, with each individual sample being no longer than 1.5 m.
Drill
core is laid out for sampling and logging at the core logging facility at the camp. Sample intervals are marked on the core and depths
recorded on the appropriate box. A geologist is responsible for determining and marking the drill core intervals to be sampled, selecting
them based on geological and structural logging. The sample length must not exceed 1.2 m or be less than 30 cm.
December 31, 2023 | Page 17 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
The elements
of silver, copper, lead and zinc are assayed using either; atomic absorption (AA); inductively coupled plasma atomic emission spectroscopy
(ICP-AES); or for high lead and zinc grades volumetric/titration techniques (VOL); or for high silver grades gravimetric techniques (GRAV)
depending on the laboratory and assay value. Assay results and certificates are reported electronically by e-mail.
Bulk
density samples have been primarily sourced from drill core with a limited number being sampled from underground workings. Bulk density
measurements are performed at the ALS Global Laboratory in Lima using the OA-GRA09A methodology.
Sample
collection and transportation of drill core and channel samples is the responsibility of Brownfields exploration and the Bateas mine
geology departments and must follow strict security and chain of custody requirements established by Fortuna. Samples are retained in
accordance with the Fortuna corporate sample retention policy.
Implementation
of a quality assurance/quality control (QAQC) program is current industry best practice and involves establishing appropriate procedures
and the routine insertion of certified reference material (CRMs), blanks, and duplicates to monitor the sampling, sample preparation
and analytical process. Fortuna implemented a full QAQC program to monitor the sampling, sample preparation and analytical process for
all drilling campaigns in accordance with its companywide procedures. The program involved the routine insertion of CRMs, blanks, and
duplicates. Evaluation of the QAQC data indicates that the data are sufficiently accurate and precise to support Mineral Resource estimation.
Data
verification programs performed by the QPs on the data collected by Bateas are adequate to support Mineral Resource and Mineral Reserve
estimation.
| 1.8 | Mineral
processing and metallurgical testing |
It is
the opinion of the QP that the Caylloma Mine has an extensive body of metallurgical investigation comprising several phases of testwork
as well as an extensive history of treating ore at the operation since 2006. In the opinion of the QP, the Caylloma metallurgical samples
tested and the ore that is presently treated in the plant is representative of the material included in the life-of-mine (LOM) in respect
to grade and metallurgical response.
Metallurgical
recovery values forecast in the LOM for sulfide material averages 82 % for silver, 22 % for gold, 89 % for lead, and 89 % for zinc with
the exception of gold rich veins (> 1 g/t Au) where testwork has demonstrated that minor adjustments in the processing plant can achieve
metallurgical recovery rates of 85 % for silver, 55 % for gold, 87 % for lead and 89 % for zinc.
Until
2012, ore identified as containing high zinc oxide content was classified as not amenable for flotation. Laboratory and plant tests conducted
since 2013 include metallurgical testing of material from the different levels of the Animas vein. The main conclusion was that zinc
oxide contents greater than 0.20 % within the ore were related to lower metallurgical recoveries. In order to include this type of material
without affecting the metallurgical recoveries blending has to be performed to limit the oxide material content to no more than 11 %
of the plant feed. This has been considered in the LOM plan.
December 31, 2023 | Page 18 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Beyond
the blending consideration for oxide material, as described above, there are no additional deleterious elements that require special
treatment in the plant as of the effective date of this Report.
The 2023
Mineral Resource update has relied on channel and drill hole sample information obtained by Bateas since 2005. Mineralized domains identifying
potentially economically extractable material were modeled for each vein and used to code drill holes and channel samples for geostatistical
analysis, block modeling and grade interpolation by ordinary kriging or inverse distance weighting.
Resource
confidence classification considers a number of aspects affecting confidence in the resource estimation including; geological continuity
and complexity; data density and orientation; data accuracy and precision; and grade continuity. Mineral Resources are categorized as
Measured, Indicated or Inferred. The criteria used for classification includes the number of samples, spatial distribution, distance
to block centroid, kriging efficiency (KE) and slope of regression (ZZ).
Mineral
Resources are reported based on underground mining within mineable stope shapes based on actual operational costs and mining equipment
sizes using net smelter return (NSR) values in the block model calculated based on the projected long-term metal prices, commercial terms,
and actual metallurgical recoveries experienced in the plant.
Veins
classified as wide, being on average greater than two meters, are amenable to extraction by semi-mechanized mining methods with a mine
to mill cost reported as US$ 89.78/t. Taking into account a 15% upside in metal prices for the evaluation of long-term resources
a US$ 75/t NSR cut-off value is applied to the wide veins including Animas, Animas NE, Ramal Techo ASNE, Cimoide ASNE, Nancy, Rosita,
and San Cristobal.
Veins
classified as narrow, being on average less than 2 m, are amenable to extraction by conventional mining methods with a mine to mill cost
estimated as US$ 170/t. Taking into account a 15% upside in metal prices for the evaluation of long term resources a US$135 /t
NSR cut-off value is applied to the narrow veins including Bateas, Bateas Piso, Bateas Techo, La Plata, Cimoide La Plata, Soledad, Santa
Catalina, Silvia, Ramal Piso Carolina, Paralela, San Carlos, San Pedro, Patricia, Pilar, and Don Luis II.
By the
application of a NSR value taking into consideration the average metallurgical recovery and long-term metal prices for each metal, and
the determination of a reasonable cut-off value using actual operating costs, as well as the exclusion of Mineral Resources identified
as being isolated or economically unviable using a floating stope optimizer, the Mineral Resources have ‘reasonable prospects for
eventual economic extraction’.
Mineral
Resources exclusive of Mineral Reserves for the Caylloma Mine are reported as of December 31, 2023, and detailed in Table 1.1.
December 31, 2023 | Page 19 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Table
1.1 Mineral Resources as of December 31, 2023
Category |
Tonnes
(000) |
Ag
(g/t) |
Au
(g/t) |
Pb
(%) |
Zn
(%) |
Contained
Metal |
Ag
(koz) |
Au
(koz) |
Pb
(kt) |
Zn
(kt) |
Measured |
524 |
98 |
0.30 |
2.09 |
3.16 |
1,646 |
5 |
11 |
17 |
Indicated |
1,262 |
82 |
0.21 |
1.47 |
2.54 |
3,338 |
9 |
19 |
32 |
Measured
+ Indicated |
1,786 |
87 |
0.24 |
1.65 |
2.72 |
4,983 |
14 |
29 |
49 |
Inferred |
4,505 |
99 |
0.43 |
2.43 |
3.70 |
14,382 |
63 |
110 |
167 |
Notes
on Mineral Resources
| · | Mineral
Resources are reported in situ, as defined by the 2014 CIM Definition Standards for Mineral
Resources and Mineral Reserves. |
| · | Mineral
Resources as reported exclusive of Mineral Reserves. Mineral Resources that are not Mineral
Reserves do not have demonstrated economic viability. |
| · | Mineral
Resources are reported as of December 31, 2023. |
| · | Mr. Eric
Chapman P.Geo., a Fortuna employee, is the Qualified Person for the estimate. |
| · | Point
metal values (taking into account metal price, concentrate recovery, smelter cost, metallurgical
recovery) used for NSR evaluation are US$ 0.49/g for silver, US$ 15.40/% for lead, and US$
15.58/% for zinc with the exception of gold rich veins that used US$ 0.51/g for silver,
US$ 24.69/g for gold, US$ 14.88/% for lead, and US$ 15.48/% for zinc, based on metal prices
of US$ 21/oz for silver, US$ 1,600/oz for gold, US$ 2,000/t for lead and US $2,600/t
for zinc, and metallurgical recovery values of 82 % for silver, 22 % for gold, 89 %
for lead, and 89 % for zinc, with the exception of gold rich veins that used 85 % for silver,
55 % for gold, 87 % for lead, and 89 % for zinc. |
| · | Mineral
Resources for veins classified as wide (Anima, Animas NE, Cimoide ASNE, Nancy, Rosita, and
San Cristobal) are reported above an NSR cut-off value of US$ 75/t. Mineral Resources for
veins classified as narrow (all other veins) are reported above an NSR cut-off value of US$
135/t based on actual and projected mining costs and a 15% upside in metal prices. |
| · | Mineral
Resource tonnes are rounded to the nearest thousand. |
| · | Totals
may not add due to rounding. |
Factors
that may affect the Mineral Resource estimates include metal price and exchange rate assumptions; changes to the assumptions used to
generate the cut-off grade; changes in local interpretations of mineralization geometry and continuity of mineralized zones; changes
to geological and mineralization shape and geological and grade continuity assumptions; variations in density and domain assignments;
geometallurgical assumptions; changes to geotechnical, mining, dilution, and metallurgical recovery assumptions; change to the input
and design parameter assumptions that pertain to the conceptual stope designs constraining the estimates; and assumptions as to the continued
ability to access the site, retain mineral and surface rights titles, maintain environment and other regulatory permits, and maintain
the social license to operate.
Mineral
Reserves were converted from Measured and Indicated Mineral Resources. Inferred Mineral Resources were set to waste.
Mineral
Reserves assume overhand cut and fill or sublevel stoping mining methods.
The overall
mining recovery is approximately 94 % which takes into account the presence of pillars in wide veins and crown pillars for each main
level of the mine.
Two sources
of dilution were considered, operational dilution and mucking dilution. Operational dilution for cut and fill (mechanized – breasting)
averages 17 % if a zero
December 31, 2023 | Page 20 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
grade
for the waste material is applied and this represents 91 % of the total reserves estimated. Other mining methods applied in less tonnage
are cut and fill (mechanized – enhanced) averages 21 %, cut and fill (semi-mechanized) average 22 % and conventional cut and fill
averages 34 %. For Sublevel longhole stoping, the calculation of the mining width estimated is 0.8 m (0.6 m for hangingwall and 0.2 m
for footwall) with a minimum mining width of 0.8, then minimum stope shape dimension of 1.6m.
Metal
prices used for Mineral Reserve estimation were determined as of June 2023 by the corporate financial department of Fortuna based
on market consensus.
Metallurgical
recoveries were based on metallurgical test work and operational results at the plant from July 2022 to June 2023.
Net smelter
return (NSR) values were dependent on various parameters including metal prices, metallurgical recovery, price deductions, refining charges
and penalties.
A breakeven
cut-off grade was determined based on all variable and fixed costs applicable to the operation. These include exploitation and treatment
costs, general expenses and administrative and commercialization costs (including concentrate transportation). The breakeven cut-off
grade was determined to be US$ 89.78/t for mechanized (breasting); US$ 79.70/t for mechanized (enhanced); US$ 88.81/t for sub-level stoping
(SLS); US$ 93.27/t for semi-mechanized; and US$ 170/t conventional.
Mechanized
(breasting) cut and fill mining will be used for 91 % of the total Mineral Reserves, with the other methods representing the remainder.
Mineral
Reserves as of December 31, 2023, are reported in Table 1.2.
Table
1.2 Mineral Reserves as of December 31, 2023
Category |
Tonnes
(000) |
Ag
(g/t) |
Au
(g/t) |
Pb
(%) |
Zn
(%) |
Contained
Metal |
Ag
(koz) |
Au
(koz) |
Pb
(kt) |
Zn
(kt) |
Proven |
20 |
261 |
0.94 |
2.23 |
2.62 |
165 |
0.6 |
0.4 |
0.5 |
Probable |
2,269 |
81 |
0.13 |
2.79 |
4.06 |
5,924 |
9.3 |
63.2 |
92.0 |
Proven
+Probable |
2,288 |
83 |
0.13 |
2.78 |
4.04 |
6,089 |
9.9 |
63.6 |
92.5 |
Notes
on Mineral Reserves
| · | Mineral
Reserves are reported at the point of delivery to the process plant using the 2014 CIM Definition
Standards. |
| · | Mineral
Reserves are reported as of December 31, 2023. |
| · | Raul
Espinoza, FAusIMM (CP), a Fortuna employee, is the Qualified Person for the estimate. |
| · | Mineral
Reserves are reported based on underground mining within optimized stope designs using an
NSR breakeven cut-off for extraction including; mechanized (breasting) at US$ 89.78/t;
mechanized (enhanced) at US$ 79.70/t; sub-level stoping (SLS) at US$88.81/t; semi-mechanized
at US$ 93.27/t; and conventional at US$ 170/t. |
| · | Metal
prices used in the NSR evaluation are US$ 21/oz for silver, US$ 1,600/oz for gold,
US$ 2,000/t for lead, and US$ 2,600/t for zinc. |
| · | Metallurgical
recovery rates used for NSR values are 82% for Ag, 22% for Au, 89% for Pb and 89% for Zn
except for gold rich veins (>1 g/t Au) that use 85% for Ag, 55% for Au, 87% for Pb and
89% for Zn and include the Soledad, Cimoide La Plata, La Plata, Pilar, San Pedro, and Ramal
Piso Carolina veins. |
| · | Mining,
processing and administrative costs used to determine NSR cut-off values were estimated based
on second half of 2022 and first half of 2023 actual operating costs. |
| · | Mining
recovery is estimated to average 94 % with mining dilution ranging from 10 % to 34 % depending
on the mining methodology. |
December 31, 2023 | Page 21 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
| · | Tonnes
are rounded to the nearest thousand. |
| · | Totals
may not add due to rounding. |
The mining
method employed at the Caylloma Mine is primarily cut-and-fill, which is commonly used in the mining of steeply dipping orebodies in
stable rock masses. Cut-and-fill is a bottom-up mining method that consists of removing ore in horizontal slices, starting from a bottom
undercut and advancing upwards. The operation bases its mining plan on a mix of mechanized, semi-mechanized, and conventional extraction
methods based on vein width and rock quality.
Geotechnical
recommendations used in mine design are based on a combination of rock mass rating and geotechnical strength index data.
Water
inflows are currently managed using three pumping stations installed at different levels of the mine. Main pumping station at level 17
is under construction and expected to be completed in January 2024 with testing and commissioning in February 2024.
The mining
production period extends from 2024 to 2028, almost 5 years. At full production the planned mining rate is 1,500 tpd (543,000 tonnes
per annum). Planned LOM production is 2.3 Mt at an average silver grade of 83 g/t, gold grade of 0.14 g/t, lead grade of 2.79 %,
and zinc grade of 4.03 %.
Access
to the Caylloma underground mine is from surface through a main ramp. The Caylloma Mine has been designed with a separation of 100 m
between levels primarily to limit blast vibration but also to assist with hanging wall and footwall stability.
Transportation
of ore and waste is done via trucks with a 15 m3 of capacity through the main and secondary ramps.
The ventilation
requirements for the Animas underground mine to produce 1,500 tpd is 345,100 cfm based on the utilization of the planned mining equipment.
Air intake is through the RB 509 N and the main access ramp for levels 7 (NE), 8, 9 and 12 which represents an estimated 356,855 cfm.
Ventilation is controlled by three principal fans, two operating at 120,000 cfm and one at 100,000 cfm.
The mine
uses two kinds of backfill; waste rock backfill generated during underground mining and hydraulic backfill.
The mobile
equipment fleet is based on the current mining operations, which are known to achieve the production targets set out in the LOM.
Mine
infrastructure and supporting facilities are sufficient for the remaining LOM.
| 1.12 | Processing and recovery
methods |
The process
design is based on metallurgical testwork completed on samples from the deposit. The design and equipment are conventional.
The process
plant design is split into four principal stages including: crushing; milling; flotation; and thickening, filtering and shipping. The
plant has a 1,500 tpd throughput rate.
Energy
requirements at the operation are provided by a state power line of 15 kV. The maximum power demand for the plant is 2300 kW.
December 31, 2023 | Page 22 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
The processing
plant water consumption is 2.45 m3/t to process one tonne of ore. Approximately 74 % (1.82 m3/t) is recovered from
the tailings facility and pumped back to the plant to be re-used in the process along with 26 % (0.63 m3/t) fresh water collected
from the mine and pumped to Level 9 to send it to the plant.
The plant
uses conventional reagents, including a frother, collectors, flocculant and a depressor.
| 1.13 | Project infrastructure |
All mine
and process infrastructure and supporting facilities are in place at the operation with only an increase in tailings storage facility
in 2026 and designation of underground waste disposal area required to meet the needs of the mine plan and production rate beyond 2025.
The Caylloma
Mine has infrastructure consisting primarily of the concentration plant, electrical power station, water storage facilities, tailings
facilities, stockpiles, and workshop facilities, all connected by unsealed roads. Additional structures located at the mine include offices,
dining hall, laboratory, core logging and core storage warehouses. The mine site infrastructure has a footprint of 91.12 ha associated
with the Huayllacho beneficiation concession.
All process
buildings, offices, and camp facilities for operating the mine have been constructed.
The current
tailings storage facility (TSF N° 3) is located approximately 4 km to the south of the concentration plant. The tailings facility
has a current incremental capacity of 921,000 m3, sufficient to handle tailings until the end of 2026 based on current production
levels, with an expansion required for completion in 2026 to provide sufficient capacity for the LOM.
The mine
currently has a single surface waste stockpile used for storing waste material that could not be effectively disposed of underground.
There is sufficient remaining capacity for LOM requirements based on the currently defined underground waste disposal areas that are
sufficient to the end of 2025 and the identification of an additional waste storage area on Level 8 of the Animas vein.
The mine
currently has one ore stockpile which is used for blending or plant feed if underground mining is temporarily stopped.
The maximum
power demand for the operation is 7800 kW provided mainly through the national power grid and three diesel generators on site to cover
the shortfall and provide backup.
Water
demand at the Caylloma Mine is 60 l/s, including 10 l/s for the camp. Approximately 70 % of the processing plant total water consumption
is recovered from tailings facility N° 3 with the other 30 % from fresh water provided by the Santiago River.
| 1.14 | Market studies
and contracts |
Since
the operation commenced production in October 2006, a corporate decision was made to sell the concentrate on the open market. In
order to get the best commercial terms for the concentrates, it is Fortuna’s policy to sign contracts for periods no longer than
one year. All commercial terms entered between the buyer and Bateas are regarded confidential, but are considered to be within standard
industry norms.
December 31, 2023 | Page 23 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Fortuna
established the metal pricing for Mineral Resources and Mineral Reserves using a consensus approach based on long-term analyst and bank
forecasts prepared in May 2023. A long-term price estimate of US$ 21/oz for silver and US$ 1,600/oz for gold has been applied, based
on the mean consensus prices from 2024 to 2026 of US$ 24.00/oz of silver and US$ 1,788/oz for gold weighted at 40 % and the 10-year historical
average of US$ 19.1/oz for silver and US$ 1,452/oz for gold weighted at 60 %.
Bateas
has used a Peruvian sol exchange rate of 3.6 soles to the US dollar for financial analysis purposes, which conforms with general industry-consensus.
Bateas
has eight major contracts for services relating to operations at the mine regarding: mining activities, ground support, raise boring,
drilling, transportation, electrical installations, plant and mine maintenance, explosives and civil works. The costs of such contracts
are accounted for in the capital and operating expenditures depending on work performed. Contracts are negotiated and renewed as needed.
Contract terms are typical of similar contracts in Peru that Fortuna is familiar with.
The QP
has reviewed the information provided by Fortuna on marketing, contracts, metal price projections and exchange rate forecasts and notes
that the information provided support for the assumptions used in this Report and are consistent with the source documents, and that
the information is consistent with what is publicly available within industry norms.
| 1.15 | Environmental
studies and permitting |
The mining
operation has been developed under strict compliance of norms and permits required by public institutions associated with the mining
sector. Furthermore, all work follows quality and safety international norms as set out in ISO 14001 and OHSAS 18000.
In addition
to these norms and permits obtained from the environmental department, the operation also ensures that all environmental activities are
regularly monitored and recorded as part of the quality control measures that are presented to the Ministry of Energy and Mining (MEM)
and other legal regulatory organizations.
Of particular
importance is monitoring of the quality of river water in the area. This activity involves monitoring the Santiago River, being the main
river that passes through the property, employing people from the local communities to verify the results.
Bateas
has a very strong commitment to the development of neighboring communities of the Caylloma Mine. In this respect, Bateas is committed
to sustainable projects, direct support and partnerships that build company engagement in local communities while respecting local values,
customs and traditions. The company aims to develop projects or programs based on respect for ethno-cultural diversity, open communication
and effective interaction with local stakeholders that improve education, health and infrastructure.
Mine
closure is included in the environmental program. For 2024 a total of US$ 471,000 has been budgeted for the ongoing closure plan
and environmental liabilities. The closure plan is performed to ensure compliance with the programs and plans submitted to the MEM. Budgeted
mine closure costs for the LOM total US$ 16.1 million.
| 1.16 | Sustaining capital
and operating costs |
Capital
and operating cost estimates are based on established cost experience gained from current operations, projected budget data and quotes
from manufacturers and suppliers.
December 31, 2023 | Page 24 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
The capital
and operating cost provisions for the LOM plan that supports Mineral Reserves have been reviewed. The basis for the estimates is appropriate
for the known mineralization, mining and production schedules, marketing plans, and equipment replacement and maintenance requirements.
The QP
considers the capital and operating costs estimated for the Caylloma Mine as reasonable based on industry-standard practices and actual
costs observed for 2023.
All remaining
capital costs are considered to be sustaining capital costs.
Capital
costs include all investments in ongoing mine development, infill drilling, mine equipment overhaul and components, infrastructure necessary
to sustain the continuity of the operation. The capital costs are split into three areas: mine development; equipment and infrastructure;
and mine closure and site rehabilitation.
Mine
development includes the main development and infrastructure of the mine through the generation of ramps, ventilation raises, and extraction
levels. Infill delineation drilling is included under mine development costs as this activity has the objective of increasing the confidence
in currently defined Mineral Resources, and Brownfields exploration drilling is included regarding planned activities for the coming
year.
Equipment
and infrastructure costs are attributed to mine infrastructure in the Animas NE vein and energy capacity expansion for the plant and
other minor equipment acquisition and spare parts.
Mine
closure costs are attributed to site rehabilitation costs required to remediate the area where the mine is located and to meet mine closure
requirements.
The capital
cost estimate is summarized in Table 1.3
Table
1.3 Summary of projected major capital costs for the LOM
Capital
Cost Item (MUS$) |
2024 |
2025 |
2026 |
2027 |
2028 |
Development
|
3.61 |
5.89 |
2.52 |
2.87 |
0.00 |
Brownfields |
0.24 |
0.00 |
0.00 |
0.00 |
0.00 |
Infill
drilling |
0.74 |
0.50 |
0.50 |
0.50 |
0.50 |
Mine
Development & Brownfields |
4.59 |
6.39 |
3.02 |
3.37 |
0.50 |
|
Mine |
6.07 |
0.98 |
1.32 |
4.08 |
0.00 |
Plant |
0.36 |
0.13 |
0.09 |
0.03 |
0.00 |
Tailings
dam |
0.44 |
3.61 |
5.41 |
0.31 |
0.00 |
Maintenance
and Energy |
6.18 |
1.68 |
0.23 |
0.00 |
0.00 |
General
services |
1.07 |
2.89 |
0.15 |
0.23 |
0.00 |
Equipment
and Infrastructure |
14.11 |
9.29 |
7.20 |
4.64 |
0.00 |
|
Mine
Closure & Site Rehabilitation |
0.47 |
0.07 |
2.10 |
1.90 |
11.52 |
|
Total
Capital Expenditure* |
19.17 |
15.75 |
12.32 |
9.91 |
12.02 |
*Numbers
may not add due to rounding |
Long-term
projected operating costs are based on the LOM mining and processing requirements, as well as historical information regarding performance,
operational and administrative support demands.
December 31, 2023 | Page 25 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Operating
costs include site costs and operating expenses to maintain the operation. These operating costs are analyzed on a functional basis and
the cost structure is not similar to the operating costs reported by the financial statements published by Fortuna.
Site
costs relate to activities performed on the property including mine, plant, general services, and administrative service costs. Other
operating expenses include costs associated with concentrate transportation and community support activities.
Projected
operating costs for the LOM are detailed in Table 1.4.
Table
1.4 Life-of-mine operating costs
Area |
Units |
2024 |
2025 |
2026 |
2027 |
2028 |
Mine |
US$/t |
45.3 |
44.1 |
42.4 |
41.9 |
43.2 |
Plant |
US$/t |
15.7 |
12.2 |
12.2 |
12.2 |
12.2 |
General
Services |
US$/t |
16.4 |
16.4 |
16.4 |
16.4 |
16.4 |
Administrative
Services |
US$/t |
12.0 |
12.1 |
12.1 |
12.1 |
12.0 |
Management
Fee |
US$/t |
1.7 |
1.8 |
1.8 |
1.8 |
1.7 |
Distribution |
US$/t |
7.4 |
7.1 |
7.3 |
7.1 |
7.2 |
Community
Support Activities |
US$/t |
1.2 |
1.2 |
1.2 |
1.2 |
1.2 |
Total |
US$/t |
99.8 |
94.8 |
93.3 |
92.6 |
93.9 |
Fortuna
is using the provision for producing issuers, whereby producing issuers may exclude the information required under Item 22 for technical
reports on properties currently in production and where no material expansion in production is planned.
Mineral
Reserve declaration is supported by a positive cashflow for the period set out in the LOM based on the assumptions detailed in this Report.
An economic
analysis was performed in support of the estimation of Mineral Reserves. This indicated a positive cash flow using the assumptions and
parameters detailed in this Report.
| 1.19 | Risks, and opportunities |
Opportunities
include:
| · | Reduction
in overall pumping costs through improvements to the mine dewatering system resulting in
reduced power consumption and maintenance requirements. |
| · | Potential
to expand the ore processing capacity at the plant. The conceptual study indicates a possible
business case to increase production to 2,200 tpd and requires further studies to confirm
its feasibility. |
| · | Potential
to expand current resources through exploration of the Animas NE vein with mineralization
remaining open to the northeast and at depth. |
Risks
include:
| · | An
expansion of the current tailings storage facility TSF N° 3 will be required for stage
(3C) to cover the current production levels up to LOM requirements. A |
December 31, 2023 | Page 26 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
permit
will be required for the expansion, and although there is no guarantee this will be granted, Bateas is confident that if the
application is submitted in a timely manner, the permit should be granted based on previous permit applications.
| · | Bateas
management occasionally receives requests from local authorities and/or civil organizations
regarding unrealistic social expectations. Bateas are mitigating the risk of conflict regarding
these demands by working with local authorities, landowners, and communities to address expectation
levels and to take requests into account in preparing its annual community relations work
program and budget. |
| · | TSF
N° 2 provides a small capacity (two months) as a contingency plan for tailings storage.
It is currently being used as a temporary cyclone / tailings classification facility. TSF
N° 2 is planned for decommissioning in 2025 when a new cyclone plant is planned to be
operational adjacent to the mill. A site investigation study was conducted in the third quarter
of 2023 to sample foundation materials and laboratory testing is planned for January 2024.
Engineering trade off analysis is expected to be completed by the end of the second quarter
2024 to determine closure costs associated with this facility. TSF N° 2 closure costs
are currently unknown. |
Recommendations
for the next phase of work have been broken into those related to ongoing exploration activities and those related to additional technical
and operational studies. Recommended work programs are independent of each other and can be conducted concurrently unless otherwise stated.
The exploration phase is estimated to cost $ 980,000 with an additional technical studies phase estimated to cost $ 180,000. Depending
on results from these phases a plant expansion pre-feasibility study phase may be executed at an estimated cost of approximately $ 1,000,000.
| · | Exploration.
It is recommended that Bateas continue surface mapping of key areas of interest including
Antacollo, Condorcoto, Santa Rosa and Antimonio, as well as geophysical surveys at Llocococha
to identify potential future drill targets. The budgeted cost of the surface mapping activities
is $ 244,000 (excluding personnel costs). |
| · | Delineation
(infill) drilling. Bateas is planning to continue the delineation drilling from underground
in 2024 focusing on the lower levels of ore shoot 3 in the Animas NE vein. A total of 20
drill holes totaling 4,027 m is planned at a budgeted total cost of $ 736,000. |
| 1.20.2 | Technical and operational studies |
| · | Review
of mining methodology. The width of mineralization and rock quality varies greatly throughout
the deposit. It is recommended that an evaluation of mining method be conducted to assess
potential implementation of the SLS mining method applied to high grade Au-Ag veins, additionally
to review an increment on the bench height of the SLS stopes from 13.5 m to 20 m. The study
could be conducted in-house or externally, with an external cost estimated at $ 80,000. |
December 31, 2023 | Page 27 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
| · | Review
of mine cost optimization. It is proposed to do a cost optimization study in order to
identify operational bottlenecks where savings can be found both in mine, auxiliary services
and plant. The estimated cost of the study is $ 100,000. |
| · | Plant
expansion pre-feasibility study. A pre-feasibility study is recommended to assess if
the production rate at the Caylloma plant could be increased to 2,200 tpd. The estimated
cost of the study is approximately $ 1,000,000. |
| · | Density
estimation. It is recommended that the number of bulk density measurements be increased
in veins that lack sufficient values for meaningful statistical analysis. This will be completed
utilizing the operations resources and part of normal operating cost. |
December 31, 2023 | Page 28 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
This
Technical Report (the Report) was prepared by Mr. Eric Chapman, P.Geo., Mr. Paul Weedon, MAIG, Mr. Raul Espinoza, FAusIMM
(CP), Mr. Mathieu Veillette, P.Eng., and Ms. Patricia Gonzalez, MMSA (QP), for Fortuna on the Caylloma Mine (Caylloma Project
or Project) in accordance with the disclosure requirements of Canadian National Instrument 43-101 – Standards of Disclosure
for Mineral Projects (NI 43-101).
The mineral
rights of the Caylloma Mine are held by Bateas. Bateas is a Peruvian subsidiary that is 100 % indirectly owned by Fortuna and is responsible
for operating the Caylloma Mine.
The Report
discloses updated Mineral Resource and Mineral Reserve estimates for the Caylloma Mine.
Mineral
Resource and Mineral Reserve estimates are reported using the 2014 CIM Definition Standards - for
Mineral Resources and Mineral Reserves (the 2014 CIM Definition Standards).
Costs
are in US dollars (US$) unless otherwise indicated.
The following
Qualified Persons are responsible for the preparation of this Report:
Mr. Eric
Chapman, P.Geo., Senior Vice President of Technical Services – Fortuna Silver Mines Inc.
Mr. Paul
Weedon, MAIG, Senior Vice President of Exploration – Fortuna Silver Mines Inc.
Raul
Espinoza, FAusIMM (CP), Director of Technical Services – Fortuna Silver Mines Inc.
Mr. Mathieu
Veillette, P.Eng., Director, Geotechnical, Tailings and Water – Fortuna Silver Mines Inc.
Ms. Patricia
Gonzalez, MMSA (QP), Director of Operations – Compania Minera Cuzcatlan S.A. de C.V.
| 2.3 | Scope
of personal inspection |
Mr. Eric
Chapman has visited the property on multiple occasions, the most recent being November 18 to 19, 2023. During his site visits Mr. Chapman
has reviewed data collection, drill core, storage facilities, database integrity, procedures, and geological model construction. Discussions
on geology and mineralization were held with Bateas personnel, and field site inspections were performed including a review of underground
geology, and inspection of operating underground drill machines. He worked with site geological personnel reviewing aspects of data storage
(database) and analytical quality control.
Mr. Paul
Weedon has visited the mine on multiple occasions, most recently from August 11 to 13, 2023. During these visits, Mr. Weedon
has reviewed drilling
December 31, 2023 | Page 29 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
performance,
sample and data collection, site QAQC records and geological model development for the Caylloma Mine mineralization.
Mr. Raul
Espinoza visited the property most recently on November 18 to 19, 2023. During this visit Mr. Espinoza reviewed geotechnical
observations, mine and plant infrastructure, mining methods, Mineral Reserve estimates, LOM and scheduling plans, and discussed environmental,
social, permitting, operating and capital expenditure requirements with Bateas personnel.
Mr. Mathieu
Veillette has visited the property on multiple occasions, most recently from May 30 to 31, 2023 where he performed a field visit
on the tailings storage facilities, underground operation, waste dumps and water management facilities. He also reviewed and discussed
with Bateas site personnel, designs and procedures for the tailings storage facilities, waste dumps, geotechnical model and water balance.
Ms. Patricia
Gonzalez last visited the property in 2017 where she inspected the processing facilities, reviewed metallurgical performance records
and held discussions with the Bateas metallurgical and processing personnel. In late 2023 and early 2024, Ms. Gonzalez reviewed
historical plant performance records, and metallurgical testwork reports for mineralized material projected for future processing.
The Report
has a number of effective dates, as follows:
| · | June 30,
2023: date of database cut-off for assays used in the Mineral Resource estimate for the Caylloma
Mine. |
| · | December 31,
2023: date of the Mineral Resource and Mineral Reserve estimate for the Caylloma Mine, taking
into account production related depletion to this date. |
| · | December 31,
2023: date to which drilling has been reported. |
The overall
effective date of the Report is the date of the most recent supply of information on the ongoing drilling program, and the date of the
Mineral Resource and Mineral Reserve estimates, which is December 31, 2023.
| 2.5 | Previous
technical reports |
Fortuna
has previously filed the following technical reports on the Caylloma Mine, listed in reverse chronological order:
| · | Chapman,
E.N., & Sinuhaji, A., 2019. Technical Report on the Caylloma Mine, Caylloma District,
Peru, prepared for Fortuna Silver Mines Inc., effective date March 8, 2019. |
| · | Chapman,
E.N., & Gutierrez, E., 2017. Amended Technical Report on the Caylloma Property,
Caylloma District, Peru, prepared for Fortuna Silver Mines Inc., effective date August 31,
2016. |
| · | Chapman,
E.N., & Kelly, T.E.M., 2013. Amended Technical Report on the Caylloma Property,
Caylloma District, Peru, prepared for Fortuna Silver Mines Inc., effective date March 22,
2013. |
December 31, 2023 | Page 30 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
| · | Chapman,
E.N., & Acosta, E.V., 2012. Amended Technical Report on the Caylloma Property, Caylloma
District, Peru, prepared for Fortuna Silver Mines Inc., effective date May 7, 2012. |
| · | Nielsen,
R.L., Milne, S., & Sandefur, R.L., 2009. Technical Review (NI 43-101), Caylloma
Project, Peru, prepared by Chlumsky, Armbrust & Meyer, LLC. for Fortuna Silver Mines
Inc., effective date August 11, 2009. |
| · | Sandefur,
R.L., 2006. Technical Report, Caylloma Project, Arequipa, Peru, prepared by Chlumsky, Armbrust &
Meyer, LLC. for Fortuna Silver Mines Inc., effective date October 3, 2006. |
| · | Armbrust,
G.A., Kilpatrick, L.R., & Sandefur, R.L., 2005. Technical Report, Caylloma Project,
Arequipa, Peru, prepared by Chlumsky, Armbrust & Meyer, LLC. for Fortuna Silver
Mines Inc., effective date April 22, 2005. |
| 2.6 | Information
sources and references |
The main
information sources referenced in this Report is the 2019 technical report:
| · | Chapman,
E.N., & Sinuhaji, A., 2019. Technical Report on the Caylloma Mine, Caylloma District,
Peru, prepared by Fortuna Silver Mines Inc., effective date March 8, 2019. |
Additional
information was obtained from Bateas site personnel including metallurgical input from Marco Flores (Plant Superintendent) and social,
environmental and permitting guidance from Eduardo Asmat (Director of Corporate Affairs and Sustainability.
Some
of the more commonly used acronyms used in the Report are detailed in Table 2.1.
Table
2.1 Acronyms
Acronym |
Description |
|
Ag |
silver |
|
Au |
gold |
|
cfm |
cubic
foot per minute |
|
cm |
centimeters |
|
COG |
cut-off
grade |
|
Cu |
copper |
|
g |
grams |
|
g/t |
grams
per tonne |
|
ha |
hectares |
|
kg |
kilograms |
|
km |
kilometers |
|
kV |
kilovolts |
|
kW |
kilowatts |
|
lbs |
pounds |
|
l |
liter |
|
LOM |
life-of-mine |
|
m |
meters |
|
Ma |
millions
of years |
|
December 31, 2023 | Page 31 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Acronym |
Description |
|
masl |
meters
above sea level |
|
Moz |
million
troy ounces |
|
Mn |
manganese |
|
Mt |
million
metric tonnes |
|
MVA |
megavolt
ampere |
|
MW |
megawatt |
|
n/a |
not
applicable |
|
NI |
national
instrument |
|
NN |
nearest
neighbor |
|
nr |
not
recorded |
|
NSR |
net
smelter return |
|
OK |
ordinary
kriging |
|
oz |
troy
ounce |
|
ppm |
parts
per million |
|
Pb |
lead |
|
psi |
pounds
per square inch |
|
QAQC |
quality
assurance/quality control |
|
RMR |
rock
mass rating |
|
RQD |
rock-quality
designation |
|
s |
second |
|
t |
metric
tonne |
|
t/m3 |
metric
tonnes per cubic meter |
|
tpd |
metric
tonnes per day |
|
yd |
yard |
|
yr |
year |
|
Zn |
zinc |
|
US$/t |
United
States dollars per tonne |
|
US$/g |
US
dollars per gram |
|
US$/% |
US
dollars per percent |
|
December 31, 2023 | Page 32 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
| 3 | Reliance on Other Experts |
The QPs
have not independently reviewed ownership of the Caylloma Mine or any underlying agreements, mineral tenure, surface rights, or royalties.
The QPs have fully relied upon, and disclaim responsibility for, information derived from Fortuna and legal experts retained by Fortuna
for this information through the following documents:
| · | Rubio Leguia Normand., 2024. Legal Opinion prepared by Rubio Leguia
Normand for Fortuna Silver Mines Inc. dated January 2024, 78 p. |
This
information is used in Section 4 of the Report. The information is also used in support of the Mineral Resource estimate in Section 14
and the Mineral Reserve estimate in Section 15.
December 31, 2023 | Page 33 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
| 4 | Property Description and Location |
The Caylloma
Mine is located in the Caylloma District, 225 road-kilometers north-northwest of Arequipa, Peru. The property is 14 km northwest of the
town of Caylloma at the UTM grid location of 8192263E, 8321387N, (WGS84, UTM Zone 19S). The location of the mine is shown in Figure 4.1.
Figure
4.1 Map showing the location of the Caylloma Mine
Fortuna
acquired a 100 % interest in the Caylloma Mine in June 2005. The property comprises mining concessions; surface rights; a permitted
1,500 tpd flotation plant; connection to the national electric power grid; permits for camp facilities for 890 persons; and the
infrastructure necessary to sustain mining operations.
| 4.1.1 | Mining claims and concessions |
The Caylloma
Mine consists of mineral rights for 74 mining concessions for a total surface area of 35,622 hectares (ha). A list of the mining concessions
showing the names, areas in hectares, and title details are presented in Table 4.1. In addition to the mining concessions, the Huayllacho
mill-site (processing plant) has a titled beneficiation concession comprising 91.12 ha.
December 31, 2023 | Page 34 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
In Peru,
mining concessions do not have expiration dates, but an annual fee must be paid to retain the concessions in good standing. Bateas states
that all fees are up to date and the concessions listed in Table 4.1 are all in good standing.
Table
4.1 Mining concessions owned by Bateas
No. |
Concession
Name |
Area
(ha)* |
Title
Resolution |
|
1 |
Acumulacion
Cailloma No. 1 |
989.53 |
R.J.
No. 522-00-RPM |
|
2 |
Acumulacion
Cailloma No. 2 |
920.41 |
R.D.
No. 355-90/EM/DCMDE |
|
3 |
Acumulacion
Cailloma No. 3 |
979.28 |
R.D.
No. 410-90/EM/DCMDE |
|
4 |
Corona
de Antimonio No.2 |
84.00 |
R.J.
No. 8642-96-RPM |
|
5 |
Cailloma
4 |
865.39 |
R.J.
No. 01391-2002-INACC/J |
|
6 |
Cailloma
5 |
514.19 |
R.J.
No. 01405-2002-INACC/J |
|
7 |
Cailloma
6 |
678.88 |
R.J.
No. 1401-2002-INACC/J |
|
8 |
Eureka
88 |
4.46 |
R.J.
No. 2782-99-RPM |
|
9 |
Sandra
No. 5 |
6.00 |
R.J.
No. 6917-94-RPM |
|
10 |
Sandra
No. 6 |
4.00 |
R.J.
No. 6920-94-RPM |
|
11 |
Sandra
No. 7 |
2.00 |
R.J.
No. 7054-94-RPM |
|
12 |
Sandra
No. 9 |
9.00 |
R.J.
No. 6919-94-RPM |
|
13 |
Sandra
No. 102-A |
124.99 |
R.J.
No. 2811-2000-RPM |
|
14 |
Sandra
106 |
724.00 |
R.J.
No. 404-91-RPM |
|
15 |
Sandra
107 |
794.00 |
R.D.
No. 764-90-EM-DGM-DCM |
|
16 |
Sandra
108 |
614.00 |
R.D.
No. 72-91-EM-DGM-DCM |
|
17 |
Sandra
120 |
4.00 |
R.D.
No. 086-88-EM-DG-DCM |
|
18 |
Sandra
121 |
4.00 |
R.D.
No. 173-88-EM-DGM-DCM |
|
19 |
Sandra
123 |
90.00 |
R.J.
No. 1769-99-RPM |
|
20 |
S.P.
No.16 |
0.12 |
R.M.
No 2142 |
|
21 |
Cristobal
R1 |
300.00 |
R.P.
No. 4573-2009-INGEMMET/PCD/PM |
|
22 |
Sandra
106-A |
276.00 |
R.P.
No. 1546-2010-INGEMMET/PCD/PM |
|
23 |
Sandra
107-A |
206.00 |
R.P.
No. 0685-2010-INGEMMET/PCD/PM |
|
24 |
Sandra
108-A |
386.00 |
R.P.
No. 1282-2010-INGEMMET/PCD/PM |
|
25 |
Sandra
108-B |
3.58 |
R.P.
No. 1767-2013-INGEMMET/PCD/PM |
|
26 |
Sandra
108-C |
9.25 |
R.P.
No. 1704-2013-INGEMMET/PCD/PM |
|
27 |
Cailloma
11 |
96.35 |
R.P.
No. 2165-2010-INGEMMET/PCD/PM |
|
28 |
Cailloma
12 |
100.00 |
R.P.
No. 2056-2010-INGEMMET/PCD/PM |
|
29 |
Cailloma
14 |
282.27 |
R.P.
No. 2180-2010-INGEMMET/PCD/PM |
|
30 |
Cailloma
15 |
371.31 |
R.P.
No. 2436-2010-INGEMMET/PCD/PM |
|
31 |
Cailloma
16 |
954.08 |
R.P.
No. 2259-2010-INGEMMET/PCD/PM |
|
32 |
Cailloma
17 |
337.26 |
R.P.
No. 3561-2010-INGEMMET/PCD/PM |
|
33 |
Cailloma
18 |
219.65 |
R.P.
No. 4711-2010-INGEMMET/PCD/PM |
|
34 |
Cailloma
19 |
102.04 |
R.P.
No. 2514-2010-INGEMMET/PCD/PM |
|
35 |
Cailloma
20 |
112.69 |
R.P.
No. 2754-2010-INGEMMET/PCD/PM |
|
36 |
Cailloma
21 |
100.00 |
R.P.
No. 3193-2010-INGEMMET/PCD/PM |
|
37 |
Cailloma
22 |
854.75 |
R.P.
No. 2334-2012-INGEMMET/PCD/PM |
|
38 |
Cailloma
23 |
1,000.00 |
R.P.
No. 0348-2012-INGEMMET/PCD/PM |
|
39 |
Cailloma
24 |
1,000.00 |
R.P.
No. 1014-2012-INGEMMET/PCD/PM |
|
40 |
Cailloma
25 |
1,000.00 |
R.P.
No. 0932-2012-INGEMMET/PCD/PM |
|
41 |
Cailloma
26 |
1,000.00 |
R.P.
No. 3218-2012-INGEMMET/PCD/PM |
|
42 |
Cailloma
27 |
1,000.00 |
R.P.
No. 1882-2012-INGEMMET/PCD/PM |
|
43 |
Cailloma
28 |
1,000.00 |
R.P.
No. 1816-2012-INGEMMET/PCD/PM |
|
44 |
Cailloma
29 |
200.00 |
R.P.
No. 0930-2012-INGEMMET/PCD/PM |
|
45 |
Cailloma
30 |
1,000.00 |
R.P.
No. 0346-2012-INGEMMET/PCD/PM |
|
46 |
Cailloma
38** |
1,000.00 |
R.P.
No. 0616-2012-INGEMMET/PCD/PM |
|
47 |
Cailloma
39** |
400.00 |
R.P.
No. 0419-2012-INGEMMET/PCD/PM |
|
December 31, 2023 | Page 35 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
No. |
Concession
Name |
Area
(ha)* |
Title
Resolution |
|
48 |
Cailloma
40** |
1,000.00 |
R.P.
No. 0227-2012-INGEMMET/PCD/PM |
|
49 |
Cailloma
41** |
1,000.00 |
R.P.
No. 0507-2012-INGEMMET/PCD/PM |
|
50 |
Cailloma
42** |
1,000.00 |
R.P.
No. 0498-2012-INGEMMET/PCD/PM |
|
51 |
Cailloma
43 |
200.00 |
R.P.
No. 0949-2012-INGEMMET/PCD/PM |
|
52 |
Cailloma
44 |
1,000.00 |
R.P.
No. 1521-2012-INGEMMET/PCD/PM |
|
53 |
Cailloma
45 |
1,000.00 |
R.P.
No. 0497-2012-INGEMMET/PCD/PM |
|
54 |
Cailloma
46 |
1,000.00 |
R.P.
No. 0638-2012-INGEMMET/PCD/PM |
|
55 |
Cailloma
47 |
1,000.00 |
R.P.
No. 0640-2012-INGEMMET/PCD/PM |
|
56 |
Cailloma
48 |
700.00 |
R.P.
No. 0909-2012-INGEMMET/PCD/PM |
|
57 |
Cailloma
49 |
1,000.00 |
R.P.
No. 0989-2012-INGEMMET/PCD/PM |
|
58 |
Cailloma
50 |
1,000.00 |
R.P.
No. 1074-2012-INGEMMET/PCD/PM |
|
59 |
Cailloma
51 |
5.35 |
R.P.
No. 1718-2013-INGEMMET/PCD/PM |
|
60 |
Cailloma
52 |
11.98 |
R.P.
No. 1740-2013-INGEMMET/PCD/PM |
|
61 |
Cailloma
10A |
999.97 |
R.P.
No. 1859-2012-INGEMMET/PCD/PM |
|
62 |
Gaya
9 |
1,000.00 |
R.P.
No. 3114-2010-INGEMMET/PCD/PM |
|
63 |
Gaya
8 |
1,000.00 |
R.P.
No. 2970-2010-INGEMMET/PCD/PM |
|
64 |
Gaya
22 |
27.14 |
R.P.
No. 2163-2012-INGEMMET/PCD/PM |
|
65 |
Gaya
7-A |
55.39 |
R.P.
No. 2699-2010-INGEMMET/PCD/PM |
|
66 |
Gaya
10 |
900.00 |
R.P.
No. 0890-2013-INGEMMET/PCD/PM |
|
67 |
Cailloma
33 |
23.80 |
R.P.
No. 2118-2019-INGEMMET/PCD/PM |
|
68 |
Cailloma
31 |
32.58 |
R.P.
No. 3623-2018-INGEMMET/PCD/PM |
|
69 |
Cailloma
13 |
536.51 |
R.P.
No. 1372-2019-INGEMMET/PCD/PM |
|
70 |
Cailloma
32 |
204.54 |
R.P.
No. 1541-2020-INGEMMET/PCD/PM |
|
71 |
Cailloma
55 |
46.75 |
R.P.
No. 2032-2020-INGEMMET/PCD/PM |
|
72 |
Cailloma
57 |
108.23 |
R.P.
No. 2033-2020-INGEMMET/PCD/PM |
|
73 |
Cailloma
56 |
38.55 |
R.P.
No. 3733-2021-INGEMMET/PCD/PM |
|
74 |
Cailloma
58 |
7.61 |
R.P.
No. 3150-2021-INGEMMET/PCD/PM |
|
Total |
|
35,621.88 |
|
|
*Areas of mining concessions (including the five leased) have been rounded down to take into account mining concessions that
overlap. |
|
**Leased to Compania de Minas Cerro Hablador SAC until October 29, 2026 |
|
Pursuant
to an agreement dated June 21, 2021, Bateas has leased five of the mining concessions (“Cailloma 38”, “Cailloma
39”, “Cailloma 40”, “Cailloma 41” and “Cailloma 42”) to Compañía de Minas Cerro
Hablador SAC, with the term of the lease expiring on October 29, 2026. The concessions are located to the south of the Caylloma
Mine (Figure 4.2). There are no known Mineral Resources or Mineral Reserves located in these concessions as of the effective date of
this Report.
The Mineral
Rights are located in the districts of Caylloma, Choco, Tapay, Lari, Chachas and Suyckutambo, provinces of Caylloma, Castilla y Espinar,
of the departments of Arequipa and Cusco in Peru. The location of each of the Mineral Rights is fixed, for all legal purposes, by Universal
Transversal Mercator (UTM) coordinates (WGS 84) of their vertices.
December 31, 2023 | Page 36 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Figure
4.2 Location of mining concessions at the Caylloma Mine
Figure prepared by
Bateas, 2023
December 31, 2023 | Page 37 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Surface
rights and easements held by Bateas at Caylloma are detailed in Table 4.2.
Table
4.2 Surface rights for operations held by Bateas at Caylloma
No. |
Name |
Area
(ha)* |
Type |
|
1 |
Bahia
Electrica |
0.13 |
Surface
Right |
|
2 |
Anexo
Talta Huarahuarco – Sección A |
40.37 |
Surface
Right |
|
3 |
Anexo
Talta Huarahuarco – Sección B |
1.04 |
Surface
Right |
|
0.02 |
Easement |
|
0.11 |
Easement |
|
0.0004 |
Easement |
|
4 |
Hichoccollo
- Huarahuarco |
20.00 |
Surface
Right |
|
5 |
Fundo
Huayllacho - Bateas |
186.73 |
Surface
Right |
|
0.13 |
Easement |
|
6 |
Animas |
214.41 |
Surface
Right |
|
7 |
Putusi
- Chico |
0.03 |
Easement |
|
0.02 |
Easement |
|
0.02 |
Easement |
|
0.06 |
Easement |
|
8 |
Palcacucho |
1.48 |
Easement |
|
0.62 |
Easement |
|
1.06 |
Easement |
|
0.63 |
Easement |
|
1.00 |
Easement |
|
0.80 |
Easement |
|
1.37 |
Easement |
|
17.53 |
Easement |
|
38.13 |
Easement |
|
42.81 |
Easement |
|
67.28 |
Easement |
|
9 |
Anchaca |
0.44 |
Easement |
|
4.83 |
Easement |
|
9.66 |
Easement |
|
10 |
Chulla
Raccay Pampa |
1.22 |
Easement |
|
2.44 |
Easement |
|
11 |
Cuchuquipa |
17.49 |
Easement |
|
0.62 |
Easement |
|
14.74 |
Easement |
|
0.40 |
Easement |
|
16.87 |
Easement |
|
16.62 |
Easement |
|
12 |
Jururuni |
258.90 |
Easement |
|
13 |
Huaraco
Sahunana |
1,200.00 |
Easement |
|
14 |
Michihuasi |
192.85 |
Easement |
|
65.92 |
Easement |
|
15 |
Tayayaque
Trinidad |
89.23 |
Easement |
|
351.77 |
Easement |
|
16 |
Vilafro |
1,047.49 |
Easement |
|
38.67 |
Easement |
|
1.50 |
Easement |
|
17 |
Pumanota-Antocollo |
322.60 |
Surface
Right |
|
18 |
Parcela
105 – Predio “San Ignacio” |
0.15 |
Easement |
|
0.15 |
Easement |
|
December 31, 2023 | Page 38 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
No. |
Name |
Area
(ha)* |
Type |
|
19 |
Componentes |
4.70 |
Easement |
|
20 |
Pumpuyo |
2,744.30 |
Easement |
|
21 |
Culluhuire
Giro Amayccoto |
1,135.40 |
Easement |
|
22 |
Hatun
Hausi El Toro Kculi |
136.25 |
Easement
|
|
*Total area of land subject to easements/surface rights does not take into account overlapping easements. |
|
Regarding
the current situation of the surface rights it is important to note the following:
| · | Peruvian
legislation considers mining concessions as a right separate from the surface land where
it is located. |
| · | According
to Peruvian Mining Law, a mining concessionaire requires a previous authorization from the
surface owner or possessor of the land to undertake mining activities. |
The majority
of the surface right easements detailed in Table 4.2 are not registered and were signed by landholders (owners or possessors) that may
or may not have legal titles. The agreements signed by Bateas have all been formalized through Public Deeds or the proceedings to access
state-owned lands have been fulfilled, that to the best of Bateas’ knowledge provide sufficient rights to operate.
Fresh
water supply for the Caylloma Mine is provided by the Santiago River which runs through the property, with a permanent water permit granted
by the Ministry of Autoridad Nacional de Agua.
The Caylloma
Mine is subject to the following royalties:
| · | Pursuant
to a royalty agreement between Bateas and Minera Arcata, dated May 2, 2005, a royalty
of 2 % of the NSR which will apply after not less than a total of 21 million ounces of silver
have been recovered from certain mineral concessions processed through any mill. This contract
is a permanent condition and will remain in total validity as long as a valid mining concession
exists. This royalty was subsequently assigned by Minera Arcata to Nueva Granada Gold Ltd.
(formerly Lemuria Royalties Corp.). Bateas surpassed the silver ounce limit and commenced
paying the 2 % NSR royalty on silver production to Nueva Granada Gold Ltd. on February 16,
2022. |
| · | Holders
of mineral concessions are obliged to pay to the Peruvian Government, a mining royalty, as
a consideration for the exploitation of the metallic and non-metallic natural resources.
The mining royalty is calculated based on the quarterly operating profit of the concession
holder. |
In order
to obtain the rate of the mining royalty, an effective rate (determined by law) is applied to the operating profit. This effective rate
is variable and progressive, and it depends on the operating margin in the quarter for the concession holder.
The amount
paid as the mining royalty is the greater amount calculated when comparing the effective rate and 1 % of income generated by sales in
the quarter.
| · | In
addition, the mineral concession holders are obliged to pay the Special Tax on Mining (Impuesto
Especial a la Minería), which taxes their operating income arising from the sale of
metallic natural resources on or originating from the |
December 31, 2023 | Page 39 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
estate
in which they operate. The tax base of the Special Tax on Mining is from the quarterly operating profit of the mining concession holder.
Other
than these royalties, the concessions are not subject to any other encumbrances or back-in rights.
| 4.4 | Environmental
aspects, permits and social considerations |
Bateas
is in compliance with Environmental Regulations and Standards set out in Peruvian Law and has complied with all laws, regulations, norms
and standards at every stage of operation of the mine.
Environmental
aspects including water rights, approved permits and social considerations are set out in Section 20 of this Report.
The Caylloma
area has a long history of mining activity, including small-scale and artisan operations dating back to the 1600s. There is an expectation
that some environmental damage will have resulted from these activities.
Bateas
is responsible for environmental liabilities in respect of “Acumulación Cailloma N° 1”, “Acumulación
Cailloma N° 2”, “Cailloma 6”, “Cailloma 9” and “Sandra N° 102-A”, whose remediation
has been added to and included in the Closure Plan for Mining Environmental Liabilities of the Caylloma Mining Unit.
Bateas
has an environmental commitment related to the remediation of the current mining facilities located on its concessions. Bateas is to
set aside US$ 16 million to cover remediation and closure requirements. These programs are ongoing with funds assigned to various projects
on an annual basis. Further details of the mine closure plan are included in Section 20.
In the
opinion of the QPs:
| · | Fortuna
was provided with an independent legal opinion that supported that the mining tenure held
by Bateas for the Caylloma Mine is valid and that Bateas has a legal right to mine the deposit. |
| · | Fortuna
was provided with a legal opinion that supported the fact that the surface rights held by
Bateas for the Caylloma Mine are in good standing. The surface rights are sufficient in area
for the mining operation infrastructure and tailings facilities. |
| · | Fortuna
was provided with a legal opinion that outlined royalties payable for the concessions held
by Bateas. |
Fortuna
advised that to the extent known, there are no other significant factors and risks that may affect access, title or right or ability
to perform work at the mine.
December 31, 2023 | Page 40 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
| 5 | Accessibility, Climate, Local Resources, Infrastructure
and Physiography |
Access
to the Caylloma Mine is by a combination of sealed and gravel roads. The mine is located 225 road kilometers from Arequipa, a city of
approximately a million people that includes an international airport and requires a trip of approximately five hours by vehicle. Access
is available to all concessions via a network of unsealed roads.
The climate
in the area is characteristic of the puna, with rain and snow between December and March, followed by a dry season from April through
September. The average precipitation on site per year is approximately 820 mm with 1,300 mm of evaporation. The climate allows for year-round
mining and processing, although surface exploration can be disrupted between December and March due to electrical storms, snow
or heavy rainfall.
| 5.3 | Topography,
elevation and vegetation |
The Caylloma
Mine is located in the puna region of Peru at an altitude of between 4,300 and 5,000 meters above sea level (masl). Surface topography
is generally steep with vegetation being primarily comprised of grasses and small shrubs common at high altitudes. The mine facilities
are located at approximately 4,400 masl.
The mine
has been in operation intermittently for over 400 years. Since 2011, several new buildings have been constructed to replace aging infrastructure
including a laboratory, offices, accommodation blocks, recreation areas, mess hall, core logging and core storage warehouses.
Experienced
underground miners live in the nearby town of Caylloma and other local towns in the district and are transported to the mine by bus.
The camp
and process facilities are located on the relatively flat valley floor while the entrance to the underground operations is via portals
in the steep side of the valley. Ore is transported by a combination of rail, rubber-tired scoops and ore haulage trucks.
Sufficient
make-up water for the process plant and mining operations is available from the Santiago River that crosses the property.
The mine
facilities are connected to the Electro Sur del Perú electric system, which supplies sufficient power for the operation.
More
detailed information regarding the mine infrastructure is provided in Section 18.
| 5.5 | Sufficiency
of surface rights |
The Caylloma
Mine infrastructure has a limited footprint as detailed in Section 18 of this Report. The mine’s processing facility and supporting
infrastructure is located well within
December 31, 2023 | Page 41 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
the area
of the surface rights and mineral tenements (as detailed in Section 4) owned by Bateas.
In the
opinion of the QPs, the existing infrastructure, availability of staff, the existing power, water, and communications facilities, the
methods whereby goods are transported to and from the mine site, and any planned modifications or supporting studies are well-established,
or the requirements to establish such, are well understood by Fortuna, and support the declaration of Mineral Resources and Mineral Reserves
and the proposed life of mine (LOM) plan with mining operations conducted on a year-round basis.
December 31, 2023 | Page 42 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
The
Caylloma Mine is located in the Puna region of Peru. The earliest documented mining activity in the Caylloma District dates back to that
of Spanish miners in 1620. English miners carried out activities in the late 1800s and early 1900s. Numerous companies have been involved
in mining the district of Caylloma but limited records are available to detail these activities.
The
Caylloma Mine was acquired by Compania Minera Arcata S.A. (CMA), a wholly owned subsidiary of Hochschild Mining plc in 1981. Fortuna
acquired the mine from CMA in 2005.
CMA
focused exploration on identifying high-grade silver vein structures. Exploration was concentrated in the northern portion of the district
and focused on veins including Bateas, El Toro, Paralela, San Pedro, San Cristobal, San Carlos, Don Luis, La Plata, and Apostles.
Extensive
exploration and development were conducted on the Bateas vein due to its high silver content; however, exploration did not extend to
the northeast due to the identification of a fault structure that was thought to truncate the mineralized vein.
Animas
was one of the first vein structures identified by CMA. However, the mineralization style was identified as polymetallic in nature, rather
than the high-grade silver veins CMA was seeking. Subsequently no further exploration or development was undertaken of this vein until
Fortuna took ownership in 2005.
Table
6.1 details the drilling and channel information by vein produced by CMA that was validated by Bateas.
Table
6.1 Exploration by drill hole and channels conducted by CMA
Vein |
Drill
Holes |
Channels |
Paralela |
- |
624 |
San
Pedro |
8 |
1,939 |
San
Cristóbal |
20 |
3,833 |
San
Carlos |
- |
221 |
Santa
Catalina |
- |
735 |
Don
Luis |
1 |
- |
Don
Luis I |
2 |
- |
Elisa |
2 |
- |
La
Plata |
9 |
371 |
Cimoide
La Plata |
- |
311 |
Ramal
San Pedro |
1 |
- |
San
Miguel |
2 |
|
Ursula |
2 |
|
December 31, 2023 | Page 43 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Historically
the Caylloma area has been known as a silver producer. Past production has been from several vein systems that ranged from centimeters,
up to 20 m in width. Individual ore shoots can strike for hundreds of meters with vertical depths ranging up to 300 m. Mining
has historically taken place between the 4,380 masl and 5,000 masl. No reliable production records are available for the early
mining activities.
| 6.3.1 | Compania
Minera Arcata |
Production
prior to 2005 came primarily from the San Cristobal vein, as well as from the Bateas, Santa Catalina and the northern silver veins (including
Paralela, San Pedro, and San Carlos) with production focused on silver ores and no payable credits for base metals. During CMA management,
production parameters fluctuated during the late 1990s as reserves were depleted. Owing to low metal prices, funds were not available
to develop the Mineral Resources at depth or extend along the strike of the veins. Ultimately this resulted in production being halted
in 2002. A summary of the production records at Caylloma under CMA management from 1998 through 2002 are included in Table 6.2. Production
figures prior to 1998 are unavailable.
Table
6.2 Production figures during CMA management of Caylloma
Production |
1998 |
1999 |
2000 |
2001 |
2002 |
Total |
Ore
processed (t) |
125,509 |
129,187 |
167,037 |
180,059 |
164,580 |
766,372 |
Head
grade Ag (g/t) |
308 |
331 |
373 |
405 |
572 |
406 |
Head
grade Au (g/t) |
1.27 |
0.89 |
0.67 |
0.60 |
0.23 |
0.69 |
Recovery
Ag (%) |
85.1 |
87.7 |
87.0 |
87.2 |
87.4 |
86.9 |
Recovery
Au (%) |
78.9 |
72.9 |
61.6 |
68.2 |
55.2 |
66.5 |
Concentrate
produced (t) |
4,623 |
4,756 |
6,698 |
7,725 |
6,735 |
30,537 |
Concentrate
grade Ag (g/t) |
7,115 |
7,913 |
8,097 |
8,235 |
12,209 |
6,280 |
Concentrate
grade Au (g/t) |
27.29 |
17.68 |
10.31 |
9.45 |
3.05 |
8,821 |
Production
Ag (oz) |
1,057,535 |
1,207,550 |
1,743,535 |
2,045,398 |
2,643,788 |
8,697,806 |
Production
Au (oz) |
4,051 |
2,697 |
2,218 |
2,347 |
659 |
11,973 |
Production
under Bateas management focused on the development of polymetallic veins producing lead and zinc concentrates with silver and gold credits.
A summary of total production figures since the mine reopened in October 2006 are detailed in Table 6.3 with production rates increased
at the operation in 2011 from 1,000 tpd to 1,300 tpd and again in May 2016 to approximately 1,500 tpd.
Table
6.3 Production figures during Bateas management of Caylloma (2006-2023)
Production |
2006# |
2007 |
2008 |
2009 |
2010 |
2011 |
2012 |
2013 |
2014 |
Ore
processed (t) |
33,460 |
250,914 |
331,381 |
395,561 |
434,656 |
448,866 |
462,222 |
458,560 |
464,823 |
Head
grade Ag (g/t) |
76 |
73 |
95 |
155 |
159 |
171 |
177 |
173 |
174 |
Head
grade Au (g/t) |
0.37 |
0.66 |
0.45 |
0.47 |
0.40 |
0.36 |
0.40 |
0.36 |
0.31 |
Head
grade Pb (%) |
1.12 |
1.70 |
2.48 |
3.10 |
2.44 |
2.15 |
1.99 |
1.92 |
1.70 |
Head
grade Zn (%) |
2.33 |
2.93 |
3.65 |
3.66 |
3.10 |
2.68 |
2.56 |
2.83 |
2.97 |
Production
Ag (koz)* |
56 |
443 |
805 |
1,685 |
1,906 |
2,008 |
2,039 |
2,104 |
2,203 |
Production
Au (oz)* |
166 |
3,328 |
2,197 |
2,747 |
2,556 |
2,393 |
2,781 |
2,212 |
1,820 |
Production
Pb (t) |
309 |
3,771 |
7,485 |
11,400 |
9,695 |
8,926 |
8,113 |
8,065 |
7,326 |
Production
Zn (t) |
603 |
6,300 |
10,561 |
12,900 |
11,855 |
10,625 |
10,158 |
11,436 |
12,411 |
* Recovery of silver and gold from
lead and zinc concentrate
# Commercial production
commenced in October 2006 |
December 31, 2023 | Page 44 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Production |
2015 |
2016 |
2017 |
2018 |
2019 |
2020 |
2021 |
2022 |
2023 |
Total
(2006-2023) |
Ore
processed (t) |
466,286 |
514,828 |
529,704 |
534,773 |
531,307 |
510,047 |
539,779 |
546,186 |
543,876 |
7,997,229 |
Head
grade Ag (g/t) |
136 |
90 |
66 |
63 |
66 |
72 |
76 |
80 |
85 |
110 |
Head
grade Au (g/t) |
0.26 |
0.20 |
0.18 |
0.18 |
0.23 |
0.41 |
0.49 |
0.14 |
0.24 |
0.32 |
Head
grade Pb (%) |
2.47 |
3.06 |
2.81 |
2.62 |
2.72 |
3.00 |
3.16 |
3.27 |
3.74 |
2.66 |
Head
grade Zn (%) |
3.84 |
4.25 |
4.21 |
4.28 |
4.36 |
4.61 |
4.56 |
4.32 |
5.11 |
3.83 |
Production
Ag (koz)* |
1,696 |
1,256 |
943 |
911 |
941 |
968 |
1,074 |
1,145 |
1,227 |
23,410 |
Production
Au (oz)* |
1,163 |
533 |
491 |
693 |
1,645 |
4,109 |
6,086 |
777 |
513 |
36,210 |
Production
Pb (t) |
10,811 |
14,820 |
13,552 |
12,816 |
13,039 |
13,439 |
14,964 |
15,689 |
18,530 |
192,750 |
Production
Zn (t) |
16,252 |
19,597 |
20,115 |
20,631 |
20,684 |
20,659 |
21,568 |
20,945 |
24,975 |
272,275 |
*
Recovery of silver and gold from lead and zinc concentrate |
December 31, 2023 | Page 45 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
| 7 | Geological
Setting and Mineralization |
The
Caylloma District is located in the Neogene volcanic arc that forms part of the Cordillera Occidental of southern Peru. This portion
of the volcanic arc developed over a thick continental crust consisting of deformed Paleozoic and Mesozoic rocks.
Following
the late Eocene to early Oligocene Incaic orogeny there was a period of erosion and magmatic inactivity prior to the eruption of the
principal host rocks in the Caylloma District. Crustal thickening and uplift occurred between 22 Ma and 17 Ma accompanied by volcanism,
faulting and mineralization in the Caylloma District.
The
volcanic belt in the Caylloma District contains large, locally superimposed calderas (Figure 7.1) of early Miocene to Pliocene age comprising
calc-alkaline andesitic to rhyolitic flows, ignimbrites, laharic deposits, and volcanic domes that unconformably overlie a folded marine
sequence of quartzite, shale, and limestone of the Jurassic Yura Group.
Figure
7.1 Location map of the Caylloma District
December 31, 2023 | Page 46 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
The
mining district of Caylloma is located northwest of the Caylloma caldera complex (Figure 7.2).
Figure
7.2 Local geologic map of Caylloma District
December 31, 2023 | Page 47 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
The
host rock of the mineralized veins is volcanic in nature, belonging to the Tacaza Group (Figure 7.3). The volcanic units of the Tacaza
Group lie unconformably over a sedimentary sequence of orthoquartzites and lutites of the Yura Group. Portions of the property are covered
by variable thicknesses of post-mineral Pliocene-Pleistocene volcanic rocks of the Barroso Group and recent glacial and alluvial sediments.
Figure
7.3 Stratigraphic column of Caylloma District
The
oldest rocks exposed in the Caylloma District belong to the Yura Group, and comprise white to gray ortho-quartzites, dark gray siltstones,
and blackish greywackes, intercalated with thin layers of black lutites. The overall thickness of the group is approximately 400 m.
Outcrop
evidence indicates Yura Group strata are strongly deformed with the presence of recumbent kink folds with straight limbs and narrow hinges.
However, strain in the Yura Group is locally weaker at depth, as only open folds have been identified in the Caylloma Mine area (Echavarria
et al., 2006).
Drilling
conducted in 2021 encountered limestone at depth, which is thought to belong to the Gramadal Formation.
December 31, 2023 | Page 48 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
The
Tacaza Group consists of a sequence of effusive lavas and tuff breccias intercalated with tuff horizons that lie in angular unconformity
and in fault contact with rocks of the Yura Group.
The
Tacaza volcanic group comprises lavas of intermediate to silicic composition with a porphyritic texture. The dominant color is reddish-brown
changing to greenish in areas of chloritic alteration. These volcanic rocks locally include a horizon of limestone that grades laterally
to siltstone.
Estimated
thickness of the Tacaza Group is 3,100 m, with some sequences showing thinning of volcanic horizons along strike and down dip. The Tacaza
Group is of Lower Miocene age.
The
Tacaza Group includes the Orcopampa and Ichocollo Formations. The Orcopampa Formation (Bulletin 40 – Cailloma Quadrangle, Sheet
31-S, INGEMMET) unconformably overlies the Mesozoic sedimentary sequence of the Yura Group and is comprised of volcaniclastics,
volcanic breccias and greenish to purplish gray lavas of andesitic composition. The Ichocollo Formation unconformably overlies the Orcopampa
Formation and is considered to represent the final stage of Tacaza volcanism. The Ichocollo Formation is exposed near San Miguel and
Sukuytambo, located to the northeast of the Caylloma District, and consists of lavas and dacitic domes in the basal section and andesitic
to basaltic andesite flows in the upper section. The lavas are dark gray to gray in color and noticeably porphyritic.
| 7.2.3 | Tertiary
volcanic deposits |
Overlying
the Tacaza Group with unconformable contacts are andesitic lavas, rhyolites, dacites and tuffs belonging to the Barroso Group. They are
generally present in prominent outcrops with sub-horizontal stratification and are Plio-Pleistocene in age.
| 7.2.4 | Recent
clastic deposits |
Quaternary
clastic deposits locally cover portions of the Caylloma property. The valley floors and lower slopes are covered by alluvial material
as well as glacial moraines, colluvium, and fluvio-glacial material.
| 7.2.5 | Intrusive
igneous rocks |
The
sedimentary and volcanic rocks in the Caylloma District have been intruded by post-mineral, fault-controlled rhyolitic domes (Cuchilladas
and Trinidad domes) and dikes of the Chonta caldera sequence, characterized by coarse-grained quartz and sanidine phenocrysts, spherulites,
and lithophysae, and well-developed laminations (Echavarria et al., 2006). In addition, recent mapping has identified outcrops of a rhyodacitic
dome in the Vilafro area (Vilafro Dome) that host large alunite veins.
The
Caylloma Mine is characterized predominantly by a series of faulted fissure vein structures trending in a northeast-southwest direction
(Figure 7.4). Locally northwest-southeast trending veins are also present (for example, the Don Luis veins).
December 31, 2023 | Page 49 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Figure
7.4 Geology map of Caylloma Mine showing major vein systems
December 31, 2023 | Page 50 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Veins
in the Caylloma District show structural patterns and controls typical of other vein systems hosted by Tertiary volcanic rocks in the
western Peruvian Andean range. The Caylloma District vein system was developed as a set of dilatational structures as a consequence of
tension generated during the main compressional event of the Andes. Veins are persistent along strike and dip. Locally, veins are displaced
by post-mineral faulting along a north-northwest bearing. Horizontal displacement along these faults is minor and ranges from centimeters
up to a few meters. No significant vertical displacement is observed on the structures. The vein system is not affected by any folding.
Three
types of hydrothermal alteration have been identified at the Caylloma Mine: (1) quartz-adularia; (2) quartz-illite; and (3) propylitic.
The quartz-adularia (+pyrite +/-illite) alteration is restricted to the margins of the veins, with the thickness of the altered zone
being generally proportional to the thickness of the vein. The width varies from a few centimeters to a few meters. Quartz replaces the
volcanic matrix in the rocks, and quartz plus adularia occur as small veinlets or colloform bands. Pyrite is disseminated in the veinlets
and in iron-manganese minerals in the wall rock. Illite is a product of alteration of the plagioclase and matrix of the volcanic host
rocks. Quartz-adularia is absent in the upper parts of the vein systems. The alteration assemblage in the upper portions of the vein
systems consists of a narrow selvage of quartz-illite near the vein. Quartz-illite grades into quartz-adularia at depth. Propylitic alteration
is widespread throughout the property and may be regional in nature and unrelated to mineralizing events. The propylitic alteration is
a fine aggregate of chlorite, epidote, calcite and pyrite.
There
are two distinct types of mineralization at the Caylloma Mine, one with predominantly elevated silver values (Bateas, Bateas Piso, Bateas
Techo, La Plata, Cimoide La Plata, San Cristobal, San Pedro, San Carlos, Paralela, Carolina, Don Luis II veins), and the other being
polymetallic with elevated silver, lead, zinc, copper, and gold values (Animas, Animas Techo, Animas NE, Animas NE Techo, Cimoide ASNE,
Ramal Techo ASNE, Santa Catalina, Soledad, Silvia, Pilar, Patricia, Nancy and Rosita veins).
A supergene
oxide horizon has been identified which contains the following secondary minerals: psilomelane, pyrolusite, goethite, hematite, chalcocite,
covelite and realgar (Corona and Antimonio veins). The oxide zone is thin, with no evidence of secondary silver enrichment.
Veins
are tabular in nature, with open spaces filled by episodic deposition of metallic sulfides and gangue minerals. According to Echavarria
et al., (2006) most of the minerals, both silver and base metals, are related to the deposition of manganese mineralization occurring
in bands, comprised of quartz, rhodonite, rhodochrosite and sulfides.
Vein
systems at the Caylloma Mine have a general northeast-southwest bearing and predominant southeast dip. Host rocks are pyroclastic breccias,
effusive andesitic lavas and volcaniclastics of the Tacaza volcanic group.
There
are two different types of mineralization at Caylloma; the first is comprised of silver-rich veins with low concentrations of base metals.
The second type of vein is polymetallic in nature with elevated silver, lead, zinc, copper, and gold grades.
Mineralization
in these vein systems occurs in steeply dipping ore shoots ranging up to several hundred meters long with vertical extents of over 400
m. Veins range in thickness
December 31, 2023 | Page 51 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
from
a few centimeters to 20 m, averaging approximately 1.5 m for silver veins and 2.5 m for polymetallic veins.
The
silver vein systems outcrop in the central and northern portions of the Caylloma District, with the best exposures of mineralization
between the Santiago River, Chuchilladas and Trinidad streams. The mineralization is composed primarily of colloform banded rhodochrosite,
rhodonite, and milky quartz, with silver sulfosalts present in certain veins. Vein systems extend to the eastern flank of the Huarajo
Stream. Exposures in this area consist of quartz-calcite with low concentrations of manganese oxides. Silver veins can be sub-divided
into two groups, 1) those that have sufficient geological information to support Mineral Resource estimates and 2) those that have been
identified as exploration targets.
| 1) | Bateas/Bateas
Piso/Bateas Techo, La Plata/Cimoide La Plata, San Cristobal, San Pedro, San Carlos, Paralela/Ramal
Paralela, Carolina, and Don Luis II |
| 2) | Eureka,
El Toro, San Pedro Oeste, Apostoles, Santa Rosa, La Peruana, Vilafro Sur, Cerro Vilafro,
Cailloma 6, Condorcoto, Llocococha, Pampuyo-Pumanuta, Giro, Antacollo |
A more
detailed description of the more important silver veins presently being exploited or explored is presented below.
Bateas/Bateas
Piso & Bateas Techo
The
Bateas vein splits into two branches, Bateas Techo is the southern branch, and Bateas is the northern branch. The vein outcrops on surface
extend for approximately 900 m and can be traced from the escarpment of the Loma de Vilafro Hill extending to the northeast, at the summit
of the hill the vein is covered by younger volcanic ash. The Bateas vein has been defined over 400 m down-dip and has an average thickness
of 0.6 m. The Bateas Techo vein extends for 375 m along strike, 125 m down-dip and averages 0.4 m in thickness. Host rock is a volcaniclastic
andesite with minor dacite and latite portions. The vein has a strike of 070º and dip of 82º to the southeast.
Polymetallic
mineralization is present in two very well-defined zones. In the northeast, the vein contains chalcedonic and opaline quartz with disseminated
silver sulfosalts, pyrite, and calcite. The southwestern end of the vein is characterized by a gangue of quartz, rhodonite and rhodochrosite
containing veinlets of sphalerite, galena, chalcopyrite, and disseminated pyrite.
The
northern branch of the Bateas vein is known as the Bateas Piso vein being defined over 110 m along strike, 250 m down-dip with an average
thickness of 0.4 m and dipping at 52º to the northwest with a strike parallel to the Bateas Techo vein. At its most northeastern
extent it opens into a cymoid loop. Mineralization in the vein is characterized by base metal sulfides, sphalerite, galena, and disseminated
pyrite in a gangue of quartz, calcite, rhodonite, and rhodochrosite.
La
Plata & Cimoide La Plata
The
La Plata vein is associated with fracture filling along a regional fault extending for more than 2 km. The most representative part extends
over approximately 400 m along strike, 180 m down-dip with an average vein thickness of 1.4 m and consists of quartz, calcite, rhodonite,
and abundant manganese oxides in its central portion. The eastern portion of the vein consists of quartz with disseminated pyrite, and
ruby silver stained
December 31, 2023 | Page 52 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
with
manganese oxides. The vein has been explored from surface downwards to level 7 (4,745 masl). A splay of the La Plata vein has been identified,
referred to as the Cimoide La Plata vein. It has the same characteristics as the La Plata vein with the vein being composed of gray silica
with associated stibnite, pyrite and tetrahedrite. This cymoid has primarily been explored between level 7 and level 8 (4,745 masl and
4,695 masl).
San
Cristobal
The
San Cristóbal vein has a recognized strike length of 4 km with a 035° to 055° northeast strike, and 50 to 80° dip
to the southeast. The vein has been modeled over a 2 km strike length, 100 m down-dip with an average thickness of 1.5 m. The primary
sulfides in the vein are sphalerite, galena, polybasite, pyrargyrite, chalcopyrite and tetrahedrite distributed in gangue of pyrite,
quartz, rhodonite and calcite. This is the most extensively developed structure on the property. The silver values are highly variable
along the strike and throughout the thickness of the vein, forming localized enrichments. Silver values have a tendency to decrease gradually
at depth, as can be observed at levels 4,600 masl (level 10), 4,540 masl (level 11), and 4,500 masl (level 12). Drilling conducted in
2021 identified a transition from precious metal rich to base metal rich mineralization at depth.
San
Pedro
The
San Pedro vein outcrops extend for 900 m on surface, has been defined over 100 m down-dip with a general strike of 045º and dipping
at 85º to the southeast. The thickness of the vein averages 0.8 m and shows banded mineralization consisting of quartz, rhodonite,
and manganese and iron oxides, with concentrations of ruby silver and native silver. This vein has been traced and mined down to 4,610
masl (level 10 of the mine). The distribution of silver values in the vein shows a gradual decrease with depth.
San
Carlos
The
San Carlos vein outcrops extend for approximately 300 m on surface; and has been defined over 480 m along strike, 50 m down-dip, having
a strike direction of 045° and dip of 75° to the southeast. The thickness of the vein averages 0.4 m. The vein consists of tabular,
open-space fillings with episodic periods of deposition. Most of the metals are related to the deposition of manganese minerals that
occur in bands of quartz, rhodonite, and sulfides.
Paralela &
Ramal Paralela
The
Paralela and Ramal Paralela veins outcrop extend for 320 m on surface with a general strike of 040°, and dip at 72° to the southeast
for 175 m. The thickness of the veins average 0.9 m. The veins consist of tabular, open-space fillings with episodic periods of deposition.
Most of the metals are related to the deposition of manganese minerals.
Ramal
Piso Carolina
The
Ramal Piso Carolina vein outcrops extend for 435 m on surface with a general strike of 075° and dipping at 73° for 255 m to the
southeast. The thickness of the vein ranges from 1.2 to 2 m, averaging 1.9m, and was recognized and partially exploited with underground
workings by CMA in 3 levels (4800, 4750 and 4700 masl). In the southwest, the vein has a banded and colloform texture, with assemblages
of rhodonite, quartz, calcite and Ag sulfosalts; to the northeast the vein has a brecciated texture with assemblages of quartz, calcite,
Mn oxides and Ag sulfosalts.
December 31, 2023 | Page 53 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
During
the development of the 2012 exploration program, potential mineralization was identified over 900 m along strike and extending to approximately
300 m in depth (level 4600 masl).
Don
Luis II
The
Don Luis I & II veins outcrop extend for 1,000 m at the surface, with a general strike between 95° to 115° and dipping
at 40° and 68° to the southwest. The Don Luis II vein extends for 435 m along strike, 200m down-dip with an average vein thickness
of 1.8 m, ranging from 1.5 to 2 m and have a brecciated texture composed of fragments of gray silica, tetrahedrite and stibnite.
Only
limited exploration of the Don Luis veins was carried out by CMA and exploitation was restricted to minor workings on level 2 (4500 masl).
Drilling carried out as part of the 2012-2014 exploration program demonstrated a mineralized column as described above for the Don Luis
II vein.
A series
of polymetallic veins has been identified in the southern and central portions of the Caylloma Mine. These vein systems tend to be greater
in strike length and thickness when compared to the silver vein systems. The main metallic minerals associated with the polymetallic
veins are galena, sphalerite, pyrite, chalcopyrite, and in some zones pyrargyrite. The polymetallic veins can also be sub-divided into
two groups, 1) those that have sufficient geological information to support Mineral Resource estimates and 2) those that have been identified
as exploration targets.
| 1) | Animas,
Animas Techo, Animas NE, Animas NE Techo, Cimoide ASNE, Ramal Techo ASNE, Santa Catalina,
Soledad, Silvia, Pilar, Patricia, Nancy, and Rosita veins. |
| 2) | El
Diablo and Antimonio veins. |
More
detailed descriptions of the more important polymetallic veins presently being exploited or explored are presented below.
Animas &
Animas NE
The
Animas vein is one of the most prominent and well-defined structures in the southern portion of the Caylloma Mine. It is a base metal-rich
polymetallic vein that is divided into two parts based on a fault structure that disrupts the vein’s continuity. The vein to the
southwest of the fault is known as Animas whereas to the northeast of the fault the vein is referred to as Animas NE. Splay structures
are also present in each of the Animas and Animas NE structures referred to as the Techo or Cimoide veins.
The
Animas/Animas NE polymetallic vein is present from level 5 (4,850 masl) to below level 18 (4,237 masl) in the mine. Several wide zones
(over 12 to 14 m in thickness) are observed in levels 6, 9, 10, 12, 16, 17 and 18 (4,800 masl, 4,645 masl, 4,595 masl, 4,495 masl, 4,290
masl, 4,240 masl and 4,190 masl respectively), especially in lateral exploration cross-cuts. The total vein outcrops extend along 1.5 km
with silicified exposures stained with manganese oxides and has been identified through diamond drilling over a total strike length of
3.3 km as well as extending for at least 690 m down-dip. Vein thickness ranges up to 16 m but averages approximately 4 to 5 m. Current
exploitation has identified widths of up to 16 m in level 9 (4,650 masl) and 10 m in level 12 (4,500 masl) and 20 m in level 18(4237
masl) where it forms a sigmoidal loop approximately 300 m in length
December 31, 2023 | Page 54 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
with
widths between 2.5 to 12.40 m in the extreme northeast and 4 to 20 m at depth to level 18 (4,237 masl).
Vein
mineralogy includes argentiferous galena, sphalerite, marmatite, and chalcopyrite accompanied by minor tetrahedrite and ruby silver.
Gangue minerals are pyrite, quartz, calcite, rhodonite, rhodochrosite, and iron-manganese oxides displaying banded, colloform, and brecciated
textures.
Cimoide
ASNE
The
Cimoide ASNE vein does not outcrop as there is 40-60 m of glacial moraine cover. The vein has been identified over a strike length of
approximately 550 m and a down-dip length of 420 m through underground workings on level 12 (4,495 masl) of the mine. The strike of the
vein varies between 30˚ to 210˚ while dipping 60˚ to 75˚ to the southeast. The width of the vein averaged 2 to 2.5
m. Mineralization is polymetallic in a gangue consisting of quartz/rhodonite. Minerals of economic importance include galena, sphalerite
and chalcopyrite. The Cimoide ASNE vein has been explored to level 16 (4,290 masl) of the mine via diamond drilling.
Ramal
Techo ASNE
The
Ramal Techo ASNE vein also does not outcrop at surface due to the same glacial moraine cover as described above. The vein extends for
approximately 225 m along strike and 185 m down-dip, having been exploited to level 12 (4,495 masl) of the underground mine. The strike
of the vein ranges between 80˚ to 260˚ while dipping 47˚ to 52˚ to the southeast. Vein width ranges from 2.0 to 2.5
m with polymetallic mineralization consisting primarily of galena, sphalerite and chalcopyrite located in a gangue of quartz and rhodonite.
Santa
Catalina
The
Santa Catalina vein has been defined over a distance of 385 m along a strike of between 245° to 260º, dipping for 150 m at 65º
to 80º to the northwest with an average thickness of 1.8 m. The vein contains silver sulfosalts (pyrargyrite and proustite), sphalerite,
galena and chalcopyrite in a gangue of quartz, calcite, rhodonite, and rhodochrosite. The host rock is an andesite that exhibits pseudo-stratification
flow banding and massive coherent structures. Tectonic breccias are present in the footwall and hanging wall of the vein. Bateas has
mined to 4,720 masl, below level 8, and diamond drilling has intercepted the vein to 4,773 masl (level 9), where polymetallic mineralization
is present in well-defined fault-controlled zones. A base-metal-rich zone is present between 4,720 masl (level 8) and 4,773 masl (level
9). The average thickness of the vein is 2.5 m.
Soledad
The
Soledad vein is partially exposed at the surface for approximately 250 m, being located to the northeast of the Santa Catalina vein.
It has a defined strike length of 835 m along 248º to 251º and extends for 255 m down-dip at 76º to the northwest.
The average thickness of the vein at the surface is 0.5 m. During 2012, the vein was exploited between level 6 (4,820 masl)
to below level 7 (4,750 masl). Exploration through diamond drilling and underground mine workings has confirmed that the vein continues
down to at least level 8 (4,720 masl). The vein has an average thickness at depth of 1.0 m. The mineralization is polymetallic
in nature, containing silver sulfosalts, sphalerite, galena, chalcopyrite, gray copper (enargite) and disseminated pyrite. The vein is
banded with two recognized events: (1) an early phase, rich in base metal sulfides and elevated gold values
December 31, 2023 | Page 55 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
in banded
rhodonite, and (2) a second phase of quartz, rhodochrosite, with disseminated silver minerals and veinlets. The host rock is flow
banded andesite with intercalated volcanic sediments.
Silvia
The
Silvia vein is discontinuously exposed on the surface and has been defined over a strike distance of approximately 500 m and down-dip
over 170 m. The thickness of the vein ranges from 0.8 to 1.8 m, averaging 1.3 m and the strike ranges between 250º and 262º.
The vein dips to the northwest between 65º and 82º. Mineralization is polymetallic, with sphalerite, galena, chalcopyrite,
and silver sulfosalts (pyrargyrite) present in a gangue of quartz, calcite, rhodonite, and rhodochrosite. The vein has a banded to massive
texture with bands of base-metal sulfides of variable thickness. The host rock is an andesitic volcanic rock with propylitic-chloritic
alteration.
Pilar
The
Pilar vein is considered to be part of the San Cristóbal system. The vein has been identified over a strike length of 252 m, having
originally been exposed in a gallery at level 8 of the San Cristóbal underground workings. It appears to be a tensional feature
of the San Cristóbal vein with banded rhodonite and quartz texture with disseminated sulfides of sphalerite, galena, and silver
sulfosalts. The vein is thought to extend for approximately 110 m down-dip with an average vein thickness of 0.7 m, a strike direction
of 153° and dipping at 48° to the southwest.
Patricia
The
Patricia vein is a fissure-type structure, composed primarily of banded rhodonite, quartz, and rhodochrosite with mineralization present
as veins and lenses in the bands of quartz/rhodonite, as well as being associated with fault zone structures and hydrothermal alteration
in the host rock. The vein has been defined over a strike length of 380 m along strike, 130 m down-dip with an average thickness of 0.6
m. The vein is located between the San Cristobal and Santa Catalina veins and was discovered from underground. Mineralization is comprised
of silver sulfosalts such as tetrahedrite, proustite-pyrargyrite and veinlets of sphalerite, galena, pyrite and chalcopyrite set in a
matrix of quartz rhodonite. The vein strikes towards 045˚ while dipping steeply at 85˚ to the northwest.
Nancy
The
Nancy vein is thought to outcrop discontinuously over a distance of approximately 1,000 m. The strike of the vein ranges between 110˚
to 120˚ while dipping 60˚ to 70˚ to the southwest. The width of the vein ranges from 0.5 to 4.5 m, averaging 3.3 m, being
wider near its intersection with the Animas vein. Mineralization is polymetallic in a gangue consisting of quartz and iron and manganese
oxides. The metallic minerals of economic importance are galena, sphalerite and chalcopyrite. During 2012, the Nancy vein was defined
by diamond drilling over approximately 360 m of its strike length and to a depth of approximately 260 m (elevation 4,420 masl). Mining
of the Nancy vein commenced in January 2018 and has been explored to level 16 (4,290 masl) of the mine via underground workings
with similar characteristics displayed as seen in the upper levels.
Rosita
The
Rosita vein is polymetallic in nature, being characterized by sphalerite, galena, pyrite, and chalcopyrite in a quartz-calcite matrix
exhibiting a brecciated texture and hosted in andesitic volcanics. The vein strikes approximately east-west, dipping at 52° to the
south.
December 31, 2023 | Page 56 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
The
vein was a blind discovery made while drilling underground holes to explore the northwest extension of the Nancy vein. Mining of the
Rosita vein commenced in January 2018.
The
mineralization present in all veins is sulfide with the exception of the uppermost portions of the Animas/Animas NE veins (Figure 7.5).
The Animas vein has been explored close to surface and a supergene oxide horizon has been identified extending to a variable depth based
on the presence of iron oxides and lesser amounts of manganese and zinc oxides. The location of elevated zinc oxide zones has been highlighted
as this material reduces recovery in the plant.
Figure
7.5 Long section of Animas vein showing sulfide/oxide/zinc oxide zones
The
Animas/Animas NE vein is the primary source of mill feed at present at the Caylloma Mine. Representative sections displaying the geological
interpretations of the Animas vein have been included in Section 10.
In the
opinion of the QPs, knowledge of the silver and polymetallic veins, the settings, the lithologies, as well as the structural and alteration
controls on mineralization is sufficiently understood to support Mineral Resource and Mineral Reserve estimation.
December 31, 2023 | Page 57 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
The
Caylloma polymetallic and silver-gold rich veins are characteristic of a typical low sulfidation epithermal deposit according to the
classification of Corbett (2002) having formed in a relatively low temperature, shallow crustal environment (Figure 8.1). The epithermal
veins in the Caylloma District are characterized by minerals such as pyrite, sphalerite, galena, chalcopyrite, marcasite, native gold,
stibnite, argentopyrite, and various silver sulfosalts (tetrahedrite, polybasite, pyrargyrite, stephanite, stromeyerite, jalpite, miargyrite
and bournonite). These are accompanied by gangue minerals such as quartz, rhodonite, rhodochrosite, johannsenite (Mn-pyroxene) and calcite.
Figure
8.1 Idealized section displaying the classification of epithermal and base metal deposits sourced
The
characteristics described above have resulted in the Caylloma veins being classified as belonging to the low sulfidation epithermal group
of precious metals in quartz-adularia veins similar to those at Creede, Colorado; Casapalca, Peru; Pachuca, Mexico and other volcanic
districts of the late Tertiary (Cox and Singer, 1992). They are characterized by Ag sulfosalts and base metal sulfides in a banded gangue
of colloform quartz, adularia with carbonates, rhodonite and rhodochrosite (Echavarria et al., 2006). Host rock
December 31, 2023 | Page 58 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
alteration
adjacent to the veins is characterized by illite and widespread propylitic alteration.
The
Caylloma Mine is considered an example of a low sulfidation epithermal-style deposit, based on the following:
| · | Mineralization
is present in veins in the form of Ag sulfosalts and base metal sulfides including pyrite,
sphalerite, galena, chalcopyrite, marcasite, stibnite, and argentopyrite. |
| · | Gangue
minerals present in the form of banded colloform quartz, adularia with carbonates, rhodonite,
rhodochrosite, and johannsenite (Mn-pyroxene). |
The
QP’s understanding of the geological setting and model concept of the Caylloma silver and base metal rich veins is adequate to
provide guidance for mining exploitation and ongoing exploration.
December 31, 2023 | Page 59 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
CMA
implemented a series of exploration programs to complement their mining activities prior to the closure of the operation in 2002. Fortuna
acquired the mine in 2005 and has continued to conduct exploration of the property since the acquisition.
| 9.1 | Exploration
conducted by Compania Minera Arcata |
There is no reliable
information available to detail the exploration conducted by CMA at the Caylloma Mine.
| 9.2 | Exploration
conducted by Bateas |
In 2007,
induced polarization (IP) and resistivity studies were conducted by Arce Geophysics over the Nancy and Animas NE veins covering an area
of 7 km2. The survey was performed using an IRIS ELREC Pro receptor with a symmetrical configuration poly pole array with
a spacing of 50 m between electrodes.
Results
of the geophysical studies identified three coincident zones of low IP potential associated with high chargeability and resistivity.
The three geophysical anomalies were investigated through a targeted drilling campaign.
In 2012,
magnetometry, IP and resistivity studies were carried out by Quantec Geoscience over Cerro Vilafro and Vilafro South, covering an
area of 17 km2 using a pole-dipole array configuration with spacing of 50 m between electrodes and 31.6 km lines in magnetometry
studies. The surveys successfully identified coincident chargeability and resistivity anomalies in the Cerro Vilafro area.
In 2015,
controlled-source audio-frequency magnetotellurics (CSAMT) geophysical surveys were completed covering the northeastern projection of
the San Pedro and Paralela veins. Similar CSAMT geophysical surveys were completed in 2016 covering the Pisacca exploration target area,
the extension of the Animas vein, and other important structure such as the San Cristobal vein to the northeast. In all areas, the CSAMT
surveys were successful in identifying resistivity anomalies spatially associated with the projections of mapped vein structures. The
2015 and 2016 geophysical surveys were carried out by Quantec GeoScience.
| 9.2.2 | Surface
channel sampling |
Extensive
surface channel samples have been taken along all principal mineralized structures identified in the Caylloma District.
Exploration
has focused on the delineation of major vein structures such as the Animas, Bateas, Santa Catalina, Soledad and Silvia veins. Additional
exploration has also been conducted to define the mineral potential of other veins on the property such as the Carolina, Don Luis and
Nancy veins (Figure 9.1).
Surface
channel samples are not used for Mineral Resource estimation but as a guide for exploration drilling and to identify the vein structure
on surface.
December 31, 2023 | Page 60 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Figure
9.1 Plan map showing principal exploration targets
December 31, 2023 | Page 61 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
| 9.2.3 | Geological
mapping of major structures |
Animas &
Animas NE
During
2006 and early 2007, a surface mapping campaign of the Animas vein structure was conducted in the northeastern portion of the property
at a scale of 1:1,000. The mapping identified discontinuous outcrops of vein quartz and occasional brecciated zones (quartz and rhodonite)
covered by a manganese oxide cap. Surface mapping was complemented by a drilling campaign (described in Section 10) that confirmed
the continuity of the Animas structure at depth.
Exploration
activities of the Animas vein resumed in 2010, during underground development of level 6 (4,800 masl); brecciated mineralization was
discovered with fragments of rhodochrosite and rhodonite in quartz and silica matrix, with disseminations and veinlets of galena and
silver sulfosalts.
Exploration
of the Animas vein led to the discovery of the Animas NE vein and two splay veins located in its hangingwall. The Cimoide ASNE vein located
200 m to the south of Animas NE and the Ramal Techo ASNE located a further 30 m to the south. Exploration of these splay veins has been
based on drilling since 2004 that targeted Animas NE but extended to the south.
Bateas
Exploration
by Fortuna of the Bateas vein has been ongoing since 2007. Initial work involved surface mapping and the sampling of outcrops that returned
anomalous silver grades. Based on the initial results a diamond drill program from surface was conducted in late 2007 and early 2008.
Exploration has been conducted from the surface as well as from underground workings of the mine.
Silvia
The
Silvia vein outcrops on surface discontinuously over a distance of approximately 200 m and was mapped in 2013 at a scale of 1:1,000.
Soledad
The
Soledad vein has been mapped on surface over a length of 250 m in 2013 at a scale of 1:1000, having been found to run parallel with the
Santa Catalina vein, and displaying a similar strike (248º to 251º) and dip (76° to the northwest).
San
Cristobal
There
has been limited new exploration by Bateas of the San Cristóbal vein as significant information regarding the structure was available
from historical underground workings. San Cristóbal is one of the most prominent veins of the Caylloma District and is known to
have higher grade silver concentrations compared to other veins at the property. From 2006 to 2008, exploration drilling was conducted
in order to explore the mineralization potential at depth. In 2011, underground exploration was conducted through 578 m of new mine workings
on level 11, comprising 282 m of galleries with the remaining development comprising bypasses, cross-cuts, and chimneys. Underground
observations identified a banded structure averaging 2.4 m in width and averaging 128 g/t Ag, consisting of quartz veinlets, calcite,
and rhodonite with veinlet and disseminated silver sulfosalts.
During
2012, an additional 489 m of underground workings were executed on level 11.
December 31, 2023 | Page 62 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Nancy
From
2006 to 2008, reconnaissance work and geological mapping were conducted over portions of the Nancy vein not covered by glacial moraine
deposits. Surface samples returned anomalous values. In 2007, resistivity and IP geophysical surveys were conducted in the area, with
high chargeability anomalies providing evidence of potential mineralization. Exploration drilling confirmed the presence of a major mineralized
structure, open laterally and to depth.
La
Plata
The
La Plata vein is associated with infilling of a fault striking northeast and dipping 60° to the southeast. The vein has been mapped
over a length of 1,400 m, having an average width of 2.5 m.
In the
first half of 2011, exploration of the vein was carried out with geological mapping and geochemical surface sampling. This involved a
reinterpretation of the structure and excavation of exploratory trenches in the far northeastern extension of the vein, and the taking
of 160 channel samples.
| 9.2.4 | Geological
mapping of exploration targets |
Antimonio
This
Antimonio vein was first recognized in the 1980s with the mapping of approximately 300 m of outcropping vein, with an average surface
thickness of 2 m and consisting of massive milky quartz with traces of stibnite. In 2006, the mapping was reviewed, and a limited drill
program was executed. In 2011, as part of the Southern Sector Exploration Program of the Caylloma Mine, geological mapping at a scale
of 1:1,000 and geochemical analysis identified the presence of the vein over a total distance of one kilometer striking in a northeast
to southwest direction. The presence of stibnite in this vein suggests a later stage of mineralization.
Vilafro
In December 2005,
samples were collected from the 900 ha Vilafro area in relation to silica-alunite anomalies identified in ASTER images. In mid-2006,
a review of the Vilafro surface geology was performed followed by geologic mapping and sampling in 2007.
During
2012, geochemical information from previous campaigns was compiled and reinterpreted. Detailed geological mapping was carried out at
a 1:1,000 scale and grid geochemical sampling and geophysical surveys of magnetics, chargeability and resistivity were completed. Based
on the work executed, potential exploration targets were identified in the Cerro Vilafro and Vilafro Sur areas.
Cerro
Vilafro
Detailed
surface mapping and channel sampling in the Cerro Vilafro area, located proximal to the Caylloma plant site, identified strong silver
and gold values associated with a northeast to southwest trending vein swarm. The mineralization is hosted by Cretaceous quartzites and
was evaluated as a potential bulk-minable, open-pit target. Sampling reported high-grade gold and silver values over narrow widths of
veins and hydrothermal breccias. Sampling of zones of quartz veinlets between the primary structures resulted in lower silver and gold
values (Figure 9.2).
December 31, 2023 | Page 63 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Figure
9.2 Plan map showing surface geology and geochemistry of Cerro Vilafro
December 31, 2023 | Page 64 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Vilafro
Sur
The
Vilafro Sur lithocap is characterized by advanced argillic alteration assemblages extending over 1,000 m in a northwest to southeast
direction and ranging up to approximately 400 m in width. The lithocap is open to the northwest and may extend beneath the Laguna Vilafro.
The main portion of the lithocap outcrops extend from approximately 4,700 to 4,860 masl.
Surface
geochemical values indicate that the alunite-bearing lithocap is generally barren of significant metal or pathfinder elements.
The
geochemical signature of the Vilafro Sur lithocap is similar to that found at certain high sulfidation style deposits.
Surface
geological mapping of the Vilafro Sur area was conducted in 2017 at a scale of 1:2,000.
Cailloma
6
Detailed
surface mapping and channel sampling in the Cailloma 6 concession area identified a prominent vein striking 035° and dipping 80-85°
to the southeast (Figure 9.3). The length of the outcropping vein is approximately 1,650 m with widths ranging from 0.2 to 0.8 m.
To the northeast, the vein forms a sigmoidal loop of 500 m length with three splits of 100 to 150 m length.
The
mineralization is composed of veinlets and cavity fillings of quartz with crustiform texture, silver sulfosalts disseminations, hematite,
goethite, and manganese oxides. The hydrothermal alteration bordering the vein consists of silicification with associated illite-pyrite
mineralization ranging in width up to 3.5 m.
The
Cailloma 6 veins are controlled by longitudinal faults with transverse faulting affecting the structure with small dextral and sinstral
displacements.
Antacollo
The
Antacollo project is located about 7 km from Caylloma mine and is formed by pyroclastic rocks and lava flows of the Sencca and Orcopampa
formations (Tertiary volcanic). Mineralization is based on veins and breccia bodies; the veins are 0.3 m to 1.1 m wide displaying
silver and gold mineralization. In addition, an IP geophysical survey carried out in May 2023 gave high chargeability results associated
with geochemical anomalous surface samples which are currently being interpreted.
Giro
Preliminary
exploration work at the Giro Project commenced in 2023. The Giro project is located about 4 km from the Caylloma mine, and geologically
consists of andesitic domes and pyroclastic breccias. Towards the edges and upper parts of the project there are tuffs and lava flows.
Mineralization occurs in hydrothermal conduits in the form of breccias and silicified ridges in a northwest and east-west direction,
striking 200 to 300 m in length. Mineralization is of the low sulfidation epithermal type, gold-silver system, with channel and trench
sampling returning anomalous values of arsenic, antimony, copper, molybdenum, lead and zinc.
December 31, 2023 | Page 65 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Figure
9.3 Plan map showing surface geology and geochemistry of Cailloma 6
Condorcoto
The
Condorcoto project is characterized by a lithocap cut by hydrothermal and crackle breccias with iron oxides (goethite > hematite)
and pyrite traces emplaced in andesitic lavas with aphanitic texture. Channel sampling results range identified gold and copper anomalous
grades. Also identified is a dacitic dome with sporadic sheeted quartz veins and iron oxide in the form of boxworks.
Llocococha
The
Llocococha project is comprised of hydrothermal breccia systems that are emplaced in andesitic lavas and have a crackle breccia envelope.
In addition, a dacitic dome and a rhyodacitic stock have been identified in the south of the area.
December 31, 2023 | Page 66 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Bateas
has identified exploration targets at the Caylloma Project (Figure 9.4) for further investigation. Planned exploration projects include:
| · | Santa
Rosa area: Three vein systems traced along a strike length of 300 m on surface, striking
280° and dipping 70° to the northeast. |
| · | Pampuyo-Pumanuta
area: A tectonic breccia system with a dacitic dome intrusion. |
Figure
9.4 Plan map showing the location of exploration targets
December 31, 2023 | Page 67 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
In the
opinion of the QP:
| · | The
mineralization style and setting of the Caylloma Mine area is sufficiently well understood
to support Mineral Resource and Mineral Reserve estimations. |
| · | Exploration
methods are consistent with industry practices and are adequate to support continuing exploration
and Mineral Resource estimation. |
| · | Exploration
results support Fortuna’s interpretation of the geological setting and mineralization. |
| · | Continuing
exploration may identify additional mineralization that could support Mineral Resource estimation. |
December 31, 2023 | Page 68 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Exploration
and definition drilling have been conducted at the Caylloma Mine by both CMA and Bateas. Diamond drilling has been the preferred methodology
with other drilling techniques regarded as unsuitable due to the terrain and the required depths of exploration.
| 10.1 | Drilling
conducted by Compania Minera Arcata |
Bateas
were able to recover and validate information on 47 diamond drill holes totaling 8,177.67 m drilled by CMA between 1981 and 2003
at the Caylloma Mine. It is unlikely these are the only holes drilled over this period but data on additional drill holes could not be
recovered and validated. Table 10.1 details the CMA exploration drilling information retrieved by Bateas.
Table
10.1 Exploration drilling conducted by CMA
Vein |
Surface
Drill holes |
Underground
Drill holes |
Number |
Meters |
Number |
Meters |
San
Pedro |
- |
- |
8 |
1,252.85 |
San
Cristóbal |
2 |
882.65 |
18 |
1,903.20 |
San
Miguel |
2 |
367.25 |
- |
- |
Don
Luis |
|
|
1 |
130.87 |
Don
Luis I |
- |
- |
2 |
252.90 |
Elisa |
- |
- |
2 |
239.10 |
La
Plata |
9 |
2,228.95 |
- |
- |
Ramal
San Pedro |
1 |
268.80 |
- |
- |
Ursula |
2 |
651.10 |
- |
- |
TOTAL |
16 |
4,398.75 |
31 |
3,778.92 |
| 10.2 | Drilling
conducted by Bateas |
As of
June 30, 2023, Bateas had completed 1,658 drill holes on the Caylloma Mine totaling 283,593.30 m since the company took ownership
in 2005 (Table 10.2) and represents all data compiled as of the data cut-off date used for Mineral Resource estimation. All holes are
diamond drill holes and include 565 from the surface totaling 160,521.80 m, and 1,093 from underground totaling 123,071.50 m. It is important
to note that not all of the holes presented encountered mineralization and only drill holes in areas where reasonable geological continuity
of mineralized structures could be established were used in defining and ultimately estimating Mineral Resources. The locations of surface
drill holes drilled by Bateas at the Caylloma Mine are displayed in Figure 10.1.
Table
10.2 Exploration drilling conducted by Bateas
Vein |
Year |
Surface
drilling |
Underground
drilling |
Number |
Meters |
Number |
Meters |
Animas, |
2005 |
0 |
0 |
94 |
2,028.00 |
Animas
NE,
Cimoide ASNE &
Ramal Techo ASNE |
2006 |
37 |
7,638.75 |
2 |
111.15 |
2007 |
34 |
9,514.85 |
0 |
0 |
2008 |
8 |
2,921.60 |
0 |
0 |
2010 |
21 |
2,300.45 |
9 |
805.4 |
2011 |
12 |
3,411.10 |
10 |
1,745.65 |
2012 |
18 |
4,966.20 |
30 |
3,944.10 |
2013 |
0 |
0 |
10 |
1,970.55 |
2014 |
9 |
1,858.00 |
15 |
1,695.20 |
2015 |
9 |
2,035.60 |
41 |
3,182.80 |
2016 |
26 |
8,130.60 |
93 |
11,733.85 |
2017 |
48 |
24,825.95 |
87 |
10,453.40 |
2018 |
27 |
11,164.25 |
63 |
6,802.20 |
2019 |
0 |
0.00 |
77 |
7,776.50 |
2020 |
0 |
0.00 |
35 |
3,503.45 |
2021 |
16 |
4,161.10 |
106 |
17,692.40 |
2022 |
0 |
0.00 |
69 |
10,299.05 |
2023 |
0 |
0.00 |
23 |
5,280.50 |
December 31, 2023 | Page 69 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Vein |
Year |
Surface
drilling |
Underground
drilling |
Number |
Meters |
Number |
Meters |
Antimonio
& Corona Antimonio |
2006 |
5 |
1,117.50 |
0 |
0 |
Bateas |
2007 |
9 |
3,605.40 |
0 |
0 |
2008 |
2 |
774.9 |
0 |
0 |
2009 |
0 |
0 |
10 |
829.50 |
2010 |
0 |
0 |
9 |
510.20 |
2011 |
3 |
1,040.85 |
38 |
2,714.10 |
2012 |
18 |
5,006.65 |
28 |
2,596.90 |
2013 |
0 |
0 |
49 |
4,318.70 |
2014 |
32 |
4,351.40 |
1 |
152.10 |
2015 |
16 |
2,791.30 |
11 |
1,666.40 |
Cailloma
6 |
2014 |
3 |
958.8 |
0 |
0 |
Carolina |
2012 |
20 |
5,117.80 |
0 |
0 |
2013 |
52 |
12,459.20 |
0 |
0 |
Corona |
2011 |
1 |
344.6 |
0 |
0 |
Don
Luis I & II |
2010 |
12 |
2,265.40 |
0 |
0 |
2012 |
6 |
2,487.00 |
0 |
0 |
2013 |
21 |
7,133.80 |
0 |
0 |
2014 |
3 |
666.9 |
0 |
0 |
El
Toro |
2012 |
1 |
177.7 |
0 |
0 |
Gaby |
2013 |
2 |
382.5 |
0 |
0 |
La Plata &
Cimoide La Plata |
2005 |
1 |
152.55 |
10 |
450.40 |
2006 |
10 |
2,109.75 |
8 |
547.85 |
2011 |
12 |
2,495.85 |
1 |
257.40 |
2012 |
0 |
0 |
3 |
812.05 |
2013 |
0 |
0 |
1 |
199.20 |
2021 |
0 |
0 |
3 |
2,370.00 |
Lucia |
2012 |
0 |
0 |
8 |
1,300.20 |
Nancy |
2006 |
1 |
86.6 |
0 |
0 |
2007 |
6 |
1,205.50 |
0 |
0 |
2008 |
12 |
3,094.00 |
1 |
83.30 |
2012 |
5 |
1,432.50 |
2 |
768.00 |
2013 |
5 |
935.5 |
0 |
0 |
2017 |
5 |
2,600.70 |
10 |
1,087.20 |
2018 |
0 |
0 |
22 |
2,663.25 |
2019 |
0 |
0 |
1 |
72.80 |
2020 |
0 |
0 |
5 |
391.80 |
2022 |
0 |
0 |
3 |
259.00 |
Patricia |
2010 |
0 |
0 |
7 |
682.80 |
2011 |
0 |
0 |
12 |
981.80 |
Pilar |
2011 |
0 |
0 |
2 |
143.50 |
San
Antonio |
2011 |
2 |
391.5 |
0 |
0 |
December 31, 2023 | Page 70 of 213 |
| |
|
Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical
Report |
Vein |
Year |
Surface
drilling |
Underground
drilling |
Number |
Meters |
Number |
Meters |
San
Carlos & |
2006 |
0 |
0 |
10 |
480.55 |
San
Carlos I |
2014 |
2 |
495.8 |
0 |
0 |
San
Cristóbal &
Santa Catalina |
2006 |
3 |
551 |
0 |
0 |
2007 |
0 |
0 |
9 |
992.6 |
2008 |
0 |
0 |
3 |
558.1 |
2011 |
4 |
1,396.15 |
4 |
527.8 |
2021 |
2 |
1,966.45 |
0 |
0 |
San
Pedro |
2012 |
6 |
2,456.00 |
0 |
0 |
San
Pedro Oeste |
2018 |
2 |
811.4 |
0 |
0 |
Silvia
& Soledad |
2008 |
0 |
0 |
7 |
967.75 |
2009 |
0 |
0 |
12 |
1,426.15 |
2010 |
7 |
923.8 |
15 |
1,010.30 |
2011 |
0 |
0 |
7 |
591.3 |
2012 |
0 |
0 |
17 |
1,634.30 |
Vilafro |
2010 |
2 |
304.3 |
0 |
0 |
2017 |
2 |
681.1 |
0 |
0 |
Wendy |
2014 |
1 |
285.1 |
0 |
0 |
Pissaca |
2021 |
4 |
2536.1 |
0 |
0 |
Total |
2005-23* |
565 |
160,521.80 |
1,093 |
123,071.50 |
*Through
June 30, 2023 |
December 31, 2023 | Page 71 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Figure
10.1 Map showing surface drill hole collar locations
Animas and Animas NE
In 2005, 94 drill holes totaling 2,028.00 m were
drilled from underground to evaluate the potential of the Animas structure at depth.
During 2006, 37 drill holes totaling 7,638.75
m were drilled from surface and two from underground in order to determine the continuity of the Animas vein to a depth of approximately
4,450 masl. Exploration of the Animas NE vein was directed towards the
December 31, 2023 | Page 72 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
4,800 masl and included nine drill holes, although
only two holes intercepted any significant mineralization. Exploration drilling of the central Animas zone was focused between 4,700 masl
(level 8) and 4,450 masl (level 13) and resulted in a number of significant intercepts. Drilling in the southwestern extension of the
Animas vein included four drill holes.
In 2007, 34 drill holes totaling 9,514.85 m were
drilled in the Animas structure. The objective was to verify the structural continuity and mineral content both horizontally and vertically
from 4,600 masl to 4,500 masl in the central Animas area.
In 2008, the Animas structure was further explored
through drilling of eight diamond drill holes including three drill holes to level 7 (4,595 masl) and one to level 12 (4,500 masl), where
the structure was characterized by the presence of quartz breccia and rhodonite, with an average width of 4.7 m.
In 2010, a diamond drill program was designed
to investigate the upper levels of the Animas vein between levels 5 (4,850 masl) and 6 (4,800 masl). Ten drill holes were completed resulting
in the identification of high-grade silver mineralization in the upper portions of the Animas structure. Additional exploration drilling
was also carried out in 2010 in the Animas Central area below 4,850 masl.
During 2011, 12 diamond drill holes totaling 3,411.10
m were drilled from surface to investigate the Animas NE vein between 4,650 masl and 4,500 masl. Results were positive with the identification
of a new mineralized shoot.
In 2012, 16 diamond drill holes totaling 4,275.80
m were completed from surface in order to estimate the potential of the Animas NE shoot. Additionally, two diamond drill holes totaling
690.40 m were completed from the surface to evaluate the potential depth of Animas SW shoot.
From underground, 10 diamond drill holes totaling
2,649.40 m were completed in 2012 to evaluate the continuity of the Animas vein to the elevation of 4,390 masl (level 14), thereby further
testing the continuity of shoots 2 and 3. Additional drilling was carried out from underground drill stations to provide information for
ore control purposes.
During 2013, 10 drill holes totaling 1,970.55
m were drilled from underground for the purposes of potentially upgrading Inferred Mineral Resources estimated in the Animas NE area,
between the elevations of 4,450 masl and 4,350 masl.
During 2014, nine drill holes totaling 1,858 m
were drilled from surface for the purposes of potentially upgrading Inferred Mineral Resources in the Animas NE area between the elevations
of 4,700 masl and 4,550 masl. In addition, 15 drill holes totaling 1,695.20 m were drilled from underground drill stations to support
upgrading of Inferred Mineral Resources in the Animas and Animas NE areas.
From 2015 to June 2018, Bateas embarked on
an extensive exploration and infill program to explore and improve the geological understanding of the Animas NE vein. Exploration drilling
continued to explore the northeast end of the vein and the continuity of mineralization at depth, with most drilling between level 12
(4,495 masl) to below level 17 (4,240 masl). Exploration drilling identified two additional bands of mineralization in the Animas NE vein
plunging steeply to the northeast. Infill drilling over the same period focused on providing support for upgrading Inferred Mineral Resources
in Animas Central at depth. Over the 3.5-year period, 111 surface holes totaling 46,072.80 m and 268 underground holes totaling 30,600.85
were drilled. The exploration and infill programs were successful in expanding the resources in the Animas NE vein and
December 31, 2023 | Page 73 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
increasing the confidence in the estimates to support upgrading
of Inferred Mineral Resources, generally replacing the tonnes that were depleted through mining production over the same period.
Exploration drilling of the Animas NE vein has
led to the discovery of two splay veins located in the hangingwall of the main Animas NE vein. The Cimoide ASNE vein is located 200 m
to the south of Animas NE with the Ramal Techo ASNE located 230 m to the south. The Cimoide ASNE vein has been intersected by numerous
drill holes drilled to investigate Animas NE between 2008 to 2023 with the majority of intercepts between 4,650 and 4,250 masl. The Ramal
Techo ASNE vein was first intersected in 2004 and, similar to the Cimoide ASNE vein has been intercepted many times during the exploration
of the Animas NE vein, particularly between 4,600 and 4,450 masl. Since 2021, exploration drilling has focused on defining the mineralization
in the upper oxide levels of the mine from surface and confirming the continuation of mineralization at depth in the Animas NE vein.
Antimonio and Corona Antimonio
In 2006, a limited drill program was executed
in the Antimonio and Corona Antimonio vein area with the drilling of five surface diamond drill holes totaling 1,117.50 m.
In 2021, three drill holes totaling 2,370 m were
drilled from underground drill stations to test for mineralization potential in La Plata and further extended to intersect the Corona
Antimonio vein.
Bateas
A diamond drill program involving 11 drill holes
from surface was carried out to explore the Bateas vein in late 2007 and early 2008. The drilling confirmed the existence of a northeast-striking
vein structure characterized by the presence of high-grade silver mineralization with manganese gangue minerals such as rhodonite, rhodochrosite,
and alabandite.
In 2011, three diamond drill holes totaling 1,040.85
m were drilled from surface that successfully identified the continuity of the Bateas vein to the northeast. In addition, 38 drill holes
totaling 2,714.10 m were completed from underground drill stations for ore definition and control purposes.
In 2012, 18 diamond drills totaling 5,006.65 m
were completed from the surface with the objective of evaluating the resource potential from level 10 upwards to the surface. Underground
drilling continued for ore definition and upgrading purposes with the drilling of 28 diamond holes totaling 2,596.90 m.
During 2013, 49 drill holes totaling 4,318.70
m were drilled from underground drill stations for purposes of supporting upgrading of Inferred Mineral Resources between the elevations
of 4,650 masl and 4,450 masl.
During 2014, 32 surface drill holes totaling 4,351.40
m were drilled for the purpose of supporting upgrading of Inferred Resources between the elevations of 4,750 masl and 4,650 masl.
During 2015, 16 surface drill holes totaling 2,791.30
m were drilled to support upgrading of Inferred Mineral Resources in the Bateas and Bateas Ramal Piso veins between the elevations of
4,800 masl and 4,650 masl. An additional 12 drill holes totaling 1,818.50 m were drilled from late 2014 into 2015 from underground drill
stations for the purposes of
December 31, 2023 | Page 74 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
supporting upgrading of Inferred Resources between
the elevations of 4,650 masl and 4,550 masl.
Cailloma 6
During 2014, three surface drill holes totaling
958.80 m were drilled to test the mineralization potential of the Cailloma 6 vein.
Carolina
In 2012, 20 diamond drill holes totaling 5,117.80
m were completed from the surface for the purpose of evaluating the potential of the Carolina vein structure and to define the morphology
of the mineralized shoot.
In 2013, 52 additional surface drill holes totaling
12,459.20 m were completed to further define and upgrade mineralization in the Carolina vein.
Corona
During 2011, one surface drill hole was completed
in order to test the mineralization potential of the Corona vein; however, no anomalous grades were intersected.
Don Luis I & II
In mid-2010, seven diamond drill holes were drilled
from surface to explore the Don Luis II vein. Positive results were received, and the program was expanded to include five additional
holes that were drilled prior to the end of 2010.
During 2012, six diamond drill holes totaling
2,487 m were completed from the surface to define the potential of this structure and to better understand the morphology of the mineralized
shoot. The results were favorable with drilling identifying a mineralized vein structure up to 2.35 m in width.
In 2013 and 2014, saw an additional 24 surface
drill holes totaling 7,800.70 m drilled to further define the mineralization potential of the Don Luis shoot.
El Toro
During 2012, one diamond drill hole totaling 177.70
m was completed from the surface for the purpose of exploring the potential of this vein to the east of the Cuchilladas creek. Anomalous
silver values were intersected; however, due to other preferential targets, no follow-up drilling has been conducted of the El Toro structure
as of the effective date of this Report.
Gaby
During 2013, two holes were drilled from surface
totaling 382.50 m in order to test the mineralization potential of the Gaby vein. Narrow structures less than a meter in width were intercepted
with anomalous silver grades.
La Plata and Cimoide La Plata
In 2005, 10 drill holes were drilled from underground
drill stations and one from surface targeting the La Plata and Cimoide La Plata structures between the elevations of 4,745 masl (level
7) and 4,695 masl (level 8).
During 2006, 10 further drill holes were drilled
from surface to confirm the continuity at the extreme western portion of the La Plata vein, between the elevations of 4,700 masl and 4,550
masl. Results confirmed the continuity of the vein with widths of 0.6 to 1.2 m.
December 31, 2023 | Page 75 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Eight diamond drill holes were also drilled from
underground targeting the La Plata vein at a depth of 4,695 masl (level 8) to investigate the continuity of the ore shoot at depth.
In 2011, the La Plata drill program included 12
drill holes from surface and one from underground targeting elevations between 4,700 masl and 4,600 masl.
In 2012 three diamond drill holes totaling 812.05
m were executed from underground for the purpose of evaluating the continuity of the mineralized shoot at the 4,600 masl level.
In 2013, one further drill hole totaling 199.20
m was drilled from an underground drill station for the purposes of testing the mineralization at the 4,500 masl level.
In 2021, three drill holes totaling 2,370 m were
drilled to test for mineralization potential in the La Plata and Corona Antimonio veins from underground drill stations. No significant
intercepts were encountered in the La Plata vein.
Lucia
In 2012, eight diamond drills totaling 1,300.20
m were executed from underground drill stations for the purpose of evaluating the potential of this newly identified structure. The results
were not favorable, identifying only low-grade polymetallic mineralization.
Nancy
Exploration drilling from 2006 to 2007 included
the drilling of seven diamond drill holes from surface totaling 1,292.10 m. The drilling identified a structure hosting a gray silica
matrix and fragments of quartz with sulfides. In 2008, 12 additional drill holes were drilled from surface totaling 3,094.00 m that encountered
a number of significant mineralized intercepts. In 2011, three drill holes designed to investigate the Animas NE vein also intercepted
the Nancy vein, providing further information on the continuity and grade of the vein.
During 2012, five diamond drill holes totaling
1,432.50 m were completed from the surface.
In 2013, five further surface diamond drill holes
totaling 935.50 m were completed.
As mining of the Animas NE vein progressed to
the northeast during the 2014 to 2016 period, the potential to access the cross-cutting Nancy vein became apparent, resulting in the drilling
of five further holes from surface totaling 2,600.70 m in 2017. In addition, 41 holes from underground totaling 4,474.05 m were drilled
from 2017 to June 30, 2023, the database cut-off date to further define and confirm the extents of mineralization. Mining of the
Nancy vein commenced in 2018.
Patricia
In 2010, exploration of the Patricia vein commenced
from underground with the drilling of seven drill holes totaling 682.80 m designed to investigate the vein structure at the 4,725 masl
level.
In 2011, an additional 12 drill holes totaling
981.80 m were completed from underground drill stations to evaluate the continuity of the Patricia vein.
Pilar
In 2011, two exploration drill holes were completed
from the underground workings of the San Cristóbal vein to investigate the possible continuity of the Pilar vein. Both drill holes
intersected the Pilar structure. At the point tested, the structure was approximately
December 31, 2023 | Page 76 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
1 m in thickness and comprised banded rhodochrosite,
rhodonite, and quartz with veinlets of sphalerite, galena, chalcopyrite, and pyrite.
San Antonio
Drilling of the San Antonio vein commenced in
2011 with the drilling of two drill holes from surface to investigate the potential of the vein. The vein thickness ranges from 0.7 to
6.0 m with mineralization consisting of massive quartz, brecciated quartz, and boxwork quartz with infillings of limonite, quartz geodes
displaying crustiform textures, pyrite and barite.
San Carlos
During 2014, two holes were drilled from surface
totaling 495.80 m in order to test the mineralization potential of the northeast portion of the San Carlos vein. The drilling encountered
narrow structures between 0.30 m to 0.75 m in thickness and high-grade silver values.
Santa Catalina
Exploration of the Santa Catalina vein by Bateas
commenced in 2006 with a drilling program from surface focused on investigating the mineral potential above and below level 8 (4720 masl).
In 2007, exploration continued through underground drilling to test the vein between level 8 (4720 masl) and level 7 (4773 masl) and resulted
in the intersection of a narrow structure less than 5 m wide composed of banded rhodonite-rhodochrosite with calcite and disseminated
silver sulfosalts. Exploration drilling of the Santa Catalina vein also resulted in the discovery of additional polymetallic veins, such
as Soledad, Silvia, Patricia, and Pilar.
San Cristobal
From 2007 to 2008, drilling was performed from
underground in order to explore the mineralization potential between level 11 (4540 masl) and level 12 (4500 masl). The drilling
did not intersect any significant mineralization.
In 2011, a drilling campaign was conducted to
test for the extension of the San Cristóbal vein to the northeast. Four drill holes totaling 1,396.15 m were drilled from surface
with three of the holes intersecting the vein structure but displaying limited mineralization. The fourth hole failed to intersect the
vein. Field reconnaissance conducted post-drilling traced the projection of the San Cristobal vein to the northeast and identified the
structure on surface in the Cailloma 6 concession.
In 2021, a drilling campaign was conducted to
test the San Cristobal vein at depth. Two drill holes totaling 1,966.45 m were drilled from surface. A transition zone was identified
at depth between the precious metal and polymetallic phases.
San Pedro
During 2012, six diamond drill holes totaling
2,456.00 m were completed from the surface to potentially support Mineral Resource estimation and to further explore the structure at
depth. The results were not favorable, intercepting lower values than previously encountered.
San Pedro Oeste
In 2018, exploration activities focused on the
northwest of the property with the drilling of two holes from surface, totaling 811.40 m to investigate a mineralized structure
December 31, 2023 | Page 77 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
identified on surface named San Pedro Oeste. The
holes did not intersect any intervals of significant mineralization.
Silvia
In late 2007 and early 2008, a drilling program
designed to investigate the Santa Catalina vein intersected mineralization averaging 0.6 m in width associated with the Silvia vein. Since
2008, underground development of the vein on level 7 (4750 masl) has increased the understanding of the style of mineralization.
During 2009, 12 drill holes totaling 1,426.15
m were drilled from underground drill stations to further test the mineral potential of the Silvia vein.
During 2010, 15 drill holes totaling 1,010.30
m were drilled from underground to investigate the mineralized shoot between 4800 masl to 4670 masl. Results proved the continuity of
the mineralization.
Twenty-four drill holes totaling 2,225.60 m were
drilled from underground drill stations during 2011 and 2012 to further define the mineralization in the Silvia vein.
Soledad
In 2007, drilling designed to investigate the
Santa Catalina vein also intersected the Soledad vein with one drill hole intercepting 1.30 m of mineralization. In late 2008, a drill
campaign was conducted from underground to confirm the continuity of the structure to level 9 (4650 masl).
In 2010, seven diamond drill holes totaling 923.8
m were drilled from surface to explore the Soledad vein to a depth of approximately 4800 masl. The drilling was successful at intersecting
the mineralized structure.
Vilafro
In 2010 two surface drill holes totaling 304.30
m were completed in order to intersect fault structures associated with quartz veinlets and disseminated silver mineralization.
In late 2017, two surface drill holes totaling
681.10 m were drilled in order to intersect hydrothermal breccias hosted in sandstones of the Yura Group.
Wendy
In 2014, one drill hole totaling 285.10 m was
drilled to test the mineralization potential of the Wendy vein. The hole intercepted a narrow vein of 0.42 m thickness.
Pisacca
In 2021, four surface drill holes totaling 2,536.10
m were completed to test the mineralization potential of structures identified on surface. One drill hole was lost due to the presence
of underground water with another intersecting a mineralized structure of 0.88 m width.
| 10.2.2 | Drilling since the Mineral Resource database cut-off date |
As of the effective
date of this Report, an additional twelve drill holes totaling 5,319.8 m were completed after the June 30, 2023, database
cut-off date. All drilling was conducted from underground drill stations. Assay results for intercepts of interest are summarized in Table
10.3. The QP has reviewed the results against the block model and has determined that the new drilling would not
materially change the Mineral Resources detailed in this Report.
December 31, 2023 | Page 78 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Table 10.3 Drill intervals
encountered post data cut-off date
Hole ID |
Easting |
Northing |
Elevation |
Azimuth (°) * |
Dip
(°)* |
From
(m) |
To
(m) |
Int.
(m) |
ETW**
(m) |
Ag
(g/t) |
Au
(g/t) |
Pb
(%) |
Zn
(%) |
Vein
ID |
ANIM100923 |
194983 |
8317705 |
4304.1 |
252 |
-38 |
269.4 |
270.1 |
0.70 |
0.45 |
45 |
0.09 |
3.33 |
9.38 |
Animas NE |
ANIM101223 |
194983 |
8317705 |
4304.0 |
237 |
-50 |
287.5 |
289.3 |
1.75 |
1.36 |
76 |
0.08 |
5.28 |
4.68 |
Animas NE |
ANIM101523 |
194984 |
8317705 |
4304.0 |
230 |
-46 |
361.4 |
363.1 |
1.65 |
0.97 |
66 |
0.06 |
4.71 |
5.72 |
Animas NE |
ANIM101923 |
194984 |
8317705 |
4303.8 |
222 |
-57 |
330.1 |
333.1 |
3.05 |
1.93 |
43 |
0.08 |
2.21 |
3.63 |
Animas NE |
ANIM102223 |
194984 |
8317705 |
4303.8 |
204 |
-61 |
399.7 |
403.2 |
3.50 |
2.18 |
51 |
0.24 |
2.45 |
3.57 |
Animas NE |
ANIM102723 |
194984 |
8317705 |
4303.8 |
216 |
-52 |
466.7 |
467.5 |
0.80 |
0.47 |
30 |
0.04 |
1.24 |
2.66 |
Animas NE |
ANIS100823 |
193806 |
8317098 |
4739.8 |
338 |
-46 |
288.8 |
289.3 |
0.50 |
0.47 |
86 |
0.27 |
4.80 |
17.30 |
Animas |
ANIS101323 |
193806 |
8317097 |
4739.8 |
320 |
-45 |
297.6 |
298.2 |
0.60 |
0.59 |
17 |
0.15 |
0.44 |
1.35 |
Animas |
ANIS101723 |
193806 |
8317097 |
4739.8 |
332 |
-56 |
328.55 |
328.95 |
0.40 |
0.36 |
18 |
0.26 |
0.31 |
2.77 |
Animas |
ANIS102023 |
193806 |
8317097 |
4739.8 |
9 |
-68 |
432.85 |
433.2 |
0.30 |
0.24 |
157 |
0.27 |
8.49 |
13.40 |
Animas |
ANIS102423 |
193806 |
8317097 |
4739.6 |
24 |
-73 |
450.5 |
452.45 |
1.95 |
1.36 |
27 |
0.13 |
1.27 |
2.08 |
Animas |
ANIS102823 |
193806 |
8317097 |
4739.7 |
44 |
-71 |
498.9 |
499.5 |
0.60 |
0.42 |
90 |
0.10 |
4.88 |
2.63 |
Animas |
*Azimuth and dip values taken at collar location |
|
**ETW = Estimated True Width |
| 10.3 | Diamond drilling methods |
Bateas has used a number of different drilling
contractors to carry out exploration and definition drilling since it took ownership of the mine in 2005. During 2012, drilling was conducted
by two drilling contractors, Geodrill and Explomin. Multiple drill rigs were used during the campaign, including two Longyear 44s, two
Geo-3000, and one TEC DRILL H-200 for underground drilling. Both HQ (63.5 mm) and NQ (47.6 mm) diameter core were obtained, depending
on the depth of the hole. From 2013 onwards, exploration and resource definition drilling has been carried out by drilling contractors,
Geodrill and Explodrilling, as well as by Bateas-owned drill rigs.
Proposed surface drill hole collar coordinates,
azimuths and inclinations were designed based on the known orientation of the veins and the planned depth of vein intersection using geological
plan maps and sections as a guide.
Surface drilling platforms, together with its
access road and sedimentation pit, were prepared using a D7 tractor. The dimensions of the drilling platform are clearly marked in advance
of construction with flags indicating the limits for earth movement to minimize soil disturbance and comply with government directive
D.S. N° 020-2008-EM regarding Environmental Regulations for Exploration Activities.
| 10.4 | Geological and geotechnical logging procedures |
The drill core is stored in either wooden or plastic
boxes with each box storing up to 3.0 m of core. Prior to transportation, core boxes are verified to ensure correct, consecutive labeling,
as well as clear and legible drill hole codes. The inside of the box is checked for a direction arrow indicating the start and end of
the core sequence. The lid of the core box is labeled to clearly show the accrued length and each side of the lid details the previous
accrued length (From), and current accrued length (To).
December 31, 2023 | Page 79 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Drill core boxes are only handled and transported
by personnel appointed to this task. Boxes are checked and secured prior to transportation to minimize the risk of shifting or mixing
of core samples during transportation. Care is taken to ensure that core boxes arrive at the logging facilities with minimal disturbance
to the core or the depth markers.
In the logging facilities, geologists and geotechnical
technicians carry out geotechnical measurements, logging and sampling of mineralized core. Core is first examined to capture geological
information. Initially, quick logging is performed to prepare a brief description of the mineralization intersects. The logging sheet
allows the recording of essential information in the form of both graphics and written descriptions. A photographic record of the core
is taken using a digital camera.
In January 2018, all logging became digital,
being incorporated daily into the Maxwell Datashed database system. Data were recorded initially with Excel templates, and later with
the Maxwell LogChief application using essentially the same structure. Both input methods used picklists and data validation rules to
ensure consistency between loggers. Separate pages were designed to capture, lithology, alteration, veins, sulfide-oxide zones, minerals,
structure (contacts, fractures, veins, and faults with attitudes to core axis), magnetic susceptibility, and special data (samples collected
for geochemistry, thin section examinations, the core library, density, etc.). Intensity of alteration phases was recorded using
a numeric 1 to 4 scale (weak, moderate, strong, very strong); abundance of veins and most other minerals were estimated in volume percent.
Geotechnical logging is conducted prior to the
cutting of the core and involves the collection of drill core recovery and rock-quality designation (RQD) data. Information is recorded
in the field using the Maxwell LogChief application.
Sample recovery for each drill interval is recorded
by geotechnical technicians. Drill core recovery is generally good, on average greater than 94 % (Figure 10.2).
Figure 10.2
Graph of core recovery of Animas/Animas NE vein
December 31, 2023 | Page 80 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Recoveries can be lower near surface or when fault
structures are encountered due to the more fragmented nature of the core. Recovery is generally excellent through mineralized vein structures.
The core recovery values are used when considering the reliability of the sample for resource estimation purposes. The presence of bias
due to core loss is detected by performing a correlation analysis on recovery and grade.
Drill holes are typically drilled on sections
spaced 40 to 60 m apart along the strike of the vein with surface drilling focusing on exploring the extents of the Animas, Bateas and
Nancy veins and underground drilling used for a mix of exploration and Mineral Resource and Mineral Reserve definition. The extent of
drilling varies for each vein with those having the greatest coverage having drill holes extending over 4,000 m of the vein’s strike
length (Animas), to the exploration prospects having only a few drill holes extending over 50 m (Antimonio).
| 10.7 | Drill hole collar surveys |
The coordinates for the proposed drill hole collar
location are determined through assessing the azimuth and inclination of the proposed drill hole to achieve the desired depth of intercept
in cross sections. Once the coordinates have been determined, the location of surface collars are located in the field using differential
global positioning system (DGPS) instruments. The drill pad is then prepared at this marked location. Upon completion of the surface drill
hole, a survey of the collar is performed using Total Station equipment, with results reported in the collar coordinates using reference
Datum WGS84, UTM Zone 19S. For underground drill holes, once the drill station has been established, the location of the collar is located
using Total Station instruments based on previously surveyed control points.
The geologist in charge of drilling is responsible
for orienting the azimuth and inclination of the hole at the collar using a compass clinometer. Downhole surveys are completed by the
drilling contractor using survey equipment such as a Flexit or Reflex tool at approximately 50 m intervals for all surface drill holes
and for underground drill holes greater than 100 m in length. Bateas assesses the downhole survey measurements as a component of data
validation.
Drill holes recovered from CMA do not include
downhole survey information and drill hole azimuths and inclinations recorded at the collar have been used to project the hole to its
full depth. The lack of downhole surveys for the CMA drill holes has been taken into account during resource classification where interpretations
relating to holes reliant in only CMA data being classified as Inferred, if classified.
Representative drill
sections displaying the geologic interpretation of the Animas vein are displayed in Figure 10.4 to Figure 10.7. A plan view showing
the location of the sections is provided in Figure 10.3.
NSR values in US dollars (US$/t) indicated on
the cross sections have been estimated for sulfides using US$ 0.49/g for Ag, US$ 15.4/% for Pb and US$ 15.58/% for Zn based
on metal prices of US$ 21.00/oz for Ag, US$ 2,000/t for Pb and US$ 2,600/t for Zn,
December 31, 2023 | Page 81 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
expected metallurgical recoveries and commercial
terms. The NSR equation is discussed in more detail in Section 14.12.
Drill intercept values provided on the sections
are for illustrative purposes and provide an overview of the ranges of thicknesses and grades that can be encountered in the veins.
Figure 10.3
Plan map showing orientation of geologic sections
December 31, 2023 | Page 82 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Figure 10.4 Geologic interpretation
of Animas & Nancy vein (Section A)
December 31, 2023 | Page 83 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Figure 10.5 Geologic
interpretation of Animas vein (Section B)
December 31, 2023 | Page 84 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Figure 10.6
Geologic interpretation of Animas vein (Section C)
December 31, 2023 | Page 85 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Figure 10.7
Geologic interpretation of Animas NE vein (Section D)
December 31, 2023 | Page 86 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| 10.10 | Sample length versus true thickness |
The relationship between the sample intercept
lengths and the true width of the mineralization varies in relation to the intersect angle between the steeply-dipping zone of mineralized
veins and the inclined nature of the diamond core holes. Calculated estimated true widths (ETWs) are always reported together with actual
sample lengths by taking into account the angle of intersection between drill hole and the mineralized structure. Exaggeration of the
true width of the mineralization does not occur during modeling as the actual vein contacts are modeled in three-dimensional space to
create vein solids.
| 10.11 | Example drill intercepts |
Table 10.4
provides a list of typical drill hole intercepts encountered at the Caylloma Mine. It should be noted that the intervals listed are a
subset for reference purposes only and do not represent the total mineralized intervals encountered from the 1,658 drill holes drilled
by Bateas at the Caylloma Mine as of June 30, 2023.
Table 10.4 Example of representative
drill results at the Caylloma Mine
Hole ID |
Easting |
Northing |
Elevation |
Azimuth
(°) * |
Dip
(°)* |
From
(m) |
To
(m) |
Int.
(m) |
ETW**
(m) |
Ag
(g/t) |
Au
(g/t) |
Pb
(%) |
Zn
(%) |
Vein |
ANIS012707 |
192364 |
8319219 |
4376 |
324 |
-69 |
303.3 |
303.9 |
0.6 |
0.53 |
20 |
0.23 |
0.75 |
1.37 |
Animas |
ANIM026114 |
192856 |
8319518 |
4491 |
0 |
-29 |
No significant mineralized intervals |
ANIS003306 |
192834 |
8319664 |
4369 |
297 |
-90 |
292.5 |
295.5 |
3 |
1.85 |
68 |
0.21 |
1.94 |
2.71 |
ANIM013110 |
193639 |
8317315 |
4605 |
159 |
-28 |
72.85 |
79.75 |
6.9 |
6.27 |
99 |
0.33 |
4.39 |
3.01 |
including |
75.25 |
76.15 |
0.9 |
0.82 |
221 |
0.41 |
10.51 |
7.49 |
ANIS016510 |
192681 |
8319842 |
4165 |
321 |
-52 |
86.1 |
88.8 |
2.7 |
2.56 |
323 |
0.29 |
7.95 |
3.24 |
ANIS011307 |
192809 |
8319496 |
4474 |
325 |
-66 |
402.8 |
409.4 |
6.6 |
5.88 |
125 |
0.16 |
5.52 |
6.26 |
ANIM019611 |
193409 |
8319758 |
4643 |
1 |
-56 |
220 |
223 |
3 |
2.19 |
19 |
0.05 |
1.25 |
1.42 |
Animas NE |
ANIS033116 |
193740 |
8320461 |
4188 |
312 |
-12 |
192.6 |
195.9 |
3.3 |
2.67 |
86 |
0.38 |
3.8 |
4.33 |
ANIS055917 |
193767 |
8320119 |
4492 |
279 |
-61 |
No significant mineralized intervals |
ANIS044416 |
194077 |
8320186 |
4507 |
309 |
-72 |
443.6 |
456.8 |
13.2 |
9.01 |
116 |
0.04 |
7.77 |
9.39 |
ANIM019211 |
194726 |
8317867 |
4441 |
336 |
-19 |
171.35 |
178.9 |
7.55 |
6.8 |
172 |
0.12 |
9.11 |
5.73 |
including |
176.2 |
178.2 |
2 |
1.8 |
390 |
0.18 |
19.76 |
10.46 |
ANIS063018 |
194086 |
8320285 |
4433 |
323 |
-74 |
365.3 |
365.9 |
0.6 |
0.34 |
335 |
0.05 |
4.66 |
13.65 |
ANIM070419 |
194738 |
8317920 |
4374 |
147 |
-25 |
119.8 |
131.95 |
12.15 |
4.5 |
71 |
0.08 |
4.27 |
8.62 |
ANIM074720 |
194868 |
8318040 |
4363 |
162 |
-25 |
141.75 |
156.1 |
14.35 |
5.4 |
62 |
0.04 |
1.66 |
1.46 |
ANIM078321 |
194724 |
8317900 |
4316 |
148 |
-22 |
142.95 |
164.85 |
21.9 |
12.4 |
127 |
0.09 |
6.63 |
5.53 |
ANIM093022 |
195340 |
8318522 |
4306 |
142 |
-34 |
123.1 |
135.4 |
12.3 |
5.5 |
113 |
0.03 |
8.93 |
14.32 |
ANIM097523 |
195538 |
8318186 |
4412 |
12 |
-55 |
458 |
462.15 |
4.15 |
3.3 |
37 |
0.01 |
3.04 |
4.80 |
NANS004417 |
196603 |
8320912 |
4539 |
306 |
-51 |
No significant mineralized intervals |
Nancy |
ANIM050717 |
195554 |
8318947 |
4459 |
328 |
-71 |
61.3 |
62.5 |
1.2 |
1.05 |
24 |
0.23 |
0.93 |
4.02 |
including |
61.6 |
61.9 |
0.3 |
0.26 |
54 |
0.64 |
2.25 |
9.57 |
NANM003017 |
196413 |
8321018 |
4494 |
24 |
1 |
86.6 |
89 |
2.4 |
1.21 |
1 |
0.03 |
0.14 |
0.87 |
NANM005818 |
196514 |
8321017 |
4455 |
54 |
23 |
78.9 |
91.8 |
12.9 |
3.26 |
27 |
0.1 |
1.11 |
4.1 |
NANS003117 |
196539 |
8320934 |
4540 |
60 |
-49 |
231.2 |
233.3 |
1.9 |
1.84 |
71 |
0.19 |
4.7 |
10.86 |
December 31, 2023 | Page 87 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Hole ID |
Easting |
Northing |
Elevation |
Azimuth
(°) * |
Dip
(°)* |
From
(m) |
To
(m) |
Int.
(m) |
ETW**
(m) |
Ag
(g/t) |
Au
(g/t) |
Pb
(%) |
Zn
(%) |
Vein |
NANS002012 |
196547 |
8320984 |
4481 |
318 |
-60 |
130.6 |
140.5 |
9.9 |
6.88 |
91 |
0.07 |
5.3 |
7.62 |
|
BATS008512 |
192654 |
8321323 |
4372 |
176 |
-44 |
137.5 |
138.7 |
1.2 |
0.81 |
61 |
0.02 |
0.02 |
0.06 |
Bateas |
BATS018114 |
192676 |
8321306 |
4369 |
150 |
-69 |
136.9 |
137.5 |
0.6 |
0.22 |
752 |
0.3 |
0.34 |
0.48 |
BATS016914 |
192697 |
8321382 |
4367 |
190 |
-57 |
98.9 |
99.8 |
0.9 |
0.41 |
3,629 |
0.59 |
0.5 |
0.81 |
|
BATS019114 |
192529 |
8321266 |
4374 |
133 |
-44 |
No significant mineralized intervals |
|
BATM014813 |
192918 |
8321296 |
4358 |
299 |
-43 |
36.25 |
38.35 |
2.1 |
1.51 |
544 |
0.03 |
0.23 |
0.25 |
BATS018514 |
193066 |
8319980 |
4665 |
159 |
-67 |
152.5 |
153.4 |
0.9 |
0.55 |
340 |
0.07 |
0.02 |
0.03 |
including |
152.8 |
153.1 |
0.3 |
0.18 |
988 |
0.19 |
0.05 |
0.06 |
LPLS002506 |
193131 |
8318523 |
4706 |
332 |
-79 |
182.85 |
183.75 |
0.9 |
0.8 |
24 |
0.08 |
0.01 |
0.01 |
La Plata |
LPLS002011 |
193763 |
8319019 |
4613 |
341 |
-50 |
190.55 |
190.95 |
0.4 |
0.35 |
70 |
0.57 |
0.01 |
0.04 |
LPLS003411 |
195203 |
8317689 |
4543 |
305 |
-59 |
242.5 |
243.65 |
1.15 |
0.9 |
37 |
0.02 |
0.28 |
1.86 |
including |
242.9 |
243.15 |
0.25 |
0.2 |
58 |
0.01 |
0.23 |
2.48 |
LPLS003011 |
194221 |
8319281 |
4588 |
325 |
-60 |
137.5 |
137.65 |
0.15 |
0.12 |
388 |
0.13 |
0.04 |
0.05 |
LPLS003311 |
194465 |
8319414 |
4450 |
334 |
-46 |
No significant mineralized intervals |
LPLS001506 |
193621 |
8319019 |
4544 |
326 |
-64 |
105 |
109.65 |
4.65 |
3.7 |
498 |
0.19 |
0.1 |
0.69 |
SCM-06-03 |
193308 |
8318734 |
4565 |
311 |
-85 |
47.8 |
48.8 |
1 |
0.65 |
21 |
0.16 |
0.01 |
0.04 |
San Cristobal |
SCS000711 |
194867 |
8320977 |
4591 |
315 |
-45 |
No significant mineralized intervals |
SCS-08-02 |
193987 |
8319620 |
4535 |
311 |
-65 |
401 |
401.6 |
0.6 |
0.45 |
52 |
0.16 |
1.15 |
1.72 |
SCM-3-02 |
193422 |
8318947 |
4568 |
357 |
-38 |
71.7 |
73.6 |
1.9 |
1.45 |
383 |
0.54 |
0.03 |
0.07 |
SCM-04-02 |
190905 |
8321290 |
4767 |
83 |
-65 |
29.3 |
32.65 |
3.35 |
2.8 |
254 |
0.05 |
0.23 |
0.42 |
*Azimuth and dip values taken at collar location **ETW = Estimated True Width |
| 10.12 | Comment on Section 10 |
The QP has the following observations and conclusions
regarding drilling conducted at the Caylloma Mine since 2005:
| · | Data was collected using industry standard practices. |
| · | Drill orientations are appropriate to the orientation
of mineralization. |
| · | Core logging meets industry standards for exploration
of epithermal-style deposits. |
| · | Geotechnical logging is sufficient to support
Mineral Resource estimation. |
| · | Collar surveys have been performed using industry-standard
instrumentation. |
| · | Downhole surveys performed by Bateas during the
drill programs have been performed using industry-standard instrumentation. |
| · | Drilling information is sufficient to support
Mineral Reserve and Mineral Resource estimates. |
December 31, 2023 | Page 88 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| 11 | Sample Preparation, Analyses, and Security |
| 11.1 | Sample preparation prior to dispatch of samples |
| 11.1.1 | Channel chip sampling |
Channel samples are collected from the faces of
underground workings. The entire process is carried out under the geology department’s supervision.
Since February 2011, the location of each
channel has been surveyed using Total Station equipment. Surveyors use an underground survey reference point to locate the starting coordinates
of each channel. Prior to February 2011, this process was performed by compass and tape measure.
The sampling process consists of making a channel
perpendicular to the structure at variable intervals along the strike of the structure. Sampling is conducted according to lithological
or mineralogical characteristics. Care is taken to ensure samples are representative, homogeneous and free of contamination.
Sampling is carried out at 2 m intervals
within the drifts of all veins and 3 m intervals in stopes (except for Bateas and Soledad, where due to the thickness of the vein,
sampling is carried out every 2 m in stopes). The channel lengths and orientations are identified using paint in the underground working
and by painting the channel number on the footwall. The channel is between 20 cm to 30 cm wide and approximately 2 cm deep,
with each individual sample being no longer than 1.5 m.
The area to be sampled
is washed down to provide a clean view of the vein. Channels are cleaned beforehand by removing a layer of approximately 2 cm of
surface material, which tends to be highly weathered and not representative of the structure. The channel is sampled by taking a succession
of chips in sequence from the hanging wall to the footwall perpendicular to the vein based on geology and mineralization.
Samples, comprised of fragments, chips and mineral
dust, are extracted using a chisel and hammer, along the channel’s length on a proportional basis. Proper marking of the channel
is critical to ensuring that the proportions taken are representative.
For veins with narrow or reduced thickness (<0.20
m), the channel width is expanded to 0.40 m, thus providing the opportunity to obtain the necessary sample mass.
Sample collection is normally performed by two
samplers, one using the hammer and pick, and the other holds the receptacle (cradle), to collect rock and ore fragments. Usually, the
cradle consists of a sack, with the mouth kept open by a wire ring. Based on ongoing evaluations of precision and the equipment available
in the Bateas Laboratory a sample mass of between 3 kg and 6 kg is generally collected.
Since August 2012, the entire sample has
been placed in a plastic sample bag with a sampling card and assigned sample ID and taken to the laboratory for homogenization and splitting.
Prior to August 2012, samples were prepared
prior to being bagged using a cone and quarter methodology. The process involved homogenizing the sample by overturning the sample numerous
times within a plastic sampling sheet, while taking care not to lose any material. Once the sample had been homogenized it was divided
into four equal quarters and a representative sample collected from opposite quarters, diagonally (the other two quarters are discarded).
Splitting could be performed more than once to ensure a sample
December 31, 2023 | Page 89 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
no heavier than
2.5 kg to 3 kg was collected, corresponding to a full sampling bag. The obtained sample was then deposited in a plastic sample
bag with a sampling card and assigned sample ID. The cone and quarter methodology were regarded as being inappropriate for sample
splitting, so the procedure was halted.
A geologist is responsible for determining and
marking the intervals to be sampled, selecting intervals based on geological and structural logging. The sample length must not exceed
1.2 m or be less than 30 cm.
When the core is of moderate to good competency,
splitting is performed by diamond saw. The geologist carefully determines the line of cutting, in such a way that both halves of the core
are representative. The core cutting process is performed in a separate building adjacent to the core logging facilities.
When core is fractured or of poor competency,
splitting is performed using a riffle splitter after the sample has been crushed and homogenized.
Once the core has been split, it is washed with
half the sample being placed in a sample bag. A sampling card with the appropriate information is inserted with the core. The other half
of the core is returned to the core tray.
| 11.1.3 | Bulk density determination |
Samples for bulk density analysis are collected
underground using a hammer and chisel to obtain a single large sample of approximately 6 kg. The sample is always taken of mineralized
material in the same locality as a channel sample. The coordinates of the closest channel sample are assigned to the density sample. The
sample is brought to the surface and delivered to the core cutting shed where each side of the sample is cut using a diamond saw to produce
a smooth sided cube. The bulk density sample is labeled and bagged prior to being stored in the storage facilities to await transportation
with other samples to the ALS Global Laboratory in Arequipa prior to being sent to Lima.
Density tests are performed at the ALS Global
Laboratory in Lima using the OA-GRA09A methodology. This test consists of firstly cutting, weighing (maximum of 6 kg) and coating
the sample in paraffin wax. Samples are then slowly placed into the bulk density apparatus which is filled with water. The displaced water
is collected into a graduated cylinder and measured. The bulk density calculations are corrected for air temperature and the density of
the wax coating.
Results of this analysis are included in Section 14.9
of this Report.
| 11.2 | Dispatch of samples, sample preparation, assaying and analytical procedures |
Once samples have been collected, they are assigned
a batch number and either submitted to the Bateas onsite laboratory or sent to the mine warehouse to await transportation (three times
a week) to the ALS Global facility in Arequipa, and then on to the ALS Global Laboratory in Lima for analysis.
The primary laboratory (Bateas) uses similar sample
preparation, assaying and analytical procedures as are performed at the umpire laboratory (ALS Global).
December 31, 2023 | Page 90 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Upon receipt of a sample batch the laboratory staff immediately verifies
that sample bags are sealed and undamaged. Sample numbers and IDs are checked to ensure they match that as detailed in the submittal
form provided by the geology department. If any damaged, missing, or extra samples are detected the sample batch is rejected and the
geology department is contacted to investigate the discrepancy. If the sample batch is accepted the samples are sequentially coded and
registered as received.
Accepted samples are then transferred to individual
stainless-steel trays with their corresponding sample IDs for drying. The trays are placed in the oven for two to four hours at a temperature
of 110°C.
Once samples have been dried, they are transferred
to a separate ventilated room for crushing using a two-stage process. Firstly, the sample is fed into a terminator crusher to reduce the
original particle size so that approximately 90 % passes ½ inch mesh sieve size. The entire sample is then fed to the secondary
Rhino crusher so that the particle size is reduced to approximately 85 % passing a 10-mesh sieve size. The percentage passing is monitored
daily to ensure these specifications are maintained. The crushing equipment is cleaned using compressed air and a barren quartz flush
after each sample.
Once the sampling has been crushed it is reduced
in size to 150 g ± 20 g using a single tier Jones riffle splitter. The reduced sample is returned to the sampling tray
for pulverizing whereas the coarse reject material is returned to a labeled sample bag and temporarily placed in a separate storage room
for transferal to the long-term storage facilities located adjacent to the core logging facilities.
Crushed samples are pulverized using a Rocklab
standard ring mill so that 90 % of particles pass a 200-mesh sieve size. The pulp sample is carefully placed in an envelope along with
the sample ID label. Envelopes are taken to the balance room where they are checked to ensure the samples registered as having been received
and processed match those provided in the envelopes.
The Bateas Laboratory’s preparation facilities
have been inspected by Mr. Eric Chapman on various occasions, most recently in November 2023, and found to be clean and well
organized. All weighing equipment is calibrated on a daily basis using in-house weights and externally calibrated once a year.
| 11.2.3 | Assaying of silver, lead, copper and zinc |
Upon receipt of samples in the analytical laboratory,
all pulps are re-checked to ensure they match the list in the submittal form. Once completed, 0.5 g of the pulp is weighed and transferred
into a 250 ml Teflon container. Added to this is 5 ml of HNO3, 5 ml of HCl, 1 ml HF, and 1 ml of perchloric
acid and the solution is placed in a small oven at 150°C to 200°C until the mixture becomes pasty in consistency. The paste is
cooled before 25 % HCl is added to the container. This mixture is then boiled until it changes color. The solution is then transferred
to a new vial, cooled and diluted with distilled water before being analyzed.
The elements of silver, copper, lead and zinc
are assayed using either; atomic absorption (AA); inductively coupled plasma atomic emission spectroscopy (ICP-AES); or for high lead
and zinc grades volumetric/titration techniques (VOL); or for high silver grades gravimetric techniques (GRAV) depending on the laboratory
and assay value (see Section 11.4). An initial and duplicate reading is taken, and an internal standard is inserted every ten samples
to monitor and calibrate the equipment.
December 31, 2023 | Page 91 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
After checking that the pulps match the submittal
form, 30 g of the pulp is weighed and added to a crucible, along with 120 g of flux, and 1 g to 5 g of KNO3
if it is a sulfide sample or 1.5 g to 2.0 g of flour if it is an oxide sample. The material is carefully homogenized before
being covered by a thin layer of borax.
The mixture is placed in an oven for approximately
one to two hours and heated to 1,150°C ± 50°C. Once the crucibles have cooled the slag material is separated and discarded
with the remaining material being transferred to a ceramic cup and placed in an oven for 45 to 60 minutes at a temperature of between
950°C to 1,050°C to evaporate any lead and leave behind a clean doré (Ag/Au).
The doré is carefully transferred to a
test tube and 1 ml of 15 % nitric acid is added before it is transferred to an oven and heated to 200°C ± 20°C and
monitored until digestion is complete. The sample tubes are removed from the oven, cooled for five minutes before 2.5 ml of hydrochloric
acid is added. The solution is heated once again until a pale-yellow solution is observed marking the end of the reaction and cooled once
more for five minutes before 1 ml of 2 % aluminum nitrate. Distilled water is then added to the test tube to ensure the volume of
solution is 5 ml, before it is covered and agitated. The test tubes are left to stand to allow sedimentation prior to analysis by
AA or using GRAV if the grades exceed a set threshold.
| 11.3 | Laboratory accreditation |
The Bateas Laboratory operated by Bateas is not
independent and does not hold an internationally recognized accreditation.
ALS Global is an independent, privately-owned
analytical laboratory group. The preparation laboratory in Arequipa and the analytical laboratory in Lima are supported by a Quality Management
System (QMS) framework which is designed to highlight data inconsistencies sufficiently early in the process to enable corrective action
to be taken in time to meet reporting deadlines. The QMS framework follows the most appropriate ISO Standard for the service at hand i.e.
ISO 9001:2015 for survey/inspection activity and ISO 17025:2005 UKAS ref 4028 for laboratory analysis.
| 11.4 | Sample security and chain of custody |
Sample collection and transportation of both drill
hole and channel samples is the responsibility of the geology department.
Core boxes are sealed and carefully transported
to the core logging facility constructed in 2012 where there is sufficient room to layout and examine several holes at a time. The core
logging facility is located at the mine site and is locked when not in use.
Once logging and sampling have been performed,
the remaining core is transferred to the core storage facilities located adjacent to the logging facilities. The storage facilities consist
of a secure warehouse constructed in 2011 to replace the older facilities that were located a kilometer to the north of the mine camp.
The warehouse is dry and well illuminated, with metal shelving with sufficient capacity to store all the historical drill core and plenty
of space for the coming years.
The core is stored chronologically, and location
plans of the warehouse provide easy access to all core collected by Bateas. The storage facility is managed by the Bateas
December 31, 2023 | Page 92 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Brownfields Exploration Manager and the Geology
Superintendent, and any removal of material must receive their approval.
Coarse reject material for drill core, channel
and exploration samples are collected from the Bateas Laboratory every ten days and stored in a storage facility adjacent to the core
storage facility. Storage of the core and exploration coarse rejects is the responsibility of the Bateas Brownfields Exploration Manager.
Storage of channel sample rejects is the responsibility of the resource modeling department. All drill core rejects are presently retained
indefinitely. Channel reject material is stored between three and twelve months depending on the sample location.
Pulps for drill core, channel and exploration
samples are returned to the originator for storage in a separate building adjacent to the Bateas Laboratory. It is the responsibility
of the originator to ensure these samples are stored in an organized and secure fashion. Samples are retained in accordance with the Fortuna
corporate sample retention policy. All exploration drill core, coarse rejects, and pulps are stored for the life of mine. All underground
infill drill core is retained until the stope from which the samples were collected has been mined, when the core that is located greater
than 10 m from the mineralized vein can be disposed. Disposal of surface and underground channel coarse reject samples is performed after
90 days and is the responsibility of the Geology Superintendent.
| 11.5 | Quality control measures |
The routine insertion of certified reference material,
blanks, and duplicates with sample submissions as part of a sample assay quality assurance/quality control (QAQC) program is current industry
best practice. Analysis of QAQC data is performed monthly at the operation to assess the reliability of sample assay data and the confidence
in the data used for estimation.
Bateas routinely inserts certified reference materials
(CRMs), blanks, and field duplicates to the Bateas Laboratory and regularly sends preparation (coarse reject), and pulp duplicates along
with CRMs and blanks to the umpire ALS Global Laboratory.
Results for the QC samples submitted with samples
to the Bateas and ALS Global Laboratories are monitored on a continuous basis with a monthly report detailing results to management and
actions taken if any issues are identified. In addition to statistical analysis, graphical analysis of the results is also conducted to
assess trends and biases over time in the data.
Previous technical
reports (Armbrust et al, 2005; Sandefur, 2006; and Nielsen et al, 2009; Chapman & Vilela,
2012; Chapman & Kelly, 2013; Chapman & Gutierrez, 2017; Chapman & Sinuhaji, 2019) have assessed the QAQC results
from CMA and Bateas and reported them as acceptable. A full evaluation of all available QC results has been conducted by Fortuna as a
component of the resource estimation process. An assessment was performed on all QC samples submitted to the Bateas Laboratory (responsible
for preparation and assaying of underground channel samples and development drill core) and the ALS Global Laboratory (responsible for
preparation and assaying of exploration drill core) up to the June 30, 2023, database cut-off date.
| 11.5.1 | Certified reference material |
CRMs are samples that are used to measure the
accuracy of analytical processes and are composed of material that has been thoroughly analyzed to accurately determine its grade
December 31, 2023 | Page 93 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
within known error limits. CRMs are inserted by
the geologist into the sample stream, and the expected value is concealed from the laboratory, even though the laboratory will inevitably
know that the sample is a CRM of some sort. By comparing the results of a laboratory’s analysis of a CRM to its certified value,
the accuracy of the result is monitored.
CRMs, whose true values are determined by a laboratory,
have been placed into the sample stream by Bateas geologists to ensure sample accuracy throughout the sampling process. CRM results are
assessed at the operation monthly using time series graphs to identify trends or biases.
Bateas Laboratory
CRMs are submitted to the Bateas Laboratory at
a submission rate of approximately one in 20 samples. As described above, the Bateas Laboratory employs a four-acid digestion methodology
with AA for assaying silver, lead and zinc, unless the grade is greater than 1,500 g/t for silver, or 13 % for lead, or 13 % for zinc.
If the silver grade was found to be greater than 1,500 g/t it was re-assayed by fire assay using a gravimetric finish (FA-GRAV). If the
lead or zinc grades were found to be higher than their upper limits, they were re-assayed by VOL. For gold, the sample is assayed using
fire assay with atomic absorption finish (FA-AA) unless the gold grade is greater than 5 g/t Au, in which case the sample is re-assayed
with FA-GRAV.
Submitted CRMs, indicate the Bateas Laboratory
has acceptable levels of accuracy for silver, lead, zinc, and gold with all elements reporting greater than 99 % pass rates. The assay
results for most CRMs demonstrate little or no bias.
ALS Global Laboratory
Drill core (exploration and infill) is sent to
ALS Global for assaying. As described above, silver, zinc, and lead are assayed by ICP-AES, unless the grade is greater than 100 g/t for
silver, or 1 % for lead or zinc, in which case the sample is re-assayed by aqua regia digestion with an AA finish up to a maximum of 1,500
g/t silver, 30 % lead, or 60 % zinc. If the silver grade is greater than 1,500 g/t it is re-assayed by fire assay using a gravimetric
finish. If the lead or zinc grades are found to be higher than their upper limits, they are re-assayed by titration. CRMs have been submitted
by Bateas with drill core to the ALS Global facilities at a submission rate of approximately 1 in 20 samples.
Results for CRMs submitted to the ALS Global Laboratory
indicate a reasonable level of accuracy is maintained for the four elements of interest.
Field blank samples are composed of material that
is known to contain grades that are less than the detection limit of the analytical method in use (or in the case of Pb and Zn are known
to be very low) and are inserted by the geologist in the field. Blank sample analysis is a method of determining sample switching and
cross-contamination of samples during the sample preparation or analysis processes. Bateas uses coarse quartz sourced from outside the
area and provided by an external supplier as their blank sample material. The blank is tested to ensure the material does not contain
elevated values for the elements of interest.
Bateas Laboratory
The analysis focuses on the submission of blanks
at a submission rate of approximately one in 20 channel samples. Results of the blanks submitted indicate that cross
December 31, 2023 | Page 94 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
contamination and mislabeling are not material
issues at the Bateas Laboratory with pass rates greater than 99 %.
ALS Global Laboratory
Blanks were submitted with core samples to the
ALS Global Laboratory by Bateas covering all core submitted at a rate of one in 20 samples. A pass rate for blanks (set at two times the
lower detection limit) of greater than 99 % was achieved for silver, gold, lead and zinc blank submissions. If two blanks failed in succession,
all assay results for the batch were automatically reviewed and re-analyzed if deemed necessary. Blank results from ALS Global were regarded
as acceptable indicating no significant sample switching or contamination.
The precision of sampling and analytical results
can be measured by re-analyzing the same sample using the same methodology. The variance between the measured results is a measure of
their precision. Precision is affected by mineralogical factors such as grain size and distribution and inconsistencies in the sample
preparation and analysis processes. There are a number of different duplicate sample types which can be used to determine the precision
for the entire sampling process. The terminologies for the duplicates employed by Fortuna at its operations are detailed Table 11.1.
Table 11.1 Terminology employed by
Fortuna for duplicates
Duplicate Type |
Description |
Field |
Samples are generated by another sampling operation at the same collection point. Includes a second channel sample taken parallel to the first or the second half of drill core sample and submitted in the same or separate batch to the same (primary) laboratory. |
Preparation |
Second sample obtained from splitting the coarse crushed rock during sample preparation and submitted in the same batch by the laboratory. |
Laboratory |
Second sample obtained from splitting the pulverized material during sample preparation and submitted in the same batch by the laboratory. |
Reject assay |
Second sample obtained from splitting the coarse crushed rock during sample preparation and submitted blind to the same or different laboratory that assayed the original sample. |
Duplicate assay |
Second sample obtained from splitting the pulverized material during sample preparation and submitted blind at a later date to the same laboratory that assayed the original pulp. |
Check assay |
Second sample obtained from the pulverized material during sample preparation and sent to an umpire laboratory for analysis. |
Numerous plots and graphs are used on a monthly
basis to monitor precision and bias levels. A brief description of the plots employed in the analysis of duplicate data, is described
below:
| · | Absolute relative difference (ARD) statistics:
relative difference of the paired values divided by their average. |
| · | Scatter plot: assesses the degree of scatter
of the duplicate result plotted against the original value, which allows for bias characterization and regression calculations. |
| · | Precision plot: half absolute difference (HAD)
of the sample pairs against their mean. |
December 31, 2023 | Page 95 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| · | Ranked half absolute relative difference (HARD)
of samples plotted against their rank percent value. |
Duplicate results are reviewed monthly by Fortuna
as part of an extensive quality assurance program and are regarded as demonstrating acceptable levels of precision.
Bateas Laboratory
Bateas inserts field, preparation, and laboratory
duplicates as part of a comprehensive QAQC program. Reject assays and check assays are sent to the certified laboratory of ALS Global
to provide an external monitor to the precision of the Bateas Laboratory. CRMs and blanks are also submitted with the reject and check
assays to monitor the accuracy and contamination of the ALS results. Field duplicates, reject assays, duplicate assays, and check assays
are required to be submitted at a rate of one in 40, whereas preparation and laboratory duplicates are submitted at a rate of one in 20.
In the early years of the assaying program, submission rates were lower but have been increased to meet the requirements according to
Fortuna’s QAQC procedural manual.
Results relating to the HARD analysis for the
various types of duplicates submitted to the Bateas Laboratory indicate reasonable precision levels with the majority of HARD values being
less than the accepted threshold level. It should be noted that precision levels for gold assays are lower than for the other elements,
particularly for the duplicate assays. This is because gold concentrations are much lower, and variability is higher. Gold is not an economic
driver in the operation and therefore the cost associated with increasing sample mass to ensure higher precision levels is not justified.
Check assays sent to the umpire laboratory showed
reasonable levels of precision between the two laboratories. Quality control samples included with the duplicates sent to the umpire laboratory
showed acceptable levels of accuracy and no issues with sample switching or contamination.
ALS Chemex Laboratory
Prior to 2013, Bateas relied only on the insertion
of preparation and laboratory duplicates by ALS Global to monitor precision levels of drill core samples submitted to the ALS facilities.
The QAQC policy was revised in late 2012 and Brownfields exploration has since submitted the full array of blind duplicates with drill
core since January 2013.
Results for duplicates submitted with drill core
to the ALS Global Laboratory show acceptable levels of precision are maintained at the laboratory, with the exception of the field duplicates,
which are occasionally slightly above the acceptance levels and tend to be related to the insertion of low grade or low mass samples.
Gold assays also tend to show poorer precision levels when compared to the other metals due to the higher variability of this element
but are not regarded as sufficiently elevated to be a concern.
| 11.5.4 | Quality control measures employed by CMA |
It is understood from the technical reports submitted
by CAM (Armbrust et al, 2005; Sandefur, 2006; and Nielsen et al, 2009), that CMA employed a comprehensive
QAQC program that was reviewed and validated by the authors of these reports. Fortuna has not been able to review this information but
believes the findings of these independent reports are reliable.
The estimation of Animas, Animas NE, Bateas, Bateas
Techo, Silvia, Soledad, Santa Catalina, Patricia, and Pilar do not rely on any CMA information. Estimates of La Plata, Cimoide La Plata,
Paralela, San Carlos, San Cristóbal, and San Pedro use drill hole and
December 31, 2023 | Page 96 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
channel samples obtained by both CMA and Bateas.
Bateas has had limited access to the underground workings from where these samples were obtained to establish the reliability of the original
results. Initial channel sample assays obtained by Bateas from the San Cristobal vein tend to be lower than from CMA drill hole and channel
samples. However, the area investigated is not extensive enough to draw meaningful conclusions at this time.
| 11.6 | Comment on Section 11 |
Analysis of CRMs and blanks submitted to both
the Bateas Laboratory and the independent ALS Global facilities indicate acceptable levels of accuracy for silver, lead, zinc, and gold
grades. The results of the blanks submitted indicate that contamination or mislabeling of samples is not a material issue at either of
the laboratories. Precision levels are good for the Bateas Laboratory with the exception of gold which is slightly below the acceptance
criteria. However, gold is not an economic driver in the operation and therefore the cost associated with increasing sample mass to ensure
high precision levels is not justified. Precision levels are also acceptable for the ALS Global Laboratory.
It is the opinion of the QPs that the sample preparation,
security, and analytical procedures used at the Caylloma Mine for samples sent to both the ALS Global and Bateas Laboratories have been
conducted in accordance with acceptable industry standards and that assay results generated following these procedures are suitable for
use in Mineral Resource and Mineral Reserve estimation.
The QPs are unable to verify the accuracy and
precision of the CMA channel data with any certainty due to insufficient data. Assay results obtained by Bateas in a limited portion of
the San Cristóbal vein tend to be lower than those reported by CMA and therefore areas estimated using samples obtained by CMA
should be regarded with a lower level of confidence. This has been taken into account during resource confidence classification.
December 31, 2023 | Page 97 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| 12.1.1 | Compania Minera Arcata |
Data relating to drill hole and channel samples
taken by CMA were collated in 2008 and 2009 through a careful data recovery process from historical documents and assay certificates.
Bateas was able to recover and validate information on 47 diamond drill holes totaling 8,177.67 m drilled by CMA between 1981 and 2003.
It is unlikely these are the only holes drilled over this period but data on additional drill holes could not be recovered and validated.
Since taking ownership in 2005, Bateas mine site
staff have adhered to a stringent set of procedures for data storage and validation, performing verification of data monthly for all data
relating to drilling and channel samples. The operation employs a Database Administrator who is responsible for oversight of data entry,
verification, and database maintenance.
Steps taken by the QP to verify the data used
in the Mineral Resource and Mineral Reserve estimation process and detailed in this Report include evaluation of the following areas:
| · | Collars and down-hole surveys. |
| · | Geological logs and assays. |
| · | Geotechnical and hydrology. |
| · | Metallurgical recoveries. |
| · | Mineral Resource estimation |
| · | Mineral Reserve estimation. |
Prior to 2018, Bateas
data used for Mineral Resource estimation was stored in two SQL databases, while historical CMA data was stored in a Microsoft Access
database. The databases were fully validated annually by Fortuna as part of the Mineral Resource estimation process.
In late 2017 and early 2018, Bateas worked with
staff from Maxwell Geoservice to transfer all information into the commercial SQL database system, Datashed, employing a dedicated Data
Manager to oversee the data transfer. All data must pass a series of validation checks prior to being imported into Datashed.
In addition, an independent audit of the database
is conducted every quarter by a dedicated database auditor. A report is filed listing any discrepancies and Bateas staff are required
to make the necessary corrections.
December 31, 2023 | Page 98 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
A further preliminary validation
of the database was performed by the Bateas geology department in June 2023 prior to usage for resource updating.
The database was then reviewed and validated
by Mr. Alexander Delgado (MAusIMM) and Mr. Chapman. The data verification procedure involved the following:
| · | Evaluation of minimum and maximum grade values. |
| · | Investigation of minimum and maximum sample lengths. |
| · | Randomly selecting assay data from the database
and comparing the stored grades to the original assay certificates. |
| · | Assessing for inconsistencies in spelling or
coding (typographic and case sensitivity errors). |
| · | Ensuring full data entry and that a specific
data type (collar, survey, lithology, and assay) is not missing. |
| · | Assessing for sample gaps or overlaps. |
No significant inconsistencies were discovered.
|
12.3 | Collars and downhole surveys |
The QP checked randomly selected collar and downhole
survey information for each campaign against source documentation. In addition, Mr. Chapman completed a hand-held GPS survey of randomly
selected surface drill hole collars. The results showed a good correlation with locations recorded in the database.
Downhole surveys
are taken using survey equipment such as a Flexit or Reflex tool. A validation of the readings is performed by Mr. Chapman
by randomly selecting readings taken from individual holes and assessing the level of deviation between successive data points. If significant
discrepancies (e.g. > 15%) exist between data points the information is flagged and follow up checks performed. Mr. Chapman is
of the opinion that collar and downhole survey data has been determined using appropriate techniques and is suitable for usage in Mineral
Resource and Mineral Reserve estimation.
|
12.4 | Geologic logs and assays |
In 2018, Bateas
initiated the use of Maxwell LogChief software that supports the electronic collection of geologic and geotechnical information
in the field using a standardized system of drop-down menus to promote consistency. In addition, all information is electronically transferred
to the database thereby removing the risk of transcription errors.
For validation purposes, Mr. Weedon, during
site visits, reviews the geological interpretation and drill core with Bateas exploration personnel.
Assays received by Bateas are reported in both
Portable Document Format (pdf) and Microsoft Excel format. Both documents are compared and only imported into the database if they are
in agreement. Importation is performed electronically without requiring transcription.
December 31, 2023 | Page 99 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Assay data is verified using a full QAQC program
including the insertion of CRMs, blanks and duplicates for assays reported by both Bateas and ALS Global laboratories. A full description
of this program and its results is provided in Section 11.5.
To further verify the assay data, Mr. Chapman
randomly selected assay data from the database and compared the assay results stored to that of the original assay certificates. Mr. Chapman
is of the opinion that the geological and assay data stored in the database is representative of that reported from the laboratories and
is suitable for usage in Mineral Resource and Mineral Reserve estimation.
|
12.5 | Geotechnical and hydrology |
Mr. Veillette helps
coordinate and manage the Engineer of Record (EoR) for tailings storage facilities (TSF) and water management. Mr. Veillette
also provides support for waste dump geotechnical aspects and has reviewed all technical documents related to the TSFs, water
management and waste dumps detailed in this Report. During Mr. Veillette’s most recent site visit (May, 2023), he
performed an internal audit on the TSF, water management and waste dump. In addition, in April 2023, he spent 10 days on site
training new Responsible Tailings Facility Engineers (RTFE) and providing support on waste dump design and stability.
|
12.6 | Metallurgical recoveries |
A daily log is produced by the Bateas plant that
monitors the performance of the plant including metallurgical recovery achieved for each metal produced. This daily log is supplemented
with a monthly metallurgical balance that reconciles the head grades with the concentrate and tailings grades to verify the recoveries
being achieved at the processing plant. Ms. Gonzalez received a copy of the above information and has used this to determine that
the proposed metallurgical recoveries set out in this Report are achievable and reasonable.
In addition to reviewing the plant performance
the metallurgical QP also conducted reviews including:
| · | Existing mineralogical information. |
| · | Metallurgical testwork results. |
| · | Historic metallurgical plant performance. |
| · | Teleconference meetings with the Caylloma plant
manager. |
|
12.7 | Mineral Resource Estimation |
The Mineral Resource estimation methodology followed
by Bateas, as described in Section 14 of this Report, is based on CIM (2019) best practice guidelines.
Each step of the process is documented, and a
checklist developed that is signed off by Bateas staff and the QP reviewer as it is completed.
The validation of data included reviews of:
| · | Site visit to review core, underground workings
and discuss estimation methodology. |
| · | The database (as described above). |
December 31, 2023 | Page 100 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| · | Wireframe modeling to define geological, structural
and mineralization domains. |
| · | Statistical evaluation to confirm domaining is
appropriate and adheres to the geological interpretation. |
| · | Variographic analysis to confirm modeled variograms
correspond to experimental variography. |
| · | Cross validation and reconciliation results. |
| · | Statistical checks on each field contained in
the resource block model to confirm minimum/maximum values are not exceeded. |
| · | Mineral Resource classification. |
| · | Depletion of mined out and remnant/isolated blocks
from the model. |
| · | Reported Mineral Resources correspond with block
model. |
The QP is of the opinion that the Mineral Resource
estimation was performed using standard industry practices and is suitable for usage in Mineral Reserve estimation.
|
12.8 | Mineral Reserve estimation |
The Mineral Reserve estimation methodology followed
by Bateas, as described in Section 15 of this Report, is based on CIM (2019) best practice guidelines.
Each step of the process is documented, and a
checklist developed that is signed by Bateas staff and Mr. Espinoza.
Mr. Espinoza has visited the Caylloma Mine
several times during 2022 and 2023 to verify the mine infrastructure, mine operating practices, as well as the conditions of the rock
mass for overhand cut and fill. Mr. Espinoza holds regular virtual meetings with the Bateas operations management and technical services
to review operational results on a monthly basis. Additionally, he is responsible for peer reviewing any technical studies relating to
operational improvements associated with the mining methods.
Other reviews made to support the Mineral Reserve
estimation process at the Caylloma Mine include:
| · | Ensuring all aspects of Mineral Reserve estimation
and reporting adhere to Fortuna’s “Technical Information Policy”. |
| · | Reviewing and confirming parameters used for
NSR evaluation adhere to Fortuna’s “Procedure for NSR point value”. |
| · | Reviewing and confirming parameters used for
cut-off grade calculation adhere to Fortuna’s “Procedural Manual for COG determination” and CIM best practices. |
| · | Reviewing and confirming operational parameters
used in the estimation of Mineral Reserves are based on current market and operational considerations and conform to CIM best practices. |
| · | Reviewing historical mining dilution and recovery
with Bateas technical services to verify parameters used in the estimation process are reasonable. |
| · | Discussions regarding mineable shape optimization
(MSO) results with the Bateas technical services and mine operations departments. |
December 31, 2023 | Page 101 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| · | Reviewing various LOM scenarios and their operational
applicability to determine the optimal LOM based on Fortuna’s strategic goals. |
| · | Review of monthly mine reconciliation results
(see below). |
Bateas performs a reconciliation of the resource
and reserve block model estimates against production following a corporate procedural manual on a monthly basis and reports these results
to Fortuna. The QPs are responsible for reviewing and validating the results reported and ensuring any discrepancies greater than 15 %
are investigated and reasons for the variation explained.
Historical mine reconciliation results indicate
that the estimation methodology is reasonable, and production has reconciled well with the estimates for the last five years.
|
12.10 | Comment on Section 12 |
The QP’s are of the opinion that the data
verification programs performed on the data collected from the mine are adequate to support the geological interpretations, the analytical
and database quality, and Mineral Resource and Mineral Reserve estimation at the Caylloma Mine and that, to the knowledge of the QPs,
there are no limitations on or failure to conduct such verification that would materially impact the results. This conclusion is based
on the following:
| · | Site visits conducted by all QP’s to review
data and observe operational activities relating to their area of expertise at the mine. |
| · | No material sample biases were identified from
the QAQC programs. Analytical data that were considered marginal were accounted for in the resource classifications. |
| · | Sample data collected adequately reflect deposit
dimensions, true widths of mineralization, and the style of the deposits. |
| · | Quarterly reviews of the database producing independent
assessments of the database quality. No significant problems with the database, sampling protocols, flowsheets, check analysis program,
or data storage were noted. |
| · | Bateas compiled and maintains a relational database
(Datashed) for the Caylloma Mine which contains all collar, assay, density, survey and lithology information as well as all associated
QAQC data. |
| · | Drill hole and channel collar and downhole surveys
are conducted using standard industry techniques. |
| · | All geologic and assay data is electronically
collected and imported into the database eliminating the potential for transcription errors. |
| · | Geotechnical and hydrology data indicates that
the mining method is suitable based on rock stability and the plant has sufficient access to water to meet its requirements. |
| · | Metallurgical recoveries continue according to
historical behavior. |
| · | Metallurgical monitoring is conducted using tests,
assays and mineralogical data. |
December 31, 2023 | Page 102 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| · | Drill data is verified prior to Mineral Resource
estimation, by running a software program check. |
| · | Mineral Resource estimation methodology is verified
by the QP responsible for resources with each stage being reviewed and checklists completed. |
| · | Mineral Reserve estimation methodology is verified
by the QP responsible for reserves with each stage being reviewed and checklists completed. |
| · | Quarterly mine reconciliation reports monitor
the performance of the resource and reserve block model estimates and indicate a high level of accuracy with production results typically
within ±15 %. |
December 31, 2023 | Page 103 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
13 | Mineral Processing and Metallurgical Testing |
The Caylloma concentrator plant was purchased
from CMA as part of the overall purchase of the Caylloma Mine. Major modifications have been made to the plant following the purchase
of the mine by Fortuna.
Numerous metallurgical tests and studies have
been conducted in the concentrator plant since Bateas took over in order to optimize mineral processing.
Metallurgical recoveries for 2023 were 84.13 %,
91.30 %, and 90.20 % for silver, lead and zinc respectively. In the opinion of Ms. Gonzalez these recovery figures are representative
of the deposit as a whole and similar numbers can be expected in the remaining LOM plan (with the exception of gold rich veins, as detailed
below at point 5). Bateas conducts ongoing work to optimize mineral processing, focusing on metallurgical recoveries and throughput capacity.
Studies or tests developed to achieve these goals include:
| 1. | Plant and metallurgical tests conducted on sulfide material |
Until 2012, ore identified as containing
high zinc oxide content was classified as not amenable for flotation.
Different plant and laboratory tests
were carried out during 2012 on the oxidized mineralized material. The maximum metallurgical recoveries achieved during the plant test
work were 63.98 % for silver, 46.45 % for lead and 32.35 % for zinc.
More laboratory and plant tests have
been conducted since 2013 including metallurgical testing of material from different levels of the Animas vein. The main conclusion being
that zinc oxide content greater than 0.20 % resulted in lower metallurgical recoveries. In order to include this type of material without
affecting the metallurgical recoveries, blending has to be performed to limit the high zinc oxide content to no more than 11 % of the
plant feed.
Additional tests have included characterization
of mine mineral samples (e.g. mechanical preparation of samples, grinding kinetics and soluble salts) as well as qualitative and quantitative
microscopy studies.
An annual bond work index (Wi) assessment
is performed, which has demonstrated that as the mine has deepened the Wi has increased from 15.3 to 18 kWh/t, due to an increase in quartz
content.
| 2. | Metallurgical tests on lead and zinc circuits |
In June 2012, Bateas requested
Blue Coast Metallurgy (BCM) to conduct a mineralogical study of concentrate and tailings products
from the lead circuit. The study aimed to characterize the lead and silver mineral species in both products and identify the form(s) in
which the lead and silver are recovered and lost in terms of size and liberation.
Based on the studies and testing developed
between 2013 and 2023 for the different stages of the process, some changes or adjustments have been implemented in the processing plant
aimed at improving the metallurgical performance including:
December 31, 2023 | Page 104 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| · | Adjustments to the grinding medium and size selection
were made to achieve 58 % passing 75 µm as the final grinding product. |
| · | The Z-11 and Z-6 collectors in the lead flotation
circuit, which were previously added as a mixed solution, are now added independently ensuring a superior effect and avoiding alteration
in their properties. |
| · | The Z-11 collector was replaced with the Z-6
in the zinc circuit to improve recovery. |
| · | Collector agent AP-3418 (6 g/t) has been added
to improve the recovery of silver in the lead circuit. |
| · | Sodium cyanide consumption, which is used as
a lead and zinc depressor in the lead floatation circuit, was reduced from 20 to 6 g/t to improve silver and gold flotation. |
| · | The Denver mill critical speed was increased
from 69 % to 76 % increasing the reduction ratio, resulting in an increase in the treatment capacity by 10 tpd. |
| · | The Magensa (6 foot by 6 foot) mill steel shell
liners were changed to rubber increasing the reduction ratio from 1.2 to 1.6. |
| · | Automatic pH control was installed to stabilize
the process, particularly in the zinc circuit, reducing lime consumption by 25 %. |
| · | Batch and locked cycle flotation tests are regularly
carried out on material extracted from different levels of the mine and fed to the plant, in order to define the optimal operating parameters. |
| · | Metallurgical tests to control the operational
parameters used in milling and flotation (e.g. concentration of reagents, dosages, density controls, reduction ratios, granulometry controls
and pH controls) are performed on a regular basis. |
| · | Stabilization of the flotation process for lead
and zinc was improved by improved control in reagent dosing. |
| · | In 2018, the pH of ore fed to the plant increased
due to added cement for underground support. The increase affected lead flotation, with subsequent metallurgical tests demonstrating carbon
dioxide (32 g/t) usage could reduce the issue. |
| · | As of 2019, the Aerofloat 242 secondary collector
is used as a specific secondary collector for oxidized ore, which helped Bateas improve the metallurgical performance of Ag and Pb by
increasing the contribution of oxide content in blending from 6 to 11%. |
| · | As of 2023, the Aerofloat 242 collector is being
used as a secondary collector in the Zn flotation, helping to stabilize metallurgical behavior. |
| 3. | Mineralogical balance and performance study |
Conducted by Metrix Plant Technologies
in 2017, the study was designed to assess the performance of the Caylloma processing facility. Benchmarking
December 31, 2023 | Page 105 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
analysis concluded that the chemical
agents and doses used in the zinc flotation circuit are within standard norms. Silver losses in the tailings of the lead circuit are mostly
fine grained acanthite (or low copper polybasite) that are problematic for recovery due to their close association with pyrite, sphalerite
or quartz. Zinc content is primarily in the form of sphalerite and its recovery depends on activation in the lead circuit. For oxidize
mineralization, the study concluded that galena makes up approximately 61% of the lead content with the rest being intercalated with non-floatable
minerals, therefore lead recoveries are estimated to be no greater than 45% to 55%.
| 4. | Processing plant optimization |
Aiming to reduce the recirculating load
within the grinding circuit by improving the size selection, pilot tests to replace cyclones with high frequency vibrating wet screens
were run by the Derrick Plant in Buffalo, New York in November 2014.
During 2016, the crushing product was
improved from 9.5 mm to 8 mm, which was achieved by changing the lining profile of the secondary crusher from EC to C type and replacing
the screens from 9.25 to 8 mm.
In March 2016, a plant optimization
project (POP) was implemented with the installation of high frequency slots for grinding, resulting in the reduction of the circulating
load from 250 to 170 % as a result of a more efficient size classification which allowed the processing capacity of the plant to be increased
from 1,300 to 1,500 tpd.
The POP also led to an upgraded lead
flotation circuit, with six OK 20 cells and nine OK 3 cells replacing the agitair cells, thereby increasing the flotation time from 14
to 38 minutes and maintaining silver recoveries even though silver head grades have declined over time.
In 2018, a zinc concentrate dryer was
implemented, reducing the moisture content in the concentrate by approximately one percent.
In 2019, two RCS 20 cells and one RCS
10 cell were installed to increase the float time of the Zn circuit, improving the quality of the concentrate from 50 to 54 %.
In 2021, the contribution of oxides
was increased from 6 to 11 % due to the higher gold grade identified in the oxidized mineralized material. Increasing the proportion of
oxide material did not have a detrimental impact of the recovery of other metals, establishing a new threshold for oxide feed to the plant.
In 2023, a modification of the grinding
circuit was carried out, sending 100 % of the discharge from the primary mills to the SK-240 Flash Unit Cell, improving the recovery and
quality of the Pb-Ag concentrate.
| 5. | Metallurgical testwork on material from elevated gold grade material |
Recovery
rates for material sourced from elevated gold grade veins (averaging > 1 g/t Au), have been derived from historical plant performance.
For example, in September 2021, ore with a head grade averaging 0.37 g/t Au and 70 g/t Ag was processed and recoveries of 56.99 %
in Au and 78.92 % in Ag were achieved. Metallurgical tests performed in May 2023 on samples with average head grades of 0.37 g/t
Au and 118 g/t Ag obtained recoveries of 50.5 % in Au and 86.2 %
December 31, 2023 | Page 106 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
in Ag. These recoveries are achieved
in a gold and silver by-product recovery process after the lead and zinc flotation, providing a baseline for expected results.
Furthermore, metallurgical testwork
has been performed on several bulk samples comprised of drill core intersecting the elevated gold rich vein of Ramal Piso Carolina, to
assess the potential gold recovery if reagents were altered in the flotation process. In May 2013, a bulk sample comprising 50 samples
averaging 5.7 g/t Au from 13 drill holes was sent to SGS for testing. In March 2015, a further three bulk samples comprising 14 drill
core samples each were tested at the Bateas Laboratory. Batch flotation tests were conducted on these samples representing mineralized
material from Ramal Piso Carolina averaging 4.67 g/t Au, 11.21 g/t Au, and 42.14 g/t Au. The samples were regarded as representative of
the mineralization of the vein as a whole. Metallurgical recoveries of greater than 75 % for gold were achieved for all bulk samples tested.
Additional metallurgical tests of mineralized
material from other veins with elevated gold values are recommended to confirm the recoveries are achievable from a range of different
ore types.
Beyond the loss in metallurgical recovery related
to elevated zinc oxide material that can be mitigated by blending, as described above, there are no additional deleterious elements that
require special treatment in the plant as of the effective date of this Report.
|
13.3 | Comments on Section 13 |
It is the opinion of the QP that the Caylloma
Mine has an extensive body of metallurgical investigation comprising several phases of testwork as well as an extensive history of treating
ore at the operation since 2006. In the opinion of the QP, the Caylloma metallurgical samples tested and the mineralized material that
has been treated in the plant is representative of the future mineralization as a whole identified in the LOM in respect to grade variability
and metallurgical response. Differences between vein systems are minimal with regard to recovery.
Metallurgical recovery values forecast in the
LOM for sulfide material average 82 % for silver, 22 % for gold, 90 % for lead, and 89 % for zinc. Metallurgical
recovery is forecast for mineralized material from veins with elevated gold grades (averaging > 1 g/t Au) to average 85 % for silver,
55 % for gold, 87 % for lead, and 89 % for zinc.
December 31, 2023 | Page 107 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
14 | Mineral Resource Estimates |
The following sections describe in detail the
Mineral Resource estimation methodology of the veins updated in 2023. These include the Animas, Animas Techo, Animas NE, Animas NE Techo,
Cimoide ASNE, Ramal Techo ASNE, Rosita and Nancy veins.
If no new information for a vein was obtained
since the previous estimate reported as of December 31, 2022, the previous result was retained, albeit with the application of new
metal prices, recoveries, and cut-off grades. Veins that did not require updating included Bateas/Bateas Piso, Bateas Techo, Santa Catalina,
Soledad, Silvia, Patricia, Pilar, Paralela, San Cristobal, San Carlos, San Pedro, La Plata/Cimoide La Plata, Ramal Piso Carolina, and
Don Luis II. A summary of the estimation methodology used to estimate these veins has been included for completeness.
Mineral Resources were prepared by Sharon Duenas,
an employee of Bateas, under the technical supervision of Alexander Delgado, MAusIMM. The estimation process was peer reviewed by Eric
Chapman, P.Geo. Mr. Delgado and Mr. Chapman are Qualified Person’s as defined in National Instrument 43-101 and employees
of Fortuna.
Mineral Resource estimates have an effective date
of June 30, 2023.
| 14.2.1 | Known issues that materially affect Mineral Resources |
Fortuna does not know of any issues that materially
affect the Mineral Resource estimates. These conclusions are based on the following, as of the effective date of this Report.:
| · | Environmental: Bateas is in compliance
with Environmental Regulations and Standards set in Peruvian Law and has complied with all laws, regulations, norms and standards at every
stage of operation of the mine. |
| · | Permitting: Bateas has represented that
permits are in good standing. |
| · | Legal: Bateas has represented that there
are no outstanding legal issues; no legal action, and injunctions are pending against the mine. |
| · | Title: Bateas has represented that the
mineral and surface rights have secure title. |
| · | Taxation: No known issues. |
| · | Socio-economic: Bateas has represented
that the mine has strong local community support. |
| · | Marketing: No known issues. |
| · | Political: Bateas believes that the current
government is supportive of the mine. |
| · | Mining: Bateas has been successfully operating
a mining facility at Caylloma since 2006, which has included extraction from the Animas, Animas NE, Ramal Techo ASNE, Cimoide ASNE, Bateas,
Soledad, Silvia, Santa Catalina, Nancy, and Rosita veins. Underground mining has also been successfully performed by CMA including extraction
of mineralized material from the San Cristóbal, Bateas, Santa Catalina, San Pedro, Paralela, and San Carlos veins. |
December 31, 2023 | Page 108 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| · | Metallurgical: Bateas presently successfully
treats ore extracted from the Caylloma Mine in the onsite processing plant to produce lead and zinc concentrates with gold and silver
credits (Section 13). |
| · | Infrastructure: No known issues. |
| · | Other relevant issues: No known issues. |
|
14.3 | Assumptions, methods and parameters |
The 2023 Mineral Resource estimates for those
veins updated (Animas, Animas Techo, Animas NE, Animas NE Techo, Cimoide ASNE, Ramal Techo ASNE, Rosita and Nancy veins) were prepared
in the following steps:
| · | Data validation as performed by Fortuna. |
| · | Data preparation including importation to various
software packages. |
| · | Geological interpretation and modeling of mineralization
domains. |
| · | Coding of drill hole and channel data within
mineralized domains. |
| · | Sample length compositing of both drill holes
and channel samples. |
| · | Analysis of extreme data values and application
of top cuts. |
| · | Exploratory data analysis of the key constituents
– silver, gold, lead, zinc, copper and density. |
| · | Analysis of boundary conditions. |
| · | Variogram analysis and modeling. |
| · | Derivation of kriging plan. |
| · | Kriging neighborhood analysis and creation of
block models. |
| · | Grade interpolation of Ag, Au, Pb, Zn, Cu, and
sample length, assignment of density values. |
| · | Validation of grade estimates against input sample
data. |
| · | Classification of estimates with respect to CIM
guidelines. |
| · | Assignment of an NSR based on long term metal
prices, metallurgical recoveries, smelting costs, commercial contracts, and average concentrate grades. |
| · | Depletion of blocks identified as extracted or
inaccessible. |
| · | Mineral Resource tabulation and reporting based
on NSR cut-off grades. |
If no new information for a vein was available
since the previous Mineral Resource estimate, the grade values were not re-estimated. However, the methodology and results were reviewed,
and updated metal prices, recoveries, and costs applied to the calculation of NSR values. This was the case for the Bateas/Bateas Piso,
Bateas Techo, Santa Catalina, Soledad, Silvia, Patricia, Pilar, Paralela, San Cristobal, San Carlos, San Pedro, La Plata/Cimoide La Plata,
Ramal Piso Carolina, and Don Luis II.
December 31, 2023 | Page 109 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
|
14.4 | Supplied data, data transformations and data validation |
Bateas information used in the 2023 estimation
is sourced from the Maxwell Datashed industry standard database system.
Bateas supplied all available data as of June 30,
2023.
| 14.4.1 | Data transformations |
Historical assays recorded by CMA in paper format
were in troy ounces per tonne and these were transformed to grams per tonne prior to entry into Datashed. The transformation was made
by multiplying the troy ounces by 31.1035 to calculate the equivalent grams. No other data transformations were required.
Mineral Resource estimates have relied on several
software packages for undertaking modeling, statistical, geostatistical and grade interpolation activities. Wireframe modeling of the
mineralized envelopes was performed in Leapfrog version 2023.1.1 Data preparation, block modeling and grade interpolations were performed
in Datamine RM version 1.11.300. Statistical and variographic analysis was performed in Supervisor version 8.15.1.
Collar, survey, lithology, and assay data exported
from Datashed provided by Bateas were imported into Datamine and used to build three dimensional representations of the drill holes and
channels. Assay values at or below the detection limit were corrected to half the detection limit. The number of surface drill holes,
underground drill holes and channels available for the geologic interpretation process is shown in Table 14.1.
Table 14.1
Drill holes and channels available for geologic interpretation
Vein |
Surface Drill holes |
Underground Drill holes |
Channels |
Number |
Meters |
Number |
Meters |
Number |
Meters |
Animas |
94 |
30,097 |
77 |
12,186 |
37,449 |
93,810 |
Animas NE |
176 |
54,489 |
239 |
39,639 |
28,950 |
89,673 |
Animas Techo |
|
|
|
|
117 |
160 |
Cimoide ASNE |
|
|
7 |
978 |
1,917 |
6,542 |
Ramal Techo ASNE |
|
|
|
|
916 |
2,874 |
Bateas |
80 |
17,571 |
45 |
4,857 |
16,682 |
15,062 |
Bateas Techo |
|
|
|
|
289 |
254 |
Silvia |
|
|
17 |
1,725 |
1,176 |
1,872 |
Soledad |
7 |
924 |
1 |
32 |
6,804 |
6,682 |
Santa Catalina |
3 |
551 |
8 |
1,123 |
1,743 |
3,582 |
Patricia |
|
|
7 |
683 |
36 |
32 |
Pilar |
|
|
|
|
63 |
105 |
La Plata*# |
26 |
5,765 |
15 |
4,116 |
373 |
292 |
Cimoide La Plata* |
311 |
373 |
San Cristóbal* |
6 |
3,363 |
7 |
770 |
5,201 |
10,030 |
Paralela |
|
|
|
|
623 |
936 |
San Carlos/ San Carlos 1* |
2 |
496 |
10 |
481 |
295 |
145 |
San Pedro* |
6 |
2,456 |
|
|
2,006 |
2,646 |
San Pedro Oeste |
2 |
811 |
|
|
|
|
Santo Domingo |
|
|
|
|
26 |
73 |
December 31, 2023 | Page 110 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Vein |
Surface Drill holes |
Underground Drill holes |
Channels |
Number |
Meters |
Number |
Meters |
Number |
Meters |
Santa Rosa |
|
|
|
|
6 |
13 |
Antimonio |
3 |
594 |
|
|
|
|
Caylloma 6 |
3 |
959 |
|
|
|
|
Corona Antimonio |
2 |
524 |
|
|
|
|
Corona |
1 |
345 |
|
|
|
|
Elisa |
|
|
|
|
7 |
7 |
Gabriela |
2 |
383 |
|
|
|
|
Lucia |
|
|
8 |
1,300 |
|
|
San Antonio |
2 |
392 |
|
|
|
|
El Toro |
1 |
178 |
|
|
|
|
Vilafro |
4 |
985 |
|
|
|
|
Wendy |
1 |
285 |
|
|
|
|
Nancy |
34 |
9,355 |
32 |
4,354 |
1,571 |
4,983 |
Carolina |
72 |
17,577 |
|
|
11 |
40 |
Ramal Piso Carolina |
|
|
|
|
5 |
26 |
Don Luis II |
42 |
12,553 |
|
|
|
|
Pissaca |
4 |
2,536 |
|
|
|
|
Total |
573 |
163,186 |
473 |
72,243 |
106,577 |
240,213 |
Notes: Some
drill holes intersect multiple veins - number and meters are attributed to the primary target vein.
* Includes
CMA channel samples.
#
Drill holes intersect both La Plata and Cimoide La Plata veins.
Totals may not add due to rounding. |
An extensive data validation process was conducted
by the Bateas operational staff and Mineral Resource groups of Fortuna prior to Mineral Resource estimation.
Validation checks were also performed upon importation
into Datamine mining software and included searches for overlaps or gaps in sample and geology intervals, inconsistent drill hole identifiers,
and missing data. No significant discrepancies were identified.
|
14.5 | Geological interpretation and domaining |
Caylloma is a low-sulfidation epithermal style
deposit, primarily consisting of sulfosalts and silver sulfides and base metal sulfides. Mineralization is associated with distinct veins
characterized by silver sulfosalts and base metal sulfides in a banded gangue of quartz, rhodonite and calcite. Host rocks adjacent to
the veins are characterized by local illite and widespread propylitic alteration.
Major vein systems recognized at the Caylloma
Mine, all have a general northeast to southwest strike orientation and dipping predominantly to the southeast. Host rocks are andesitic
lavas, pyroclastics and volcaniclastics of the Tacaza volcanic group.
There are two different types of mineralization
at Caylloma; the first is comprised of silver-rich veins with low concentrations of base metals. The second type of vein is polymetallic
in nature with elevated silver, lead, zinc, copper, and gold grades.
December 31, 2023 | Page 111 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Silver veins
| · | Bateas, Bateas Piso, Bateas Techo, La Plata,
Cimoide La Plata, San Cristóbal, San Pedro, San Carlos, Paralela, Ramal Piso Carolina, and Don Luis II veins. |
Polymetallic veins
| · | Animas, Animas Techo, Animas NE, Animas NE Techo,
Cimoide ASNE, Ramal Techo ASNE, Rosita, Santa Catalina, Soledad, Silvia, Pilar, Patricia, and Nancy veins. |
Mineralized envelopes were constructed by the
Bateas mine geology department based on the interpretation of the deposit geology and refined using the drill hole, channel and underground
mapping information. The mineralized wireframes were modeled in Leapfrog based on channel and drill hole intersections that have an average
combined (Ag, Au, Pb, and Zn) NSR value greater than US$ 50 (regarded as mineralized). Prices used for determining the metal value
were based on long term metal prices as summarized in Table 14.2.
Table 14.2
Metal prices used to define mineralized envelopes
Metal |
Price |
Ag |
21.00 |
US$/oz |
Au |
1,600 |
US$/oz |
Pb |
2,000 |
US$/t |
Zn |
2,600 |
US$/t |
|
14.6 | Exploratory data analysis |
| 14.6.1 | Compositing of assay intervals |
Compositing of sample lengths was undertaken so
that the samples used in statistical analyses and estimations have similar support (i.e., length). Bateas sample drill holes and channels
at varying interval lengths depending on the length of intersected geological features and the true thickness of the vein structure. Sample
lengths were examined for each vein and composited according to the most frequently sampled length interval (Table 14.3). The composited
and raw sample data were compared to ensure no sample length loss or metal loss had occurred.
Table 14.3
Composite length by vein
Vein |
Composite length (m) |
Animas/Animas Techo |
2.5 |
Animas NE/Animas NE Techo |
2.5 |
Ramal Techo ASNE |
2 |
Cimoide ASNE |
2 |
Bateas (inc. Techo & Piso) |
1 |
Silvia |
1.5 |
Soledad |
1 |
Santa Catalina |
2 |
Patricia |
1 |
Pilar |
1 |
La Plata |
1 |
Cimoide La Plata |
1 |
San Cristobal |
2 |
December 31, 2023 | Page 112 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Vein |
Composite length (m) |
Paralela |
1 |
Rosita |
2 |
San Carlos |
1 |
San Pedro |
1 |
Nancy |
2 |
Ramal Piso Carolina |
1 |
Don Luis II |
1 |
The Datamine COMPDH downhole compositing process
was used to composite the samples within the estimation domains (i.e. composites do not cross over the mineralized domain boundaries).
The COMPDH parameter MODE was set to a value of one to allow adjusting of the composite length while keeping it as close as possible to
the composite interval; this is done to minimize sample loss.
Due to the variable thickness of the veins, it
was noted that composite lengths were still variable with a high proportion being less than the composite length. In previous estimates
this composite length variation has been successfully dealt with by weighting the estimate by the composite length and therefore this
methodology was employed in 2023.
| 14.6.2 | Statistical analysis of composites |
Exploratory data analysis was performed on composites
identified in each geological vein (Table 14.4). Splays have been identified separately and samples composited within these domains as
detailed below. Statistical and graphical analysis (including histograms, probability plots, scatter plots) were investigated for each
vein to assess if additional sub-domaining was required to achieve stationarity.
High-grade domains have been identified in several
of the veins. Bateas used probability assigned constrained kriging (PACK) to estimate the location of high-grade regions of the deposit.
PACK was designed to define economic envelopes around mineralized zones digitally that are difficult to outline and delineate using more
traditional and labor-intensive methods such as wireframing. Probabilistic envelopes are first generated using indicators to define the
limits of the economic mineralization and then the envelopes are used in the resource estimation to confine the higher-grade assays from
smearing into lower-grade zones and restrict lower-grade assays from diluting the higher-grade zones.
PACK models were constructed for the Animas, Animas
Techo, Animas NE (except silver), Animas NE Techo (gold and zinc), Cimoide ASNE (silver, gold, and lead), Animas NE splay (silver only),
the La Plata, Bateas Piso (silver only) and Nancy (silver, gold and lead) veins as follows:
| · | Indicator thresholds were selected for samples
in the mineralized domain with grades above the threshold set to one and below to zero. |
| · | Indicator values were estimated by inverse distance
weighting into the block model. |
| · | Upon completion of the estimate, all blocks with
a probability value greater than or equal to 0.5 were assigned a code of one and blocks with a probability below 0.5 were assigned a code
of zero. |
| · | A wireframe was generated identifying the location
of the block codes equal to one for each of the thresholds of interest (i.e. the high-grade domain). |
December 31, 2023 | Page 113 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
The high-grade regions are domained separately so as to prevent smearing
of the higher grades into the lower grade areas and vice versa during the estimation process by controlling the search neighborhoods,
as described in Section 14.8.3.
Table 14.4
Univariate statistics of undeclustered composites by vein
Vein |
Grade |
Count |
Minimum |
Maximum |
Mean |
Variance |
Std. Dev. |
Animas
High grade domain |
Ag (g/t) |
3,548 |
3.00 |
15,351 |
513 |
603,055 |
777 |
Au (g/t) |
3,444 |
0.00 |
168.36 |
1.74 |
38.07 |
6.17 |
Pb (%) |
5,089 |
0.02 |
45.39 |
5.77 |
15.27 |
3.91 |
Zn (%) |
10,393 |
0.01 |
31.13 |
6.84 |
14.21 |
3.77 |
Animas
Low grade domain |
Ag (g/t) |
29,003 |
0.10 |
3,971 |
84 |
20,937 |
105 |
Au (g/t) |
29,105 |
0.00 |
172.18 |
0.30 |
2.45 |
1.56 |
Pb (%) |
27,461 |
0.00 |
36.06 |
1.35 |
2.33 |
1.53 |
Zn (%) |
22,159 |
0.00 |
26.92 |
2.11 |
3.68 |
1.92 |
Animas Techo
High grade domain |
Ag (g/t) |
346 |
32.0 |
9,565 |
697 |
1,459,934 |
1,208 |
Au (g/t) |
231 |
0.05 |
44.99 |
2.02 |
25.16 |
5.02 |
Pb (%) |
623 |
0.04 |
44.04 |
6.17 |
21.48 |
4.63 |
Zn (%) |
1,345 |
0.02 |
27.93 |
5.70 |
12.00 |
3.47 |
Animas Techo
Low grade domain |
Ag (g/t) |
3,293 |
0.10 |
4,288 |
89 |
23,205 |
152 |
Au (g/t) |
3,408 |
0.00 |
11.00 |
0.23 |
0.10 |
0.32 |
Pb (%) |
3,016 |
0.00 |
22.13 |
1.04 |
1.91 |
1.38 |
Zn (%) |
2,294 |
0.00 |
22.92 |
1.42 |
3.07 |
1.75 |
Animas NE |
Ag (g/t) |
28,949 |
0.10 |
4,164 |
100 |
11,024 |
105 |
Animas NE
High grade domain |
Au (g/t) |
3,441 |
0.00 |
1,164 |
2.29 |
500 |
22.36 |
Pb (%) |
17,809 |
0.00 |
55.90 |
5.46 |
21.27 |
4.61 |
Zn (%) |
20,278 |
0.00 |
46.21 |
6.49 |
15.94 |
3.99 |
Cu (%) |
12,869 |
0.00 |
5.42 |
0.43 |
0.12 |
0.34 |
Animas NE
Low grade domain |
Au (g/t) |
25,514 |
0.00 |
113.52 |
0.18 |
0.70 |
0.84 |
Pb (%) |
11,155 |
0.00 |
40.31 |
1.33 |
2.67 |
1.64 |
Zn (%) |
8,685 |
0.00 |
24.74 |
2.01 |
2.79 |
1.67 |
Cu (%) |
16,088 |
0.00 |
5.19 |
0.12 |
0.02 |
0.12 |
Animas NE Techo |
Ag (g/t) |
5,207 |
0.10 |
1,973 |
119 |
15,419 |
124 |
Au High (g/t) |
342 |
0.02 |
38.21 |
0.78 |
4.48 |
2.12 |
Au Low (g/t) |
4,867 |
0.00 |
7.25 |
0.21 |
0.04 |
0.20 |
Pb (%) |
5,207 |
0.00 |
49.73 |
3.39 |
13.94 |
3.73 |
Zn High (%) |
803 |
0.01 |
36.53 |
10.83 |
23.70 |
4.87 |
Zn Low (%) |
4,405 |
0.00 |
29.97 |
3.81 |
7.84 |
2.80 |
Cu (%) |
5,207 |
0.00 |
3.42 |
0.34 |
0.12 |
0.35 |
Ramal Techo Animas NE
|
Ag (g/t) |
577 |
0.10 |
1,291 |
227 |
42,685 |
207 |
Au (g/t) |
577 |
0.00 |
5.69 |
0.09 |
0.06 |
0.24 |
Pb (%) |
577 |
0.00 |
29.56 |
3.28 |
15.37 |
3.92 |
Zn (%) |
577 |
0.00 |
17.98 |
4.60 |
9.47 |
3.08 |
Cu (%) |
577 |
0.00 |
3.94 |
0.87 |
0.51 |
0.72 |
Cimoide ASNE |
Ag High (g/t) |
88 |
12.50 |
1,999 |
473 |
95,167 |
308 |
Ag Low (g/t) |
2,982 |
0.10 |
2,848 |
116 |
13,017 |
114 |
Au High (g/t) |
599 |
0.02 |
2.77 |
0.32 |
0.09 |
0.29 |
Au Low (g/t) |
2,471 |
0.00 |
4.73 |
0.13 |
0.04 |
0.19 |
Pb High (%) |
817 |
0.02 |
45.01 |
7.41 |
24.07 |
4.91 |
Pb Low (%) |
2,253 |
0.00 |
39.46 |
2.60 |
6.85 |
2.62 |
Zn (%) |
3,070 |
0.00 |
35.16 |
6.85 |
22.91 |
4.79 |
Cu (%) |
3,070 |
0.00 |
10.54 |
0.60 |
0.47 |
0.68 |
December 31, 2023 | Page 114 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Vein |
Grade |
Count |
Minimum |
Maximum |
Mean |
Variance |
Std. Dev. |
Rosita |
Ag (g/t) |
846 |
0.10 |
1,095 |
96 |
8,250 |
91 |
Au (g/t) |
846 |
0.00 |
11.71 |
0.16 |
0.17 |
0.41 |
Pb (%) |
846 |
0.00 |
23.97 |
3.13 |
8.58 |
2.93 |
Zn (%) |
846 |
0.00 |
38.12 |
6.48 |
20.24 |
4.50 |
Cu (%) |
846 |
0.00 |
10.66 |
0.63 |
0.94 |
0.97 |
Bateas |
Ag (g/t) |
13,629 |
0.10 |
31,294 |
902 |
2,675,047 |
1,636 |
Au (g/t) |
13,629 |
0.00 |
117.32 |
0.32 |
6.94 |
2.63 |
Pb (%) |
13,629 |
0.00 |
12.80 |
0.61 |
0.63 |
0.80 |
Zn (%) |
13,629 |
0.00 |
23.92 |
0.93 |
1.40 |
1.19 |
Bateas Piso |
Ag High (g/t) |
1,110 |
3.00 |
29,077 |
1,762 |
7,620,747 |
2,761 |
Au (g/t) |
1,110 |
0.01 |
49.50 |
0.68 |
6.73 |
2.59 |
Pb (%) |
1,110 |
0.00 |
2.82 |
0.31 |
0.12 |
0.35 |
Zn (%) |
1,110 |
0.01 |
5.54 |
0.57 |
0.40 |
0.64 |
Bateas Techo |
Ag (g/t) |
255 |
0.10 |
2,231 |
241 |
160,640 |
401 |
Au (g/t) |
255 |
0.00 |
2.56 |
0.12 |
0.08 |
0.28 |
Pb (%) |
255 |
0.00 |
1.84 |
0.17 |
0.08 |
0.28 |
Zn (%) |
255 |
0.00 |
3.00 |
0.25 |
0.18 |
0.42 |
Silvia |
Ag (g/t) |
1,037 |
0.10 |
2,408 |
90 |
16,659 |
129 |
Au (g/t) |
1,037 |
0.00 |
62.60 |
0.59 |
7.74 |
2.78 |
Pb (%) |
1,037 |
0.00 |
23.39 |
1.70 |
5.43 |
2.33 |
Zn (%) |
1,037 |
0.00 |
21.97 |
2.54 |
5.74 |
2.40 |
Soledad (Main) |
Ag (g/t) |
5,803 |
1.10 |
47,001 |
473 |
1,737,132 |
1,318 |
Au (g/t) |
5,803 |
0.00 |
97.65 |
2.35 |
28.27 |
5.32 |
Pb (%) |
5,803 |
0.00 |
17.70 |
1.30 |
2.55 |
1.60 |
Zn (%) |
5,803 |
0.01 |
26.14 |
1.68 |
2.20 |
1.48 |
Soledad (Splay) |
Ag (g/t) |
360 |
2.00 |
1,820 |
152 |
21,582 |
147 |
Au (g/t) |
360 |
0.02 |
46.75 |
3.41 |
32.44 |
5.70 |
Pb (%) |
360 |
0.02 |
19.73 |
2.72 |
5.03 |
2.24 |
Zn (%) |
360 |
0.03 |
17.97 |
4.62 |
10.02 |
3.17 |
Santa Catalina |
Ag (g/t) |
1,730 |
0.50 |
2,044 |
130 |
22,413 |
150 |
Au (g/t) |
1,712 |
0.00 |
80.11 |
1.11 |
13.10 |
3.62 |
Pb (%) |
1,711 |
0.00 |
29.65 |
1.60 |
3.49 |
1.87 |
Zn (%) |
1,711 |
0.00 |
15.74 |
2.31 |
3.49 |
1.87 |
Patricia |
Ag (g/t) |
62 |
6.00 |
1,948 |
213 |
107,040 |
327 |
Au (g/t) |
62 |
0.02 |
6.63 |
0.68 |
1.57 |
1.25 |
Pb (%) |
62 |
0.02 |
4.75 |
0.47 |
0.58 |
0.76 |
Zn (%) |
62 |
0.02 |
5.96 |
0.68 |
1.07 |
1.03 |
Pilar |
Ag (g/t) |
42 |
0.10 |
799 |
113 |
24,326 |
156 |
Au (g/t) |
42 |
0.00 |
3.51 |
0.84 |
0.75 |
0.87 |
Pb (%) |
42 |
0.00 |
3.68 |
0.53 |
0.57 |
0.76 |
Zn (%) |
42 |
0.00 |
7.19 |
0.64 |
1.34 |
1.16 |
La Plata
(High grade) |
Ag (g/t) |
733 |
3.10 |
58,830 |
3,308 |
54,427,165 |
7,377 |
Au (g/t) |
678 |
0.00 |
267.78 |
5.00 |
350.20 |
18.71 |
La Plata
(Low grade) |
Ag (g/t) |
69 |
0.37 |
2,646 |
232 |
244,163 |
494 |
Au (g/t) |
69 |
0.01 |
35.31 |
1.45 |
28.83 |
5.37 |
Cimoide La Plata |
Ag (g/t) |
378 |
4.04 |
22,144 |
483 |
2,369,246 |
1,539 |
Au (g/t) |
378 |
0.00 |
137.45 |
2.42 |
101.14 |
10.06 |
San Cristóbal |
Ag (g/t) |
3,334 |
1.35 |
17,471 |
229 |
422,299 |
650 |
Au (g/t) |
1,581 |
0.00 |
99.86 |
0.64 |
16.06 |
4.01 |
Paralela |
Ag (g/t) |
575 |
0.00 |
5,528 |
264 |
216,606 |
465 |
December 31, 2023 | Page 115 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Vein |
Grade |
Count |
Minimum |
Maximum |
Mean |
Variance |
Std. Dev. |
|
Au (g/t) |
104 |
0.01 |
2.50 |
0.38 |
0.28 |
0.52 |
San Carlos |
Ag (g/t) |
294 |
15.55 |
3,060 |
396 |
327,777 |
572.52 |
Au (g/t) |
106 |
0.10 |
21.3 |
0.70 |
4.79 |
2.19 |
San Pedro |
Ag (g/t) |
2,385 |
3.11 |
18,000 |
534 |
1,304,900 |
1,142 |
Au (g/t) |
305 |
0.01 |
126 |
3.89 |
74.49 |
8.63 |
Nancy
(High grade) |
Ag (g/t) |
808 |
3.00 |
772 |
167 |
10,290 |
101 |
Au (g/t) |
176 |
0.01 |
22.93 |
1.68 |
11.13 |
3.34 |
Pb (%) |
733 |
0.10 |
40.32 |
7.42 |
21.65 |
4.65 |
Zn (%) |
1,493 |
0.04 |
33.82 |
7.54 |
16.87 |
4.11 |
Nancy
(Low grade) |
Ag (g/t) |
1,764 |
0.10 |
774 |
51 |
2,185 |
47 |
Au (g/t) |
2,395 |
0.00 |
127.45 |
0.31 |
11.11 |
3.33 |
Pb (%) |
1,838 |
0.00 |
40.45 |
2.20 |
5.22 |
2.29 |
Zn (%) |
1,078 |
0.00 |
22.31 |
2.04 |
3.59 |
1.89 |
Nancy |
Cu (%) |
2,571 |
0.00 |
2.85 |
0.26 |
0.07 |
0.26 |
Ramal Piso Carolina |
Ag (g/t) |
136 |
1.00 |
2,106 |
99 |
41,261 |
203 |
Au (g/t) |
136 |
0.02 |
45.32 |
3.67 |
49.54 |
7.04 |
Don Luis II (Main) |
Ag (g/t) |
68 |
20.11 |
1,461 |
306 |
137,216 |
370 |
Au (g/t) |
68 |
0.02 |
117.52 |
2.74 |
204.49 |
14.30 |
Don Luis II (Splay) |
Ag (g/t) |
18 |
0.93 |
181 |
81 |
3,011 |
54.87 |
Au (g/t) |
18 |
0.00 |
1.58 |
0.24 |
0.17 |
0.41 |
In addition to the high-grade domains explained
above, the Animas and Animas NE veins have been explored closer to the surface than any of the other veins. Through the investigation
of the mineralogy and grade characteristics a partially oxidized domain and a zinc oxide domain have been identified. Samples have been
coded as oxide or sulfide for estimation purposes and areas of high zinc oxide (> 0.2 % ZnO) have been sub-domained in the block model
as this material results in a decrease in metallurgical recovery when fed to the plant.
A number of veins are comprised of a main component
and a separate splay vein, as detailed in Table 14.4. The main and splay veins have been domained and estimated separately to ensure grades
are not smeared between the veins.
Internal waste was also identified as being present
in the Animas/Animas NE vein and to a lesser degree in the Bateas vein. These areas of internal waste were sub-domained and samples identified
within coded as waste for estimation purposes.
| 14.6.4 | Extreme value treatment |
Top cuts of extreme grade values prevent over-estimation
in domains due to disproportionately high-grade samples. Whenever the domain contains an extreme grade value, this extreme grade will
overly influence the estimated grade.
If the extreme values are supported by surrounding
data, are a valid part of the sample population, and are not considered to pose a risk to estimation quality, then they can be left untreated.
If the extreme values are not considered to be a valid part of the population (e.g., they belong in another domain or are simply erroneous),
they should be removed from the domains data set. If the extreme values are considered a valid part of the population but are considered
to pose a risk for estimation quality (e.g., because they are poorly supported by neighboring values), they should be top cut. Top cutting
is the practice of resetting all values above a certain threshold value to the threshold value.
December 31, 2023 | Page 116 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Fortuna examined the grades of all metals to be estimated (Ag, Pb,
Zn, Cu, and Au) to identify the presence and nature of extreme grade values. This was done by examining the sample histogram, log histogram,
log-probability plot, and by examining the spatial location of extreme values. Top cut thresholds were determined by examination of the
same statistical plots and by examination of the effect of top cuts on the mean, variance, and coefficient of variation (CV) of the sample
data. Top cut thresholds used for each vein are shown in Table 14.5. If insufficient data is present to determine appropriate top cut
values for a splay vein the values from the main vein have been applied.
Table 14.5
Topcut thresholds by vein
Vein |
Ag (g/t) |
Au (g/t) |
Pb (%) |
Zn (%) |
Cu (%) |
Animas - High Grade |
5,000 |
37 |
25 |
25 |
- |
Animas - Low Grade |
850 |
5 |
13 |
12 |
- |
Animas Techo - High Grade |
3,500 |
15 |
18 |
16 |
- |
Animas Techo - Low Grade |
600 |
1.5 |
10 |
10 |
- |
Animas NE - High grade |
900 |
25 |
36 |
32 |
3 |
Animas NE - Low grade |
2.7 |
15.6 |
9.7 |
1 |
Animas NE Techo ASNE – High grade |
900 |
2.5 |
22 |
28 |
2.2 |
Animas NE Techo ASNE – Low grade |
0.6 |
8 |
Ramal Techo ASNE |
800 |
0.24 |
24 |
12 |
2.5 |
Cimoide ASNE - High Grade |
930 |
1.3 |
25 |
24 |
4.6 |
Cimoide ASNE - Low Grade |
110 |
0.8 |
8 |
Bateas |
12,500 |
35 |
6 |
7.5 |
- |
Bateas Piso |
20,000 |
15 |
2 |
3.5 |
- |
Bateas Techo |
1,200 |
1 |
1.4 |
1.5 |
- |
Silvia |
600 |
7 |
14 |
11 |
- |
Soledad |
7,000 |
30 |
12 |
8.5 |
- |
Santa Catalina |
850 |
11 |
11 |
10 |
- |
Patricia |
500 |
1.5 |
- |
3 |
- |
Pilar |
- |
- |
- |
- |
- |
La Plata - High grade |
1,300 |
17 |
10 |
- |
- |
La Plata - Low grade |
350 |
3.5 |
- |
- |
- |
Cimoide La Plata |
10,000 |
60 |
- |
- |
- |
San Cristóbal |
3,950 |
5 |
5 |
6 |
- |
Paralela |
1,750 |
1 |
- |
- |
- |
San Carlos |
3,000 |
18 |
- |
- |
- |
San Pedro |
8,000 |
20 |
- |
- |
- |
Nancy - High grade |
450 |
6 |
25 |
25 |
1.5 |
Nancy - Low grade |
250 |
2 |
11.8 |
8.5 |
- |
Ramal Piso Carolina |
1,000 |
40 |
0.6 |
1 |
- |
Rosita |
300 |
0.8 |
11.4 |
21 |
2.7 |
Don Luis II |
- |
15 |
1 |
2 |
- |
| 14.6.5 | Boundary conditions |
The boundary conditions at Caylloma are well established
with underground workings identifying a sharp contact between the mineralized vein structures and the host rock in all veins. Subsequently
domain boundaries were treated as hard boundaries. Only samples coded within a vein were used to estimate blocks within that vein, to
prevent smearing of high-grade samples in the vein into the low-grade host rock, and vice versa.
The boundary conditions between oxide and sulfide
material in the Animas/Animas NE veins is gradational in nature occurring over tens of meters. This boundary has been
December 31, 2023 | Page 117 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
treated as a soft boundary with samples from either domain being used for estimation in the vein.
This allows a gradational effect in the grade estimates.
The boundary between high- and low-grade areas
is also gradational but less so than the oxide/sulfide boundary and is regarded as firm. To prevent high grades smearing into low grade
areas a two-stage approach is used in the estimate where a small search ellipse is allowed to estimate grades across the boundary over
short distances, but a larger search ellipse is restricted to selecting composites and estimating grades within the defined high- or low-grade
domain.
Descriptive statistics of sample populations within
a domain may be biased by the clustering of sample data in particular areas of the domain. To reduce any bias caused by clustering of
sample data, Fortuna declustered the input sample data using a grid system. Declustered data statistics are used when comparing estimated
grade values and input sample grades during model validation.
| 14.6.7 | Sample type comparison |
A comparison between drill hole and channel samples
was conducted, comparing the different sampling types over a similar spatial coverage. The results showed a bias indicating that grades
returned from channel samples on average tend to return higher values compared to grades from drill core samples.
However, in the majority of cases channel samples
are clustered around historical and present-day workings, whereas drilling is focused on exploring the periphery of the veins and is therefore
generally located away from the workings so finding examples where they share the same spatial coverage is difficult.
The estimation predominantly uses channel samples
with drill hole samples generally only used to infer resources at the edge of the mineralized envelopes. Both sample types are required
to provide a reasonable assessment of the deposit with reconciliation results supporting the usage of channels and drill holes.
| 14.7.1 | Continuity analysis |
Continuity analysis refers to the analysis of
the spatial correlation of a grade value between sample pairs to determine the major axis of spatial continuity.
The grade distribution has a log-normal distribution
therefore traditional experimental variograms tended to be poor in quality. To counteract this, data was transformed into a normal score
distribution for continuity analysis.
Horizontal, across strike, and down dip continuity
maps were examined (and their underlying variograms) for Ag, Au, Pb, Zn, and Cu to determine the directions of greatest and least continuity.
As each vein has a distinct strike and dip direction analysis was only required to ascertain if a plunge direction was present.
Continuity analysis confirmed that some veins
have insufficient data to allow variogram modeling, including the Patricia, Pilar, Paralela, San Cristóbal, San Carlos, San Pedro,
Ramal Piso Carolina, Don Luis II and any splay veins. In the case of these veins inverse distance weighting was used as an alternative
estimation technique.
December 31, 2023 | Page 118 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
The next step is to model the variograms for the
major, semi-major, and minor axes. This exercise creates a mathematical model of the spatial variance that can be used by the ordinary
kriging algorithm. The most important aspects of the variogram model are the nugget effect and the short-range characteristics. These
aspects have the most influence on the estimation of grade.
The nugget effect is the variance between sample
pairs at the same location (zero distance). Nugget effect contains components of inherent variability, sampling error, and analytical
error. A high nugget effect implies that there is a high degree of randomness in the sample grades (i.e., samples taken even at the same
location can have very different grades). The best technique for determining the nugget effect is to examine the downhole variogram calculated
with lags equal to the composite length.
After determining
the nugget effect, the next step is to model directional variograms in the three principal directions for Ag, Au, Pb, Zn, and Cu (where
applicable) based on the directions chosen from the variogram fans. It was not always possible to produce a variogram for the minor axes,
and in these cases the ranges for the minor axes were taken from the downhole variograms, which have a similar orientation (perpendicular
to the vein) as the minor axes. Modeled variograms were back transformed from normal score as grade estimation is conducted without data
manipulation. Variogram parameters are detailed in Table 14.6.
Table 14.6
Variogram model parameters
Vein |
Metal |
Major
axis orientation |
C0§ |
C1§ |
Ranges
(m)† |
C2§ |
Ranges
(m)† |
C3§ |
Ranges
(m)† |
Animas
|
Ag |
-44°
® 164° |
0.38 |
0.19 |
8,9,3 |
0.22 |
24,32,4 |
0.22 |
400,260,30 |
Au |
-44°
® 164° |
0.60 |
0.20 |
12,11,4 |
0.12 |
38,26,8 |
0.06 |
108,103,8 |
Pb |
-44°
® 150° |
0.34 |
0.17 |
10,10,6 |
0.25 |
38,28,10 |
0.25 |
250,230,17 |
Zn |
-44°
® 164° |
0.27 |
0.18 |
12,13,3 |
0.20 |
46,27,13 |
0.34 |
340,370,37 |
Cu |
-44°
® 164° |
0.30 |
0.28 |
14,11,4 |
0.20 |
50,48,10 |
0.22 |
316,370,37 |
Animas
NE |
Ag |
-45°
® 145° |
0.32 |
0.28 |
13,11,4 |
0.18 |
38,34,8 |
0.22 |
300,150,14 |
Au |
00°
® 235° |
0.31 |
0.29 |
8,10,3 |
0.12 |
22,38,6 |
0.28 |
650,400,16 |
Pb |
-45°
® 145° |
0.33 |
0.27 |
11,12,4 |
0.19 |
37,36,5 |
0.20 |
128,106,9 |
Zn |
-45°
® 145° |
0.30 |
0.21 |
6,8,2 |
0.26 |
24,27,7 |
0.24 |
500,240,16 |
Cu |
-45°
® 145° |
0.32 |
0.23 |
10,9,3 |
0.24 |
31,27,7 |
0.22 |
260,134,20 |
Ramal
Techo ASNE |
Ag |
46°
® 020° |
0.23 |
0.32 |
8,6,6 |
0.28 |
25,33,10 |
0.18 |
94,54,16 |
Au |
08°
® 074° |
0.33 |
0.23 |
10,7,6 |
0.05 |
87,35,10 |
0.39 |
104,62,16 |
Pb |
08°
® 074° |
0.26 |
0.43 |
10,7,6 |
0.15 |
54,20,10 |
0.17 |
80,40,16 |
Zn |
48°
® 327° |
0.22 |
0.35 |
12,8,5 |
0.31 |
29,28,10 |
0.13 |
70,60,16 |
Cu |
42°
® 032° |
0.22 |
0.31 |
5,6,5 |
0.29 |
21,21,10 |
0.18 |
80,70,16 |
Cimoide
ASNE |
Ag |
-09°
® 212° |
0.35 |
0.32 |
18,9,2 |
0.16 |
40,53,7 |
0.17 |
300,80,16 |
Au |
28°
® 024° |
0.42 |
0.31 |
10,6,5 |
0.11 |
101,31,9 |
0.16 |
160,76,10 |
Pb |
-09°
® 207° |
0.30 |
0.33 |
14,6,3 |
0.16 |
27,40,6 |
0.21 |
300,80,10 |
Zn |
-19°
® 203° |
0.31 |
0.28 |
9,7,3 |
0.24 |
28,40,74 |
0.16 |
150,100,10 |
Cu |
-09°
® 207° |
0.36 |
0.29 |
16,8,4 |
0.14 |
55,42,9 |
0.21 |
400,66,16 |
Bateas |
Ag |
-10°
® 070° |
0.20 |
0.49 |
17,19,3 |
0.31 |
330,70,4 |
|
|
Au |
-45°
® 070° |
0.22 |
0.43 |
12,21,6 |
0.35 |
100,80,10 |
|
|
Pb |
-10°
® 070° |
0.20 |
0.42 |
18,20,2 |
0.38 |
156,110,8 |
|
|
Zn |
65°
® 070° |
0.08 |
0.63 |
9,19,2 |
0.29 |
392,97,9 |
|
|
Silvia |
Ag |
-48°
® 068° |
0.10 |
0.42 |
4,6,2 |
0.48 |
45,40,3 |
|
|
Au |
05°
® 091° |
0.10 |
0.33 |
6,5,2 |
0.57 |
150,40,4 |
|
|
Pb |
-43°
® 075° |
0.10 |
0.53 |
8,7,1 |
0.37 |
60,35,2 |
|
|
|
|
|
|
|
|
|
|
|
December 31, 2023 | Page 119 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Vein |
Metal |
Major
axis orientation |
C0§ |
C1§ |
Ranges
(m)† |
C2§ |
Ranges
(m)† |
C3§ |
Ranges
(m)† |
|
Zn |
43°
® 105° |
0.15 |
0.39 |
3,6,1 |
0.46 |
125,30,2 |
|
|
Soledad |
Ag |
19°
® 075° |
0.21 |
0.24 |
6,7,10 |
0.25 |
25,23,20 |
0.30 |
219,100,40 |
Au |
24°
® 243° |
0.32 |
0.09 |
3,15,20 |
0.26 |
24,26,40 |
0.33 |
236,89,60 |
Pb |
00°
® 250° |
0.21 |
0.27 |
10,10,10 |
0.29 |
35,32,20 |
0.23 |
257,170,40 |
Zn |
-48°
® 267° |
0.21 |
0.27 |
9,8,10 |
0.29 |
24,31,20 |
0.23 |
241,225,40 |
Santa
Catalina |
Ag |
00°
® 250° |
0.11 |
0.35 |
6,5,1 |
0.13 |
14,34,2 |
0.41 |
141,48,5 |
Au |
00°
® 250° |
0.31 |
0.31 |
8,12,1 |
0.26 |
40,45,2 |
0.12 |
153,124,8 |
Pb |
09°
® 245° |
0.04 |
0.45 |
7,7,1 |
0.22 |
21,35,2 |
0.29 |
190,40,10 |
Zn |
-59°
® 075° |
0.04 |
0.26 |
2,3,6 |
0.28 |
14,30,2 |
0.42 |
215,32,10 |
La
Plata |
Ag |
00°
® 070° |
0.25 |
0.24 |
6,20,20 |
0.51 |
204,164,40 |
|
|
Au |
08°
® 064° |
0.02 |
0.76 |
9,4,6 |
0.22 |
48,14,10 |
|
|
Cimoide
La Plata |
Ag |
00°
® 245° |
0.42 |
0.36 |
5,7,3 |
0.21 |
33,13,5 |
|
|
Au |
-55°
® 155° |
0.35 |
0.44 |
43,6,7 |
0.21 |
57,15,12 |
|
|
Nancy |
Ag |
44°
® 356° |
0.28 |
0.25 |
7,7,4 |
0.15 |
18,24,8 |
0.33 |
130,110,10 |
Au |
39°
® 007° |
0.37 |
0.29 |
10,9,6 |
0.16 |
46,67,10 |
0.18 |
217,150,16 |
Pb |
44°
® 006° |
0.30 |
0.22 |
8,7,2 |
0.15 |
26,25,5 |
0.33 |
104,90,10 |
Zn |
42°
® 343° |
0.22 |
0.25 |
8,11,2 |
0.19 |
26,16,4 |
0.35 |
300,50,10 |
Cu |
44°
® 006° |
0.24 |
0.30 |
11,10,6 |
0.20 |
25,37,7 |
0.27 |
90,60,10 |
Rosita |
Ag |
54°
® 344° |
0.31 |
0.24 |
5,13,6 |
0.06 |
100,38,10 |
0.38 |
115,45,14 |
Au |
59°
® 039° |
0.23 |
0.36 |
13,5,6 |
0.18 |
38,18,10 |
0.24 |
150,62,14 |
Pb |
54°
® 344° |
0.38 |
0.12 |
4,18,6 |
0.24 |
12,28,10 |
0.27 |
130,38,16 |
Zn |
57°
® 352° |
0.27 |
0.29 |
11,9,6 |
0.23 |
31,57,10 |
0.22 |
121,71,16 |
Cu |
54°
® 344° |
0.16 |
0.35 |
11,9,6 |
0.27 |
83,25,10 |
0.23 |
100,70,16 |
Note:
§ variances have been normalized to a total of one; † ranges for major, semi-major, and minor axes,
respectively; structures are modelled with a spherical model |
|
14.8 | Modeling and estimation |
| 14.8.1 | Block size selection |
Block size was selected principally based on drill
hole spacing, mineralized domain geometry, and the proposed mining method. Quantitative kriging neighborhood analysis (QKNA) was also
used to assess the optimum block size based on kriging efficiency (KE) and slope of regression (ZZ) in the veins where variogram models
had been established (Animas, Animas NE, Ramal Techo ASNE, Cimoide ASNE, Bateas, Santa Catalina, Silvia, Soledad, La Plata, Nancy and
Rosita). Results were assessed from a centroid likely to be mined in the next 12 months.
The objective of QKNA is to determine the optimal
combination of search neighborhood and block size that limits conditional bias and, subsequently provides the best possible estimation
with the evaluable data (Vann et al, 2003).
The slope of regression is a measure of the regression
between the theoretical actual and estimated values for blocks. The values should be from 0 to 1. Values close to one indicate low conditional
bias.
Kriging efficiency indicates the degree of smoothing
(averaging) in the estimation. Values close to 100 % are not smoothed very much and values close to 0 % are highly smoothed. Where the
kriging efficiency is negative, the global mean is considered a better estimate of grade than the kriged estimate.
In conjunction with the QKNA process, the veins’
geometry and the size of the equipment used in extraction are also considered. The narrow and undulating nature of
December 31, 2023 | Page 120 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
the vein is a justification to subdivide the blocks into smaller subcells.
This ensures the block model is volumetrically representative. The incremental block sizes selected for each vein are detailed in Table
14.7
| 14.8.2 | Block model parameters |
Vein structures are generally orientated in a
northeast to southwest direction. Such an orientation can be problematic when filling the vein wireframes with blocks as these are orientated
orthogonally which can result in large discrepancies in volumes. To counteract this each vein has been rotated so that the strike direction
of the vein is orientated in an orthogonal direction (i.e. east to west) for block modeling. Splitting of the parent blocks was allowed
to ensure a close fit to the wireframe, although estimation was applied to parent cells only (all sub-cells in a parent cell have the
same grade). To ensure a successful estimation the drill hole and channel composites were also rotated to coincide with the veins. Table
14.7 gives the block model parameters for the 2023 Caylloma Mineral Resource models with coordinates using the WGS84, UTM Zone 19S system
prior to rotation.
Each vein has been block modeled separately with
care taken to ensure that overlapping blocks do not exist. Additionally, each block in the vein has been coded using the field name “TIPO”
(Type) as being oxide (OXs), zinc oxide (OXz), sulfide (SFRs) or internal waste (RDN). This code corresponds to that assigned to the sample
data and has been used for estimation and reporting purposes.
Table 14.7
Caylloma block model parameters by vein
Vein |
Rotation |
Direction |
Minimum |
Maximum |
Increment |
Animas |
59 |
X |
193266 |
194471 |
4 |
Y |
8317066 |
8318139 |
2 |
Z |
4296 |
4941 |
2 |
Animas Techo |
59 |
X |
193476 |
194454 |
4 |
Y |
8317244 |
8317917 |
2 |
Z |
4366 |
4898 |
2 |
Animas NE |
59 |
X |
194395 |
195816 |
4 |
Y |
8317534 |
8319178 |
2 |
Z |
3920 |
4821 |
2 |
Animas NE Techo |
59 |
X |
194437 |
195613 |
4 |
Y |
8317665 |
8318964 |
2 |
Z |
4140 |
4816 |
2 |
Ramal Techo ASNE |
78 |
X |
195604 |
195878 |
4 |
Y |
8318796 |
8319066 |
2 |
Z |
4384 |
4660 |
2 |
Cimoide ASNE |
39 |
X |
195626 |
195853 |
4 |
Y |
8318344 |
8319025 |
2 |
Z |
4177 |
4712 |
2 |
Bateas |
70 |
X |
192890 |
193738 |
4 |
Y |
8319893 |
8320224 |
2 |
Z |
4404 |
4829 |
2 |
Bateas Piso |
70 |
X |
193246 |
193339 |
4 |
Y |
8320079 |
8320160 |
2 |
Z |
4580 |
4829 |
2 |
Bateas Techo |
70 |
X |
193080 |
193475 |
4 |
Y |
8319971 |
8320056 |
2 |
Z |
4457 |
4740 |
2 |
Silvia |
85 |
X |
194245 |
194800 |
4 |
December 31, 2023 | Page 121 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Vein |
Rotation |
Direction |
Minimum |
Maximum |
Increment |
|
|
Y |
8320220 |
8320571 |
2 |
|
|
Z |
4599 |
4908 |
2 |
Soledad |
73 |
X |
194271 |
195105 |
4 |
Y |
8320220 |
8320571 |
2 |
Z |
4631 |
4783 |
2 |
Santa Catalina |
67 |
X |
194446 |
194811 |
4 |
Y |
8320470 |
8320661 |
2 |
Z |
4631 |
4783 |
2 |
Patricia |
75 |
X |
194347 |
194861 |
4 |
Y |
8320330 |
8320514 |
2 |
Z |
4646 |
4854 |
2 |
Pilar |
75 |
X |
194296 |
194714 |
4 |
Y |
8320148 |
8320326 |
2 |
Z |
4599 |
4956 |
2 |
La Plata |
60 |
X |
193853 |
195305 |
4 |
Y |
8316821 |
8318144 |
2 |
Z |
4462 |
4868 |
2 |
Cimoide La Plata |
60 |
X |
194000 |
194490 |
4 |
Y |
8317051 |
8317517 |
2 |
Z |
4550 |
4829 |
2 |
San Cristobal |
45 |
X |
192873 |
194970 |
4 |
Y |
8318244 |
8321056 |
2 |
Z |
4484 |
4966 |
2 |
Paralela |
45 |
X |
192746 |
193403 |
4 |
Y |
8321599 |
8322403 |
2 |
Z |
4492 |
4876 |
2 |
San Carlos |
50 |
X |
192590 |
193403 |
4 |
Y |
8321599 |
8322403 |
2 |
Z |
4492 |
4876 |
2 |
San Pedro |
60 |
X |
195485 |
195880 |
4 |
Y |
8318600 |
8319179 |
2 |
Z |
4185 |
4698 |
2 |
Nancy |
111 |
X |
195485 |
195853 |
4 |
Y |
8318797 |
8319180 |
2 |
Z |
4378 |
4697 |
2 |
Ramal Piso Carolina |
105 |
X |
193196 |
193797 |
4 |
Y |
8321955 |
8322153 |
2 |
Z |
4530 |
4876 |
2 |
Rosita |
100 |
X |
195626 |
195853 |
4 |
Y |
8318788 |
8319016 |
2 |
Z |
4358 |
4610 |
2 |
Don Luis II |
110 |
X |
190787 |
191303 |
4 |
Y |
8319486 |
8319767 |
2 |
Z |
4496 |
4909 |
2 |
| 14.8.3 | Sample search parameters |
QKNA was undertaken on the Caylloma veins to determine
the optimal search parameters for the Mineral Resource estimates. This study, which was consistent with Fortuna’s experience with
the deposit, showed that the best estimation results in terms of slope of regression, kriging efficiency, and kriging variance were obtained
using the following search strategy:
December 31, 2023 | Page 122 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| · | A search range of approximately 50 m to 60 m
along strike and down dip and 10 m to 20 m across the vein, corresponding with the vein thickness. |
| · | A minimum of 6 to 10 composites per estimate. |
| · | A maximum of 12 to 24 composites per estimate. |
| · | A maximum of two or three samples from a single
channel or drill hole. |
The search ellipsoid used to define the extents
of the search neighborhood has the same orientation as the continuity directions observed in the variograms.
Distances used were designed to match the configuration
of the drill hole data (i.e., areas of sparse drilling have larger ellipses than more densely drilled or sampled areas). This was achieved
by using a dynamic search ellipsoid where a second search equal to two times the maximum variogram range and requiring a minimum of three
to six composites was used wherever the first search did not encounter enough samples to perform an estimate. If sufficient samples were
not encountered in the second search, a third search equal to three times (or five in the case of Animas NE) the primary search range
and requiring one composite was used. The exception to this was for the Bateas, Nancy, Ramal Piso Carolina and Don Luis II veins that
used a third search ellipse four (or five times in the case of Nancy) the primary search range with a minimum of three composites. The
larger search ellipses were used in cases where peripheral sample numbers were low and using a single composite for estimation purposes
was problematic. For blocks where the minimum number of samples required was not encountered, no estimate was made.
In the veins where a high-grade domain had been
identified, the search neighborhood was used to control which composites were allowed to inform which domains to prevent smearing. The
first (smallest) search ellipse as described above was allowed to use composites from both grade domains for estimation, whereas the second
and third, were restricted to using composites to estimate grades into blocks from the same grade domain (i.e. high to high, or low to
low).
| 14.8.4 | Grade interpolation |
Estimation of grades into blocks was performed
using either ordinary kriging (OK) or inverse distance weighting (Table 14.8) based on the success of generating a variogram model and
cross validation results as reported in Section 14.10.1.
Table 14.8
Estimation method by vein
Vein |
Estimation Method |
Animas |
Ordinary Kriging |
Animas Techo |
Ordinary Kriging |
Animas NE |
Ordinary Kriging |
Animas NE Techo |
Ordinary Kriging |
Ramal Techo ASNE |
Ordinary Kriging |
Cimoide ASNE |
Ordinary Kriging |
Bateas* |
Ordinary Kriging* |
Bateas Piso |
Ordinary Kriging |
Bateas Techo |
Ordinary Kriging |
Silvia |
Ordinary Kriging |
Soledad (Main) |
Ordinary Kriging |
Soledad (Splay) |
Inverse distance weighting (power=2) |
Santa Catalina |
Ordinary Kriging |
December 31, 2023 | Page 123 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Vein |
Estimation Method |
Patricia |
Inverse distance weighting (power=2) |
Pilar |
Inverse distance weighting (power=2) |
La Plata |
Inverse distance weighting (power=2) |
Cimoide La Plata |
Ordinary Kriging |
San Cristóbal |
Inverse distance weighting (power=2) |
Paralela |
Inverse distance weighting (power=2) |
San Carlos |
Inverse distance weighting (power=2) |
San Pedro |
Inverse distance weighting (power=2) |
Nancy |
Ordinary Kriging |
Ramal Piso Carolina |
Inverse distance weighting (power=2) |
Rosita |
Ordinary Kriging |
Don Luis II |
Inverse distance weighting (power=2) |
*Gold grades estimated by inverse distance weighting (power=2) |
Parameters were derived from block size selection,
search neighborhood optimization, and variogram modeling. The sample data were composited and, where necessary, top cut prior to estimation.
The sample data and the blocks were categorized
into mineralized domains for the estimation. Each block is discretized (an array of points to ensure grade variability is represented
within the block) and grade interpolated into parent cells (Datamine ESTIMA parameter PARENT=1).
Due to the variable lengths of the composites
a weighting system has been employed to nullify this volume variance issue when estimating into the three-dimensional block models, which
involves the following steps: -
| 1. | Generation of a grade aggregate in the sample file by multiplying the grade of the composite by its length. |
| 2. | Estimation of the grade aggregate into the block model using the parameter files detailed above. |
| 3. | Estimation of the composite length into the block model by inverse distance weighting (power = 2) using
the same search and estimation parameters as were used to estimate the grade aggregate. |
| 4. | Estimated aggregate grades are divided by the corresponding composite length estimate to provide the final
grade. |
This procedure was employed for the previous Mineral
Resource estimates and reconciliation results indicated a positive result. The methodology has therefore been maintained for the 2023
Mineral Resource update.
There has been a total of 5,509 density measurements
taken by Bateas as of June 30, 2023. Of these 4,607 were taken from underground and 467 from drill core. Density analysis was performed
on each vein separately with twenty samples regarded as the minimum to ensure representative statistics. Extreme values that were thought
not to be representative of the sample population were discarded reducing the total density measurement numbers used in the analysis to
5,250 (Table 14.9).
December 31, 2023 | Page 124 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Table 14.9
Density statistics by vein
Vein |
No. of samples |
Mean
(t/m3) |
Minimum (t/m3) |
Maximum (t/m3) |
Variance |
Animas/Animas NE (Sulfide) |
3,530 |
3.11 |
2.33 |
3.93 |
0.11 |
Animas/Animas NE (Oxide) |
198 |
2.77 |
1.73 |
3.88 |
0.25 |
Cimoide ASNE |
148 |
2.89 |
2.29 |
3.63 |
0.09 |
Ramal Techo ASNE |
20 |
2.72 |
2.49 |
3.01 |
0.03 |
Bateas |
567 |
3.01 |
2.52 |
3.54 |
0.06 |
Bateas Techo |
7 |
2.67 |
2.43 |
2.97 |
0.03 |
Silvia |
84 |
3.35 |
2.57 |
4.19 |
0.11 |
Soledad |
313 |
3.09 |
2.49 |
3.84 |
0.10 |
Santa Catalina |
18 |
3.09 |
2.52 |
3.66 |
0.09 |
Pilar |
3 |
3.35 |
3.29 |
4.23 |
0.18 |
La Plata |
41 |
2.59 |
2.33 |
2.76 |
0.01 |
San Cristóbal |
41 |
2.75 |
2.54 |
3.09 |
0.02 |
Rosita |
29 |
2.86 |
2.11 |
3.74 |
0.16 |
Nancy |
88 |
2.85 |
2.27 |
3.64 |
0.10 |
Ramal Piso Carolina |
117 |
2.55 |
2.29 |
2.86 |
0.01 |
Don Luis II |
46 |
2.42 |
2.03 |
2.76 |
0.02 |
Spatial coverage of density measurements is regarded
as sufficient for estimation in the Animas and Animas NE veins. For other veins where insufficient samples have been taken to allow estimation
of density, the mean density value has been applied to all blocks in that vein. In respect to veins that have insufficient samples to
determine the density with confidence (<30) the following was applied:
| · | In the cases where veins splayed, the same density
was applied to the splay as was assigned to the main vein (i.e. Ramal Soledad assigned the same density as Soledad) |
| · | In the case of Ramal Techo ASNE and Rosita the
vein structures are closely aligned and crosscut one another so a density of 2.79 t/m3, being the average of all density measurements
taken from both veins was assigned. |
| · | Pilar has similar geological characteristics
as the Silvia vein so was assigned a density of 3.35 t/m3. |
| · | San Pedro, San Carlos, Patricia and Paralela
were assigned a density of 3.0 t/m3, being the global average density for all veins. |
Density values applied to the block model for
each vein are detailed in Table 14.10.
Table 14.10
Density assigned in the 2023 block models
Vein |
Density assigned (t/m3) |
Animas & Animas NE (Sulfide) |
Ordinary kriging |
Animas-Animas NE (Oxide) |
Ordinary kriging |
Ramal Techo ASNE |
2.79 |
Cimoide ASNE |
2.89 |
Bateas |
3.01 |
Bateas Techo |
3.01 |
Silvia |
3.35 |
Soledad |
3.09 |
December 31, 2023 | Page 125 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Vein |
Density assigned (t/m3) |
Santa Catalina |
3.09 |
Patricia |
3.00 |
Pilar |
3.35 |
La Plata |
2.59 |
Cimoide La Plata |
2.59 |
San Cristóbal |
2.75 |
Paralela |
3.00 |
San Carlos |
3.00 |
San Pedro |
3.00 |
Nancy |
2.85 |
Ramal Piso Carolina |
2.55 |
Rosita |
2.79 |
Don Luis II |
2.42 |
The techniques for validation of the estimated
tonnes and grades included visual inspection of the model and samples in plan, section, and in three-dimensions; cross-validation; global
estimate validation through the comparison of declustered sample statistics with the average estimated grade per domain; and local estimate
validation through the generation of slice validation plots.
In defining the modeled variograms, estimation
and search neighborhoods there are a range of potential values that can be set. To optimize these values cross validation, or jack-knifing,
was performed. This technique involves excluding a sample point and estimating a grade in its place using the remaining composites. This
process is repeated for all the composites being used for estimation and the average estimated grade is compared to the actual average
grade of the composites (Table 14.11). Using this methodology, a variety of estimation techniques, search neighborhoods and variogram
models were tested to establish the parameters that provided the most accurate result.
Table 14.11
Cross validation results by vein
Vein |
Ag (g/t) |
Au (g/t) |
Pb (%) |
Zn (%) |
Composite |
Estimate |
Composite |
Estimate |
Composite |
Estimate |
Composite |
Estimate |
Animas |
128 |
128 |
0.43 |
0.43 |
2.04 |
2.04 |
3.62 |
3.63 |
Animas Techo |
100 |
100 |
0.30 |
0.30 |
3.87 |
3.89 |
5.14 |
5.16 |
Animas NE |
136 |
137 |
0.31 |
0.31 |
1.90 |
1.90 |
2.99 |
3.00 |
Animas NE Techo |
118 |
119 |
0.24 |
0.24 |
3.37 |
3.39 |
4.87 |
4.90 |
Ramal Techo ASNE |
223 |
223 |
0.08 |
0.08 |
3.27 |
3.27 |
4.54 |
4.57 |
Cimoide ASNE |
125 |
126 |
0.16 |
0.16 |
3.87 |
3.90 |
6.83 |
6.88 |
Rosita |
95 |
96 |
0.14 |
0.14 |
3.04 |
3.07 |
6.42 |
6.46 |
Nancy |
86 |
87 |
0.27 |
0.28 |
3.61 |
3.64 |
5.21 |
5.26 |
Bateas |
902 |
904 |
0.29 |
0.30 |
0.61 |
0.61 |
0.93 |
0.93 |
Bateas Piso |
1,766 |
1,786 |
0.62 |
0.63 |
0.31 |
0.32 |
0.57 |
0.57 |
Bateas Techo |
237 |
239 |
0.10 |
0.10 |
0.18 |
0.17 |
0.24 |
0.24 |
Santa Cata |
130 |
132 |
1.12 |
1.13 |
1.65 |
1.67 |
2.39 |
2.40 |
Soledad |
442 |
443 |
2.24 |
2.25 |
1.30 |
1.30 |
1.67 |
1.67 |
Silvia |
93 |
93 |
0.43 |
0.41 |
1.84 |
1.84 |
2.68 |
2.68 |
Cimoilde La Plata |
446 |
443 |
2.10 |
2.13 |
0.01 |
0.01 |
0.02 |
0.02 |
December 31, 2023 | Page 126 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Vein |
Ag (g/t) |
Au (g/t) |
Pb (%) |
Zn (%) |
Composite |
Estimate |
Composite |
Estimate |
Composite |
Estimate |
Composite |
Estimate |
La Plata 1* |
892 |
890 |
3.06 |
3.14 |
2.22 |
2.32 |
0.05 |
0.06 |
La Plata 2* |
106 |
126 |
0.68 |
0.67 |
0.12 |
0.12 |
0.24 |
0.23 |
San Cristobal* |
206 |
206 |
0.32 |
0.32 |
0.34 |
0.34 |
0.64 |
0.64 |
Pilar* |
117 |
107 |
0.88 |
0.82 |
0.53 |
0.47 |
0.65 |
0.58 |
Patricia* |
190 |
190 |
0.47 |
0.46 |
0.29 |
0.29 |
0.41 |
0.43 |
Paralela* |
242 |
247 |
0.32 |
0.31 |
0.17 |
0.18 |
0.37 |
0.37 |
San Carlos* |
369 |
388 |
0.11 |
0.11 |
- |
- |
0.01 |
0.01 |
San Pedro* |
506 |
504 |
0.34 |
0.35 |
- |
- |
- |
- |
Ramal Piso Carolina* |
91 |
90 |
3.72 |
3.75 |
0.05 |
0.04 |
0.07 |
0.06 |
Don Luis 2* |
286 |
322 |
1.33 |
1.46 |
0.06 |
0.05 |
0.11 |
0.11 |
Results of the cross validation confirmed that
ordinary kriging is a reasonable estimation method when sufficient data is available for variogram analysis (Animas, Animas Techo, Animas
NE, Anima NE Techo, Ramal Techo ASNE, Cimoide ASNE, Bateas, Bateas Piso, Bateas Techo, Silvia, Soledad, Santa Catalina, Cimoide La Plata,
Nancy, and Rosita). For veins that have insufficient data, inverse distance weighting proved a superior estimation technique (Patricia,
Pilar, La Plata, San Cristobal, Paralela, San Carlos, San Pedro, Ramal Piso Carolina). Cross validation also assisted in the fine tuning
of the variogram and search neighborhood parameters.
| 14.10.2 | Global estimation validation |
Global validation of the estimate involves comparing
the mean ordinary kriged grade for each vein against the mean declustered grade generated using a nearest-neighbor (NN) estimation approach.
Analysis was performed by classification to ensure low confidence areas do not distort the results from higher confidence regions (Table
14.12, Table 14.13, and Table 14.14). The results for blocks classified as Measured are regarded as reasonable, with differences being
generally less than 5 %. Differences greater than 5 % are due to either the over-estimation of the NN grade due to the presence of isolated
high-grade composites or due to low overall grade concentrations.
Table 14.12
Global validation statistics of Measured Resources at a zero cut-off grade (COG)
Vein |
Ag (g/t) |
Au (g/t) |
Pb (%) |
Zn (%) |
OK |
NN |
Diff (%) |
OK |
NN |
Diff (%) |
OK |
NN |
Diff (%) |
OK |
NN |
Diff (%) |
Animas |
126 |
127 |
0.6 |
0.38 |
0.39 |
1.9 |
1.70 |
1.71 |
0.5 |
3.14 |
3.15 |
0.3 |
Animas Techo |
130 |
140 |
6.7 |
0.29 |
0.31 |
5.2 |
1.51 |
1.52 |
0.9 |
2.74 |
2.73 |
-0.6 |
Animas NE |
98 |
99 |
0.2 |
0.32 |
0.32 |
2.3 |
3.80 |
3.81 |
0.4 |
5.06 |
5.06 |
0.1 |
Animas NE Techo |
104 |
106 |
1.8 |
0.22 |
0.22 |
-0.4 |
2.90 |
2.90 |
0.0 |
4.35 |
4.28 |
-1.5 |
Ramal Techo ASNE |
197 |
194 |
-1.1 |
0.09 |
0.09 |
-0.8 |
2.78 |
2.71 |
-2.5 |
4.70 |
4.75 |
1.1 |
Cimoide ASNE |
127 |
126 |
-0.4 |
0.16 |
0.16 |
0.2 |
3.88 |
3.92 |
1.0 |
6.72 |
6.69 |
-0.4 |
Rosita |
91 |
90 |
-1.0 |
0.14 |
0.14 |
-2.4 |
2.84 |
2.76 |
-2.8 |
5.94 |
5.74 |
-3.4 |
Nancy |
81 |
80 |
-1.1 |
0.21 |
0.22 |
2.5 |
3.45 |
3.46 |
0.2 |
4.96 |
4.97 |
0.2 |
Bateas |
762 |
748 |
-1.8 |
0.23 |
0.19 |
-20.5 |
0.58 |
0.58 |
-0.6 |
0.87 |
0.86 |
-1.5 |
Bateas Piso |
1486 |
1490 |
0.2 |
0.54 |
0.50 |
-8.3 |
0.30 |
0.30 |
1.8 |
0.53 |
0.54 |
1.3 |
Santa Cata |
127 |
128 |
0.9 |
1.08 |
1.07 |
-1.4 |
1.59 |
1.58 |
-0.3 |
2.32 |
2.33 |
0.4 |
Soledad |
342 |
330 |
-3.8 |
1.84 |
1.80 |
-1.9 |
1.23 |
1.22 |
-0.6 |
1.59 |
1.57 |
-1.2 |
Silvia |
96 |
95 |
-1.1 |
0.41 |
0.43 |
5.6 |
1.86 |
1.93 |
3.6 |
2.71 |
2.72 |
0.1 |
Note: OK = ordinary kriging; NN = nearest neighbor |
Results for blocks classified as Indicated and
Inferred are also regarded as reasonable. Any large discrepancies (>10 %) were investigated and were generally attributed to low tonnages
or isolated higher-grade values.
December 31, 2023 | Page 127 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
Table 14.13 Global validation
statistics of Indicated Resources at a zero COG
Vein |
Ag (g/t) |
Au (g/t) |
Pb (%) |
Zn (%) |
OK |
NN |
Diff (%) |
OK |
NN |
Diff (%) |
OK |
NN |
Diff (%) |
OK |
NN |
Diff (%) |
Animas |
72 |
68 |
-5.8 |
0.30 |
0.31 |
3.5 |
1.03 |
0.98 |
-5.0 |
2.49 |
2.44 |
-1.91 |
Animas Techo |
31 |
29 |
-6.7 |
0.18 |
0.17 |
-7.0 |
1.05 |
0.97 |
-8.3 |
2.52 |
2.28 |
-10.83 |
Animas NE |
74 |
74 |
-0.1 |
0.14 |
0.14 |
-2.9 |
2.71 |
2.52 |
-7.5 |
3.91 |
3.84 |
-1.92 |
Animas NE Techo |
54 |
58 |
5.7 |
0.09 |
0.10 |
11.0 |
1.85 |
2.04 |
9.5 |
3.01 |
3.23 |
6.67 |
Ramal Techo ASNE |
139 |
164 |
15.2 |
0.08 |
0.08 |
-6.0 |
2.10 |
1.88 |
-12.0 |
4.29 |
4.10 |
-4.50 |
Cimoide ASNE |
62 |
61 |
-0.5 |
0.11 |
0.11 |
-0.1 |
2.57 |
2.58 |
0.2 |
5.28 |
5.48 |
3.52 |
Rosita |
84 |
83 |
-1.3 |
0.12 |
0.12 |
-3.6 |
2.91 |
2.75 |
-5.9 |
5.92 |
5.57 |
-6.25 |
Nancy |
54 |
55 |
1.9 |
0.23 |
0.25 |
8.0 |
1.91 |
1.75 |
-9.1 |
3.78 |
3.62 |
-4.15 |
Bateas |
261 |
241 |
-8.4 |
0.10 |
0.10 |
1.5 |
0.21 |
0.19 |
-9.8 |
0.33 |
0.31 |
-4.10 |
Bateas Piso |
1,636 |
1,317 |
-24.2 |
0.35 |
0.21 |
-65.5 |
0.28 |
0.27 |
-3.3 |
0.47 |
0.44 |
-6.50 |
Santa Cata |
76 |
72 |
-4.7 |
0.48 |
0.38 |
-26.6 |
0.88 |
0.84 |
-5.5 |
1.36 |
1.31 |
-4.08 |
Soledad |
184 |
158 |
-17.0 |
1.32 |
1.53 |
13.7 |
1.08 |
1.02 |
-6.0 |
1.43 |
1.40 |
-1.94 |
Silvia |
72 |
68 |
-6.3 |
0.65 |
0.57 |
-13.7 |
1.18 |
1.13 |
-4.0 |
2.12 |
2.05 |
-3.47 |
Cimoide La Plata |
397 |
358 |
-10.8 |
2.03 |
1.11 |
-82.7 |
0.00 |
0.00 |
-26.6 |
0.01 |
0.01 |
-29.83 |
La Plata 1* |
697 |
688 |
-1.4 |
2.39 |
2.34 |
-2.3 |
1.81 |
1.55 |
-16.8 |
0.02 |
0.02 |
10.28 |
San Cristobal* |
300 |
304 |
1.5 |
0.63 |
0.66 |
3.9 |
0.30 |
0.29 |
-2.7 |
0.66 |
0.66 |
-0.30 |
Note: OK = ordinary kriging; NN = nearest neighbor
*Estimated by inverse power of distance
(power=2) |
Table
14.14 Global validation statistics of Inferred Resources at a zero COG
Vein |
Ag (g/t) |
Au (g/t) |
Pb (%) |
Zn (%) |
OK-Ac |
NN |
Diff (%) |
OK-Ac |
NN |
Diff (%) |
OK-Ac |
NN |
Diff (%) |
OK-Ac |
NN |
Diff (%) |
Animas |
55 |
52 |
-6.0 |
0.26 |
0.25 |
-2.3 |
0.98 |
0.97 |
-0.4 |
2.31 |
2.38 |
3.1 |
Animas Techo |
91 |
59 |
-53.7 |
0.31 |
0.23 |
-34.3 |
0.62 |
0.45 |
-38.0 |
1.53 |
1.08 |
-42.3 |
Animas NE |
62 |
60 |
-3.7 |
0.13 |
0.13 |
1.2 |
2.54 |
2.36 |
-7.6 |
3.75 |
3.61 |
-3.8 |
Animas NE Techo |
38 |
35 |
-6.7 |
0.05 |
0.05 |
-2.9 |
1.24 |
1.20 |
-3.6 |
2.92 |
2.62 |
-11.2 |
Ramal Techo ASNE |
102 |
92 |
-11.2 |
0.09 |
0.08 |
-2.5 |
2.10 |
1.97 |
-6.5 |
4.30 |
4.01 |
-7.3 |
Cimoide ASNE |
48 |
47 |
-3.4 |
0.09 |
0.11 |
16.3 |
2.32 |
2.22 |
-4.6 |
4.53 |
4.19 |
-8.1 |
Rosita |
84 |
77 |
-8.6 |
0.12 |
0.12 |
-5.5 |
2.68 |
2.39 |
-12.3 |
5.57 |
4.68 |
-18.9 |
Nancy |
60 |
64 |
5.6 |
0.14 |
0.15 |
8.1 |
2.43 |
2.44 |
0.4 |
3.87 |
3.89 |
0.3 |
Bateas |
284 |
313 |
9.1 |
0.11 |
0.12 |
9.8 |
0.15 |
0.14 |
-9.3 |
0.24 |
0.23 |
-5.5 |
Bateas Piso |
994 |
737 |
-35.0 |
0.22 |
0.14 |
-59.8 |
0.13 |
0.09 |
-52.7 |
0.28 |
0.20 |
-38.1 |
Bateas Techo |
171 |
214 |
20.3 |
0.13 |
0.16 |
15.7 |
0.05 |
0.05 |
-0.4 |
0.08 |
0.08 |
1.3 |
Santa Cata |
62 |
57 |
-8.8 |
0.26 |
0.25 |
-3.2 |
0.45 |
0.43 |
-4.2 |
0.67 |
0.66 |
-0.8 |
Soledad |
137 |
112 |
-21.7 |
0.82 |
0.93 |
11.9 |
0.80 |
0.69 |
-15.7 |
1.29 |
1.28 |
-0.9 |
Silvia |
49 |
46 |
-5.9 |
0.59 |
0.49 |
-20.7 |
0.80 |
0.69 |
-16.8 |
1.37 |
1.28 |
-7.0 |
Cimoilde La Plata |
145 |
179 |
19.1 |
0.75 |
0.68 |
-10.8 |
0.03 |
0.03 |
3.0 |
0.09 |
0.08 |
-8.7 |
La Plata 1* |
189 |
188 |
-0.5 |
1.11 |
1.25 |
11.9 |
0.42 |
0.21 |
-102.6 |
0.03 |
0.03 |
-4.8 |
La Plata 2* |
136 |
117 |
-16.6 |
0.75 |
0.82 |
9.3 |
0.14 |
0.14 |
2.9 |
0.28 |
0.29 |
0.7 |
San Cristobal* |
212 |
204 |
-3.8 |
0.28 |
0.26 |
-5.7 |
0.18 |
0.18 |
-5.0 |
0.37 |
0.38 |
2.5 |
Pilar* |
182 |
191 |
4.9 |
0.93 |
0.95 |
2.1 |
0.40 |
0.45 |
11.9 |
0.32 |
0.35 |
8.1 |
Patricia* |
146 |
149 |
2.0 |
0.60 |
0.56 |
-7.4 |
0.35 |
0.33 |
-6.3 |
0.50 |
0.47 |
-7.0 |
Paralela* |
337 |
287 |
-17.4 |
0.29 |
0.27 |
-8.7 |
0.21 |
0.14 |
-54.1 |
0.54 |
0.36 |
-49.1 |
San Carlos* |
353 |
392 |
10.1 |
0.13 |
0.06 |
-128.6 |
0.04 |
0.04 |
1.1 |
0.22 |
0.21 |
-0.9 |
San Pedro* |
568 |
626 |
9.3 |
2.04 |
2.48 |
17.7 |
- |
- |
- |
- |
- |
- |
Ramal Piso Carolina* |
89 |
99 |
9.8 |
4.18 |
5.11 |
18.1 |
0.04 |
0.05 |
8.7 |
0.07 |
0.07 |
10.9 |
Don Luis 2* |
267 |
217 |
-23.0 |
0.76 |
0.67 |
-13.5 |
0.04 |
0.03 |
-21.9 |
0.07 |
0.07 |
-3.9 |
Note: OK = ordinary kriging; NN = nearest neighbor
*Estimated by inverse power of distance (power=2) |
December 31, 2023 | Page 128 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
14.10.3 Local estimation validation
Slice validation plots of estimated block grades
and declustered input sample grades were generated for each of the veins by easting, northing, and elevation to validate the estimates
on a local scale. Validation of the local estimates assesses each model to ensure over-smoothing or conditional bias is not being introduced
by the estimation process and an acceptable level of grade variation is present. An example slice (or swath) plot for Animas is displayed
in Figure 14.1.
Figure 14.1
Slice validation plot of the Animas NE vein
Figure prepared by Bateas, 2023
The slice plots display a good continuity between
the ordinary kriged estimates and declustered nearest neighbor estimates indicating that the kriging is not over-smoothing. Areas that
do not have a good correlation, such as the far west of the Animas vein are related to areas where sample numbers are limited. Based on
the above results it was concluded that ordinary kriging was a suitable interpolation method and provided reasonable global and local
estimates of all economical metals.
| 14.10.4 | Mineral Resource reconciliation |
The ultimate validation of the block model is
to compare actual grades to predicted grades using the established estimation parameters. A comparison of the estimation against mineral
in-situ (SMU blocks estimated as being above cut-off grade during extraction) is conducted monthly as part of the ongoing reconciliation
program and demonstrates a good level of correlation with tonnes and grade generally within 10 % on a quarterly basis. Gold grades tend
to be more erratic than other metals, but the metal is not an economic driver. In 2023, lead and zinc grades have tended to be higher
than estimated due to wider
December 31, 2023 | Page 129 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
than expected vein thicknesses and superior grades
in the lowest levels of the Animas vein. The updated Mineral Resource estimate that uses data available as of June 30, 2023, has
been shown to improve the estimates in the lower level.
|
14.10.5 |
Mineral Resource depletion |
All underground development and stopes are regularly
surveyed using Total Station methods at Caylloma as a component of monitoring the underground workings. The survey information is imported
into Datamine and used to generate three dimensional solids defining the extracted regions of the mine. Each wireframe is assigned a date
corresponding to when the material was extracted providing Bateas with a history of the progression of the mining since 2006.
The three-dimensional solids are used to identify
resource blocks that have been extracted and assign a code that corresponds to the date of extraction. Table 14.15 details the codes stored
in the resource block model and the date ranges that they represent. Blocks with a ZONA (Zone) code of one or greater are excluded from
the reported Mineral Resources.
Removal of extracted material often results in
remnant resource blocks being left in the model that will likely never be exploited. These represent inevitable components of mining such
as pillars and sills, or lower grade peripheral material that was left behind. To take account of this, areas were identified by the mine
planning department as being fully exploited, and any remnant blocks within these areas were identified in the block model using the code
“RM = 1” and excluded from the reported Mineral Resources.
Table 14.15
Depletion codes stored in the resource block model
Zone |
Description |
0 |
Mineral In-situ (not extracted) |
1 |
Mineral extracted prior to June 2022 |
2 |
Mineral extracted from July to December 2022 |
3 |
Mineral extracted from January to June 2023 |
4 |
Mineral extracted as developments (Galleries) |
5 |
Mineral extracted from July to December 31, 2023 |
| 14.11 | Mineral
Resource classification |
Resource classification considers a number of
aspects affecting confidence in the estimation, such as:
| · | Geological continuity (including geological understanding
and complexity). |
| · | Data density and orientation. |
| · | Data accuracy and precision. |
| · | Grade continuity (including spatial continuity
of mineralization). |
| 14.11.1 | Geological continuity |
There is substantial geological information to
support a good understanding of the geological continuity at the Caylloma Mine. Detailed surface mapping identifying vein structures are
supported by extensive exploration drilling.
December 31, 2023 | Page 130 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
The Bateas exploration geologists log drill core
in detail including textural, alteration, structural, geotechnical, mineralization, and lithological properties, and continue to develop
a detailed understanding of the geological controls on mineralization.
Understanding of the vein systems is greatly increased
by the presence of extensive underground workings allowing detailed mapping of the geology. Underground observations have greatly increased
the ability to accurately model mineralization. The proximity of resources to underground workings has been taken into account during
resource classification.
| 14.11.2 | Data density and orientation |
The estimation relies on two types of data, channel
samples and drill holes. Bateas has explored the Caylloma veins using a drilling pattern spaced roughly 50 m apart along strike.
Each hole attempts to intercept the vein perpendicular to the strike of mineralization but this is rarely the case, with the actual intercept
angle being between 70 to 90 degrees.
Exploration drilling data is supplemented by a
wealth of underground information including channel samples taken at approximately 3 m intervals perpendicular to the strike of the
mineralization. Geological confidence and estimation quality are closely related to data density, and this is reflected in the classification
of resource confidence categories.
| 14.11.3 | Data accuracy and precision |
Classification of resource confidence is also
influenced by the accuracy and precision of the available data. The accuracy and the precision of the data may be determined through QAQC
programs and through an analysis of the methods used to measure the data.
Analysis of CRMs and blanks for the Bateas Laboratory
indicate acceptable levels of accuracy for silver, lead, zinc, and gold grades. The results of the blanks submitted indicate that contamination
or mislabeling of samples is not a material issue at the Bateas laboratory. Preparation and laboratory duplicates indicate acceptable
levels of precision in the Bateas Laboratory for silver, lead, zinc, and gold grades.
The high levels of accuracy and lack of contamination
indicate that grades reported from the Bateas Laboratory are suitable for Mineral Resource estimation.
Fortuna have been unable to verify the accuracy
and precision of the CMA channel data used in the estimation of the Paralela, San Pedro, and San Carlos veins and therefore this has been
taken into consideration during classification.
| 14.11.4 | Spatial grade continuity |
Spatial grade continuity, as indicated by the
variogram, is an important consideration when assigning resource classification. Variogram characteristics strongly influence estimation
quality parameters such as kriging efficiency and regression slope.
The nugget effect and short-range variance characteristics
of the variogram are the most important measures of continuity. For the Caylloma veins, the variogram nugget variance for silver and gold
is between 20 % and 60 % of the population variance, demonstrating the high variability of these precious metals. The variogram nugget
variance for lead and zinc is lower, being generally 4 % to 38 %. This shows that in general the lead and zinc grades have good continuity
at short distances which results in a higher confidence in these estimated grades.
December 31, 2023 | Page 131 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
| 14.11.5 | Estimation quality |
Estimation quality is influenced by the variogram,
the scale of the estimation, and the data configuration. Estimations of small volumes have poorer quality than estimations of large volumes.
Measures such as kriging efficiency, kriging variance, and regression slope quantify the quality of local estimations.
Fortuna used the estimation quality measures to
aid in assignment of resource confidence classifications. The classification strategy has resulted in the expected progression from higher
to lower quality estimates when going from Measured to Inferred Resources.
The Mineral Resource confidence classification
of the Caylloma resource block models incorporated the confidence in the drill hole and channel data, the geological interpretation, geological
continuity, data density and orientation, spatial grade continuity, and estimation quality. The resource models were coded as Inferred, Indicated,
and Measured in accordance with the 2014 CIM standards. Classification was based on the following steps:
| · | Blocks estimated using primary search neighborhoods
were considered for the Measured Resource category. |
| · | Blocks estimated using secondary search neighborhoods
were considered for the Indicated Resource category. |
| · | Blocks estimated using tertiary search neighborhoods
were considered as Inferred Resources. |
| · | KE and ZZ values were assessed, and the classification
adjusted to take into account this information. |
| · | Perimeter strings were digitized in Studio RM
and the block model coded as either CAT=1 (Measured), CAT=2 (Indicated) or CAT =3 (Inferred) based on the above steps. |
The above criteria ensure a gradation in confidence
making it impossible that Inferred blocks are adjacent to Measured. It also ensures that blocks considered as Measured are informed from
at least three sides, blocks considered as Indicated from two sides, and blocks considered as Inferred from one side. An example of a
classified vein is provided in Figure 14.2.
December 31, 2023 | Page 132 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
Figure 14.2 Longitudinal
section showing Mineral Resource classification for the Animas vein
Figure prepared by Bateas, 2023
| 14.12 | Mineral Resource reporting |
| 14.12.1 | Reasonable prospects for eventual economic extraction |
Mineral Resources are reported based on underground
mining within mineable stope shapes based on actual operational costs and mining equipment sizes using NSR values in the block model calculated
based on the projected long-term metal prices, commercial terms, and actual metallurgical recoveries experienced in the plant. Details
of the values for each parameter used in the NSR determination are displayed in Table 14.16.
Table 14.16
Parameters used in NSR estimation
Zinc and Lead |
|
Gold and Silver |
Item |
Unit |
Zinc |
Lead |
|
Item |
Unit |
Silver |
Gold |
Metal Price (a) |
US$/t |
2,600 |
2,000 |
|
Metal Price (a) |
US$/oz |
21 |
1,600 |
Concentrate grade (b) |
% |
54 |
62 |
|
|
|
|
|
Deduction |
% |
85 |
95 |
|
Deduction (b) |
% |
95 |
95 |
Minimum deduction |
% |
8 |
3 |
|
Refining Charges (c) |
US$/oz |
-0.99 |
-15 |
Payable grade (e) |
% |
45.9 |
58.9 |
|
Escalator1 |
US$/oz |
0 |
0 |
Payment per tonne (f) |
US$/t |
1193 |
1178 |
|
|
|
|
|
Smelting costs |
US$/t |
-248.29 |
-104.96 |
|
|
|
|
|
Escalator1 |
US$/t |
|
|
|
|
|
|
|
Escalator 2 |
US$/t |
|
|
|
|
|
|
|
|
|
|
|
|
Royalty |
US$/oz |
-0.4 |
|
Penalties |
US$/t |
|
|
|
Value after Met. Recovery (d) |
US$/oz |
17.22 |
352.00 |
Total Charges (g) |
US$/t |
-248 |
-105 |
|
Payable metal (e) |
US$/oz |
1265.60 |
-0.43 |
Concentrate value (h) |
US$/t |
945 |
1073 |
|
|
|
|
|
Met. recovery – (i) |
% |
89 |
88 |
|
Met. recovery – (f) |
% |
82 |
22 |
Value – (j) |
US$/% |
15.58 |
15.40 |
|
Value – (h) |
US$/g |
0.49 |
n/a |
Notes:
|
|
Notes:
|
December 31, 2023 | Page 133 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
Metallurgical parameters and concentrate characteristics
have been based on historical recoveries observed in the plant from mid-2022 to mid-2023.
Metal prices were defined by Fortuna’s financial
department based on standard industry long term predictions. The proposed metal prices were reviewed and agreed upon by the company’s
Qualified Persons.
In the case of gold rich veins that include Soledad,
Cimoide La Plata, La Plata, Pilar, San Pedro, and Ramal Piso Carolina, testwork suggested that adjustments could be made in the plant
to maximize gold recovery and therefore a metallurgical recovery rate of 55 % for gold, 85 % for silver, and 87 % for lead were used being
the equivalent of $24.69/g Au, $0.51/g Ag, and $14.88/% Pb in the NSR calculation for this vein.
Veins classified as wide, being on average greater
than two meters, are amenable to extraction by semi-mechanized mining methods with a mine to mill cost reported as US$ 89.78/t. Taking
into account a 15% upside in metal prices for the evaluation of long-term resources a US$ 75/t NSR cut-off value is applied to the
wide veins including Animas, Animas NE, Ramal Techo ASNE, Cimoide ASNE, Nancy, Rosita, and San Cristobal.
Veins classified as narrow, being on average less
than 2 m, are amenable to extraction by conventional mining methods with a mine to mill cost estimated as US$ 170/t. Taking into
account a 15% upside in metal prices for the evaluation of long term resources a US$135 /t NSR cut-off value is applied to the narrow
veins including Bateas, Bateas Piso, Bateas Techo, La Plata, Cimoide La Plata, Soledad, Santa Catalina, Silvia, Ramal Piso Carolina, Paralela,
San Carlos, San Pedro, Patricia, Pilar, and Don Luis II.
| 14.12.2 | Mineral Resource statement |
Eric Chapman P.
Geo. is the QP for the Mineral Resource estimate for the Caylloma Mine. Mineral Resources are reported insitu and have an effective date
of December 31, 2023. Mineral Resources are summarized in Table 14.17. Mineral Resources are reported within mineable stope shapes
accounting for operational dilution at the selective mining unit size using an either a US$ 75/t or US$ 135/t NSR value, depending
on the vein thickness and proposed mining method (see above), in areas identified as accessible. The Measured and Indicated Mineral
Resources are exclusive of those Mineral Resources modified to produce the Mineral Reserves through the process described in Section 15.
Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
Table 14.17
Mineral Resources exclusive of Mineral Reserves
Category |
Tonnes (000) |
Ag (g/t) |
Au (g/t) |
Pb (%) |
Zn (%) |
Contained Metal |
Ag (Moz) |
Au (koz) |
Pb (kt) |
Zn (kt) |
Measured |
524 |
98 |
0.30 |
2.09 |
3.16 |
1.6 |
5 |
11 |
17 |
Indicated |
1,262 |
82 |
0.21 |
1.47 |
2.54 |
3.3 |
9 |
19 |
32 |
Measured + Indicated |
1,786 |
87 |
0.24 |
1.65 |
2.72 |
5.0 |
14 |
29 |
49 |
Inferred |
4,505 |
99 |
0.43 |
2.43 |
3.70 |
14.4 |
63 |
110 |
167 |
Notes on Mineral Resources
| · | Mineral Resources are reported in-situ, as defined
by the 2014 CIM Definition Standards for Mineral Resources and Mineral Reserves. |
| · | Mineral Resources as reported exclusive of Mineral
Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. |
| · | Mineral Resources are reported as of December 31,
2023. |
| · | Mr. Eric Chapman P.Geo., a Fortuna employee,
is the Qualified Person for the estimate. |
December 31, 2023 | Page 134 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
| · | Point metal values (taking into account metal
price, concentrate recovery, smelter cost, metallurgical recovery) used for NSR evaluation are US$ 0.49/g for silver, US$ 15.40/% for
lead, and US$ 15.58/% for zinc with the exception of gold rich veins that used US$ 0.51/g for silver, US$ 24.69/g for gold, US$ 14.88/%
for lead, and US$ 15.48/% for zinc, based on metal prices of US$ 21/oz for silver, US$ 1,600/oz for gold, US$ 2,000/t for lead and US
$2,600/t for zinc, and metallurgical recovery values of 82 % for silver, 22 % for gold, 89 % for lead, and 89 % for zinc, with the exception
of gold rich veins that used 85 % for silver, 55 % for gold, 87 % for lead, and 89 % for zinc. |
| · | Mineral Resources for veins classified as wide
(Anima, Animas NE, Cimoide ASNE, Nancy, Rosita, and San Cristobal) are reported above an NSR cut-off value of US$ 75/t. Mineral Resources
for veins classified as narrow (all other veins) are reported above an NSR cut-off value of US$ 135/t based on actual and projected mining
costs and a 15% upside in metal prices. |
| · | Mineral Resource tonnes are rounded to the nearest
thousand. |
| · | Totals may not add due to rounding. |
| · | Mineral Resources in this table are not additive
to the Mineral Resources reported in Table 14.18, Table 14.19, and Table 14.20. |
Factors that may affect the estimates include
metal price and exchange rate assumptions; changes to the assumptions used to generate the cut-off grade; changes in local interpretations
of mineralization geometry and continuity of mineralized zones; changes to geological and mineralization shape and geological and grade
continuity assumptions; variations in density and domain assignments; geometallurgical assumptions; changes to geotechnical, mining, dilution,
and metallurgical recovery assumptions; change to the input and design parameter assumptions that pertain to the conceptual stope designs
constraining the estimates; and assumptions as to the continued ability to access the site, retain mineral and surface rights titles,
maintain environment and other regulatory permits, and maintain the social license to operate.
There are no other known environmental, legal,
title, taxation, socioeconomic, marketing, political or other relevant factors that would materially affect the estimation of Mineral
Resources or Mineral Reserves that are not discussed in this Report.
| 14.12.3 | Mineral Resources by key geologic attributes |
The following section provides a breakdown of
the Mineral Resources based on various key geologic attributes. It is important to note that all numbers presented in this section are
not additive to the Mineral Resources presented in Table 14.17. A cornerstone of this analysis involves the evaluation of the Mineral
Resource inclusive of Mineral Reserves for the Caylloma Mine, as summarized in Table 14.18. Mineral Resources are reported within mineable
stope shapes accounting for operational dilution in-situ using either a US$ 75/t or US$ 135/t NSR value cut-off depending on
vein width (see notes below).
Table 14.18
Mineral Resources inclusive of Mineral Reserves
Category |
Tonnes (000) |
Ag (g/t) |
Au (g/t) |
Pb (%) |
Zn (%) |
Contained Metal |
Ag (Moz) |
Au (koz) |
Pb (kt) |
Zn (kt) |
Measured |
696 |
107 |
0.35 |
2.28 |
3.43 |
2.4 |
8 |
16 |
24 |
Indicated |
3,779 |
89 |
0.18 |
2.56 |
3.86 |
10.8 |
22 |
97 |
146 |
Measured + Indicated |
4,475 |
92 |
0.21 |
2.52 |
3.79 |
13.2 |
30 |
113 |
170 |
Inferred |
4,505 |
99 |
0.43 |
2.43 |
3.70 |
14.4 |
63 |
110 |
167 |
Notes on Mineral Resources
| · | Mineral Resources are reported in-situ, as defined
by the 2014 CIM Definition Standards for Mineral Resources and Mineral Reserves. |
| · | Mineral Resources as reported inclusive of Mineral
Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. |
| · | Mineral Resources are reported as of December 31,
2023. |
December 31, 2023 | Page 135 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
| · | Mr. Eric Chapman P.Geo., a Fortuna employee,
is the Qualified Person for the estimate. |
| · | Point metal values (taking into account metal
price, concentrate recovery, smelter cost, metallurgical recovery) used for NSR evaluation are US$ 0.49/g for silver, US$ 15.40/% for
lead, and US$ 15.58/% for zinc with the exception of gold rich veins that used US$ 0.51/g for silver, US$ 24.69/g for gold, US$ 14.88/%
for lead, and US$ 15.48/% for zinc, based on metal prices of US$ 21/oz for silver, US$ 1,600/oz for gold, US$ 2,000/t for lead and US
$2,600/t for zinc, and metallurgical recovery values of 82 % for silver, 22 % for gold, 89 % for lead, and 89 % for zinc, with the exception
of gold rich veins that used 85 % for silver, 55 % for gold, 87 % for lead, and 89 % for zinc. |
| · | Mineral Resources for veins classified as wide
(Anima, Animas NE, Cimoide ASNE, Nancy, Rosita, and San Cristobal) are reported above an NSR cut-off value of US$ 75/t. Mineral Resources
for veins classified as narrow (all other veins) are reported above an NSR cut-off value of US$ 135/t based on actual and projected mining
costs and a 15% upside in metal prices. |
| · | Mineral Resource tonnes are rounded to the nearest
thousand. |
| · | Totals may not add due to rounding. |
| · | Mineral Resources in this table are not additive
to the Mineral Resources reported in Table 14.17, Table 14.19, and Table 14.20. |
| · | Above notes are applicable to both oxide (Table
14.19) and sulfide (Table 14.20) reported resources. |
The Mineral Resource
can be further assessed by examining the tonnes and grade associated with each vein for material identified as oxide (Table 14.19)
and sulfide (Table 14.20).
Table 14.19
Mineral Resources inclusive of Mineral Reserves (Oxide)
Category |
Vein |
Tonnes |
Ag (g/t) |
Au (g/t) |
Pb (%) |
Zn (%) |
Measured Resources |
Animas |
39,000 |
235 |
0.40 |
0.88 |
1.17 |
Animas NE |
59,000 |
134 |
0.97 |
3.08 |
3.12 |
Cimoide ASNE |
5,000 |
64 |
0.12 |
2.04 |
3.01 |
Rosita |
7,000 |
97 |
0.15 |
2.67 |
5.00 |
Nancy |
8,000 |
92 |
0.20 |
4.49 |
2.27 |
Total |
118,000 |
159 |
0.64 |
2.38 |
2.53 |
Indicated Resources |
Animas |
50,000 |
227 |
0.39 |
0.87 |
1.53 |
Animas NE |
324,000 |
112 |
0.58 |
2.88 |
1.73 |
Cimoide ASNE |
32,000 |
90 |
0.16 |
2.29 |
2.84 |
Rosita |
10,000 |
125 |
0.15 |
3.19 |
4.90 |
Nancy |
30,000 |
87 |
0.16 |
3.77 |
1.36 |
Total |
446,000 |
122 |
0.49 |
2.68 |
1.83 |
Measured + Indicated Resources |
Total |
564,000 |
130 |
0.52 |
2.62 |
1.98 |
Inferred Resources |
Animas |
12,000 |
86 |
0.33 |
1.26 |
2.80 |
Animas NE |
272,000 |
117 |
0.60 |
2.98 |
1.46 |
Cimoide ASNE |
24,000 |
85 |
0.21 |
2.07 |
2.49 |
Rosita |
15,000 |
105 |
0.13 |
2.74 |
4.56 |
Nancy |
65,000 |
96 |
0.19 |
4.20 |
0.88 |
Total |
388,000 |
110 |
0.48 |
3.07 |
1.59 |
Refer to notes on Mineral Resources below Table 14.18
Mineral Resources in Table 14.17, Table 14.18 and Table 14.20 are not
additive to the Mineral Resources reported in this table |
December 31, 2023 | Page 136 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
Table 14.20
Mineral Resources inclusive of Mineral Reserves (Sulfide)
Category |
Vein Type |
Vein |
Tonnes |
Ag (g/t) |
Au (g/t) |
Pb (%) |
Zn (%) |
Measured Resources |
Silver Veins |
Bateas |
12,000 |
608 |
0.25 |
0.32 |
0.50 |
Total |
12,000 |
608 |
0.25 |
0.32 |
0.50 |
Polymetallic
Veins |
Animas |
198,000 |
66 |
0.30 |
1.75 |
3.43 |
Animas NE |
252,000 |
76 |
0.15 |
2.99 |
4.02 |
Ramal Techo ASNE |
9,000 |
116 |
0.07 |
1.47 |
3.36 |
Cimoide ASNE |
23,000 |
55 |
0.11 |
1.95 |
4.92 |
Rosita |
6,000 |
63 |
0.11 |
2.10 |
4.29 |
Nancy |
48,000 |
47 |
0.18 |
2.02 |
3.71 |
Soledad |
30,000 |
394 |
1.88 |
1.13 |
1.39 |
Total |
567,000 |
86 |
0.29 |
2.30 |
3.68 |
Total Measured Resources |
578,000 |
97 |
0.29 |
2.26 |
3.62 |
Indicated Resources |
Silver Veins |
Bateas |
39,000 |
419 |
0.10 |
0.18 |
0.27 |
Bateas Piso |
3,000 |
690 |
0.16 |
0.10 |
0.15 |
Cimoide La Plata |
25,000 |
549 |
3.13 |
0.01 |
0.01 |
La Plata |
14,000 |
591 |
2.89 |
1.41 |
0.02 |
San Cristóbal |
39,000 |
478 |
0.21 |
0.36 |
0.73 |
Total |
120,000 |
492 |
1.09 |
0.34 |
0.34 |
Polymetallic Veins |
Animas |
252,000 |
52 |
0.29 |
1.38 |
3.61 |
Animas NE |
2,505,000 |
72 |
0.06 |
2.89 |
4.38 |
Ramal Techo ASNE |
21,000 |
114 |
0.07 |
1.79 |
3.69 |
Cimoide ASNE |
279,000 |
40 |
0.06 |
1.99 |
4.45 |
Rosita |
27,000 |
52 |
0.08 |
2.37 |
5.14 |
Nancy |
73,000 |
48 |
0.21 |
1.71 |
4.00 |
Santa Catalina |
3,000 |
199 |
1.43 |
1.89 |
2.39 |
Soledad |
43,000 |
232 |
1.53 |
1.35 |
1.54 |
Silvia |
9,000 |
155 |
0.46 |
3.25 |
4.09 |
Total |
3,213,000 |
70 |
0.11 |
2.63 |
4.28 |
Total Indicated Resources |
3,333,000 |
85 |
0.14 |
2.55 |
4.13 |
Total Measured + Indicated Resources |
3,912,000 |
87 |
0.16 |
2.51 |
4.06 |
Inferred Resources |
Silver Veins |
Bateas |
23,000 |
471 |
0.08 |
0.08 |
0.16 |
Bateas Piso |
14,000 |
510 |
0.12 |
0.07 |
0.14 |
Bateas Techo |
5,000 |
319 |
0.10 |
0.08 |
0.16 |
La Plata |
28,000 |
305 |
2.02 |
0.75 |
0.37 |
Cimoide La Plata |
29,000 |
428 |
2.24 |
0.02 |
0.03 |
San Cristóbal |
24,000 |
406 |
0.15 |
0.23 |
0.50 |
Paralela |
39,000 |
426 |
0.36 |
0.23 |
0.59 |
San Carlos |
5,000 |
362 |
0.18 |
0.04 |
0.22 |
San Pedro |
63,000 |
668 |
2.52 |
0.00 |
0.00 |
Ramal Piso Carolina |
154,000 |
128 |
7.23 |
0.06 |
0.10 |
Don Luis II |
84,000 |
514 |
0.85 |
0.07 |
0.14 |
Total |
467,000 |
371 |
3.18 |
0.12 |
0.17 |
Polymetallic Veins |
Animas |
56,000 |
73 |
0.23 |
1.25 |
2.67 |
Animas NE |
2,802,000 |
62 |
0.06 |
2.87 |
4.49 |
Ramal Techo ASNE |
82,000 |
92 |
0.07 |
1.90 |
3.87 |
Cimoide ASNE |
258,000 |
35 |
0.04 |
1.81 |
4.19 |
Rosita |
13,000 |
54 |
0.08 |
2.34 |
5.55 |
Nancy |
386,000 |
58 |
0.09 |
2.27 |
4.29 |
Santa Catalina |
2,000 |
204 |
0.66 |
1.15 |
1.84 |
Soledad |
23,000 |
210 |
1.16 |
1.35 |
1.89 |
Silvia |
9,000 |
158 |
0.61 |
3.59 |
3.89 |
Pilar |
19,000 |
358 |
1.29 |
0.50 |
0.41 |
Total |
3,650,000 |
63 |
0.08 |
2.66 |
4.37 |
Total Inferred Resources |
4,117,000 |
98 |
0.43 |
2.37 |
3.90 |
Refer to notes on Mineral Resources below Table 14.18
Mineral Resources in Table 14.17, Table 14.18 and Table 14.19 are not
additive to the Mineral Resources reported in this table |
December 31, 2023 | Page 137 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
| 14.12.4 | Comparison to previous estimate |
The primary reasons for the changes in the reported
Mineral Resources compared to the previous estimate are due to:
| · | Infill drilling of the Animas NE, Ramal Techo
ASNE, Cimoide ASNE, and Nancy veins. |
| · | Exploration drilling of the Animas NE and Cimoide
Animas NE veins. |
| · | Production related depletion and sterilization
of material mined out from the Animas NE, Ramal Techo ASNE, Cimoide ASNE, Nancy, and Rosita since the previous estimate. |
| · | Geological reinterpretation. |
| · | Changes in metal prices and projected commercial
terms. |
The most significant changes occurred in the Animas
NE vein where infill and exploration drilling, and mineral extraction was focused.
| 14.13 | Comment on Section 14 |
The QP is of the opinion that the Mineral Resources
for the Caylloma Mine, which have been estimated using core drill and channel data, have been performed to industry best practices, and
conform to the requirements of CIM (2019). Mineral Resources are acceptable to support declaration of Mineral Reserves.
Furthermore, it is the opinion of the QP that
by Bateas performing an annual depletion exercise where material identified as inaccessible to underground mining due to economic or geotechnical
reasons is sterilized, and that the resource evaluation is based on actual mining, processing and smelting costs; actual metallurgical
recoveries achieved in the plant; reasonable long-term metal prices; and the application of a transparent cut-off grade, the Mineral Resources
have ‘reasonable prospects for eventual economic extraction’.
December 31, 2023 | Page 138 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
| 15 | Mineral Reserve Estimates |
| 15.1 | Mineral Resource handover |
The Mineral Resource is comprised of Measured, Indicated
and Inferred categories.
Upon receipt of the block model a review was conducted
to confirm the Mineral Resource was reported correctly and to validate the various fields in the block model.
For estimating Mineral Reserves, only Measured
and Indicated Resources that are considered accessible have been considered. Inferred Mineral Resources were treated as waste material.
The Mineral Reserve estimation process considered
the Mineral Resources above a US$ 75/t NSR value for veins such as Animas, Animas NE, Cimoide ASNE, Nancy and San Cristobal and US$ 135/t
NSR value for all other veins.
| 15.2 | Mineral Reserve methodology |
The Mineral Reserve estimation procedure conducted
by Bateas for the Caylloma deposit is defined as follows:
| · | Review of Mineral Resources. |
| · | Identification and removal of inaccessible Mineral
Resources to account for recovery based on current mining practices including crown pillars and isolated areas. |
| · | Set Inferred Mineral Resources to waste. |
| · | Dilution of tonnages and grades for each vein
based on dilution factors calculated by the planning department based on operational observations from July 2022 to June 2023. |
| · | After obtaining the Mineral Resources with diluted
tonnages and grades, the value per tonne of each block is determined based on metal prices and metallurgical recoveries for each metal
and recorded as a NSR value (US$/t). |
| · | A breakeven cut-off grade is determined for each
vein based on operational costs for mining, processing, administration, commercial, and general administrative costs (total operating
cost in US$/t). If the NSR value of the block is higher than the breakeven cut-off grade, the block is considered a Mineral Reserve, otherwise
it is considered as either Mineral Resource exclusive of reserve, or waste. |
| · | Depletion of Mineral Reserves relating to operational
extraction between July 1 and December 31, 2023. |
| · | Reconciliation of the reserve block model against
mine production between July 1 and December 31, 2023, to confirm estimation parameters. |
| · | Mineral Reserve tabulation and reporting as of
December 31, 2023. |
Each vein has a different operating cost; therefore,
Mineral Reserve evaluation was performed for each individual vein.
December 31, 2023 | Page 139 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
| 15.3 | Key Mining Parameters |
Mining recovery levels vary due to the geometry
of the vein and geotechnical characteristics of the material being mined. Some mineralized material cannot be economically extracted due
to its isolated location; thickness being below the minimum mineable width; or due to other technical or economic constraints.
Overall mining recovery is 94 %. Measured and
Indicated Resources were reduced by 1.78 Mt representing material below the required breakeven cut-off for Mineral Reserves, 258,000 t
due to crown pillars and 217,000 t due to non-accessible material based on stope designs. Mineral losses were estimated based on mine
designs and specific analysis of isolated areas where mineral extraction is not viable due to technical difficulties or excessive operating
cost demands at this time.
Dilution refers to the waste material (below breakeven
cut-off grade) that is not separated from the ore (above breakeven cut-off grade) during mining. The dilution factor considers operational
(over-break) and mucking effects. Dilution factors for the wider veins and the alternative narrow veins have been assessed independently.
The assumption was made that non-mineralized material is waste that carries no grade; therefore, waste material was set at a zero value
for metal contents.
The Caylloma Mine considers two types of dilution:
operational and mucking.
Operational dilution
The estimate of
the operational dilution (OP) was based on the proportion of extracted mineral versus in-situ mineral obtained by reconciliation
data for the previous 12 months. It includes both the planned and unplanned components displayed in Figure 15.1.
Planned dilution is caused by the inclusion of
waste inside the planned mining section based on the minimum mining width allowed by the mechanized equipment. Within this mining width,
it is not possible to differentiate waste material from ore. The unplanned dilution is caused by waste material located outside the defined
mining area. This material is also difficult to avoid because of mining geometry, overbreak impacts from blasting activities or geotechnical
conditions.
December 31, 2023 | Page 140 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
Figure 15.1
Conceptual diagram of operational dilution
Figure prepared by Bateas, 2023 from William et
al (2001)
The unplanned dilution was calculated based on
underground surveys defining the mined volumes between July 2022 and June 2023, or total material encountered (ore and waste)
at a zero-cut-off grade. The following formula was applied to calculate the total dilution, sourced from William et al (2001) dilution
definitions, equation number 1.
Based on the above a dilution factor was estimated
for each vein in accordance with the vein width.
Mucking Dilution
The mucking dilution (MD) estimates the
undesired waste material extracted as part of the mucking process and is based on operational experience for the twelve months prior to
the reserve estimation.
MD = 4%
December 31, 2023 | Page 141 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
Based on the above, the total dilution
(TD) applied for the reserves estimate is defined by the following formula:
TD = OP + MD
The dilution factor applied varies according to
the vein thickness, the proposed mining methodology and rock quality (for mechanized mining). The average dilution factor applied at the
Caylloma Mine by proposed mining method is detailed in Table 15.1. Additionally, an estimated dilution factor was estimated for the sub
level stoping (SLS) mining method based on the information for the latest trial done and rock conditions presented where the method is
going to be applicable for a minimum mining width (MMW) of 0.8 m and external dilution as an ELOS for HW (hangingwall) and FW (footwall)
for a mining final diluted stope shape width of 1.6m
Table 15.1
Average dilution factors for wide and narrow veins
Mining methodology |
Rock Type |
Average Dilution Factor (%) |
Mechanized (breasting) |
Type IV (RMR=21-40) |
17 |
Mechanized (enhanced) |
Type III (RMR=41-60) |
21 |
Semi-mechanized |
Type III (RMR=41-60) |
22 |
Conventional |
Type III (RMR=41-60) |
34 |
Sublevel longhole stoping |
Type III (RMR=41-60) |
Based on a MMW 0.8 m and ELOS 0.6 m HW & 0.2 m FW. Minimum stope width as 1.6m |
| 15.3.3 | Metal prices, metallurgical recovery and NSR values |
Metal prices used for Mineral Reserve estimation
(Table 15.2) were determined as of June 2023 by the corporate financial department of Fortuna from market consensus.
Table 15.2
Metal prices
Metal |
Price |
Silver (US$/oz) |
21.0 |
Gold (US$/oz) |
1,600 |
Lead (US$/t) |
2,000 |
Zinc (US$/t) |
2,600 |
Metallurgical recoveries used for Mineral Reserve
estimation are displayed in Table 15.3 and were based on achieved recoveries observed in the processing plant during the period July 2022
to June 2023. Mineralized material over this period was sourced from polymetallic veins that blended sulfide and oxide material.
A maximum blend of 11.6 % has been defined for oxide material as above this level metallurgical recovery decreases. The blended polymetallic
veins represent 97% of Mineral Reserves. High gold content veins (> 1 g/t Au) consider alternative recoveries (Table 15.3)
to maximize silver and gold recovery at the expense of lead and represent 3% of the Mineral Reserves.
Table 15.3
Metallurgical recoveries
Metal |
Metallurgical Recovery (%) |
Polymetallic veins |
High Au-Ag grade
veins |
Silver |
82 |
85 |
Gold |
22 |
55 |
Lead |
89 |
87 |
Zinc |
89 |
89 |
December 31, 2023 | Page 142 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
NSR values depend on various parameters including
metal prices, metallurgical recovery, price deductions, refining charges and penalties. Methodology for NSR determination is the same
as that described in Section 14.11. NSR values used for Mineral Reserve estimation are detailed in Table 15.4.
Table 15.4
NSR values
Metal |
NSR Value |
Polymetallic veins |
High Au-Ag grade veins |
Silver (US$/g) |
0.49 |
0.51 |
Gold (US$/g) |
0.00 |
24.69 |
Lead (US$/%) |
15.40 |
14.88 |
Zinc (US$/%) |
15.58 |
15.48 |
| 15.4 | Cut-off grade determination |
The breakeven cut-off values have been determined
based on actual operating costs incurred in the period from July 2022 to June 2023 (Table 15.5). The principal mining method
is the Mechanized (Breasting) cut and fill, which represents 91 % of Mineral Reserves. The same costs are applied to other mining methods
used in specific periods of the LOM and operational considerations like dip, mining width, geomechanical conditions and economic criteria
such as Mechanized (enhanced), Semi-mechanized, conventional and sublevel longhole stoping, and they represent 9 % of the total reserves.
Table 15.5
Operating costs by mining method
Area |
Cost (US$/t) |
Mechanized
(Breasting) |
Mechanized
(enhanced) |
Semi-mechanized |
Conventional |
Sublevel Longhole Stoping |
Mine |
41.65 |
25.35 |
45.07 |
104.60 |
33.97 |
Plant |
13.69 |
15.03 |
14.81 |
15.39 |
14.82 |
General services |
13.08 |
15.09 |
11.77 |
11.93 |
16.08 |
Administrative services |
10.23 |
12.14 |
11.65 |
27.53 |
13.29 |
Concentrate transportation |
7.58 |
7.57 |
7.39 |
7.53 |
7.81 |
Management fee |
1.31 |
0.93 |
0.76 |
1.09 |
0.79 |
Community support activities |
1.08 |
1.26 |
0.78 |
0.89 |
0.88 |
SG&A Expenses |
1,18 |
2.34 |
1.05 |
1.05 |
1.18 |
Breakeven cut-off |
89.78 |
79.70 |
93.27 |
170.00 |
88.81 |
Mineral Reserves reported by vein as of December 31,
2023, are detailed in Table 15.6. Measured Resources have been converted to Proven Reserves and Indicated Resources have been converted
to Probable Reserves.
December 31, 2023 | Page 143 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
Table 15.6
Mineral Reserves
Category |
Vein |
Tonnes |
NSR (US$/t) |
Ag (g/t) |
Au (g/t) |
Pb (%) |
Zn (%) |
Contained Metal |
Ag (koz) |
Au (koz) |
Pb (kt) |
Zn (kt) |
Proven |
Animas (Sulfide) |
2,000 |
127 |
36 |
0.17 |
2.03 |
5.02 |
2 |
0.0 |
0.0 |
0.1 |
Animas NE (Oxide) |
4,000 |
151 |
104 |
0.31 |
2.95 |
3.54 |
14 |
0.0 |
0.1 |
0.1 |
Cimoide ASNE |
2,000 |
158 |
91 |
0.17 |
2.91 |
4.38 |
6 |
0.0 |
0.1 |
0.1 |
Nancy |
4,000 |
125 |
56 |
0.13 |
3.89 |
2.43 |
7 |
0.0 |
0.2 |
0.1 |
Soledad |
7,000 |
378 |
583 |
2.20 |
0.77 |
0.94 |
136 |
0.5 |
0.1 |
0.1 |
Total |
20,000 |
227 |
261 |
0.94 |
2.23 |
2.62 |
165 |
0.6 |
0.4 |
0.5 |
Probable |
Animas (Sulfide) |
50,000 |
118 |
51 |
0.38 |
1.71 |
4.32 |
81 |
0.6 |
0.9 |
2.2 |
Animas NE (Sulfide) |
1,809,000 |
147 |
71 |
0.05 |
2.88 |
4.34 |
4,133 |
2.9 |
52.1 |
78.5 |
Animas NE (Oxide) |
187,000 |
123 |
113 |
0.52 |
2.91 |
1.48 |
679 |
3.1 |
5.4 |
2.8 |
Cimoide ASNE |
126,000 |
141 |
50 |
0.08 |
2.36 |
5.16 |
204 |
0.3 |
3.0 |
6.5 |
Ramal Techo ASNE |
5,000 |
133 |
132 |
0.04 |
1.62 |
2.80 |
22 |
0.0 |
0.1 |
0.1 |
Nancy |
20,000 |
127 |
79 |
0.15 |
3.64 |
2.08 |
50 |
0.1 |
0.7 |
0.4 |
Rosita |
24,000 |
150 |
76 |
0.09 |
2.69 |
4.61 |
58 |
0.1 |
0.6 |
1.1 |
La Plata |
2,000 |
426 |
642 |
3.00 |
1.60 |
0.00 |
39 |
0.2 |
0.0 |
0.0 |
Cimoide La Plata |
13,000 |
316 |
489 |
2.71 |
0.00 |
0.00 |
212 |
1.2 |
0.0 |
0.0 |
San Cristóbal |
15,000 |
304 |
589 |
0.18 |
0.30 |
0.73 |
276 |
0.1 |
0.0 |
0.1 |
Soledad |
18,000 |
223 |
286 |
1.26 |
1.48 |
1.56 |
170 |
0.7 |
0.3 |
0.3 |
Total |
2,269,000 |
147 |
81 |
0.13 |
2.79 |
4.06 |
5,924 |
9.3 |
63.2 |
92.0 |
Total Proven + Probable Reserves |
2,288,000 |
147 |
83 |
0.13 |
2.78 |
4.04 |
6,089 |
9.9 |
63.6 |
92.5 |
Notes:
| · | Mineral Reserves are as defined by the 2014 CIM
Definition Standards for Mineral Resources and Mineral Reserves. |
| · | Mineral Reserves are reported as of December 31,
2023. |
| · | Mineral Reserves are reported above NSR breakeven
cut-off values based on the proposed mining method for extraction including mechanized (breasting) at US$ 89.78/t; that represents
91 % of the total mineral reserves. Other mining methods applied are mechanized (enhanced) at US$ 79.30/t; semi-mechanized at US$ 93.27/t;
conventional at US$ 170.00/t and Sublevel longhole stoping at US$ 88.81/t. |
| · | Metal prices used in the NSR evaluation are US$ 21/oz
for silver, US$ 1,600/oz for gold, US$ 2,000/t for lead and US$ 2,600/t for zinc. |
| · | Metallurgical recovery values used in the NSR
evaluation for polymetallic veins are 82 % for silver, 22 % for gold, 89 % for lead, and 89 %, and for high Au-Ag grade veins are 85 %
for silver, 55 % for gold, 87 % for lead, and 89 % for zinc. |
| · | Operating costs were estimated based on actual
operating costs incurred from July 2022 through June 2023. |
| · | Mining recovery is estimated to average 94 %
with mining dilution ranging from 10 % to 40 % depending on the mining methodology. |
| · | Raul Espinoza, FAusIMM (CP) is the Qualified
Person for Mineral Reserves, being an employee of Fortuna Silver Mines Inc. |
| · | Reserve tonnes are rounded to the nearest thousand. |
| · | Totals may not add due to rounding. |
Factors that may affect the estimates include
metal price and exchange rate assumptions; changes to the assumptions used to generate the cut-off grade; changes in local interpretations
of mineralization geometry and continuity of mineralized zones; changes to geological and mineralization shape and geological and grade
continuity assumptions; variations in density and domain assignments; geometallurgical assumptions; changes to geotechnical, mining, dilution,
and metallurgical recovery assumptions; change to the input and design parameter assumptions that pertain to the conceptual stope designs
constraining the estimates; and assumptions as to the continued ability to access the site,
December 31, 2023 | Page 144 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
retain mineral and surface rights titles, maintain
environment and other regulatory permits, and maintain the social license to operate.
There are no other known environmental, legal,
title, taxation, socioeconomic, marketing, political or other relevant factors that would materially affect the estimation of Mineral
Reserves that are not discussed in this Report.
A long section showing
the location of Mineral Reserves and the stope design is displayed in Figure 15.2.
| Figure 15.2 | Longitudinal section showing Proven and Probable Reserves,
Mineral Resources exclusive of reserves and stope design for the Animas vein |
Figure prepared by Bateas, 2023
| 15.6 | Comments on Section 15 |
Mineral Reserves are to be extracted primarily
using an underground cut-and-fill mechanized mining method. Other mining methods such as semi-mechanized, conventional or SLS mining methods
are used in specific cases depending on the vein geometry, geological and geomechanics conditions and economic viability. In the opinion
of the QP, Mineral Reserves are reported appropriately with the application of reasonable mining recovery and dilution factors based on
operational observations and transparent breakeven cut-off grades based on actual mining, processing and smelting costs; actual metallurgical
recoveries achieved in the plant; and reasonable long-term metal prices based on market consensus.
The QP is of the opinion that the Proven and Probable
Mineral Reserve estimate has been undertaken with reasonable care and has been classified using the 2014 CIM Definition Standards. Furthermore,
it is the opinion of the QP that Mineral Reserves are unlikely to be materially affected by mining, metallurgical, infrastructure, permitting
or other factors, as these have all been well established over the last 10 years of mining.
December 31, 2023 | Page 145 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
This section summarizes the mine design and planning
work completed to support the preparation of the Mineral Reserve statement. The predominant mining method applied in the exploitation
of the main vein (Animas) is mechanized overhand cut-and-fill and will be used to mine 91 % of the Mineral Reserves. Other mining methods
that represent 9 % of the Mineral Reserves include semi-mechanized, conventional cut and fill and SLS, which are used as an alternative
to the mechanized depending on rock conditions such as geomechanics, dip and width of the veins. All mining is undertaken by contractors
in a southwest to northeast direction following the strike of the vein. Production capacity at the mine is 1,500 tpd.
The hydrogeological study was carried out by SRK
Consulting in November 2017 to characterize and quantify the penetration of groundwater into the underground workings. The model
provides a tool for developing the conceptual understanding of the groundwater system and to quantify a range of possible dewatering rates
to consider for mine design.
Based on the transient hydrogeological modeling,
the estimated groundwater inflows to the present underground workings reach a nominal 120 l/s with a maximum depth of approximately 4400
masl. The area receiving the majority of inflow is approximately 250 m in length, and an estimated 300 m below the pre-mined groundwater
table.
A hydrogeological study update was conducted in
July 2020 by Rhind, using information from the Caylloma Mine from level 12 (4495 masl) to level 16 (Ramp 462), analyzing in-depth
water flows during mining activities in Animas. For this study, one of the objectives was to develop a representative numerical model
of groundwater flow up to level 16. The calculated flow for Ramp 462 is 70 l/s, while for the exit of level 12, it is 165 l/s.
In the extension of the model, the regional groundwater
flow has a north-to-south direction, draining towards the area where the underground workings are located in Animas. In the area where
Ramp 462 would be located, the flow direction is radial, and equipotential curves form a depression cone whose extension corresponds to
an ellipsoid.
The ravines in the study area and Lake Vilafro
seem to be connected to the general or main groundwater system. The upper lakes (Jesús Maria and Antimonio) appear to be isolated
from the groundwater regime since no influence area is observed in the piezometric surface around them. This is partly because the water
table passes below the bottom level of these lakes, partly due to underground workings. On the other hand, the Santiago River appears
as a recharge and discharge zone in sections.
As the mine operations are going deeper, another
updated report prepared by Rhind focusing on a diagnosis and recommendations for increasing water drainage at level 18 of the Animas vein
delivered in November 2023. This update report by Rhind identifies the following flows in the mine: 35 l/s for level 16, 95 l/s for
level 17, and 30 l/s for level 18, totaling 160 l/s. A volume projection of around 200 l/s was made, with the main ramp 462 capacity at
level 12 being 250 l/s. It is expected that the flows at level 18 could potentially exceed 250 l/s, so the recommendation to expand the
drainage system in the mine is necessary. Additionally, the recommendation is to define the surface water
December 31, 2023 | Page 146 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
recharge system, with a detailed description of
the Santiago River and the Trinidad stream to determine their influence on groundwater bodies that may have seepage towards the mining
workings.
Dewatering requirements are discussed in Section 16.8.8.
The Bateas Geotechnical
Department continuously undertakes geotechnical evaluation through the classification of rock mass using RQD, rock mass rating (RMR) and
Q (classification of rock mass quality for underground opening) systems. Results of the geotechnical evaluations for the presently mined
Animas and Nancy veins indicate the quality of the rock mass ranges from regular to good (Table 16.1), which is consistent with
the behavior observed underground.
Table 16.1
Classification of rock mass
Vein |
RQD (%) |
RMR |
Q |
Animas |
40-60 |
30 - 55 |
0.05 – 2.15 |
Nancy |
<40 |
20 - 40 |
0.05 – 0.25 |
Cimoide |
40 - 60 |
35 - 60 |
0.1 – 4.65 |
The rock quality allows openings with dimensions
of up to 11.5 m wide, 5.0 m high, and 50-80 m long in the Animas/Animas NE vein and 9.0 m wide, 4.5 m high, and 80 m long in the Nancy
vein. Based on these values the mining method of overhand cut-and-fill (with hydraulic and waste backfill) is regarded as the most suitable.
A bulk mining method, such as sub-level stoping, can be applied in the Cimoide ASNE vein, when the dip of the vein (70°- 80° average)
would make feasible to use this mining method.
The mining method
is cut-and-fill which is used in mining steeply dipping orebodies in stable rock masses. Cut-and-fill is a bottom up mining method that
consists of removing ore in horizontal slices (known as breasting), starting from a bottom undercut and advancing upwards. The following
describes the cut-and-fill mechanized, semi-mechanized, and conventional extraction methods.
| 16.4.1 | Mechanized cut-and-fill |
This is the main mining method applied at Minera
Bateas. Mechanized mining uses a jumbo drill rig and scoop tram for loading. The ore haulage is performed by trucks. Rock support is applied
through rock bolts and shotcrete. The average mining width ranges between 3.5 m and 17 m. Mechanized mining is regarded as only being
suitable for the Animas, Animas NE and their associated splays, as well as the Nancy vein based on the geological structure and geotechnical
studies (Section 16.4). The majority of production came from the Animas/Animas NE and associated splay veins in 2023. Mechanized
cut-and-fill comprises 91 % of mining planned in the LOM. A less common variation of this methos is applied, known as “enhanced
mechanized” and it is used for vertical drilling for the last cut of the stope in order to reach the bridge or pillar at the upper
level.
The mechanized mining sequence is shown in Figure
16.1 and includes drilling (with a jumbo drill rig), blasting, support, loading (with a scoop tram) and haulage.
December 31, 2023 | Page 147 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
Figure 16.1
Schematic showing mechanized mining sequence
Figure prepared by Bateas, 2023
| 16.4.2 | Semi-mechanized cut-and-fill |
Semi-mechanized mining is performed using handheld
drilling equipment (jacklegs) and scoops for loading. Mineral material haulage is performed by truck. Rock support is supplied using rock
bolts installed using manual drilling and installation techniques. Semi-mechanized mining is applied in specific circumstances to narrow
veins with average widths between 0.8 m and 2.0 m, dip between 70 to 80 degrees.
The semi-mechanized mining sequence involves drilling
(with jacklegs), blasting, support, loading and haulage. Depending on vein width, once the mineralized material has been extracted the
walls have to be drilled and blasted in order to allow the minimum working width, especially for the loading equipment.
| 16.4.3 | Conventional cut-and-fill |
Conventional mining is performed using handheld
drilling equipment (jacklegs) and scrapers for loading. The ore haulage is done with trucks and the support is applied with rock bolts
in manual form. This system is applied in narrow veins with average widths between 0.5 m and 0.8 m. This mining method is only applicable
to the Bateas, La Plata, Cimoide La Plata and San Cristobal veins that are scheduled for mining in the final years of the LOM.
| 16.4.4 | Sublevel Longhole Stoping (SLS) |
The SLS mining method, specifically the Avoca
method, will be implemented in early 2024. A trial test was conducted between June and September 2023, during which operational
parameters and cost projections were established. This mining method is considered for veins in competent rock quality in RMR >=41
with widths ranging from 0.8 m to 3 m and a mining bench of 13.5 m height, initially focused on the Cimoide ASNE vein that is scheduled
for mining for 2024.
December 31, 2023 | Page 148 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
The mining production
period extends from 2024 to 2028, almost five years. At full production the planned mining rate is 1,500 tpd approximately (540,000 tonnes
per year). Planned LOM production is 2.3 Mt at an average silver grade of 83 g/t, gold grade of 0.14 g/t, lead grade of 2.79 %, and zinc
grade of 4.03 % (Table 16.2 and Table 16.3).
Table 16.2
Caylloma life-of-mine production schedule by vein
Vein |
2024 |
2025 |
2026 |
2027 |
2028 |
Total |
Animas NE |
516,000 |
488,000 |
459,000 |
447,000 |
86,000 |
1,999,000 |
Cimoide ASNE |
28,000 |
55,000 |
27,000 |
19,000 |
0 |
129,000 |
Nancy |
0 |
0 |
7,000 |
17,000 |
0 |
24,000 |
Animas |
0 |
0 |
30,000 |
7,000 |
16,000 |
52,000 |
Soledad |
0 |
0 |
12,000 |
13,000 |
0 |
26,000 |
Rosita |
0 |
0 |
8,000 |
16,000 |
0 |
24,000 |
San Cristobal |
0 |
0 |
0 |
15,000 |
0 |
15,000 |
Ramal Techo ASNE |
0 |
0 |
0 |
5,000 |
0 |
5,000 |
La Plata |
0 |
0 |
0 |
2,000 |
0 |
2,000 |
Cimoide La Plata |
0 |
0 |
0 |
1,000 |
12,000 |
13,000 |
Total |
544,000 |
542,000 |
542,000 |
542,000 |
114,000 |
2,288,000 |
Note: Totals may not add due to rounding
| 16.5 | Mine production schedule |
Measured and Indicated
Mineral Resources were converted to Mineral Reserves and any Inferred Resources in the mine design considered as waste. Table 16.3
details the annual production plant feed and concentrate production for the Caylloma Mine.
The LOM annual tonnage and head grades have been
obtained from the Mineral Reserves estimate based on the processing plant treatment capacity and the established mining sequence.
Metallurgical recoveries, concentrate production
and metal content for the LOM have been estimated based on the estimated head grades, processing plant historical metallurgical recoveries
as well as metallurgical testing.
Table 16.3
Caylloma life-of-mine production schedule
Type |
Item |
2024 |
2025 |
2026 |
2027 |
2028 |
Total |
Treatment |
Tonnes |
544,000 |
542,000 |
542,000 |
542,000 |
114,000 |
2,288,000 |
Ag (g/t) |
64 |
54 |
60 |
125 |
86 |
83 |
Au (g/t) |
0.18 |
0.15 |
0.16 |
0.29 |
0.10 |
0.13 |
Pb (%) |
2.53 |
2.04 |
1.80 |
1.96 |
2.25 |
2.78 |
Zn (%) |
3.87 |
3.67 |
3.58 |
3.41 |
3.93 |
4.04 |
Metallurgical Recovery |
Ag (%) |
82 |
81 |
82 |
83 |
86 |
82 |
Au (%) |
17 |
18 |
25 |
18 |
55 |
25 |
Pb (%) |
90 |
88 |
88 |
89 |
88 |
89 |
Zn (%) |
89 |
88 |
89 |
89 |
88 |
88 |
Concentrate |
Pb (t) |
24,000 |
21,000 |
21,000 |
22,000 |
4,000 |
92,000 |
Zn (t) |
37,000 |
35,000 |
38,000 |
37,000 |
7,000 |
154,000 |
Recovered
Metal |
Ag (oz) |
1,111,000 |
996,000 |
1,106,000 |
1,442,000 |
373,000 |
5,027,000 |
Au (oz) |
330 |
360 |
680 |
390 |
740 |
2,510 |
Pb (t) |
15,000 |
13,000 |
13,000 |
13,000 |
3,000 |
56,000 |
Zn (t) |
20,000 |
18,000 |
20,000 |
19,000 |
4,000 |
81,000 |
Note: Totals may not add due to rounding
December 31, 2023 | Page 149 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
The dilution factor
applied varies according to the vein thickness and the proposed mining methodology. The average dilution factor by vein applied at the
Caylloma Mine varies between 10 and 34 %. Waste material is considered to contain no mineralization.
The exploitation infrastructure required to service
mechanized mining is similar to that used to service semi-mechanized mining. This includes a center ramp connecting to sub level development
running parallel to the vein. A crosscut from the sub level is developed to intersect the vein perpendicularly and allow exploitation.
Each cross cut allows the exploitation of a 150 m long stope by mechanized mining or a 90 m long stope by semi-mechanized mining. Additionally,
development may include raises used for ventilation, service systems or as ore passes adjacent to stopes.
Conventional mining requires less development.
A center raise is driven in the vein to allow access for exploitation and extraction, giving access to a 60 m long stope (30 m each side
of the raise). Two additional raises allow for access, ventilation and services.
Sublevel longhole stoping mining requires a production
ramp (if it already exists), otherwise a central ramp to the footwall of the vein must be excavated. From there, parallel sublevels will
be developed along the vein, and crosscuts will be prepared intersecting the vein perpendicular to create a gallery at the base of the
stope and prepare draw points for ore extraction. Above at 13.5 m as bench or height, another gallery or sublevel is excavated in the
direction of the vein, accessed through crosscuts spaced 100 m apart. Mining in retreat will be carried out from one of these crosscuts,
while on the opposite side, will be used for rock filling, leaving a maximum opening of 20 m between the production side and the rock
filling side as per geomechanical recommendations.
| 16.6 | Underground mine model |
The mine plan includes a program for mine development
which can be divided into three types: 1) development, 2) stope preparation and 3) exploration. In order to produce 1,500 tpd, approximately
470 m of new development is required each month. Development includes infrastructure such as ore passes, ramps, bypasses, and ventilation
raises; preparation consists of all workings for exploitation purposes; and mine exploration is to assist with the exploration of the
veins.
| 16.6.2 | Lateral development |
A summary of the lateral development requirements
for the life-of-mine are detailed in Table 16.4.
Table 16.4
Summary of lateral development requirements for LOM
Activity |
2024 |
2025 |
2026 |
2027 |
2028 |
Total |
Bypass (m) |
596 |
475 |
|
186 |
|
1,256 |
Drift (m) |
1,208 |
1,313 |
1,400 |
889 |
|
4,811 |
Gallery (m) |
410 |
816 |
485 |
835 |
60 |
2,606 |
Crosscut (m) |
28 |
51 |
5 |
|
|
84 |
Ramp (m) |
729 |
1,054 |
1,145 |
1,246 |
|
4,173 |
Sub Level (m) |
1,099 |
866 |
1,866 |
1,117 |
|
4,949 |
Stope access (m) |
1,224 |
1,235 |
1,206 |
948 |
|
4,613 |
Total (m) |
5,293 |
5,811 |
6,107 |
5,221 |
60 |
22,492 |
December 31, 2023 | Page 150 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
Lateral development totals 22,492 m, equivalent
to a development ratio of 120 t/m.
| 16.6.3 | Raising requirements |
Table 16.5 is a summary of LOM raising requirements.
With vertical development totaling 4,170 m, all being ventilation raises.
Table 16.5
Summary of vertical development requirements for LOM
Activity |
2024 |
2025 |
2026 |
2027 |
2028 |
Total |
Vent. raises (m) |
225 |
230 |
691 |
1,485 |
89 |
2,720 |
Raise borer (m) |
175 |
939 |
182 |
155 |
|
1,451 |
Total |
401 |
1,169 |
872 |
1,639 |
89 |
4,170 |
Development advance rates have been planned to
take into account potential bottlenecks such as available ventilation, capacity to move muck, congestion in the main ramp, and the availability
of trained operating and maintenance crews. Development meters required for production per year, in accordance with the production schedule
is detailed in Table 16.6.
Table 16.6
LOM development schedule
Vein |
Type |
2024 |
2025 |
2026 |
2027 |
2028 |
Total |
Animas |
Horizontal (m) |
2,612 |
2,258 |
3,430 |
1,543 |
0 |
9,842 |
|
Incline (m) |
1,648 |
1,472 |
2,278 |
1,240 |
0 |
6,638 |
|
Vertical (m) |
356 |
941 |
602 |
338 |
0 |
2,236 |
|
Total (m) |
4,616 |
4,670 |
6,310 |
3,121 |
0 |
18,717 |
Cimoide ASNE |
Horizontal (m) |
470 |
1,113 |
236 |
0 |
0 |
1,819 |
|
Incline (m) |
562 |
968 |
73 |
0 |
0 |
1,603 |
|
Vertical (m) |
45 |
228 |
30 |
0 |
0 |
303 |
|
Total (m) |
1,077 |
2,309 |
339 |
0 |
0 |
3,726 |
Cimoide La Plata |
Horizontal (m) |
0 |
0 |
0 |
415 |
60 |
475 |
|
Incline (m) |
0 |
0 |
0 |
415 |
0 |
415 |
|
Vertical (m) |
0 |
0 |
0 |
554 |
89 |
643 |
|
Total (m) |
0 |
0 |
0 |
1,385 |
149 |
1,534 |
Ramal Techo ASNE |
Horizontal (m) |
0 |
0 |
0 |
252 |
0 |
252 |
|
Incline (m) |
0 |
0 |
0 |
319 |
0 |
319 |
|
Vertical (m) |
0 |
0 |
0 |
0 |
0 |
0 |
|
Total (m) |
0 |
0 |
0 |
571 |
0 |
571 |
San Cristobal |
Horizontal (m) |
0 |
0 |
0 |
54 |
0 |
54 |
|
Incline (m) |
0 |
0 |
0 |
0 |
0 |
0 |
|
Vertical (m) |
0 |
0 |
0 |
325 |
0 |
325 |
|
Total (m) |
0 |
0 |
0 |
379 |
0 |
379 |
Soledad |
Horizontal (m) |
0 |
0 |
91 |
700 |
0 |
791 |
|
Incline (m) |
0 |
0 |
0 |
283 |
0 |
283 |
|
Vertical (m) |
0 |
0 |
240 |
422 |
0 |
662 |
|
Total (m) |
0 |
0 |
331 |
1,405 |
0 |
1,736 |
Total all veins (m) |
|
5,694 |
6,980 |
6,979 |
6,861 |
149 |
26,662 |
December 31, 2023 | Page 151 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
| 16.8 | Equipment, manpower, services, and infrastructure |
| 16.8.1 | Contractor development |
The underground mine is operated by a mining contractor
selected by Bateas based on a competitive bidding process. The scope of work for the mining contractor generally includes mine decline
and raise development, stope preparation development, stoping, backfilling, and all related services required for the operation of a 1,500
tpd narrow vein silver-gold-lead-zinc mine.
Table 16.7 shows Bateas’ estimate of the
mining fleet required to execute the mine plan including the supporting surface units. The maximum number of units is shown for each equipment
type, as actual equipment requirements vary throughout the mine life.
Replacement equipment required during the mine
life is not included in the list shown.
Table 16.7
Planned mining equipment
Equipment |
Quantity |
Type |
Model |
Capacity |
Scoop |
5 |
Caterpillar |
R1300 LHD |
4.2 yd3 |
Scoop |
2 |
Caterpillar |
R1600 |
6.0 yd3 |
Jumbo |
3 |
Sandvik |
DD311 |
1 arm |
Jumbo |
2 |
Sandvik |
DD210 |
1 arm |
Truck |
9 |
Volvo |
FMX500 |
15 m3 |
Tractor |
1 |
Caterpillar |
962L |
5.0 yd3 |
Excavator |
1 |
Caterpillar |
329DL |
2.4 m3 |
Front-end loader |
2 |
Komatsu |
WA430-6 |
4.3 yd3 |
Mixer |
2 |
Putzmeister |
Mixcret 4 |
4 m3 |
Mixer |
1 |
Putzmeister |
Mixcret 4 |
4 m3 |
Concrete sprayer |
2 |
Putzmeister |
SPM 4210 |
250 l |
Scaler |
2 |
Paus |
852 |
n/a |
Telehandler |
2 |
ALO LIFT |
FR02 |
n/a |
Bolter |
2 |
Resemin |
Bolter 99 |
n/a |
Bolter |
1 |
Resemin |
Small Bolter |
n/a |
Loader |
1 |
CAT |
246D |
n/a |
Bateas estimates a total of 1,126 employees are
required for mine-related activities in 2023, consisting of 746 contractors and 380 Bateas staff. The operating costs for the LOM are
based on maintaining similar staffing numbers, although Fortuna has identified an opportunity to potentially reduce numbers in future
years.
| 16.8.4 | Production drilling |
Mechanized
For mechanized drilling, Bateas uses a jumbo drilling
machine, with the drilling taking place on horizontal benches (breasting) with an average advance of 2.8 m and vertical average advance
of 2.5 m. The minimum mining width varies according to the thickness of the vein. Production starts from the lower level and proceeds
to higher levels of the stope by leaving an intermediate 3 m crown pillar between stopes for safe operating conditions.
December 31, 2023 | Page 152 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
The production drill holes for breasting and vertical
drilling use drill pipe of 10 ft length and drill bits of 51 mm and 45 mm.
The drilling pattern varies according to the hardness
of the rock and type of cut.
Semi-mechanized
For semi-mechanized drilling, Bateas uses handheld
drilling equipment (jacklegs). Similar to the mechanized drilling, the drilling takes place on horizontal benches (breasting) with average
advances of 2.3 m and vertical advances averaging 1.8 m. The minimum mining width varies according to the thickness of the vein. Production
starts from the lower level and proceeds to higher levels of the stope by leaving an intermediate 3 m crown pillar between stopes for
safe operating conditions.
The production drill holes for breasting and vertical
drilling use drill pipes of 8 and 6 ft lengths and drill bits of 41 mm.
The drilling pattern varies according to the hardness
of the rock and type of cut.
Conventional
For conventional drilling, Bateas uses handheld
drilling equipment (jacklegs). The drilling takes place with vertical advances averaging 1.6 m. The minimum mining width varies according
to the thickness of the vein. Production starts from the lower level and proceeds to higher levels of the stope by leaving intermediate
3 m crown pillar between stopes for safe operating conditions.
Production drill holes for vertical drilling use
drill pipes of 4 and 6 ft lengths and drill bits of 41 mm.
The drilling pattern varies according to the hardness
of the rock and type of cut.
Sublevel longhole stoping
For longhole drilling, the use of a Simba equipment
for vertical drilling is considered, with a burden of 0.7 m and a spacing of 0.8 m for the blast pattern, with a 5° inclination towards
the free face.
The consideration of minimum vein width is 0.8
m of which an additional 0.8 m waste skin is added between the hanging wall and footwall to be able to extract a mining block no smaller
than 1.6 m of mining width. The mineral extraction draw points will be at the lower gallery along the structure in the opposite direction
to the mining and rock filling will be located 100m away from the extraction area.
The vertical drilling length (bench) is considered
to be 13.2 m with a drill diameter of 64 mm.
| 16.8.5 | Ore and waste handling |
A combination of 4.2-yard load-haul-dump (LHD)
units and 25 t trucks were selected as being the most economical option for ore and waste haulage. Broken ore from the stopes is mucked
by LHDs to an ore pass or loaded directly into the 25 t trucks. Waste rock from development headings is mucked by LHDs directly to the
trucks or to local waste storage areas. The waste rock is then hauled by truck to the surface storage facilities where it is classified
and trucked to the hydraulic backfill plant.
The estimated air flow required for the Animas
underground mine is 345,100 cfm for a production rate of 1,500 tpd based on the utilization of the planned mining equipment.
December 31, 2023 | Page 153 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
Air intake is through the RB 509 N and the main
access ramp for levels 7 (NE), 8, 9 and 12 which represents an estimated 356,855 cfm.
Ventilation is controlled by three main fans (two
of 120,000 cfm and two of 100,000 cfm) that draw in contaminated air from the underground levels, stopes, galleries, and raises and expels
the air at surface.
Stopes in operation are ventilated via auxiliary
fans (20,000 to 40,000 cfm) that move fresh air from the ramps with ducting along the level access crosscuts and along the vein to active
work areas.
Backfill required by the mine to complete the
mining sequence is provided by waste rock and classified mill tailings. While waste rock backfill is generated by underground development,
the quantity produced is generally insufficient to meet mine backfill requirements. To supplement the waste rock from development activities,
classified mill tailings or hydraulic backfill is produced by a small plant on the surface. The proportion of waste and hydraulic backfill
is 30 % and 70 %, respectively. The total volume of backfill required by the mine is estimated to be 190,000 m3 per annum.
The construction of a new hydraulic fill pumping
system is planned for the first quarter of 2024, with the goal of eliminating hydraulic backfill transportation through trucks, optimizing
their operation, reducing dust generation, and being cost-effective. The project would commence operations in the fourth quarter of 2024.
The hydraulic backfill system has a processing capacity of 224 m3/h using tailings with 23.4% solids and operates 24 hours a day to produce
31 m3/h of hydraulic backfill.
| 16.8.8 | Mine dewatering system |
The underground mine dewatering system has been
designed to handle an estimated peak rate of 200 l/s. A new water pumping system is under construction, with a capacity of 225 l/s at
level 17 to pump water from the deepest areas of the mine. The project is planned to be completed in January 2024 with testing and
commissioning in February 2024.
The dewatering of the Animas vein is primarily
through a series of sumps using pumps of 150 HP at auxiliary sumps and 450 HP pumps at the principal sumps located in the following stations:
| · | Auxiliary station sump at level 16, with one
150 HP pump with a flow rate of 30 l/s to 40 l/s of capacity |
| · | Main station sump at Animas level 15 has two
submersible pumps capable of handling up to 200 l/s. From level 15, water is pumped through the sediment’s sumps located at level
12 (CAM 383). |
| · | After undergoing treatment in CAM 383 (flocculation
and coagulation), the mine water exits to the surface through the ditch channel. |
On the surface, mine water undergoes additional
treatment to avoid any environmental contamination prior to being discharged.
| 16.8.9 | Maintenance facilities |
Maintenance facilities for the underground mobile
fleet consist of a surface maintenance shop for major failures of the equipment and two underground workshops for minor
December 31, 2023 | Page 154 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
repairs and lubrication performed as part of the
preventive maintenance program. An underground workstation was implemented in 2019 on level 14 of the Animas vein.
| 16.8.10 | Electrical power distribution |
Power to support the mine infrastructure is provided
from the main site electrical substation via two lines of 15-kV connected to the national power grid line from Callalli via a 66-kV line.
Bateas signed a contract with distribution company Statkraft for the electricity supplied.
Electrical energy requirements for the Bateas
operation are as follows; plant concentrator 3,200 kilowatts; mine 3,900 kilowatts; and general services and camp 700 kilowatts, with
a total of 34 electrical substations for mine and 21 electrical substations for surface areas.
Primary line
Bateas has two overhead 15 kV transmission lines,
one of which is projected for 22.9kV from the Caylloma substation to the onsite substation located at the power distribution room.
Secondary line
The main onsite substation distributes electrical
power to the main operational centers via overhead 15 kV lines to:
There are three principal substations located
on the surface, Substation N° 15, Substation No. 29, and Substation No. 37 that reduce electrical voltage from 15 kV to
4.16 kV and 3.2 kV and distribute electric power to production and mine development activities. With 31 additional substations, reducing
voltage from 4.16 kV and 3.2 kV to 0.44 kV, are located on levels 10, 12, 14, 15, 16 and 17 of the mine, and distribute electric power
to mine equipment such as fans, jumbos, and pumps. Substation No. 8, located on surface, distributes electric power with an overhead
of 3.2 kV, via a transformer, to distribute 440 and 220 V electricity to the camp and administrative areas.
In addition, Bateas maintains three backup power
sources to generate electric power by using diesel power generation to cover the Animas demand for ventilation and water pumps on the
13, 14, 15, 16. 17 and 18 levels as detailed below:
| · | GE05: Caterpillar, 6HN00653 of 2 MW (installed
power), 1,200 kW (effective power). |
| · | GE06: Caterpillar, 6HN00726 of 2 MW (installed
power), 1,200 kW (effective power). |
| · | GE03: Cummins GEC15 of 800 kW (installed power),
and 600 kW (effective power). |
Compressed air supply
Average compressed air consumption during mine
production is estimated at approximately 1,000 cfm. The compressed air is supplied from the surface by air compressors (one electric and
two diesel powered). These provide compressed air of
December 31, 2023 | Page 155 of 213 |
| |
|
Fortuna Silver Mines Inc.: Caylloma Mine, Caylloma
District, Peru
Technical Report |
110 psi for the development and mining activities.
Compressed air is used mainly to launch shotcrete to the working areas, for the jackleg drills to excavate raises and for loading explosives
into the drillholes.
| 16.9 | Comments on Section 16 |
The QP is of the opinion that:
| · | The mining methods being used are appropriate
for the deposit being mined. The underground mine design, tailings facility design, and equipment fleet selection are appropriate to reach
production targets. |
| · | The mine plan is based on historically successful
mining philosophy and planning and presents low risk. |
| · | Inferred Resources are regarded as waste in the
mine plan. |
| · | Mining equipment requirements are based on actual
operational conditions experienced at the Caylloma Mine producing 1,500 tpd. |
| · | All mine infrastructure and supporting facilities
meet the needs of the current mine plan and production rate with new infrastructure, such as underground workshops, being constructed
as required. |
December 31, 2023 | Page 156 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
|
17.1 | Processing
plant design |
The Bateas processing plant is a typical flotation
operation and consists of five stages: crushing; milling; flotation; thickening and filtering and tailings disposal. Each of the main
stages is comprised of multiple sub-stages. A summary of each stage is as follows:
| · | Crushing: includes three stages, primary,
secondary, and tertiary. |
| · | Milling: includes two stages, primary
and secondary. |
| · | Flotation: consists of two operating flotation
circuits (lead–silver, and zinc) and one copper flotation circuit on standby. |
| · | Thickening and filtering are performed
separately for the concentrates, which after filtering undergo a drying process before being placed in their respective storage bins to
await transportation. |
| · | Tailings disposal: Final tailings are
classified through cyclones. The coarse fraction (underflow) is placed onto a concrete pad and transported to the mine to be used as hydraulic
fill. The finer fraction (overflow) is pumped to the tailing’s storage facility. |
The Caylloma concentrator plant resumed operations
in October 2006, treating 600 tpd of polymetallic mineral. Capacity increased progressively. With the installation of a 1.8 m
by 2.4 m ball mill in 2009 the plant reached a treatment capacity of 1,300 tpd, and with the installation of two Derrick Stack
Sizer vibrating wet screens the plant achieved a treatment capacity of 1,500 tpd at the end of March 2016. The treatment process
is differential flotation. Initially, two concentrates were obtained: lead–silver and zinc. From late 2009 to January 2011,
a copper–silver concentrate was also produced, but due to unfavorable commercial terms the production of copper concentrate was
suspended, and the copper circuit put on standby.
| 17.1.1 | Crushing and milling circuits |
The crushing and milling circuits are shown in
Figure 17.1. The crushing process is fed from the 10,000 t capacity stockpile used for ore storage and blending. The process commences
with feed to the coarse hopper, which has a 450 t active capacity with 30 cm separation grates. The mineral is extracted from the
coarse hopper through the apron feeder that feeds the vibrating grizzly with variable separation that, in turn, feeds the Kurimoto jaw
crusher, resulting in a product size varying between 76 mm and 90 mm. The mineral is transported on two conveyor belts to the
two-deck vibrating 6 by 14-foot (1.82 x 4.27 m) screen. The screen’s undersize (100% -¾") is fed to the stockpile via
conveyer belts with the oversize going to a Sandvik CH-420 secondary crusher, the product of which goes to the two-deck vibrating 5 by
14 foot (1.52 x 4.27 m) screen, the undersize of this screen feeds the stockpile. The oversize is fed through a conveyor belt to the Sandvik
CH-430 tertiary crusher, the discharge of which returns to the initial conveyer belt, closing the circuit. The actual capacity of this
circuit is 1800 tpd.
December 31, 2023 | Page 157 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Figure 17.1
Crushing and milling circuits at the Caylloma processing plant
Figure prepared by Bateas, 2023 |
December 31, 2023 | Page 158 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Additionally, there is a standby primary crushing
circuit that starts at a 100 t capacity coarse hopper. From the hopper, the mineral is fed to a Kueken 24 by 36-inch (0.6 x 0.9 m)
jaw crusher through a Ross chain feeder. The discharge from this crusher is transported via conveyors 19 and 20 to conveyor 2-A. There
are three permanent magnets and one electromagnet on the conveyors to prevent the entry of tramp iron.
The grinding circuit has two stages. The primary
stage operates in an open circuit, consisting of two ball mills (Comesa 2.4 m by 3.0 m and a Denver 2.1 m by 2.1 m). The secondary stage
operates in closed circuit and consists of three ball mills, a Magensa 1.8 m by 1.8 m, a Hardinge 2.4 m by 0.9 m and a Liberty 1.8 m
by 2.4 m. The final product of the grinding circuit is 55 % passing 130 µm.
The Comesa and Denver
primary grinding mills are fed independently by conveyor belts. The discharge from the Comesa mill and the Denver Mill feeds a
flash cell (SK 240) and the concentrate from the flash cell is sent to the lead thickener. Tailings are fed to a 6 by 6-inch (15 x 15
cm) horizontal pump which in turn feeds the Derrick Stack Sizer. The undersize goes to the flotation circuit and the oversize feeds the
three secondary ball mills.
The discharge from the Hardinge and Magensa mills
feeds a 6 by 4 inch (15 x 10 cm) horizontal pump, which in turn feeds the D-15 cyclone. The fine product from the cyclone passes to the
flotation circuit and the coarse product returns to the three secondary ball mills. The discharge from the Liberty mill also feeds the
flash cell (SK240).
|
17.2 |
Metallurgical
treatment |
Metallurgical treatment is through a process of
differential flotation; the first step is the flotation of lead–silver followed by zinc flotation.
| 17.2.1 | Lead-silver flotation circuit |
The D-15 cyclone
overflow and the Derrick Stack Sizers undersize are fed to a 10 m3 conditioner before going to the TC-20-unit cell of 20 m3
capacity. The unit cell tailings are fed to three TC-20 rougher cells. The unit cell concentrate together with the rougher
concentrate are fed to the primary cleaner cells, consisting of four 3 m3 OK-3 cells.
The primary cleaner concentrate is fed to the secondary cleaner cells, consisting of three 3 m3
OK-3 cells. The secondary cleaner concentrate is fed to the tertiary cleaner cells, consisting of two 3 m3
OK-3 cells. Concentrate from the tertiary cleaner forms the final lead-silver concentrate. Tailings from the secondary and tertiary cleaner
cells return to the head of the primary and secondary cleaner cells, respectively.
The rougher tailings feed the scavenger flotation
bank, consisting of two TC-20 cells. The scavenger concentrate, as well as the primary cleaner tailings are pumped to join the Derrick
Stack Sizers with oversize returning to the secondary grinding circuit. The scavenger tailings feed the zinc flotation circuit.
| 17.2.2 | Zinc flotation circuit |
The lead-silver flotation tailings are sent to
three conditioners (two 10 m3 and one 22 m3). The conditioned pulp is fed to the zinc rougher flotation stage, consisting
of two RCS 20 cells of 20 m3 and six 8 m3 OK8U cells working in series. The rougher concentrate is fed to the
cleaner flotation circuit, comprised of four stages consisting of an RCS 10 cell of 10 m3 and five, three and two 2.8 m3
Sub-A30 cells for the primary, secondary and tertiary cleaner stages respectively. These stages work in series, the concentrate from the
primary cleaner feeds the secondary cleaner, the secondary concentrate feeds the tertiary cleaner and the concentrate from this, feeds
the fourth cleaning stage. The concentrate from the
December 31, 2023 | Page 159 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
latter is the final product from the zinc flotation
circuit. The zinc concentrate goes through an automatic sampler and is then sent to the zinc thickener.
The rougher tailings feed the scavenger flotation
circuit that is comprised of two 8 m3 OK8U cells. The scavenger concentrate is sent to a conditioner before returning it to
the rougher circuit. The scavenger tailings are the final tailings of the whole process.
The flotation process in 2022 achieved metallurgical
recoveries of 81.34 % for silver, 31.78 % for gold, 87.83 % for lead, and 88.75 % for zinc. Metallurgical recoveries of lead and
zinc are affected due to the increase in treatment of the oxidized ore to 11% due to its higher gold head grade. Historical data show
consistent achievable metallurgical recoveries of 90 % for lead, 81 % for silver (in the lead concentrate) and 88 % for zinc.
| 17.2.3 | Concentrates thickening and filtration |
The lead–silver concentrate is thickened
in an Outotec 9.0 m diameter thickener; the underflow is pumped to a 1.8 m diameter disc filter (six discs). The filtered lead concentrate
contains on average 7.5 % moisture.
The zinc concentrate is thickened in an Outotec
12.0 m diameter thickener; the underflow is pumped to a 1.8 m diameter disc filter (eight discs). The filtered zinc concentrate contains
on average 9.0 % moisture.
Each filtered concentrate is discharged into a
covered temporary storage area from where it is loaded by a front-end loader into trucks for transport to the concentrate purchaser’s
storage facilities in Matarani, Arequipa for the zinc concentrate and Callao, Lima for the lead-silver concentrate.
Tailings from the concentration process are pumped
and classified through cyclones. The underflow is accumulated in a temporary storage area for later transportation to the mine as hydraulic
backfill. Approximately 40 % of the tailings are used as backfill material in the mine.
The overflow is
pumped to the tailing’s facility for final disposal. The water collected from the tailing’s impoundment is pumped back to
the processing plant and reused in the process. Usage of the new tailing’s storage facility (N° 3) commenced in January 2013,
with the capacity increased to 921,000 m3 in January 2022 (sufficient to handle tailings for 4 years at current production
levels) with a further expansion planned in 2025.
|
17.3 | Requirements
for energy, water, and process materials |
Electric power requirements are supplied through
the Callalli substation from the national grid. The whole operation requires 7.8 MW of energy including 3.2 MW required by the processing
plant. The operation also keeps two diesel generators on site as a backup power supply in case of emergencies.
The processing plant water consumption is 2.45
m3/t. Approximately 74 % (1.82 m3/t) is recovered from the tailings facility and pumped back to the plant to be
re-used in the process along with 26 % (0.63 m3/t) fresh water.
All process materials are available from Arequipa
and Lima. Reagents are provided from local service representatives representing international reagent suppliers. Reagents and consumables
used in the processing include sodium cyanide (10 g/t), copper sulphate
December 31, 2023 | Page 160 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
(239 g/t), zinc sulfate (954 g/t), xantato Z-11
(6 g/t), xantato Z-6 (16 g/t), calcium oxide (483 g/t), foaming agent MC 5 (94 g/t), steel balls (720 g/t).
|
17.4 | Comment
on Section 17 |
The QP considers process requirements to be well
understood, and consistent based on the actual observed conditions in the operating plant. There is no indication that the characteristics
of the material being mined will change, with the expectation of the high zinc oxide material that has been accounted for, and therefore
the recovery assumptions applied for future mining are considered as reasonable for the LOM. The plant is of a conventional design and
uses conventional consumables.
December 31, 2023 | Page 161 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
The Caylloma Mine
has a well-established infrastructure used to sustain the operation. The infrastructure includes a main access road from the city of Arequipa,
mine access roads, tailing storage facilities, mine waste storage facilities, mine ore stockpiles, camp facilities, concentrate transportation,
power generation, communications systems, concentrate production and transportation (Figure 18.1).
Figure 18.1
Plan view of mine infrastructure
Figure prepared by Bateas, 2023 |
Roads on the property are shown in Figure 18.1.
Access roads are unpaved but are in good condition due to regular maintenance. Water tankers are used in summer to dampen
December 31, 2023 | Page 162 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
the roads to reduce dust pollution. Roads interconnect
all the facilities on the property and allow access through various portals to the underground operations.
|
18.3 | Tailing
storage facilities |
The mine currently operates two tailings storage
facilities, TSF N° 3 and TSF N° 2 as a contingency.
The TSF N° 3 operation permit
was issued by the Ministry of Energy and Mines in December 2012. Based on the 2019 plant treatment capacity of 1,500 tpd
and mine backfill demand, the second stage facility (2A) completed in January 2019, with a tailing’s embankment elevation
of 4,419.5 masl, provided an additional capacity of three and a half years till mid-2022 (4,423.5 masl). The stage (2B) was
constructed and provides capacity until the end of 2026, based on current production rates. Detailed engineering studies are in
progress for the third expansion of stage (3C) which is going to cover tailings capacity for LOM requirements.
The south embankment of TSF N° 2 (4,474 masl)
provides a small additional capacity (two months) as a contingency plan for tailings storage. TSF N° 2 is currently used as a cyclone
(tailings classification) processing location. Coarse tailings (40% by volume) are sent back to the mine as mine backfill. The remainder
of the tailings (finer overflow) is pumped to TSF N° 3.
|
18.4 | Mine
waste stockpiles |
The mine currently operates a single waste stockpile,
Bateas Level 12, which is used for storing waste material that could not be effectively disposed of underground. The waste stockpile capacity
on Level 12 is sufficient until mid-2024 and the potential for expansion is being evaluated. Bateas has also obtained a permit for a new
underground waste storage facility located at Animas Level 6 with an additional storage capacity of 18 months that has been prepared for
usage when the waste stockpile at Level 12 reaches full capacity. Beyond this an internal study on waste management has identified Level
8 of the Animas vein as the best location for storing waste beyond 2025. A detailed engineering study to establish exact designs and construction
costs is planned for late 2024, with estimated construction costs budgeted in the LOM plan.
The mine currently has four ore stockpiles
which store mine production of oversized, low grade and already crushed ore. The total stockpile capacity is approximately 60,000 t.
The total stockpile tonnage as of December 31, 2023, was 29,521 t.
|
18.6 | Concentrate
production and transportation |
In March 2015, the processing capacity was
increased from 1,300 to 1,500 tpd by improving the grinding and flotation circuits. Concentrate transportation is carried out using 30
tonne capacity trucks. Before the trucks depart camp, they are weighed at the truck scale. In 2018, two RCS 20 cells of 20 m3
and one RCS 10 cell of 10 m3 were installed in the Zn circuit to improve the quality of the Zinc concentrate. The LOM is based
on this 1,500 tpd capacity.
Concentrate transportation is carried out using
30 t capacity trucks. Before the trucks depart the camp, they are weighted at the truck scale. All trucks are systematically
December 31, 2023 | Page 163 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
registered and controlled to ensure that the delivered
concentrate weight at the storage port reconciles with the weight recorded when leaving the mine.
The power demand on the whole operations is 3.9
MW on average, power supply is obtained mainly (87 %) through the national power grid. The mine site also maintains two diesel generators
on site with a total capacity of 2 MW to cover the shortage (13 %) and also as backup.
In January 2016, Bateas increased the power
supply capacity from 3.2 MW to 6.8 MW including a new 15kV power line and the installation of a new 7.5 MVA transformer to replace the
3.75 MVA transformer at the Caylloma substation. Currently, the power demand of the operation is slightly higher than the capacity of
the transformer, this deficit is compensated for by the diesel generators.
Maximum power demand required is 7.8 MW, distributed
for the Plant: 2.3 MW; for the Mine: 3.9 MW, and for the camp: 0.70 MW.
Additional information on power is provided in
Section 16.8.10.
| 18.8 | Communications
systems |
The Caylloma Mine site is equipped with cellular
phones and internet connections provided by local suppliers. The cellular phone signal is delivered through optic fiber and an antenna
located on the mine site; the signal is 4G with a coverage range of 3 km. The internet signal is provided through two main connections:
the primary connection is delivered via optic fiber from Arequipa to Talta Site and the Caylloma Mine, with a bandwidth of 100 MB. The
contingency connection is provided by Starlink through satellite, with a bandwidth of 100 MB. Along with the internet signal, the camp
also has a landline telephone service and data link.
The communication system for the underground was
implemented through a WiFi signal and a Push-to-Talk platform over cellular networks. This platform is managed in the cloud, and the communication
system is digital, allowing connection to devices like pump sensors, weather sensors, fan sensors, etc.
The fresh water supply for the Caylloma Mine is
provided by the Santiago River which runs through the property. The permanent water permit was granted by the Ministry of Autoridad Nacional
de Agua. Currently, the freshwater demand is 60 liters per second, including 10 liters per second for the camp.
Approximately 70 % of the processing plant total
water consumption is recovered from the TSF N° 3 and pumped back to the plant for reuse in the process along with 30 % of fresh water.
| 18.10 | Comments
on Section 18 |
The majority of the infrastructure required to
support the LOM plan is in place and is operational. Bateas is in the process of permitting a new underground waste storage facility.
Increases in the capacity of the tailing’s storage facility are in progress to support the LOM plan.
December 31, 2023 | Page 164 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
19 | Market
Studies and Contracts |
The Caylloma Mine is an operational mine with
concentrate sales contracts in place for 2024. As a result, market studies are not relevant to the operation.
Bateas signed contracts with Trafigura Peru S.A.C.
(Trafigura) for 2024 to supply lead and zinc concentrates. Contracts have been made with Trafigura to provide 26,000 wet tonnes of lead
concentrate and 40,700 wet tonnes of zinc concentrate. The concentrate quantities represent the estimated production of the Caylloma Mine
for 2024, with addendums to the contracts in case the quantities vary during the year. These contracts are reviewed annually and signed
before the end of each year for the upcoming year.
Commercial terms used in projecting the NSR value
and cut-off grade determination are based on 2023 contracts, with the application of average penalties from contracts signed by the operation
over the previous 5 years, to remove short term variations. The contract terms signed for 2024 are not materially different to those signed
for 2023.
Projected metal prices used in the LOM and economic
analysis are based on consensus estimates from multiple financial institutions on price behavior over the next 3 years and 10-year historical
prices.
Commercial terms entered between the buyer and
Bateas are regarded as confidential but are considered to be within standard industry norms.
|
19.2 | Commodity
price projections |
The Fortuna financial department provides Bateas
with metal price projections to be used in their analysis and as used in the Report. Fortuna established the pricing using a consensus
approach based on long-term analyst and bank forecasts prepared in May 2023.
Mr. Espinoza and Mr. Chapman have reviewed
the key input information and consider that the data reflects a range of analyst predictions that are consistent with those used by industry
peers. Based on these sources, price projections are considered acceptable as long-term consensus prices for use in mine planning and
financial analyses for the Caylloma Mine in the context of this Report.
The long-term price
forecasts that have been used in the estimation of Mineral Reserves and Mineral Resources at the Caylloma Mine are summarized in Table
19.1.
Table 19.1
Long-term concensus commodity price projections
Commodity |
3 yr Projected
(40% weight) |
10 yr Historical
(60% weight) |
Weighted Average* |
Silver (US$/oz) |
24.0 |
19.1 |
21.0 |
Gold (US$/oz) |
1,788 |
1,452 |
1,600 |
Lead (US$/t) |
2,022 |
2,061 |
2,000 |
Zinc (US$/t) |
2,780 |
2,557 |
2,600 |
*Rounded to two significant figures |
A long-term price estimate of US$21/oz for silver,
US$1,600/oz for gold, US$2,000/t for lead and US$2,600/t for zinc has been applied, based on the mean 3-year projected consensus prices
weighted at 40 % and the 10-year historical average weighted at 60 % and rounded to the nearest two significant figures.
December 31, 2023 | Page 165 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Bateas has used a Peruvian nuevo sol exchange
rate of 3.60 soles to the US dollar for financial analysis purposes, which conforms with general industry-consensus.
Trafigura has stipulated the specifications for
lead concentrate to be delivered from Bateas in 2024, which are regarded to be within standard industry norms.
All parameters in the lead concentrate were found
to be at, or within, specification limits as of the effective date of this Report.
Trafigura has stipulated the specifications for
zinc concentrate to be delivered from Bateas in 2024, which are regarded to be within standard industry norms.
All parameters in the zinc concentrate were found
to be at, or within, specification limits as of the effective date of this Report.
Bateas has eight major contracts for services
relating to operations at the mine regarding mining activities, ground support, raise boring, drilling, transportation of personnel and
concentrates, explosives and civil works. Contracts are negotiated and renewed as needed. Contract terms are typical of similar contracts
in Peru with which Fortuna is familiar.
|
19.4 | Comments
on Section 19 |
The QPs have reviewed the information provided
by Fortuna on marketing, contracts, metal price projections and exchange rate forecasts, and note that the information provided is consistent
with the source documents used, and that the information is consistent with what is publicly available on industry norms. The information
can be used in mine planning and financial analyses for the Caylloma Mine in the context of this Report.
Long-term metal price assumptions used in the
Report are based on a consensus of price forecasts for those metals estimated by numerous analysts and major banks. The analyst and bank
forecasts are based on many factors that include historical experience, current spot prices, expectations of future market supply, and
perceived demand. Over a number of years, the actual metal prices can change, either positively or negatively, from what was earlier predicted.
If the assumed long-term metal prices are not realized, this could have a negative impact on the operation’s financial outcome.
At the same time, higher than predicted metal prices could have a positive impact.
December 31, 2023 | Page 166 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
20 | Environmental
Studies, Permitting and Social or Community Impact |
Information included in the following section
is partially sourced from the Environmental Impact Assessment (EIA) report prepared by the consulting firm Asesores y Consultores Mineros
S.A. (2011) and its subsequent updates submitted in 2013, 2017 and 2021 to the Ministry of Energy and Mines (MEM).
| 20.1 | Regulation
and permitting |
In June 1997, the Ministry of Mines approved
the Environmental Compliance and Management Program (PAMA) of the San Cristobal Economic Management Unit through Directorial Resolution
N°. RD 087-97-97-EM/DGM, for compliance with the mining unit's environmental commitments.
In 2006, the PAMA identified a series of programs
to be fulfilled for the operation to comply with norms and standards. The main projects foreseen in the PAMA program were the construction
of a retaining wall and vegetation for TSF No. 2, the construction of a retaining wall at the base of tailings N°. 3, as well
as the monitoring and treatment of mine wastewater.
The mine closure plan was approved by Executive
Resolution N°. 365-2009-MEM/AAM dated November 13, 2009. On November 12, 2012, Bateas submitted a request to modify and
update the mine closure plan in accordance with the mine closure regulations.
By Directorial Resolution 173-2011-MEM/AAM dated
June 8, 2011, the Environmental Impact Study for the "Expansion of the Huayllacho Mine and processing plant from 1,030 tpd to
1,500 tpd" was approved.
On December 20, 2012, the Ministry of Energy
and Mines, through Resolution N°. 0274-2012 MEM/DG, authorized the use of Tailings Deposit N°. 3 Stage 1A for tailings disposal
up to 4,410 masl.
The updated mine closure plan was approved by
Resolution N°. 085-2013-MEM-AAM dated March 22, 2013.
On September 2, 2013 by Resolution N°.
459-2013-MEM/AAM. the modification of the Environmental Impact Study "Huayllacho Mine and processing plant expansion, primary power
line project SE Caylloma-Bateas 15 kV" was approved.
On September 30, 2014 by Resolution N°.
492-3014-MEM-DGAAM. the modification of the monitoring program - Water Tailings Monitoring Point, TSF N°3 of the San Cristobal EAU
was approved.
On January 13, 2014, the Ministry of Energy
and Mines, through Resolution N° 0015-2014-MEM-DGM/V., approved the elevation of the south side (from 4,470 to 4,474 masl) of TSF
N° 2, pending the elevation and operation of the north side of the facility.
On June 15, 2014, the Ministry of Energy
and Mines, through Resolution No. 0216-2014-MEM-DGM_V, authorized the elevation and use of Tailings Deposit No. 3 Stage 1B up
to 4,415 masl.
On July 3, 2015, the Ministry of Energy and
Mines, through Resolution No. 0750-2015-MEM/DGM, approved Bateas' request to expand the "Huayllacho" concession area from
73.63 to 91.12 Ha to include some additional facilities.
December 31, 2023 | Page 167 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
On December 1, 2014, the Ministry of Energy
and Mines, through Resolution 588-2014-MEM-DGAAM, approved the closure of 25 environmental mining liabilities from former operations located
within Bateas' mining concessions.
On August 21, 2015, the Ministry of Energy
and Mines, through Resolution No. 327-2015-MEM/AAM, approved the modification of the Mine Closure Plan requested by Bateas.
On April 8, 2015, the National Water Authority
(ANA) through R. D. N° 0048-2015- ANA/AAA.XI-PA updated the surface water use authorization covering the operational surface water
demand.
On March 28, 2017, through Directorial Resolution
N° 092-2017 MEM-DGAAM, the second modification of the Mine Closure Plan was approved.
On June 14, 2017, through Directorial Resolution
No. 172-2017 MEM-DGAAM, the second modification of the Environmental Impact Study was approved, for the Huayllacho Plant and Mine
Expansion Project from 1,030 tpd to 1,500 tpd.
On December 19, 2017, through Directorial
Resolution No. 355-2017 MEM-DGAAM, the modification of 9 components to the Mining Environmental Liabilities Closure Plan was approved.
On December 7, 2018, through Directorial
Resolution No. 224-2018 MEM-DGAAM, the third modification to the Mine Closure Plan was approved.
On November 17, 2021, through Directorial
Resolution N° 220-2021 MINEM-DGAAM, the second update of the Mine Closure Plan was approved.
| 20.1.1 | Environmental legislation |
The environmental legislation relevant to Bateas
is as follows:
| · | Law N° 28245 - Framework Law of the National
Environmental Management System and its respective regulation approved by D.S. 008-2005-PCM. The purpose of this Law is to ensure the
most efficient compliance with the environmental objectives of public entities; strengthen intersectoral mechanisms in environmental management,
the role of the National Environmental Council - CONAM, and the sectoral, regional and local entities in the exercise of their environmental
competencies in order to ensure that they comply with their functions and prevent overlaps, omissions, duplicities, gaps or conflicts
in the exercise of the same. Supreme Decree No. 040-2014-EM, which approves the Protection Regulation and Environmental Management
for the Activities of Exploitation, Benefit, General Labor, Transportation and Mining Storage. The purpose of this regulation is to ensure
that mining activities in the national territory are carried out safeguarding the constitutional right to enjoy a balanced and adequate
environment for the development of life, within the framework of free private initiative and the sustainable use of natural resources. |
| · | Law No. 27446 - Law of the Environmental
Impact Assessment System and its respective amendments by D.L. No. 1078. The purpose of this Law is: a) The creation of the National
System of Environmental Impact Assessment (SEIA), as a unique and coordinated system of identification, prevention, supervision, control
and early correction of the negative environmental impacts derived from human action expressed through the investment project. b) The
establishment of a uniform process that includes the requirements, stages and scope of the |
December 31, 2023 | Page 168 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
environmental
impact assessments of investment projects. c) The establishment of mechanisms that ensure citizen participation in the environmental impact
assessment process.
Other environmental legislation related
to Bateas:
| · | The operating permit for the treatment plant
was granted by Resolution No. 102-80-EM/DCFM, dated July 7, 1980. The permit is permanent. |
| · | Authorization for direct discharge of solid effluents
was granted on June 25, 2004, by Resolution No. 0744-2004-DIGESA/SA and is permanent. |
| · | Authorization for the use of gasoline and diesel
storage tanks was registered by resolution CDFJ No.###-##-####, dated May 26, 2006. It is of a permanent nature. |
| · | Authorization for the development of thermoelectric
generation activities with energy greater than 500 kW was granted by Ministry of Mines Decree No. 391-2005-MEM/DM, dated September 12,
2005. The permit is permanent. The Tax Stability Agreement was granted for a period of ten years in relation to the investment plan detailed
in the technical and economic feasibility study (tax stability) by Executive Resolution N°370-2006 mina MEM-DGM, dated August 21,
2006. |
| · | The authorization to restart activities at the
wastewater treatment plant was granted by resolution No.1078-2006-MEM-DGM/V, dated September 6, 2006. The permit is permanent. |
| · | Directorial Resolution No. 1035-2007/DIGESA/SA
dated March 22, 2007, authorizes the use of a sanitary system for the treatment and land disposal of domestic wastewater, with permanent
effect. |
| · | Authorization of TSF No. 2 in accordance
with the mine closure plan approved by Resolution No. 351-2010-MEM-DGM/V. |
| · | Authorization for the operation of the Huayllacho
beneficiation plant was granted by resolution of the Ministry of Mines PB-0015-2010/MEM-DGM-DTM, dated January 14, 2010. The permit
is permanent. |
| · | The authorization to operate the concentrator
plant with an expanded capacity of 1,030 tpd was granted by resolution N° 007-2010-MEM-DGM-DGM/V, dated January 14, 2010. Authorization
for the development of a 15 kV transmission was granted by the order of the Ministry of Mines N° 052-2010-EM, of August 21, 2010.
The permit is permanent. |
| · | Authorization for the operation of TSF No. 3
(Stage 1A, 4,410 masl). Approved by Resolution No. 0274-2012 MEM/DG, dated December 20, 2012. |
| · | Certificate of Non-existence of Archaeological
Remains of various components of the Caylloma mining unit, approved by CIRA N° 2012-172/MC, dated May 17, 2012. |
| · | Authorization for the elevation of the embankment
of TSF No. 2 (From 4,470 to 4,474 masl) approved by Resolution No. 306-2013 MEM-DGM/V, dated August 9, 2013. |
December 31, 2023 | Page 169 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| · | Authorization for the elevation of the embankment
of Tailings Deposit N° 2 (south side). Approved by Resolution N° 0015-2014 -MEM-DGM/V, dated January 13, 2014. |
| · | Authorization for the operation of Tailings Deposit
No. 3 (Stage 1B, 4,415 masl). Approved by Resolution No. 0216-2014 MEM-DGM_V, dated June 15, 2014. |
| · | Authorization for discharge of water effluent
sampling point E-03. Approved by Resolution No. 040-2015-ANA-DGCRH, dated February 13, 2015. The authorization has subsequently
been renewed twice, most recently by Resolution No. 106-2021-ANA-DCERH valid until February 22, 2023. The company has submitted
the required documentation to the Ministry to renew the permit for a further six years which is pending approval. Prior to approval being
obtained, the company is entitled to continue with its discharges. |
| · | Authorization for the use of fresh (surface)
water. Approved by ANA (National Water Authority) with Directorial Resolution No. 0048-2015 ANA/AAA.XI-PA, dated April 8, 2015. |
| · | Renewal of the authorizations of water effluent
discharge sampling points EF-3 and E-05. Approved by Resolution No. 123-2015-ANA-DGCRH, dated May 11, 2015. Authorizations have
subsequently been renewed twice, most recently by Resolution No. 0203-2021-ANA-DCERH issued on November 23, 2021 and are valid
until May 30, 2024. The Company intends to apply for renewals of the authorizations within the appropriate timeframe prior to the
expiration of the current term. |
| · | Authorization for the construction and operation
for the processing plant with increased capacity to 1,500 tpd. Approved by Resolution No. 0539-2015-MEM-DGM/V, dated November 4,
2015. |
| · | Renewal of authorization of ANFO magazine by
Resolution N°. 00614-2016-SUCAMEC/GEP, dated March 21, 2016. An updated resolution was approved in 2023. |
| · | Renewal of authorization of water effluent sampling
points E-04, E-08 and E-12. Approved by Resolution No. 083-2016-ANA-DGCRH, dated April 25, 2016. The authorizations were valid
for four years and were renewed by Resolution No. 009-2020-ANA -DCERH until October 2021. An application to extend the authorizations
was rejected as was the Company’s subsequent appeal in November 2023. The Company may no longer discharge water effluents at
points E-04, E-08 and E-12. To date the discharges are dry and do not generate an impact to the operation. |
| · | Authorization for disposal of treated industrial
wastewater from tailings pond No. 3, approved by Directorial Resolution No. 071-2018 ANA-DCERH, dated April 24, 2018. The
authorization is valid for six years. The Company intends to apply for a renewal of the authorization within the appropriate timeframe
prior to the expiration of the current term. |
| · | On November 15, 2018, Mining Operation Certification
(COM) N° 037-2019-C was approved. |
December 31, 2023 | Page 170 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| · | On February 1, 2023, a renewal of the authorization
to acquire and use explosives and related materials was obtained by the issuance of Resolution No. 00507-2023-SUCAMEC/GEPP which
is valid until February 2024. The Company filed an application for a new authorization for the acquisition and use of explosives
and related materials for 2024 which was approved on January 18, 2024, and is valid until February 15, 2025. |
| · | On November 10, 2017, Resolution N°
1061-2017 MEM/DGM/V granted Bateas the right to the civil works and auxiliary facilities required for the construction of the second stage
of tailings deposit N° 3, with construction divided into two sub-stages (Stage 2A at an altitude of 4419.50 masl and Stage 2B at 4423.50
masl). |
| · | On December 28, 2020, through Directorial
Resolution N° 783-2020-MINEM/DGM, Bateas was granted the start of mining exploration activities for the mining project "3rd ITS
Accumulation Caylloma 1, 2 and 3 Stage B-area 2". |
| · | On November 17, 2021, through Directorial
Resolution N° 220-2021-MINEM-DGAAM, the Second Update of the Mine Closure Plan for the Caylloma mine presented by Minera Bateas S.A.C.
was approved. |
| · | On June 17, 2022, through Directorial Resolution
N° 093-2022-SENACE-PE/DEAR, the "Fifth Sustainable Technical Report of the Second “Modificatoria de Estudio de Impacto
Ambiental” (MEIA)-d of the Huayllacho Mine Expansion Project and Beneficiation Plant from 1030 TMD to 1500 TMD" was approved. |
| · | On March 20, 2023, through Directorial Resolution
No. 139-2023-ANA-AAA-PA authorized the Installation of Measuring Instruments and Execution of Minimum Works in Natural Water Sources
for the construction or installation of ten (10) Hydrometric Stations. |
| 20.1.2 | Environmental obligations |
Law No. 27446, Law of the National System
of Environmental Impact Assessment and these Regulations constitute the general rules on environmental impact assessment in the national
territory. For these purposes, it is understood that any mention of the aforementioned Law refers to Law No. 27446. MINAM, as the
national environmental authority, is the governing body of the SEIA; it also constitutes the technical-regulatory authority at the national
level and, as such, issues the rules and establishes the procedures related to the SEIA.
MINAM carries out the Registry of Authorized Entities
to prepare environmental studies. The Environmental Certification implies the pronouncement of the Competent Authority on the environmental
viability of the project, in its entirety.
|
20.2 | Environmental
baseline |
| 20.2.1 | Location and access routes |
The Caylloma Mine is located in the district and
province of Caylloma, Arequipa Region. Geographically, it is located in the lower part of the confluence of the local Huarajo and Chilladas
micro-basins, and its facilities are located on both banks of the Santiago River, a tributary of the Apurimac River.
December 31, 2023 | Page 171 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
The Caylloma Mine is accessible from the city
of Lima to the city of Arequipa by air, then by paved road to the town of Sibayo, where the road is also paved and connects the city of
Arequipa with the district of Caylloma. Bateas is located 14 km NW of the town of Caylloma, about 225 km from Arequipa, approximately
four hours away by land. The Mine is located in the natural Puna region, at an altitude of 4,500 to 5,000 masl.
The area of influence has a cold, dry climate
throughout the year, with strong winds between August and September, and rain from December to March, as well as hailstorms
and snowfall that cover the entire area.
The average temperature in the area is 8 °C,
the average relative humidity is 65 %, and the predominant wind direction is from SW to NE with a range of speeds that vary between 2.1
to 3.6 m/s. Precipitation occurs mainly in the months of November to March, with a range of 150.5 to 558.7 mm.
Average monthly temperature data for the Santiago
and Huarajo micro-basins show high values from January to April and October to December (ranging from 6 to 9ºC),
and from May to August the temperature varies from 1 to 3 ºC (La Angostura, Caylloma and Cabanaconde stations).
Among the most important meteorological data,
average annual rainfall is estimated at 774 mm/year, and annual evaporation is 1,550 mm/year. Bateas is located in the ecological zone
known as the Humid Subalpine Tropical Paramo (Ph-Sat), whose average annual biotemperature varies between -3 °C and 10 °C. To
estimate maximum precipitation and extreme hydrological events over the Bateas area, the maximum 24-hour precipitation for different return
periods is based on annual maximum daily precipitation data.
Climatic conditions in the area contribute to
dust generation, including ultrafine dust particles generated by soil erosion. The characterization of air quality in the mining unit
has considered the analysis of eleven monitoring stations approved in the Environmental Management Plan (EMP) with R.D. N° 172-2017-MEM-DGAAM.
The EIA analyzed air quality, the results of which
indicate that for the selected pollutants, concentrations are below air quality standards. The air quality monitoring plan has been designed
considering the environmental aspects of the Caylloma Mine, which may have a potential impact on air quality expected during the construction
and operation stages of the Caylloma Mine.
This plan will allow Bateas to continue monitoring
and recording air quality parameters to demonstrate compliance with environmental regulations and air ECAs. The results also correspond
to the natural levels at the site, corresponding to the levels of pollutants from the activities carried out in the area at the time of
the evaluation to the levels of particulate matter transported by the wind.
Surface water quality monitoring is important
for the diagnosis of the baseline conditions of water resources, since their use can be limited as a result of high contaminant concentrations,
which are above the limit values of the parameters considered in the National Environmental Quality Standards for Water (D.S. N°-004-2017-MINAM).
The results obtained were compared with the Environmental Quality Standards for Water,
December 31, 2023 | Page 172 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
regulated according to D.S. N° 015-2015-MINAM
and D.S. N°004-2017-MINAM, Categories 3: Irrigation of Vegetables, and Category 4: Conservation of the aquatic environment.
The main purpose of the water monitoring program
is to ensure the quality of the receiving bodies, according to the Water Quality Standards. Natural water seepage into the Santiago
River that may alter its composition is evaluated in the Comprehensive Plan. Water quality monitoring will verify the correct application
of prevention and mitigation measures for possible impacts identified.
Likewise, the characterization of water quality,
the fifteen water quality stations approved by R.D. 172-2017 MEM/DGAAM and one water quality station approved in the ITS PAMA by R.D.
N° 206-2017 MEM/DGAAM have been taken into consideration.
The hydrological network of the mining unit is
inscribed within the Caylloma quadrangle. The area where the Caylloma Mine is located is in a NE - SW direction, with the main rivers
being the Apurimac, Hornillos and Molloco. The type of drainage is controlled by the Caylloma depression, two types have been distinguished:
The first type of drainage is developed over the
area of the Caylloma depression, where the waters flow towards the lower parts, being the main collector the Apurímac river (where
the rivers: Santiago, Lamamayo, Azulmayo, Chonta, Coñicmayo, Pausa Huaylo, Pescamayo and Chilamayo flow), and as a secondary collector
the Hornillas river; at the junction of these two rivers a small canyon is formed in a north-south direction, where the waters of the
Caylloma depression flow out.
The second type of drainage is a radial dendritic
drainage; this drainage develops around the Caylloma depression, and the waters flow to the north or south, controlled by the Continental
Divide. This hydrographic network carries out the work of incision and erosion of the pre-existing materials.
Water sources identified in the mine’s area
of environmental influence are the Vilafro, Jesús María, Antimonio and Muscapamp lagoons, the Santiago River and the Huarajo,
Huancané, Cuchilladas, Trinidad, Santa Cata and Quello Apacheta streams.
Soils are defined as natural, independent, three-dimensional
and dynamic bodies, with their own intrinsic characteristics, product of the interaction of different edaphogenic processes and formation
factors. The predominant soils are Andosols and Paramosols, with important variations, such as volcanic soils in the south. The soils
in this macro-Andean region are generally incomplete, sandy or stony, with a very low content of organic matter, since this is produced
in small quantities and takes a long time to decompose. Only in the few humid places are there peatland formations, which develop very
slowly due to the prevailing conditions.
The methodology used for the description and characterization
of the soils was based on the criteria and norms established in the Regulations for the Execution of Soil Surveys (D.S. Nº 013-2010-AG),
as well as in the Soil Survey Manual (Soil Survey Manual, 1993) of the United States Department of Agriculture (USDA).
In order to know the characteristics of soil quality
in the area where the mining unit is located, information from the monitoring reports of the stations approved in the Second Modification
of the Detailed Environmental Impact Study of the "Huayllacho" Mine and
December 31, 2023 | Page 173 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Beneficiation Plant Expansion Project from 1030
TMD to 1500 TMD (R.D. N° 172-2017-MEM-DGAAM) was considered.
The analysis of the results obtained in the evaluated
soil quality parameters during the environmental monitoring, corresponded with the values established in the Environmental Quality Standards
for Soil approved in D.S. N° 002-2013-MINAM, and in a referential way with the National Environmental Quality Standard for Soil in
force (D.S. N° 011-2017-MINAM).
Three life zones have been reported in the area,
which are: Pluvial Tundra - Andean Subtropical (tp - AS), Very Humid Paramo - Sub-Andean Subtropical (PMH-SaS) and Subtropical Level (NS).
According to the EMP of the second MEIAd of the
"Huayllacho Mine and Beneficiation Plant Expansion from 1030 to 1500 TMD" Project, three (03) vegetation units are considered
for the monitoring area: Bofedal, Roquedal and Pajonal.
The evaluation of flora / vegetation and wildlife
(birds, mammals, reptiles, amphibians and arthropods) was carried out in 21 monitoring stations defined according to the PMA of the second
MEIAd of the "Huayllacho Mine and Beneficiation Plant Expansion from 1030 to 1500 TMD" Project and the Second Modification of
the Semi-Detailed Environmental Impact Study (MEIA-sd) of the mining exploration project "Cailloma Accumulation 1, 2 and 3 Stage
B".
From the records obtained in the monitoring, 29
species have been obtained in some category of conservation or endemic status for Peru.
Twenty-three (23) species are on the IUCN Red
List (2021-3), of which 21 species are categorized as Least Concern (LC), one (1) as Endangered (NT) and one (1) as Vulnerable
(VU). As for CITES, three (3) species of the Orchidaceae family are in Appendix II, which includes species whose populations have
been greatly reduced, and although they are not in danger of extinction, the necessary controls must be applied for their commercialization.
| 20.2.8 | Ecosystem characterization |
The study area includes ecosystems typical of
the Andean region, between terrestrial and aquatic, according to the National Map of ecosystems of Peru (MINAM, 2019), the following ecosystems
are registered: Pajonal of dry puna, Bofedal, Periglacial Zone and glacier, lake and lagoon.
Terrestrial ecosystems
| · | Puna seca Pajonal: High Andean ecosystem with
herbaceous vegetation, where Amazonian rains arrive with difficulty, occupies flat and undulating terrain or hills of gentle to moderate
slope; with a marked climate. |
| · | Bofedal: Andean hydromorphic ecosystem with herbaceous
vegetation of hydrophilic type, which occurs in the Andes on flat land, in depressions or slightly inclined, permanently flooded or saturated
with running water (poor drainage) with dense vegetation, evergreen and of almoadillado bearing. |
| · | Periglacial and glacial zone: High Andean ecosystem,
generally located above 4500 meters. Cryoturbed and uncovered soils with abundant quebradillas (product of thaw), with presence in certain
areas of cryoturbed and dynamic |
December 31, 2023 | Page 174 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
vegetation (frequently
successional). Low and scattered vegetation (generally not higher than 30 or 40 cm), represented by scarce Gramineae, Asteraceae, lichens,
cushion plants, among others.
Aquatic ecosystems
From the point of view of water resources, lakes
and lagoons include all waters that do not present a continuous current and correspond to waters in a lentic state.
| · | Lakes are extensions of water of great size and
depth, separated from the sea, and may contain fresh, brackish or salt water. |
| · | Lagoons are natural water reservoirs of lesser
depth than lakes of permanent or temporary regime and of different storage capacities. |
Fragile ecosystems
According to the General Environmental Law (Law
No. 28611), which amends Article 99 (Law No. 29895), fragile ecosystems include: deserts, semiarid lands, mountains, swamps,
paramos, jalcas, wetlands, bays, small islands, wetlands, high Andean lagoons, coastal hills, cloud forests and relict forests.
Two types of fragile ecosystems have been identified
in the study area: wetlands and high Andean lagoons and wetlands.
| 20.2.9 | Identification of protected areas |
The distance between the study area and the closest
Natural Protected Areas (NPAs) is 55.66 km, being the Cotahuasi sub-basin Landscape Reserve. The distance to the buffer zone of this reserve
is 44.77 km.
The Caylloma Mine has received Certificates of
Non-existence of Archaeological Remains (CIRA) related to this area.
| 20.2.11 | Environmental risks |
Environmental factors are the set of components
of the biotic and abiotic environment (air, soil, water, biota, etc.) and the social environment (social relations, economic activities, etc.),
which are susceptible to changes, positive or negative, as a result of a given action or set of actions.
The environmental factors considered for the identification
of potential impacts that could be produced by the Caylloma Mine’s actions during the LOM are presented in Table 20.1.
Table 20.1
Environmental factors
Environment |
Environmental/ Socioeconomic Component |
Environmental/ Socioeconomic Factor |
Effect on Environmental/ Socioeconomic Factor |
Physical Environment |
Geomorphology and Landscape |
Local relief |
Modification of local relief |
Visual quality of the landscape |
Alteration of the visual quality of the landscape |
Soil |
Edaphological capacity of the soil |
Request for floor/ground restoration |
Soil Quality |
Soil erosion |
Soil quality alteration |
December 31, 2023 | Page 175 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Environment |
Environmental/ Socioeconomic Component |
Environmental/ Socioeconomic Factor |
Effect on Environmental/ Socioeconomic Factor |
|
Air |
Air Quality (Particulate Matter) |
Variation in the concentration of particulate matter |
|
Air quality (gases) |
Variation in gas concentration |
|
Noise and Vibration |
Noise quality |
Noise level variation |
|
Vibrations |
Variation of vibration levels |
|
Water |
Surface water quality |
Alteration of surface water quality |
|
Surface water quality |
Alteration of surface water quality |
|
Groundwater quality |
Alteration of groundwater quality |
|
Groundwater quality |
Alteration of groundwater quality |
Biological Environment |
Flora |
Vegetation cover and habitat-Flora |
Disturbance and/or modification of vegetation cover and flora-habitat. |
Species diversity and abundance-Flora |
Variation in the diversity and abundance of species-flora. |
Endangered species-Endangered |
Disturbance of endangered species-Flora |
Fauna |
Habitat-Fauna |
Alteration of aquatic habitat |
Diversity and abundance-Fauna |
Variation in the diversity and abundance of fauna species |
Endangered Species-Fauna |
Disturbance of endangered species-Fauna |
Flora and fauna |
Ecosystem functionality |
Modification of the functionality of species in the ecosystem |
Hydrobiology |
Aquatic habitat |
Alteration of aquatic habitat |
Species diversity and abundance-Hydrobiology |
Variation in species diversity and abundance |
Economical |
Goods and services |
Procurement of goods and services |
Continuity of procurement of goods and services |
Employment |
Local Employment |
Continuity of local job creation |
Economic activity |
Economic revitalization |
Continuity of economic dynamization |
Social |
Occupational health and safety of workers |
Worker health and safety |
Affecting worker health and safety |
Cultural |
Archaeological remains |
Archaeological findings |
- |
The factors shown in the table correspond to those
that could be affected as a result of the execution of operational activities, although most of them can be mitigated or reduced through
the implementation of the activities of the EMP.
Environmental Impact Register
The initial step in the impact identification
and evaluation process is the selection of the most significant actions. The operations area is divided into: San Pedro Zone, Bateas Zone,
San Cristóbal Zone, San Ánimas Zone, Reserved Zone. In order to identify impacts on each sone more precisely, the activities
for the construction stage, activities for the operation stage and activities for the closure stage have been identified, which will have
a significant impact on environmental and social factors; this will allow a more adequate evaluation of the impacts.
Environmental Situation Analysis
Bateas' main concern is that the mining activities
to be developed are carried out in an adequate manner, caring for and preserving the environment, applying appropriate standards and,
above all, that such activities are also beneficial for the population.
December 31, 2023 | Page 176 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
It is worth mentioning that this same criterion
was used for previous studies that the Caylloma Mine has carried out over time with the intention of increasing the life and operability
of the mine. For each expansion and/or modification, the record of environmental impacts caused by the activities to be carried out was
taken into account; these impacts were evaluated and subsequently controlled by a management plan whose main function is to prevent, minimize
and mitigate negative impacts and enhance positive impacts.
Prior to the identification and evaluation of
the possible impacts generated for the Environmental Impact Study Modification, the analysis of the previous environmental situation of
the baseline will be taken into account, with the transformations that have taken place up to the present time. For the development of
impact matrices, the participation of a multidisciplinary team of professionals is essential, since the multi-criteria analysis allows
the impact assessment to be as less subjective as possible, which in turn will allow a closer approach to what may actually happen in
the project-environment interaction and vice versa, thus facilitating the selection and sizing of the environmental measures that need
to be applied to ensure that such interaction is as harmonious as possible.
For this reason, an analysis of the environmental
situation of the area where the project is located is carried out, taking into account that the governing entities in the environmental
sector, binding entities as well as regulatory entities in the mining sector have established reference standards for environmental components
(water, air, noise, soil, effluents) in order to establish the level of concentration or degree of elements, substances or parameters
that may be present. In such a way that the adequate quality of the component is maintained and safeguarded. Minera Bateas has been carrying
out periodic environmental monitoring as part of its environmental commitments, duly reporting to the competent authorities.
Identification and evaluation of impacts
The following are the results of the identification
and evaluation of the potential impacts presented by the Proprietor during the construction, operation and closure stages, using for the
identification of impacts an adaptation of the cause-effect matrix of Leopold (1971) and the evaluation of environmental impacts using
the methodology proposed by Vicente Conesa Fernández (2010).
The impact assessment methodology used by the
Proprietor considers the calculation of the Impact Importance (I), represented by the arithmetic calculation made with the following attributes:
Nature of the impact (N), Intensity (IN), Extent (EX), Momentum (MO), Persistence (PE), Reversibility (RV), Synergy (SI), Accumulation
(AC), Effect (EF), Periodicity (PR) and Recoverability (MC); whose formula is as follows:
I = +/- (3IN + 2EX + MO + PE + RV
+ SI + AC + EF + PR + MC)
In this regard, Impact Importance value ranges
are established, which are related to a level of importance (significance) of the impacts. The environmental components and/or subcomponents
will not be impacted by the Caylloma Mine objectives, as described below:
December 31, 2023 | Page 177 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Surface water - Activities conducted by the operation
must not impact the quality of surface water bodies. To enhance protection a minimum distance to a body of body for drilling activities
has been set at 86.03 m and from the cement silos at 95.59 m. Complementary measures to reduce impact such as access irrigation (minimizing
any type of dust interaction with identified water bodies) and runoff water management are to be considered. Water volumes used in the
proposed activities must be within the amount approved in their surface water licenses.
Groundwater – Volumes will not be affected
by the proposed activities, since the water resource will come from surface water, which is already included in the approved water use
licenses. Regarding groundwater quality, for drilling activities, if there is any interception with the water table, the borehole will
be immediately plugged, so this possibility is considered a risk, and the measures are described in Bateas’ Contingency Plan.
Vibrations - This factor is not considered a risk
because none of the activities of the Caylloma Mine are significant sources of vibrations that merit evaluation. At the same time, the
distance to the nearest population center is 7.26 km.
Soil quality - During construction and drilling
activities, hazardous and non-hazardous solid waste will be generated. Poor disposal of this waste could affect soil quality. In addition,
the occurrence of accidental spills of materials or substances (hydrocarbons, additives) that could have an impact on soil quality have
been identified as an environmental risk.
Hydrobiology - The components are located at a
distance of 75.75 m from the nearest body of water (Jesús María lagoon); while the nearest drilling platform for Mineral
Reserve confirmation will be at a minimum distance of 86.03 m from the nearest body of water (Jesús María lagoon) in the
Animas Sector. Although there will be dispersion of particulate material that could be generated by specific activities, it is not expected
to generate appreciable impact due to the distance of more than 50 m of the auxiliary components such as temporary accesses, with respect
to the bodies of water, for this reason, no environmental impacts are expected during the construction, operation and closure stages on
this environmental component.
Fragile ecosystems - The identified fragile ecosystems
will not be affected, because the various components are located at a distance of 74.50 m and 730.86 m from components such as Access
SC-014-21 (Santa Catalina), and in the case of the high Andean lagoon (Jesús María), they will be located at a minimum distance
of 75.75 m.
Archaeological remains – Operations at the
Caylloma Mine are not expected to have an impact from an archaeological perspective. The operations are located in areas that have certificates
of non-existence of archaeological remains (CIRA) as defined from archaeological reconnaissance reports.
Socioeconomic components - They involve non-significant
positive impacts on the generation of local employment for the closure and post-closure stage due to the generation of temporary jobs
and revitalization of the economy for the construction and operation stages due to the contracting of services and the purchase of inputs
and goods in the populated centers. It should be noted that they do not involve the intervention of new communities or other populations
other than those contemplated and approved by Directorial Resolution No. 172-2017-MEM-DGAAM.
December 31, 2023 | Page 178 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| 20.2.12 | Environmental management plan |
Bateas' internal policy is to carry out its activities
through sustainable mechanisms, giving priority to the environmental components of its surroundings. Therefore, during the stages of operation
at the Caylloma Mine it is committed to safeguarding the environment where its activities will be carried out.
The prevention measures will establish the actions
to be taken to minimize and/or mitigate activities that may cause adverse impacts to environmental components that present established
elements or factors. The environmental management measures described correspond to those included in the approved IGAs of the Caylloma
mine, which are part of the current EMP and are being developed and implemented at the mine.
The objective of the Prevention, Correction and/or
Mitigation Plan is to provide the necessary environmental measures to avoid, correct and mitigate possible environmental impacts.
Construction and operation stage
Currently the environmental commitments are being
developed and reported to the competent authority in accordance with the declared in the environmental management instruments, in June 2017
the Second Modification of the Environmental Impact Study "Expansion of mine and beneficiation plant Huayllacho from 1030 TMD to
1500 TMD" was approved by R.D. No. 172-2017-MEM/DGAAM.
Activities were developed for the components declared
in the third “Informe Technico Sustentatorio” of the second MEIA of the project "Expansion of Huayllacho Mine and Beneficiation
Plant from 1030 TDM to 1500 TMD" (Auxiliary Components) by means of R.D. N° 105-2019-SENACE-PE/DEAR approved on July 05,
2019, also the Fourth ITS of the 2nd MEIA of the Caylloma Project "Expansion of Mine and Beneficiation Plant from 1,030 tpd to 1,500
tpd of the Caylloma Mine" by means of R.D. N°00124-2021-SENACE-PE/DEAR approved on September 17, 2021.
Bateas also carries out controls corresponding
to the construction and operation of components already approved, such controls are as follows:
| o | Humidification through irrigation of access roads and work sites by tanker truck and spray atomizer system. |
| o | Provision of dust protection equipment (respirators), hearing protection (earplugs), and visual protection
for personnel working in areas where dust and noise are generated. |
| o | Control of the maximum speed of vehicles in accordance with REGL-SEG-002 Internal transportation regulations
in the areas where operations are carried out, by means of signs placed in strategic locations. |
| o | Optimized movement of vehicles to work fronts. |
| o | Preventive maintenance of equipment and machinery. |
| o | Periodic maintenance of roads and accesses. |
| o | Periodic monitoring of air quality and environmental noise. |
December 31, 2023 | Page 179 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| o | Restoration of the topography by filling and leveling the areas disturbed by the operation. |
| o | Contaminated soil and rags impregnated with fuels are segregated in color-coded cylinders for temporary
storage and transfer by EO-RS in charge of transport and final disposal. |
| o | There is a treatment system for effluents from the operation. |
| o | There is a domestic wastewater treatment plant with an automated system. |
| o | There is a drinking water treatment plant that ensures the quality of drinking water distributed to all
camps, offices, and dining halls. |
| o | Water quality monitoring in the receiving body, effluents, and drinking water in accordance with the approved
environmental program. |
| o | Delimitation of the work area so as not to disturb vegetation unnecessarily. |
| o | Bateas avoids unnecessary clearance of areas. |
| o | The organic soil is not mixed with other material and if necessary, it is transferred to the topsoil deposit. |
| o | Transfer of plants to suitable locations for replanting. |
| o | Sensitization of workers for the protection and conservation of flora. |
| · | Protection of avifauna and terrestrial fauna |
| o | Hunting activities or other disturbances to avifauna and terrestrial fauna are prohibited; there are visible
signs in the areas with the highest concentrations of animals. |
| o | Protective fencing around the riskiest components prevents animals from entering. |
| o | Provide training and raise awareness among workers about wildlife protection. |
| o | Air quality and noise are monitored periodically. |
| · | Aquatic fauna protection |
| o | Maintenance of trucks and equipment in the unit's maintenance workshops, avoiding grease and oil spills
that impact surface waters. |
| o | Raising awareness among workers about the protection and conservation of the aquatic ecosystem. |
| o | Periodic monitoring of water quality. |
December 31, 2023 | Page 180 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| o | Hazard warning signs are posted in the work areas. |
| o | Proper behavior of workers at all times. |
| o | Respect for people and private property. |
| o | Strict application of the Code of Ethics for workers in general. |
Mine closure stage: progressive closure
The Mine Closure Plan of Caylloma Mine has been
updated and approved by R.D. N° 085-2013-MEM/AAM, where there is a committed schedule of progressive closure of components and a letter
of guarantee before the MEM for the closure as required by current law.
By means of R.D. N° 327-2015-MEM-DGAAM, the
Modification of the Mine Closure Plan of the Caylloma Mine was approved, where the financial schedule for the closure of the TSF N°2,
Pumahuasi Mouthpiece, San Cristóbal Nv. 12 B landfill, and Bateas camp was modified.
By means of R.D. N° 092-2017-MEM-DGAAM a Second
Modification of the Mine Closure Plan of the Caylloma Mine was approved, where the closure schedule of the TSF N°2, shotcrete plant,
power line, and domestic wastewater treatment plant was modified.
By means of R.D. N°224-2018-MEM-DGAAM, the
Third Modification of the Mine Closure Plan of the Caylloma Mine was approved, where the closure schedule of the Animas Level 6, Animas
Level 7 portal, Pumahuasi Level 12 portal, 240 E- Level 12 ramp, and Bateas waste deposit was modified.
By means of R.D. N°220-2021/MINEM-DGAAM a
Second Update of the Mine Closure Plan of the Caylloma Mine was approved where there is a progressive closure schedule for the Bateas
explosives mine magazine, San Carlos blasting accessories mine magazine, San Carlos explosives mine magazine, and the recovery of the
crown pillar from Animas Levels 5 and 6.
| 20.2.13 | Operation and management |
Water quality monitoring (surface water, domestic
and industrial wastewater, and groundwater), air, soil, noise levels, non-ionizing radiation, hydrobiology, sediments, flora and fauna
in the area of influence of the Caylloma Mine are monitored on a regular and permanent basis, in accordance with the monitoring program
and in compliance with the sector's environmental laws.
The participatory environmental monitoring program
is executed in accordance with Directorial Resolution N°172-2017-MEM-DGAAM Approval of the 2nd Modification of the Detailed Environmental
Impact Study and the ITS of R.D. N° 334-2015-MEM/DGAAM and R.D. N° 206-2017-MEM-DGAAM.
Different monitoring programs are developed for
the environmental components that interact with the project, in order to ensure that the management and mitigation measures adopted meet
the objectives of the Caylloma Mine.
Air quality monitoring
The Caylloma Mine has an environmental surveillance
plan in which an air quality monitoring program consisting of ten monitoring stations was approved. These stations are being monitored
and reported to the MEM on a quarterly basis.
December 31, 2023 | Page 181 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Environmental noise quality monitoring
The Caylloma
Mine has an environmental surveillance plan in which an environmental noise quality monitoring program consisting of eight monitoring
stations was approved. These stations are being monitored and reported to the MEM on a quarterly basis.
Surface water quality monitoring
The Caylloma Mine has an environmental surveillance
plan in which a surface water quality monitoring program consisting of 15 monitoring stations was approved. These stations are being monitored
and reported to the MEM on a quarterly basis.
Effluent monitoring
The Caylloma Mine has an environmental surveillance
plan in which an effluent monitoring program consisting of eight monitoring stations was approved. These stations are being monitored
and reported to the MEM on a quarterly basis.
Soil quality monitoring
The Caylloma Mine has an environmental surveillance
plan in which a soil quality monitoring program consisting of nine monitoring stations was approved. These stations are monitored and
reported to the MEM every six months.
Environmental monitoring of flora
The Caylloma Mine has an environmental surveillance
plan in which the flora monitoring program consisting of fifteen monitoring stations was approved. The results of the parameters to be
evaluated are compared with the Categorization List of Threatened Species of Wild Flora published by D.S N° 043-2006-AG.
Wildlife environmental monitoring
The Caylloma Mine has an environmental surveillance
plan in which the fauna monitoring program consisting of fifteen monitoring stations was approved. The results of the parameters to be
evaluated are compared with the Categorization List of Threatened Species of Wildlife published by Supreme Decree No. 004-2014-MINAGRI.
Environmental monitoring of hydrobiological
resources
The Caylloma Mine has an environmental surveillance
plan in which the hydrobiological monitoring program consisting of ten monitoring stations was approved.
The Caylloma Mine is located at 4,500 meters above
sea level in the district of Caylloma, approximately 225 kilometers northwest of the city of Arequipa, in Peru. The total area of the
district covers 1,499 km² and has approximately 3,697 inhabitants distributed among two population centers (Caylloma and Jachana),
three peasant communities (Apacheta Rajada, Cucho Capilla, Santa Rosa), and eight annexes (Antayaque, Aparuyo, Chinosiri, Coraza, Nequeta,
Pusa Pusa, Sotocaya, Talta huarahuarco).
The area of social influence of the mine is made
up of only eight sectors. The Caylloma Town Center, the Annex of Talta Huarahuarco and the Peasant Community of Santa Rosa, recognized
by the Ministry of Culture as original indigenous peoples, make up the area of direct social influence. The Annex of Coraza, the Annex
of Pusa Pusa, the Minor Populated Center of Jachaña, the Peasant Community of Cucho Capilla and the Peasant Community of Apacheta
Rajada constitute the area of indirect social influence.
December 31, 2023 | Page 182 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
The Caylloma town center is the capital of the
district and is the sector closest to the mining unit (located 14 km to the south), concentrating 86 % of the total population (INEI,
2017). The highest administrative authority is the district mayor, elected in electoral processes that take place every four years and
based in the district capital. The representative of the Executive Power is the Sub-Prefect, who is responsible for ensuring internal
order and appointing the lieutenant governors of the annexes and communities. Due to its distance from the capital of the district and
being the second town with the highest population density, the Minor Town Center of Jachaña has a mayor to address the problems
of the sector.
The district has a history of mining activity.
Silver has been mined for more than 500 years and the population is familiar with the process and impact on the community of mining centers.
Caylloma can be seen in the list of mines that existed in Tahuantinsuyo, from the book Los caminos del Inca en el antiguo Perú
by Alberto Regal Matienzo.
The raising of camelids (alpacas, llamas and vicuñas)
is one of the main economic activities in the district of Caylloma, which highlights its livestock vocation. More than 90 % of producers
are dedicated to the commercialization of alpaca meat and fiber.
The commercialization of fiber is one of the main
sources of income for alpaquera families. However, due to the proximity to mining centers, in recent years there has been an increase
in laundry businesses, hotels, car rental and restaurants with the aim of supplying mining companies and boosting the local economy.
The district is located at a high altitude and
has extreme low temperatures, with frost seasons between June and August. The occurrence of these events affects livestock activity,
since the quality and quantity of feed available to livestock decreases and even disappears completely in cases of snowfall. In addition,
it impacts on the health and development of routine activities of the people who live in the annexes and communities located in the high
areas of the district, because houses are predominately constructed from adobe or stone with mud and calamine.
In recent years, there has been a process of migration
of residents of the district of Caylloma to the city of Arequipa. However, they continue to attend political, cultural and social activities
in the district.
| 20.3.1 | Social management approach |
Bateas assumes sustainable management in all its
processes with conviction and commitment, ensuring that its activities are carried out in a responsible manner and respectful of the environment
and the communities in its area of influence.
Bateas prioritizes its commitment to the community
as follows:
| · | Harmonious relationships: Bateas relates respectfully
and proactively with the people in their environment, considering their needs and expectations, with a focus on legality and full respect
for all the rules that govern its activities and the link with our environment. |
| · | Fulfillment of commitments: Bateas is responsible
for both the commitments assumed in the environmental impact studies and voluntarily commitments with its surrounding communities. Its
implementation aims to promote social peace between the company and the district of Caylloma, as well as the sustainable development of
the district. |
December 31, 2023 | Page 183 of 213 |
| |
| Fortuna
Silver Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| · | Co-responsibility: Bateas responsibly involves
key actors of the State, communities, companies and civil society, from the role that corresponds to them, to generate synergies and maximize
the positive impact of the projects. |
| · | Sustainable development: Bateas aims to promotes
projects and actions that contribute to a sustained improvement in the quality of life of the people who live in the surroundings, promoting
the balance between economic growth, the preservation of the environment and the well-being of the population. |
Bateas has a Permanent Information Office in the
capital of the district of Caylloma, with the presence of community relations personnel for fluid and direct communication with community
members.
| 20.3.2 | Framework convention management committee |
In 2021, Bateas signed a Framework Agreement with
the District Municipality of Caylloma, the National Government and the United Front for the Defense of the Interests of the District of
Caylloma (FUDICAY) to establish a Development Fund for the benefit of the district. Bateas has committed to contribute 2.2 million Peruvian
soles per year to the fund between 2021 and 2024, for a total of 8.8 million Peruvian soles. The agreement also aims to create employment
and training opportunities for communities and business development for local suppliers.
The fund is closely supervised and regulated by
two committees: the Management Committee and the Supervisory Committee. The Management Committee is made up of seven members, representatives
of various organizations, including Minera Bateas, the District Municipality of Caylloma, FUDICAY, the Federation of Andean Women, peasant
communities, annexes and neighborhoods. In this space, stakeholders can propose development projects that respond to the needs of the
community.
In addition, the fund strengthens its management
through the establishment of two specialized committees:
| · | Subcommittee on Employment and Local Purchasing:
facilitates accountability of local employment and supply commitments. It also communicates local employment, training and acquisition
opportunities for Bateas and its contractors. |
| · | Subcommittee on Participatory Environmental Monitoring:
its function is to promote environmental oversight with the participation of key local actors. |
Until 2022, the Bateas’ disbursements to
the Development Fund totaled 4.4 million soles prioritized in the following initiatives to be developed between 2023-2025:
| · | Improvement in the services of the Municipal
Slaughterhouse of the District of Caylloma, which consists of the rehabilitation of the facilities, equipment and management of the exploitation
permits necessary for its operation (2023). |
| · | Installation of traditional water reservoirs
to promote the rational use of water and improve the production of natural pastures for animal feed (2023-2025). |
| · | Provide technological equipment to the district's
educational institutions at the initial, primary and secondary levels to provide the necessary tools that contribute to better student
learning (2023-2024). |
| · | Ensure adequate territorial management to reduce
chronic child malnutrition and anemia in children under 5 years of age and pregnant mothers in the district. (2023-2024) |
December 31, 2023 | Page 184 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| · | Improvement of the hygienic services and dressing
rooms of the Municipal Stadium, to promote cultural and sports activities for the development of the youth of Caylloma (2023). |
| · | Support to the supplementary food service "Qali
Warma" provided in the district's educational institutions at the initial, primary and secondary levels (2023). |
In order to contribute effectively to the execution
of sustainable initiatives that respond to the real needs of the population of Caylloma, the social management of Bateas has been oriented
to apply a multi-actor model through which ministries, municipalities and residents of Caylloma meet efforts to promote the sustainable
development of the district in a coordinated manner and under the principle of co-responsibility.
The programs are designed and executed under five
lines of action aimed at promoting well-being and improving living conditions in Caylloma:
| · | Economic development |
| · | Health and nutrition |
| · | Education |
| · | Socio-environmental |
| · | Communication |
Additionally, the mine has generated local employment
opportunities directly and indirectly since the beginning of its activities. Local staff represent 18% of Bateas' total employees and
contractors today.
In recent years, there has been a greater demand
for the supply of local products and services. The company has developed training programs to strengthen the skills of local businesses
and promote their formalization. Approximately 12% of its suppliers are local.
The following is a brief description of the main
general and specific regulations applicable to Closure Plans, with the objective of achieving the management of economic activities within
the framework of environmental conservation and sustainable use of natural resources.
General legislation at national level
| · | Political Constitution of Peru (1993) |
The Political Constitution of Peru of
1993, in its article 2, paragraph 22, establishes that: "Every person has the right to peace, tranquility, enjoyment of free time
and rest, as well as to enjoy a balanced and adequate environment for the development of his or her life".
| · | D. L. No. 635, Penal Code |
The Sole Chapter of Title XIII of the
Criminal Code. “Crimes against Ecology” regulates crimes against ecology, natural resources and the environment.
December 31, 2023 | Page 185 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
In Articles from 304˚ to 314˚,
crimes against Ecology are established for pollution and infringing the rules on environmental protection, in addition to the aspects
of prohibition and crimes against hunting and extraction of flora and fauna among others.
| · | D. L. Nº 757, Framework Law for the Growth
of Private Investment in Peru. |
Its purpose is to guarantee free initiative
and private investments, made or to be made, in all sectors of economic activity and in any of the entrepreneurial or contractual forms
permitted by the Constitution and the laws.
Legislative Decree No. 757 (11/13/91)
establishes in its Art. 50º that: "The competent sectorial authorities to know about matters related to the application of the
provisions of the Environmental and Natural Resources Code are the Ministries or the supervising agencies, as the case may be, of the
sectors corresponding to the activities developed by the companies without prejudice of the attributions corresponding to the Regional
and Local Governments according to the provisions of the Political Constitution. (Text according to the modification provided by the Ninth
Complementary Provision of Law No. 26734).
"In the event that the company
develops two or more activities under the jurisdiction of different sectors, the competent sectorial authority shall be the one corresponding
to the activity of the company that generates the highest gross annual income".
| · | Law N° 28245, Framework Law of the National
System of Environmental Management |
The purpose of this Law is to ensure
the most effective compliance with the environmental objectives of public entities; to strengthen the mechanisms of trans-sectoriality
in environmental management, the role that corresponds to sectorial, regional and local entities in the exercise of their environmental
attributions in order to guarantee that they comply with their functions and to ensure that overlapping, omissions, duplicity, gaps or
conflicts are avoided in the exercise of them.
The purpose of this law is to guide,
integrate, coordinate, supervise, evaluate and guarantee the application of policies, plans, programs and actions for the protection of
the environment and contribute to the conservation and sustainable use of natural resources.
| · | Law No. 27446, Law of the National Environmental
Impact Assessment System (SEIA). |
The purpose of this Law is:
a) "The creation of the National
SEIA, as a unique and coordinated system of identification, prevention, supervision, control and anticipated correction of the negative
environmental impacts derived from human actions expressed through the investment project.
b) The establishment of a uniform process
that includes the requirements, stages, and scope of the environmental impact assessments of investment projects.
December 31, 2023 | Page 186 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
c) The establishment of mechanisms to
ensure citizen participation in the environmental impact assessment process".
The creation of the SEIA as a unique
and coordinated system of identification, prevention, supervision, control and early correction of negative environmental impacts derived
from human actions expressed through the investment project. The establishment of a uniform process that includes the requirements, stages,
and scope of environmental impact assessments of investment projects. The establishment of mechanisms to ensure citizen participation
in the environmental impact assessment process.
| · | Law No. 26821, Organic Law for the Sustainable
Use of Natural Resources. |
It regulates the regime of sustainable
use of natural resources, as they constitute patrimony of the Nation, establishing their conditions and the modalities of granting them
to individuals, in compliance with the mandate contained in Articles 66° and 67° of Chapter II of Title III of the Political Constitution
of Peru and in accordance with the provisions of the General Law of the Environment and the International Agreements ratified by Peru.
Article 28 indicates that sustainable
use implies the rational management of natural resources taking into account their capacity for renewal, avoiding overexploitation and
replenishing them qualitatively and quantitatively. In the case of non-renewable resources, it consists of their efficient exploitation,
under the principle of substitution of real values or benefits, avoiding or mitigating the negative impact on other resources of the surroundings
and the environment.
| · | Law Nº 26834, Law of Natural Protected Areas |
Its objective is to regulate aspects
related to the management of Natural Protected Areas and their conservation in accordance with Article 68 of the Political Constitution
of Peru.
This law defines Natural Protected Areas
as National Heritage, therefore, their natural condition must be maintained in perpetuity, allowing the regulated use of the area and
the exploitation of resources, or determining the restriction of direct uses. They are part of the National System of Natural Areas Protected
by the State (SINANPE), whose governing body is the National Institute of Natural Resources (INRENA), which also oversees the management
of Natural Protected Areas that are not part of this system.
| · | Law No. 27308, Forestry and Wild Fauna Law |
The purpose of this Law is to regulate,
regulate and supervise the sustainable use and conservation of the country's forest and wildlife resources, making their use compatible
with the progressive valorization of the forest's environmental services, in harmony with the social, economic and environmental interest
of the Nation, in accordance with the provisions of Articles 66° and 67° of the Political Constitution of Peru, ; Article 92
of Law No. 28611, General Environmental Law; Law No. 26821, Organic Law for the Sustainable Use of Natural Resources and the
International Agreements in force for the Peruvian State.
| · | Law No. 26839 - Law for the Conservation
and Sustainable Development of Biological Diversity |
December 31, 2023 | Page 187 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
It regulates the conservation of biological
diversity and the sustainable use of its components in accordance with Articles 66° and 68° of the Political Constitution of Peru.
Within the framework of sustainable
development, the conservation and sustainable use of biological diversity implies:
a) Conserving the diversity of ecosystems,
species and genes, as well as maintaining the essential ecological processes on which the survival of species depends.
b) Promoting the fair and equitable
sharing of the benefits arising from the use of biological diversity.
c) Encourage education, information
exchange, human resource capacity building, scientific research, and technology transfer related to biological diversity and the sustainable
use of its components.
d) Promote the economic development
of the country based on the sustainable use of the components of biological diversity, promoting the participation of the private sector
for these purposes.
| · | D.S. Nº 043-2006-AG, Categorization of Threatened
Species of Wild Flora and Fauna |
Stablishes the official list of threatened
flora species in Peru in categories of Critically Endangered (CR), Endangered (EN), Vulnerable (VU), Threatened (NT).
| · | D.S. Nº 004-2014-AG, Update of the list
of Classification and Categorization of threatened species of legally protected fauna. |
Establishes the official list of endangered
fauna species in Peru in categories:
Critically Endangered (CR), Endangered
(EN), Vulnerable (VU), Near Threatened (NT) and adds the category (DD) as Data Deficient.
| · | D.S. Nº 017-2009-AG, Land Classification
Regulation, among others. |
The regulation establishes a National
Land Classification System according to its Major Use Capacity as an interpretative system of soil studies, with the help of climatic
information (life zones) and relief, which will have a dynamic character as it allows the reclassification of a land unit, when changes
in soil or relief parameters have had an impact on the change of its use capacity, as a result of appropriate technological practices
such as irrigation, rehabilitation of saline conditions and poor drainage, terraces and others.
| · | D.S. Nº 013-2010-A, Regulation for the Execution
of Soil Surveys. |
This Regulation has two objectives:
a) to establish a) a method and procedure for the execution, presentation, review and approval of soil surveys, and b) to ensure that
professionals who perform soil surveys use uniform criteria that allow their integration with those performed in neighboring areas or
in different circumstances, according to the level of study.
December 31, 2023 | Page 188 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
The main objective of the Closure Plan is to ensure
that the environment where the mining activity is carried out recovers the quality conditions necessary to ensure its sustainability,
either in conditions similar to those it had before the start of operations, and/or alternative use conditions that are environmentally
viable and that are in accordance with the particular characteristics of the area.
Have the progressive and final closure schedules
according to the mine's LOM, approved in the 3rd MPCM.
The closure measures for the components implemented
are included in the following environmental management instruments:
| · | Second Modification of the detailed EIA of the
project "Expansion of Caylloma Mine and Beneficiation Plant from 1030 TMD to 1500 TMD" approved by R.D. N°172-2017- MEM-DGAAM
(14.06.2017). |
| · | Informe Técnico Sustentatorio (ITS) para
la Mejora, Reposición de las Infraestructuras de la Línea de Transmisión de 15 Kv (LT 15 Kv), adición de Sistema
de Ventilación y Compresión en el Nivel 7 Animas approved by R.D. N° 206-2017-MEM-DGAAM (21.07.2017). |
| · | First Substantive Technical Report (ITS) of the
Second Modification of the Detailed Environmental Impact Study of the project "Expansion of Caylloma Mine and Beneficiation Plant
from 1030 to 1500 TMD" approved by R.D. N°044-2018-SENACE/DCA (21.03.2018). |
| · | Second Substantive Technical Report (ITS) of
the Second Modification of the Detailed Environmental Impact Study of the project "Expansion of Caylloma Mine and Beneficiation Plant
from 1030 to 1500 TMD" approved by R.D. N°018-2019-SENACE-PE/DEAR (28.01.2019). |
| · | Third Substantive Technical Report (ITS) of the
Second Modification of the Detailed Environmental Impact Study of the project "Expansion of Caylloma Mine and Beneficiation Plant
from 1030 to 1500 TMD" approved by R.D. N°105-2019-SENACE-PE/DEAR (05.07.2019). |
In order to meet the objectives, set for the closure
of the Caylloma Mine and Mill, "closure criteria" have been defined, which will allow the design of strategies to ensure their
technical, economic and environmentally sustainable viability.
The closure of the Caylloma Mine and Processing
Plant is intended to achieve a planned closure of its operations, thus minimizing the environmental impacts that could occur in the components
involved in the post-closure stage, leaving them physically and chemically stable, dismantling infrastructure, profiling and stabilizing
the land as appropriate.
It is necessary to know the specific conditions
of the disturbed areas and in which it will be necessary to apply a restoration or rehabilitation, taking into account physical, geological,
hydrological, hydrogeological, climatic and environmental characteristics, methods of mining-metallurgical operation applied and the conditions
of the process; all this leads to take particular criteria applicable only to the reality presented.
December 31, 2023 | Page 189 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
There are environmental components typified in
the current environmental legislation and in which there are commitments that we must all consider in order to protect them, such as:
water resources, soil resources, air, flora and fauna. A beneficial use of soil must also be contemplated after closure in some areas,
which implies applying Sustainable Development guidelines.
| 20.4.4 | Stakeholder identification |
According to the Community Relations Guide of
the Ministry of Energy and Mines in Peru, stakeholders are considered as all those social groups that may be impacted by the project.
Stakeholders can be made up of families, neighborhoods, economic organizations.
The main usefulness of stakeholders lies in the
fact that they are people or organizations that allow the focus of the information on that data most relevant to the study of the company-community
relationship.
The purposes of this technique are:
| · | Identify the stakeholders. |
| · | Define their interests and perceptions of the
specific problems on which we intend to intervene. |
| · | Identify the resources that each group brings
to the problem. |
| · | Identify the institutional responsibilities that
each group has. |
| · | Identify the interest that each group has in
the initiative. |
| · | Identify the conflicts that each stakeholder
group would have with respect to the initiative. |
| · | Conclude on the activities that can be carried
out to satisfy the interests of the stakeholders. |
| 20.4.5 | Post-closure maintenance and monitoring |
In accordance with current regulations for mine
closure, in our Second Mine Closure Plan Update for the Caylloma Mine and Processing Plant, we are committed to execute the closure measures,
as well as to maintain and monitor the effectiveness of the measures implemented both during its execution and in the post-closure stage.
The monitoring program (location, frequency, elements,
parameters and conditions to be monitored) was approved by the competent authority, this program is specific, according to the characteristics
of each area, work or facility and will be carried out until the physical and chemical stability of the mining components of the Mine
Closure Plan is demonstrated.
In this sense, the actions, measures and/or post-closure
maintenance and monitoring procedures designed for the present closure at the Caylloma Mine and Processing Plant are aimed at ensuring
that the closure activities or measures comply with the objectives for which they were designed.
Once the closure of the areas and facilities
used by the mining unit has been completed, we must continue to develop the corresponding monitoring, maintenance or surveillance measures,
as proposed in this Closure Plan, which was approved by the competent
December 31, 2023 | Page 190 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
authority. The execution of engineering and infrastructure
construction works for environmental rehabilitation are not included in the post-closure stage.
The post-closure stage will be in charge and under
the responsibility of Compania Minera Bateas S.A.C. (hereinafter Bateas), for a period of five (05) years after the conclusion of the
execution of the works contemplated in this closure of the Caylloma Mine and Processing Plant.
The goal of the closure measures formulated is
to achieve stability, taking as a reference the Environmental Quality Standards and National and International Maximum Permissible Limits,
as well as physical, chemical, hydrological, biological and social stability criteria.
The closure measures for the components contemplated
in the Caylloma Mine and Processing Plant have been designed under the Passive Care closure criterion, so some closure measures will require
the application of Passive Maintenance and Monitoring activities, which will imply a minimum need for periodic care and maintenance programs
in the post-closure stage, basically including surveillance programs and eventual maintenance actions, annual inspections of the facilities, etc.
without requiring permanent personnel on site.
| 20.4.6 | Post-closure maintenance activities |
As previously indicated in the Approved PCM Update,
due to the characteristics of the components and the proposed closure activities, it is anticipated that only Passive Care or Maintenance
activities will be required.
The following are the measures for the post-closure
stage of the components contemplated in this closure of the Caylloma Mine and Processing Plant.
The objective of the implementation of the maintenance
program is to ensure that the closure works operate effectively until they are self-sustaining, so maintenance will be performed.
| · | Physical Stability Maintenance. |
| · | Geochemical Maintenance. |
| · | Hydrological Maintenance. |
Post-closure monitoring activities
The following activities will be performed as
follow-up:
| · | Physical Stability Monitoring. |
| · | Air quality monitoring program. |
| · | Geochemical stability monitoring. |
| · | Monitoring of Social Programs |
Mine closure is also included in the environmental
program. For 2024 a total of US$ 471,000 has been budgeted for the ongoing closure plan and environmental liabilities. The closure
plan is performed to ensure compliance with the programs and
December 31, 2023 | Page 191 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
plans submitted to the MEM. A breakdown of the
budgeted mine closure costs for the LOM are presented in Table 20.2 and totals US$ 16.1 million.
Table 20.2 Mine closure budget
Capital Cost Item |
2024 |
2025 |
2026 |
2027 |
2028 |
Total |
Budget (US$000) |
471 |
71 |
2,098 |
1,896 |
11,524 |
16,060 |
| 20.5 | Comment on Section 20 |
It is the opinion of the QP that the appropriate
environmental, social and community impact studies have been conducted to date at the Caylloma Mine. Bateas has maintained all necessary
permits to develop mining activities in compliance with what is specified in its environmental, social and community impact studies.
December 31, 2023 | Page 192 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| 21 | Capital and Operating Costs |
The Caylloma Mine is a producing operation managed
by Bateas having mined underground continuously since 2006. Capital and operating cost estimates are based on the established cost experience
gained from the operation, projected budgets, and quotes from manufacturers and suppliers. Overall, the cost estimation is of sufficient
detail that, with the current experience at Bateas, Mineral Reserves can be declared. The analysis includes forward estimates for sustaining
capital. Inflation is not included in the cost projections and exchange rates were estimated at S/3.60 (Peruvian Soles) to one US dollar.
| 21.1 | Sustaining capital costs |
Projected capital costs for the Caylloma Mine
LOM are summarized in Table 21.1.
Table 21.1 Summary of projected major
capital costs for the LOM
Capital Cost Item (MUS$) * |
2024 |
2025 |
2026 |
2027 |
2028 |
Development |
3.61 |
5.89 |
2.52 |
2.87 |
0.00 |
Brownfields |
0.24 |
0.00 |
0.00 |
0.00 |
0.00 |
Infill |
0.74 |
0.50 |
0.50 |
0.50 |
0.50 |
Mine Development & Brownfields |
4.59 |
6.39 |
3.02 |
3.37 |
0.50 |
|
Mine |
6.07 |
0.98 |
1.32 |
4.08 |
0.00 |
Plant |
0.36 |
0.13 |
0.09 |
0.03 |
0.00 |
Tailings dam |
0.44 |
3.61 |
5.41 |
0.31 |
0.00 |
Maintenance and Energy |
6.18 |
1.68 |
0.23 |
0.00 |
0.00 |
General services |
1.07 |
2.89 |
0.15 |
0.23 |
0.00 |
Equipment and Infrastructure |
14.11 |
9.29 |
7.20 |
4.64 |
0.00 |
|
Mine Closure & Site Rehabilitation |
0.47 |
0.07 |
2.10 |
1.90 |
11.52 |
|
Total Capital Expenditure |
19.17 |
15.75 |
12.32 |
9.91 |
12.02 |
*Numbers may not total due to rounding |
Capital costs include all investments in mine
development, equipment and infrastructure necessary to maintain the mine facilities and sustain the continuity of the operation. Capital
costs are split into three main areas; mine development and Brownfields; equipment and infrastructure; and mine closure and site rehabilitation.
Mine development includes the main development
and infrastructure of the mine through the generation of ramps, ore and waste shafts, ventilation shafts, and level extraction. It also
includes the development of drives for Brownfield exploration to allow investigation of areas that are inaccessible from the surface.
Infill delineation drilling is included under mine development & brownfield costs as this activity has the objective of increasing
confidence in currently defined Mineral Resources. Capital costs for the mine are higher in the next two years due to an investment required
in 2024 to continue development of the deeper levels (levels 20 to 21) of the mine.
December 31, 2023 | Page 193 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| 21.1.2 | Equipment and infrastructure |
Equipment and infrastructure costs are attributed
to all departments of the mine including mine, plant, tailing facilities, maintenance and energy, safety, information technology, administration
and human resources, logistic, camps, geology, planning, laboratory and environmental. Capital costs for equipment and infrastructure
are related to completion of the construction for the pumping system, construction of a new backfill system, energy capacity expansion,
energy substations and energy contingency line proposed for completion in 2024. Additionally, further investment is required for tailing
dam expansion and studies in the coming years.
| 21.1.3 | Mine closure and rehabilitation |
Mine closure costs are attributed to site rehabilitation
costs required to remediate the area where the mine is located and to meet mine closure requirements.
Projected operating
costs for the LOM are detailed in Table 21.2.
Table 21.2 Life-of-mine operating
costs
Area |
Units |
2024 |
2025 |
2026 |
2027 |
2028 |
Mine |
US$/t |
45.3 |
44.1 |
42.4 |
41.9 |
43.2 |
Plant |
US$/t |
15.7 |
12.2 |
12.2 |
12.2 |
12.2 |
General Services |
US$/t |
16.4 |
16.4 |
16.4 |
16.4 |
16.4 |
Administrative Services |
US$/t |
12.0 |
12.1 |
12.1 |
12.1 |
12.0 |
Management Fee |
US$/t |
1.7 |
1.8 |
1.8 |
1.8 |
1.7 |
Distribution |
US$/t |
7.4 |
7.1 |
7.3 |
7.1 |
7.2 |
Community Support Activities |
US$/t |
1.2 |
1.2 |
1.2 |
1.2 |
1.2 |
Total |
US$/t |
99.8 |
94.8 |
93.3 |
92.6 |
93.9 |
Operating costs include the site costs and other
operating expenses for the operation. These operating costs are analyzed on a functional basis and the cost structure is not similar to
the operating costs reported by financial statements of Fortuna. The site costs relate to activities that are performed on the property
including mine, plant, general services, and administrative service costs. The other operating expenses include costs associated with
distribution, management, and community support activities.
| 21.3 | Comment on Section 21 |
The capital and operating cost provisions for
the LOM plan that supports Mineral Reserves have been reviewed. The basis for the estimates is appropriate for the known mineralization,
mining and production schedules, marketing plans, and equipment replacement and maintenance requirements.
The QP considers the capital and operating costs
estimated for the Caylloma Mine as reasonable based on industry-standard practices and actual costs observed for 2023.
December 31, 2023 | Page 194 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Fortuna is using the provision for producing issuers,
whereby producing issuers may exclude the information required under Item 22 for technical reports on properties currently in production
and where no material production expansion is planned.
Mineral Reserve declaration is supported by a
positive cashflow.
| 22.2 | Comments on Section 22 |
An economic analysis was performed in support
of estimation of the Mineral Reserves; this indicated a positive cashflow for the period set out in the LOM using the assumptions detailed
in this Report.
December 31, 2023 | Page 195 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
This section is not relevant to this Report.
December 31, 2023 | Page 196 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| 24 | Other Relevant Data and Information |
This section is not relevant to this Report.
December 31, 2023 | Page 197 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| 25 | Interpretation and Conclusions |
| 25.1 | Mineral tenure, surface rights, water rights, royalties and agreements |
Fortuna was provided with a legal opinion that
supports that the mining tenure held by Bateas for the Caylloma Mine is valid and that Fortuna has a legal right to mine the deposit.
The mineral tenement holdings cover 74 mining
concessions for a total surface area of 35,622 hectares (ha). In Peru, mining concessions do not have expiration dates, but an annual
fee must be paid to retain the concessions in good standing. Bateas states that all fees are up to date and the concessions are all in
good standing.
Bateas has signed 22 surface right or easement
contracts covering a total of 8,311 ha with landowners to cover the surface area needed for the operation and tailings facilities.
There are royalties attached to the mineral concessions
with the following being applicable to Mineral Reserves and taken into consideration in the economic analysis:
| · | A 2 % royalty on silver production to Nueva Granada
Gold Ltd. (formerly Lemuria Royalties Corp.) |
| · | A 1% royalty or an effective rate based on operating
profit (whichever is greater) to the Peruvian Government. |
| | |
| · | A Special Tax on Mining based on the quarterly operating profit of
the mining concession holder. |
| 25.2 | Geology and mineralization |
The Caylloma polymetallic and silver-gold rich
veins are characteristic of a typical low sulfidation epithermal deposit having formed in a relatively low temperature, shallow crustal
environment.
Epithermal veins at the Caylloma Mine are characterized
by minerals such as pyrite, sphalerite, galena, chalcopyrite, marcasite, native gold, stibnite, argentopyrite, and silver-bearing sulfosalts
(tetrahedrite, polybasite, pyrargyrite, stephanite, stromeyerite, jalpite, miargyrite and bournonite). These are accompanied by gangue
minerals, such as quartz, rhodonite, rhodochrosite, johannsenite (manganese-pyroxene) and calcite.
There are two distinct types of mineralization
at the Caylloma Mine, one with predominately elevated silver values (Bateas, Bateas Piso, Bateas Techo, La Plata, Cimoide La Plata, San
Cristobal, San Pedro, San Carlos, Paralela, Carolina, Don Luis II veins), and the other being polymetallic with elevated silver, lead,
zinc, copper, and gold values (Animas, Animas Techo, Animas NE, Animas NE Techo, Cimoide ASNE, Ramal Techo ASNE, Santa Catalina, Soledad,
Silvia, Pilar, Patricia, Nancy and Rosita veins).
Underground operations are presently focused on
mining the Animas and Animas NE veins.
| 25.3 | Exploration, drilling and analytical data collection in support of Mineral Resource estimation |
Drill holes drilled under Bateas management in
the period 2005 to 2023 have data collected using industry-standard practices. Drill orientations are appropriate to the
December 31, 2023 | Page 198 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
orientation of the mineralization and core logging
meets industry standards for exploration of an epithermal-style deposit.
Geotechnical logging is sufficient to support
Mineral Resource estimation with the data having been used to support detailed mine planning for the underground mine for over 15 years
of operation.
Collar and downhole surveys have been performed
using industry-standard instrumentation. Any uncertainties in survey information have been incorporated into subsequent resource confidence
category classification.
All collection, splitting, and bagging of channel
and core samples were carried out by Bateas personnel since 2005 representing more than 96 % of all information collected at the mine.
No material factors were identified with the drilling programs that could affect Mineral Resource or Mineral Reserve estimation.
Sample preparation and assaying for samples that
support Mineral Resource estimation has followed approximately similar procedures for most drill programs since 2005. The preparation
and assay procedures are adequate for the type of deposit and follow industry standard practices.
Sample security procedures met industry standards
at the time the samples were collected. Current core and pulp sample storage procedures and storage areas are consistent with industry
standards.
Paul Weedon
Mr. Weedon has visited the Caylloma Mine
on multiple occasions and during these visits has reviewed the geological interpretations and drill core. He is of the opinion that the
data verification programs performed on the data collected from exploration are adequate to support the geological interpretations, the
analytical and database quality, and Mineral Resource estimation at the Caylloma Mine.
Eric Chapman
Mr. Chapman has personally verified data
used in the Mineral Resource estimation, including the database, collars and downhole surveys, geological logs and assays, estimation
parameters, and mine reconciliation.
Mr. Chapman is of the opinion that the geological
and assay data stored in the database is representative of that reported from the laboratories and is suitable for usage in Mineral Resource
estimation.
Monthly and quarterly QC reports detailing results
for exploration drilling, infill drilling and channel sampling are received and reviewed by Mr. Chapman on an ongoing basis. Any
discrepancies identified are immediately followed up with site staff for further investigation.
To further verify the assay data, Mr. Chapman
has randomly selected assay data from the database and compared the assay results stored to that of the original assay certificates. Mr. Chapman
is of the opinion that the geological and assay data stored in the database is representative of that reported from the laboratories and
is suitable for usage in Mineral Resource estimation.
December 31, 2023 | Page 199 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Raul Espinoza
Mr. Espinoza has reviewed on site the current
mining methods and verified the Mineral Reserve estimation methodology including review of documents and discussions with relevant Bateas
personnel regarding permitting, metallurgical testwork and processing, operating and capital expenditure requirements.
Mr. Espinoza also works closely with the
relevant departments reviewing the environmental and community programs as part of Fortuna’s Environmental, Social, and Governance
(ESG) criteria.
Mr. Espinoza is of the opinion that the parameters
used for the estimation of Mineral Reserves based on the proposed mining method, geotechnical studies, environmental and community commitments,
operational, processing and cost estimates are reasonable and representative for the Caylloma Project.
Mathieu Veillette
Mr. Veillette has been providing technical
support to Caylloma since August 2022. Mr. Veillette helps coordinate and manage the Engineer of Record (EoR) for TSF and water
management. Mr. Veillette provides support for waste dump geotechnical aspects and has reviewed all technical documents related to
the TSFs, water management and waste dumps. During Mr. Veillette’s most recent site visit he performed an internal audit on
the TSF, water management and waste dump. In April 2023, he spent 10 days on site training new RTFEs and providing support on waste
dump design and stability. Mr. Veillette’s most recent site visit was May 30 to 31, 2023.
Patricia Gonzalez
Ms. Gonzalez has reviewed the metallurgical
results comprising several phases of testwork and in the opinion of Ms. Gonzalez, the Caylloma Mine metallurgical samples tested,
and the ore that is presently treated in the plant is representative of the orebody as a whole in respect to grade and metallurgical response.
Differences between vein systems are minimal with regard to recovery.
| 25.4 | Metallurgical testwork |
Metallurgical recovery values forecast in the
LOM for sulfide material average 82 % for silver, 22 % for gold, 89 % for lead, and 89 % for zinc with the exception of veins with elevated
gold grades (>1g/t) where metallurgical testwork has shown that minor adjustments in the plant can result in average metallurgical
recovery rates of 85 % for silver, 55 % for gold, 87 % for lead and 89 % for zinc.
Metallurgical recovery has been found to decrease
with elevated zinc oxide material, however this can be mitigated by blending with sulfide material, as long as the oxide content does
not exceed 11 %. This blending strategy has been taken into account in the LOM. There are no additional deleterious elements that require
special treatment in the plant as of the effective date of this Report.
| 25.5 | Mineral Resource estimation |
The
2023 Mineral Resource update has relied on channel and drill hole sample information obtained by Bateas since 2005. Mineralized domains
identifying potentially economically extractable material were modeled for each vein and used to code drill holes
December 31, 2023 | Page 200 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
and channel samples for geostatistical analysis,
block modeling and grade interpolation by ordinary kriging or inverse distance weighting.
Mineral Resources are reported based on underground
mining within mineable stope shapes based on actual operational costs and mining equipment sizes using NSR values in the block model calculated
based on the projected long-term metal prices, commercial terms, and actual metallurgical recoveries experienced in the plant. Mineral
Resources have been reported above a US$ 75/t NSR cut-off value for veins wider than two meters and amenable to extraction by semi-mechanized
mining methods (Animas, Animas NE, Ramal Techo ASNE, Cimoide ASNE, Nancy, Rosita, and San Cristobal veins); or above a US$ 135/t
NSR cut-off value for veins narrower than two meters regarded as amenable to conventional mining methods (all other veins).
Mineral
Resources are categorized as Measured, Indicated or Inferred. The criteria used for classification includes the number of samples,
spatial distribution, distance to block centroid, KE and ZZ.
Mr. Chapman is of the opinion that the Mineral
Resources have been estimated using standard industry practices and conform to the requirements of CIM (2019). The Mineral Resources are
acceptable to support the declaration of Mineral Reserves.
Furthermore, it is the opinion of Mr. Chapman
that by the application of US$ value for each metal taking into consideration projected commercial terms, the average metallurgical recovery,
average grade in concentrate and long-term metal prices as well as the exclusion of Mineral Resources identified as being isolated or
economically unviable via the application of a mineable stope optimizer that accounts for operational dilution, the Mineral Resources
have ‘reasonable prospects for eventual economic extraction’.
| 25.6 | Mineral Reserve estimation |
Mineral Reserves are estimated as of December 31,
2023, and will support a four-year and 3-month LOM considering 350 days in the year for production and a capacity rate of 1,500 tpd. The
expectation based on an optimized production schedule is for an annual average production of approximately 1.1 Moz of silver and
15 kt of lead and 20 kt of zinc.
The conversion of Mineral Resources to Mineral
Reserves was undertaken using industry recognized methods, actual operational costs, capital costs, and plant performance data. Thus,
it is considered to be representative of future operational conditions. This Report has been prepared with the latest information regarding
environmental and closure cost requirements.
Mr. Espinoza is of the opinion that the Proven
and Probable Mineral Reserves estimate has been undertaken with reasonable care and has been classified using the 2014 CIM Definition
Standards.
Factors that may affect the estimates include:
metal price and exchange rate assumptions; changes to the assumptions used to generate the cut-off grade; changes in local interpretations
of mineralization geometry and continuity of mineralized zones; changes to geological and mineralization shape and geological and grade
continuity assumptions; variations in density and domain assignments; geometallurgical assumptions; changes to geotechnical, mining, dilution,
and metallurgical recovery assumptions; change to the input and design parameter assumptions that pertain to the conceptual stope designs
constraining the estimates; and assumptions as to the continued ability to access the site,
December 31, 2023 | Page 201 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
retain mineral and surface rights titles, maintain
environment and other regulatory permits, and maintain the social license to operate.
Mining at Caylloma is conducted by contractors
based on conventional overhand cut-and-fill using mechanized, semi-mechanized and conventional extraction methodologies.
Since October 2006 Bateas has successfully
managed the underground operation of the Caylloma Mine, processing 8.0 Mt of ore and producing 23 Moz of silver, 36 koz of gold, 193 kt
of lead, and 272 kt of zinc as of December 31, 2023. During this period considerable investment has been made to improve the processing
plant, develop the underground infrastructure, and increase the capacity of the TSFs.
Mr. Espinoza is of the opinion that:
| · | The mining method being used is appropriate for
the deposit being mined. The underground mine design, stockpiles, tailings facilities, and equipment fleet selection are appropriate for
the operation. |
| · | The mine plan is based on historical mining and
planning methods practiced at the operation for the previous twelve years and presents low risk. |
| · | Inferred Resources are not included in the mine
plan. |
| · | The mobile equipment fleet presented is based
on the actual mining operations, which are known to achieve the production targets set out in the LOM. |
| · | All mine infrastructure and supporting facilities
meet the needs of the current mine plan and production rate. |
The current process plant design is split into
four principal stages including crushing; milling; flotation; and thickening, filtering, shipping.
Ms. Gonzalez considers process requirements
to be well understood, and consistent based on the actual observed conditions in the operating plant. There is no indication that the
characteristics of the material being mined will change and therefore the recovery assumptions applied for future mining are considered
as reasonable for the LOM.
Mr. Espinoza is confident that all mine and
process infrastructure and supporting facilities are included in the present general layout to ensure that they meet the needs of the
mine plan and production rate and notes that:
| · | The Caylloma Mine is located 225 km, or 5 hours
by road from the city of Arequipa, the main service center for the operation, with good year-round access. |
| · | The mine site infrastructure has a footprint
of 91.12 ha associated with the Huayllacho beneficiation concession. |
| · | An expansion to the tailings facility stage (2B)
was constructed and provides capacity until the end of 2026, based on current production rates. Detailed |
December 31, 2023 | Page 202 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
engineering studies are in progress for the third expansion stage (3C)
which is going to cover tailings capacity for LOM requirements.
| · | Power demand on the operations is 7.8 MW provided
mainly (87 %) through the national power grid and two diesel generators on site to cover the shortfall and provide backup. |
| · | Water demand at the Caylloma Mine is 60 l/s,
including 10 l/s for the camp. Approximately 70 % of the processing plant total water consumption is recovered from tailings facility
N° 3 with the other 30 % from fresh water provided by the Santiago River. |
| · | All process buildings, offices, and camp facilities
for operating the mine have been constructed. |
| 25.10 | Markets and contracts |
Since the operation commenced production in October 2006,
a corporate decision was made to sell the concentrate on the open market. To get the best commercial terms for the concentrates, it is
Fortuna’s policy to sign contracts for periods no longer than one year. All commercial terms entered between the buyer and Bateas
are regarded confidential but are considered to be within standard industry norms.
The QP has reviewed the information provided by
Fortuna on marketing, contracts, metal price projections and exchange rate forecasts and notes that the information provided support the
assumptions used in this Report and are consistent with the source documents, and that the information is consistent with what is publicly
available within industry norms.
| 25.11 | Environmental, permitting and social considerations |
In June 1997, the Ministry of Mines approved
the PAMA (Environmental Compliance and Management Program) of the San Cristóbal Economic Management Unit through Directorial Resolution
No. RD 087-97-EM/DGM, for compliance with the commitment’s environmental conditions of the mining unit.
The mining operation has been developed under
strict compliance with the regulations and permits required by public institutions linked to the mining sector. In addition, all work
follows the international quality and safety standards established in ISO 14001 and ISO 45001.
Standards and permits obtained by the environmental
area together with the legal area. The operation also ensures that all environmental activities are periodically monitored and recorded
as part of the quality control measures submitted to the MEM. and other legal regulatory entities.
Of particular importance is the monitoring of
the river water quality in the area. This activity consists of monitoring the Santiago River, being the main river that passes through
the property, employing people from the local communities to verify the results.
Bateas has a very strong commitment to the development
of the communities surrounding the Caylloma Mine. In this sense, Bateas is committed to sustainable projects, direct support and alliances
that build the company's commitment to local communities, respecting local values, customs and traditions, through projects or programs
based on respect for diversity. ethnic. -cultural, open communication and effective interaction with
December 31, 2023 | Page 203 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
local actors that improve education, health and
infrastructure. Mine closure is also included in the environmental program.
Environmental risks during the closure stage will
be reduced through remediation and monitoring works.
There will also be a significant environmental
risk during the closure of the facilities, which will cause a significant production of non-hazardous industrial waste and hazardous products
due to the movement of heavy machinery. In the closure stage, the land will be profiled with heavy machinery to minimize the long-term
impact of mining activity and return the land topology to previous conditions. It will be critical to establish clear environmental policies
with contractors during this process.
For 2024, a total of US$471,000 has been budgeted
for the ongoing closure plan and environmental liabilities. The closure plan is carried out to ensure compliance with the programs and
plans submitted to the MEM.
It is the opinion of the QPs that the appropriate
environmental, social and community impact studies have been conducted to date at the Caylloma Mine. Bateas has maintained all necessary
environmental permits that are prerequisite for operation of project infrastructure and the maintenance of mining activities.
| 25.12 | Capital and operating costs |
Capital and operating cost estimates are based
on established cost experience gained from current operations, projected budget data and quotes from manufacturers and suppliers.
The capital and operating cost provisions for
the LOM plan that supports Mineral Reserves have been reviewed. The basis for the estimates is appropriate for the known mineralization,
mining and production schedules, marketing plans, and equipment replacement and maintenance requirements.
Mr. Espinoza considers the capital and operating
costs estimated for the Caylloma Mine as reasonable based on industry-standard practices and actual costs observed for 2023.
Fortuna is using the provision for producing issuers,
whereby producing issuers may exclude the information required under Item 22 for technical reports on properties currently in production
and where no material production expansion is planned.
Mineral Reserve declaration is supported by a
positive cashflow for the period set out in the LOM based on the assumptions detailed in this Report.
| 25.14 | Risks and opportunities |
A number of opportunities and risks were identified
by the QPs during the evaluation of the Caylloma Mine.
Opportunities include:
| · | Reduction in overall pumping costs through improvements
to the mine dewatering system resulting in reduced power consumption and maintenance requirements. Mine water optimization will strive
to eliminate the need to abstract water from the Santiago River. |
December 31, 2023 | Page 204 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
| · | Potential to expand the ore processing capacity
at the plant. The conceptual study indicates a possible business case to increase production to 2,200tpd and requires further studies
to confirm its feasibility. |
| · | Potential to expand current resources through
exploration of the Animas NE vein with mineralization remaining open to the northeast and at depth. |
Risks include:
| · | An expansion of the current tailings storage
facility TSF No. 3 will be required for stage (3C) to cover the current production levels up to LOM requirements. A permit will
be required for the expansion, and although there is no guarantee this will be granted, Bateas is confident that if the application is
submitted in a timely manner, the permit should be granted based on previous permit applications. |
| · | Bateas management occasionally receives requests
from local authorities and/or civil organizations regarding unrealistic social expectations. Bateas are mitigating the risk of conflict
regarding these demands by working with local authorities, landowners, and communities to address expectation levels and to take requests
into account in preparing its annual community relations work program and budget. |
| · | TSF N° 2 closure costs are currently unknown.
A site investigation study was conducted in the third quarter of 2023 to sample foundation materials and laboratory testing is planned
for January 2024. An engineering trade off analysis is expected to be completed by the end of the second quarter 2024 to determine
closure costs associated with this facility. TSF N° 2 is planned for decommissioning in 2025 when a new cyclone plant is planned to
be operational adjacent to the mill. TSF N° 2 is currently being used as a temporary cyclone / tailings classification facility. Coarse
tailings (40% by volume) are disposed of as mine backfill with overflow fine tailings sent to TSF N° 3. |
December 31, 2023 | Page 205 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Recommendations for the next phase of work have
been broken into those related to ongoing exploration activities and those related to additional technical studies focused on operational
improvements. Recommended work programs are independent of each other and can be conducted concurrently unless otherwise stated. The exploration
phase is estimated to cost $ 980,000 with an additional technical studies phase estimated to cost $ 180,000. Depending on results
from these phases a plant expansion pre-feasibility study phase may be executed at an estimated cost of approximately $ 1,000,000.
| · | It is recommended that Bateas continue surface
mapping of key areas of interest including Antacollo, Condorcoto, Santa Rosa and Antimonio, as well as geophysical surveys at Llocococha
to identify potential future drill targets. The budgeted cost of the surface mapping activities is $ 244,000 (excluding personnel costs). |
| · | Bateas is planning to continue the delineation
drilling from underground in 2024 focusing on the lower levels of ore shoot 3 in the Animas NE vein. A total of 20 drill holes totaling
4,027 m are planned at a budgeted total cost of $ 736,000. |
| 26.3 | Technical and operational |
A number of additional studies are recommended
to improve estimates as well as operational decision making and mining costs.
| · | Review of mining methodology. The width
of mineralization and rock quality varies greatly throughout the deposit. It is recommended that an evaluation of mining method be conducted
to assess potential implementation of the SLS mining method applied to high grade Au-Ag veins, additionally to review an increment on
the bench height of the SLS stopes from 13.5 m to 20 m. The study could be conducted in-house or externally, with an external cost estimated
at $ 80,000. |
| · | Review of Mine Cost Optimization. It is
proposed to do a cost optimization study in order to identify operational bottlenecks where savings can be found both in mine, auxiliary
services and plant. The estimated cost of the study is $ 100,000. |
| · | Plant expansion pre-feasibility study.
Dependent on the results of the delineation drilling and mine cost optimization a pre-feasibility study could be executed to assess if
the production rate at the Caylloma plant could be increased to 2,200 tpd. The estimated cost of such a study is approximately $
1,000,000. |
| · | Density estimation. It is recommended
that the number of bulk density measurements be increased in veins that lack sufficient values for meaningful statistical analysis. This
will be completed using the Projects resources and part of normal operating cost. |
December 31, 2023 | Page 206 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Armbrust,
G.A., Kilpatrick L.R., & Sandefur, R.L., 2005. Technical Report, Caylloma Project, Arequipa, Peru, prepared by Chlumsky,
Armbrust & Meyer, LLC., effective date 22 April 2005.
Chapman, E.N.,
Vilela, E.A., 2012. Technical Report, Caylloma Property, Caylloma District, Peru. May 7, 2012.
Chapman, E.N.,
Kelly, T.E.M., 2013. Technical Report, Caylloma Property, Caylloma District, Peru. March 22, 2013.
Chapman, E.N.,
Gutierrez, E., 2017. Amended Technical Report on the Caylloma Property, Caylloma District, Peru, prepared by Fortuna Silver
Mines Inc., effective date 20 August 2016.
Chapman, E.N.,
Sinuhaji, A., 2019. Technical Report on the Caylloma Mine, Caylloma District, Peru, prepared by Fortuna Silver Mines Inc.,
effective date 8 March 2019.
CIM 2019.
CIM Estimation of Mineral Resources and Mineral Reserves – Best Practice Guidelines. Prepared by the CIM Mineral Resource and Mineral
Reserve Committee. Adopted by the CIM Council, November 29, 2019.
CIM, 2014. CIM
Definition Standards on Mineral Resources and Mineral Reserves. Prepared by the CIM Standing Committee on Reserve Definitions. Adopted
by the CIM Council, May 10, 2014.
Corbett, G.,
2002. Epithermal Gold for Explorationists, in AIG Journal- Applied geoscientific practice and research in Australia,
pp26.
Cox, D.P., Singer,
D.A., 1992. Mineral deposit models, in U.S. Geological Survey bulletin; 1693, 145–149.
Echavarria, L.,
Nelson, E., Humphrey, J., Chavez, J., Escobedo, L., Iriondo, A., 2006. Geological evolution of the Caylloma epithermal
vein district, in Economic Geology, 101, 843–863.
El Tani, M.,
2003. Circular tunnel in a semi-infinite aquifer in Tunnelling and Underground Space Technology 18, 49–55.
Goodman, R.E.,
Moye D.G., Van Schalkwyk A., and Javandel I., 1965. Groundwater Inflows During Tunnel Driving, in Engineering Geology,
1(1), 39–56.
Nielsen, R.L.,
Milne S., & Sandefur, R.L., 2009. Technical Review (NI 43-101), Caylloma Project, Peru, prepared by Chlumsky, Armbrust &
Meyer, LLC., effective date 11 August 2009.
Noble,
D.C., 1981a. Preliminary report on four radiometric ages from the Cailloma-Sucuitambo region, Peru: Unpublished report for
Mauricio Hochschild Company.
Noble,
D.C., 1981b. Age of the Cailloma calderas: Unpublished report for Mauricio Hochschild Company.
Noble, D.C.,
McKee, E.H., 1989. Cenozoic tectonic events, magmatic pulses, and base –precious metal mineralization in the Central
Andes: Circum-Pacific Council for Energy and Mineral Resources Earth Science Series, v. 11, pp. 189–194.
December 31, 2023 | Page 207 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Peterson, P.S.,
Noble, D.C., McKee, E.H., and Eyzaguirre, V.R., 1983. A resurgent mineralized caldera in southern Peru: Preliminary report:
EOS, American Geophysical Union Transactions, v. 64, pp.884.
Sandefur,
R.L., 2006. Technical Report, Caylloma Project, Arequipa, Peru, prepared by Chlumsky, Armbrust & Meyer, LLC., effective
date 3 October 2006.
Silberman,
M.L., McKee, E.H., and Noble, D.C., 1985. Age of mineralization at the Cailloma and Orcopampa silver districts, southern Peru:
Isochron/West, v. 43, pp.17–18.
Vann, J., Jackson,
S.; and Bertoli, O., 2003. Quantitative Kriging Neighbourhood Analysis for the Mining Geologist – a description of the
method with worked case examples, in Proceedings Fifth International Mining Geology Conference, pp.1-9. (The Australian Institute
of Mining and Metallurgy, Melbourne, Australia).
William, A.,
Hustrulid, W. A., Hustrulid, R. C., 2001. SME Underground Mining methods, Mining Dilution in moderate-to narrow width deposits.
pp 615.
December 31, 2023 | Page 208 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
Certificates
CERTIFICATE
of QUALIFIED PERSON
(a) I, Eric Chapman, Senior Vice President
of Technical Services for Fortuna Silver Mines Inc., 650-200 Burrard St, Vancouver, BC, V6C 3L6 Canada; do hereby certify that:
(b) I am the co-author of the technical report
titled “Fortuna Silver Mines Inc. Caylloma Mine, Caylloma District, Peru” that has an effective date of December 31,
2023 (the “Technical Report”).
(c) I graduated with a Bachelor of Science
(Honors) Degree in Geology from the University of Southampton (UK) in 1996 and a Master of Science (Distinction) Degree in Mining Geology
from the Camborne School of Mines (UK) in 2003. I am a Professional Geologist of the Engineers and Geoscientists of the Province of British
Columbia (Registration No. 36328) and a Chartered Geologist of the Geological Society of London (Membership No. 1007330). I
have been practicing as a geoscientist and preparing resource estimates for approximately twenty years and have completed more than thirty
resource estimates for a variety of deposit types such as epithermal gold/silver veins, porphyry gold deposits, and volcanogenic massive
sulfide deposits. I have completed at least fifteen Mineral Resource estimates for precious metal projects over the past five years.
As a result of my experience and qualifications, I
am a Qualified Person as defined in National Instrument 43–101 Standards of Disclosure for Mineral Projects (“NI 43–101”).
(d) I last visited the mine on November 18th
to 19th, 2023.
(e) I am responsible for the preparation
of Sections 1.1 to 1.4, 1.6, 1.7, 1.9, 1.19 and 1.20; Sections 2 to 8; Section 10; Section 11; Sections 12.1 to 12.4, 12.7,
12.9 and 12.10; Section 14; Sections 25.1 to 25.3, 25.5, 25.14; Sections 26.1 and 26.3; and Section 27.
(f) I am not
independent of Fortuna Silver Mines Inc (“Fortuna”) as independence is described by Section 1.5 of NI 43–101.
I am a Fortuna employee.
(g) I have been an employee of Fortuna and
involved with the mine that is the subject of the Technical Report since May 2011.
(h) I have read NI 43–101 and Form 43-101F1,
and the sections of the Technical Report for which I am responsible have been prepared in compliance with that Instrument and Form.
(i) As of the effective date of the Technical
Report, to the best of my knowledge, information and belief, the sections of the Technical Report for which I am responsible contain all
scientific and technical information that is required to be disclosed to make the Technical Report not misleading.
Dated at Vancouver, BC, February 16, 2024.
[signed]
Eric Chapman, P. Geo.
December 31, 2023 | Page 209 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
CERTIFICATE of QUALIFIED PERSON
(a) I, Paul Weedon, Senior Vice President,
Exploration of Fortuna Silver Mines Inc. (“Fortuna”), 200 Burrard Street, Suite 650, Vancouver, BC V6C 3L6, Canada, do
hereby certify that:
(b) I am the co-author of the technical report
titled “Fortuna Silver Mines Inc. Caylloma Mine, Caylloma District, Peru” that has an effective date of December 31,
2023 (the “Technical Report”).
(c) I
graduated from Curtin University, Western Australia in December 1991 with a Bachelor of Science (Geology), and a Post Graduate Diploma
of Economic Geology (Distinction) and have practiced my profession continuously since 1991. I am a professional
Geologist and a Member of the Australian Institute of Geoscientists (MAIG #6001). I have worked across all roles of exploration and
mining geology, covering open-pit and underground gold mining in production
roles up to Technical Services Manager for large scale complex operations. My exploration experience extends from project generation through
to project development and corporate roles. These roles have been conducted across Australasia, Africa and Latin America. I have held
my current position of Senior Vice President – Exploration for Fortuna Silver Mines Inc since October 2021.
As a result of my experience and qualifications, I
am a Qualified Person as defined in National Instrument 43–101 Standards of Disclosure for Mineral Projects (“NI 43–101”).
(d) I last visited the mine on August 11th
to 13th, 2023.
(e) I am responsible for the preparation
of Section 1.5, 1.19 and 1.20; Section 2.3; Section 9; Section 12.4 and 12.10; Sections 25.3.1 and 25.14; Section 26.2;
and Section 27.
(f) I am not
independent of Fortuna Silver Mines Inc (“Fortuna”) as independence is described by Section 1.5 of NI 43–101.
I am a Fortuna employee.
(g) I have been an employee of Fortuna and
involved with the property that is the subject of the Technical Report since August 2021.
(h) I
have read NI 43–101 and Form 43-101F1, and the sections of the Technical Report for which I am responsible have been prepared
in compliance with that Instrument and Form.
(i) As
of the effective date of the Technical Report, to the best of my knowledge, information and belief, the sections of the Technical Report
for which I am responsible contain all scientific and technical information that is required to be disclosed to make the Technical Report
not misleading.
Dated at Perth, Australia, February 16, 2024.
[signed]
Paul Weedon, MAIG.
December 31, 2023 | Page 210 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
CERTIFICATE of QUALIFIED PERSON
(a) I, Raul Espinoza, Technical Services
Director of Fortuna Silver Mines Inc., 650-200 Burrard St, Vancouver, BC, V6C 3L6 Canada; do hereby certify that:
(b) I am the co-author of the technical report
titled “Fortuna Silver Mines Inc. Caylloma Mine, Caylloma District, Peru” that has an effective date of December 31,
2023 (the “Technical Report”).
(c) I graduated with a Bachelor of Science
Degree in Mining Engineering from Pontificia Universidad Catolica del Peru in 2001 and a Master of Engineering Science in Mining from
Curtin University, Australia, in 2015. I am a Fellow member of the Australasian Institute of Mining and Metallurgy and registered as a
Chartered Professional in Mining - FAusIMM (CP) with Membership No. 309581. I have practiced my profession for 22 years and been
preparing reserve estimates for approximately 11 years. My experience has covered operational, technical, managerial and consultancy functions
for open pit and underground mines from early-stage projects through to producing mines in Peru, Australia, Canada and Mexico.
As a result of my experience and qualifications, I
am a Qualified Person as defined in National Instrument 43–101 Standards of Disclosure for Mineral Projects (“NI 43–101”).
(d) I last visited the mine on November 18th
to 19th, 2023.
(e) I am responsible for the preparation
of Sections 1.7, 1.10, 1.11, 1.13 to 1.20; Section 2.3; Sections 12.8 and 12.10; Section 15; Sections16.1, 16.3 to 16.9; Sections
18.1, 18.2, 18.5 to 18.10; Sections 19 to 24; Sections 25.3.1, 25.6, 25.7, 25.9 to 25.14; Section 26.3; and Section 27.
(f) I am not independent of Fortuna Silver
Mines Inc (“Fortuna”) as independence is described by Section 1.5 of NI 43–101. I am a Fortuna employee.
(g) I have been an employee of Fortuna and
involved with the property that is the subject of the Technical Report since June 2022.
(h) I have read NI 43–101 and Form 43-101F1,
and the sections of the Technical Report for which I am responsible have been prepared in compliance with that Instrument and Form.
(i) As of the effective date of the Technical
Report, to the best of my knowledge, information and belief, the sections of the Technical Report for which I am responsible contain all
scientific and technical information that is required to be disclosed to make the Technical Report not misleading.
Dated at Vancouver, Canada, February 16, 2024.
[signed]
Raul Espinoza, FAusIMM (CP)
December 31, 2023 | Page 211 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
CERTIFICATE of QUALIFIED PERSON
(a) I, Mathieu F. Veillette, Director, Geotechnical,
Tailings and Water for Fortuna Silver Mines Inc., 650-200 Burrard St, Vancouver, BC, V6C 3L6 Canada; do hereby certify that:
(b) I am the co-author of the technical report
titled “Fortuna Silver Mines Inc. Caylloma Mine, Caylloma District, Peru” that has an effective date of December 31,
2023 (the “Technical Report”).
(c) I graduated with a Bachelor of Science
Degree in Civil Engineering in 1997 from Queen’s University and a Graduate Diploma Business Administration from Simon Fraser University
in 2018. I am a Professional Engineer of the Association of Professional Engineers and Geoscientists of the Province of British Columbia
(Registration No. 28397), also a Professional Engineer from Colorado (Registration No. 36639) and Alaska (Registration No. 10914).
I have practiced my profession continuously for 25 years in geotechnical and water management related fields. The majority of my experience
has been in the mining industry including international projects on all stages of the mining process from advanced exploration through
decommissioning and reclamation. My relevant work experience includes analysis, site investigations, design, construction, dewatering
and operation of open pits, waste dumps, heap leach pads, tailings storage facilities, process ponds, water dams, diversion structures
and other mining facilities in Canada (BC, QC), USA (CO, UT, NM, AZ, MT, AK, SC), México, Panamá, Venezuela, Guyana, Peru,
Chile, Argentina, Bolivia, Australia, New Zealand and New Caledonia.
As a result of my experience and qualifications, I
am a Qualified Person as defined in National Instrument 43–101 Standards of Disclosure for Mineral Projects (“NI 43–101”).
(d) I last visited the mine on May 30th
to 31st, 2023.
(e) I am responsible for the preparation
of Section 1.19; Section 2.3; Sections 12.5 and 12.10; Section 16.2; Section 18.3, 18.4 and 18.9; and Sections 25.3.1,
25.9 and 25.14.
(f) I am not independent of Fortuna Silver
Mines Inc (“Fortuna”) as independence is described by Section 1.5 of NI 43–101. I am a Fortuna employee.
(g) I have been an employee of Fortuna since
August 2022 and involved with the property that is the subject of the Technical Report since September 2022.
(h) I have read NI 43–101 and Form 43-101F1,
and the sections of the Technical Report for which I am responsible have been prepared in compliance with that Instrument and Form.
(i) As of the effective date of the Technical
Report, to the best of my knowledge, information and belief, the sections of the Technical Report for which I am responsible contain all
scientific and technical information that is required to be disclosed to make the Technical Report not misleading.
Dated at Vancouver, Canada, February 16, 2024.
[signed]
Mathieu F. Veillette, P.Eng.
December 31, 2023 | Page 212 of 213 |
| |
|
Fortuna Silver
Mines Inc.: Caylloma Mine, Caylloma District, Peru
Technical Report |
CERTIFICATE of QUALIFIED PERSON
(a) I, Patricia Gonzalez, Director of Operations
for Minera Cuzcatlan, Carretera Oaxaca-Huatulco km 48 San Jose del Progreso, Oaxaca CP 71550, Oaxaca - Mexico; do hereby certify that:
(b) I am the co-author of the technical report
titled “Fortuna Silver Mines Inc. Caylloma Mine, Caylloma District, Peru” that has an effective date of December 31,
2023 (the “Technical Report”).
(c) I graduated with a Bachelor of Science
Degree in Chemical Engineering from Universidad Autónoma de Nuevo León, México in 2000 and a Master of Business Administration
from Instituto Tecnologico y de Estudios Superiores de Monterrey, México in 2023. I have practiced my profession for 23 years and
covered research and metallurgical technical functions for 11 years for various mines and metals such as silver, gold, lead, zinc, and
copper. My experience has covered operational, technical managerial and consultancy functions in mines in México. I am a qualified
professional member registered in Mining and Metallurgical Society of America #1586QP.
As a result of my experience and qualifications, I
am a Qualified Person as defined in National Instrument 43–101 Standards of Disclosure for Mineral Projects (“NI 43–101”).
(d) I visited the mine on October 31st
to November 2nd, 2017.
(e) I am responsible for the preparation
of Sections 1.8, 1.12, 1.19 and 1.20; Section 2.3; Sections 12.6 and 12.10; Section 13; Section 17; Section 25.3.1,
25.4, 25.8 and 25.14; and Section 27.
(f) I am not independent of Fortuna Silver
Mines Inc (“Fortuna”) as independence is described by Section 1.5 of NI 43–101. I am a Minera Cuzcatlan employee.
(g) I have been an employee of Minera Cuzcatlan
since April 2011 and involved with the property that is the subject of the Technical Report since 2017.
(h) I have read NI 43–101 and Form 43-101F1,
and the sections of the Technical Report for which I am responsible have been prepared in compliance with that Instrument and Form.
(i) As of the effective date of the Technical
Report, to the best of my knowledge, information and belief, the sections of the Technical Report for which I am responsible contain all
scientific and technical information that is required to be disclosed to make the Technical Report not misleading.
Dated at Oaxaca, Mexico, February 16, 2024.
[signed]
Patricia Gonzalez,
MMSA QP
December 31, 2023 | Page 213 of 213 |
| |
Exhibit 99.2
CONSENT OF AUTHOR
February 16, 2024
VIA SEDAR+
British Columbia Securities Commission
Alberta Securities Commission
Financial and Consumer Affairs Authority of Saskatchewan
The Manitoba
Securities Commission
Ontario Securities Commission
Nova Scotia Securities Commission
Securities, Financial and Consumer Services Commission (New Brunswick)
Office of the Superintendent of Securities (Prince Edward Island)
Office of the Superintendent of Securities, Service Newfoundland and
Labrador
Autorité des marchés financiers
| Re: | Technical Report (the “Report”) entitled “Fortuna
Silver Mines Inc: Caylloma Mine, Caylloma District, Peru” with an effective date of December 31, 2023, prepared for Fortuna
Silver Mines Inc. (the “Company”) |
I, the undersigned, a Qualified Person as defined in National Instrument
43-101 – Standards of Disclosure for Mineral Projects, hereby consent to the public filing of the Report by the Company.
“Eric Chapman” |
|
Eric Chapman, P. Geo |
|
Exhibit 99.3
CONSENT OF AUTHOR
February 16, 2024
VIA SEDAR+
British Columbia Securities Commission
Alberta Securities Commission
Financial and Consumer Affairs Authority of Saskatchewan
The Manitoba
Securities Commission
Ontario Securities Commission
Nova Scotia Securities Commission
Securities, Financial and Consumer Services Commission (New Brunswick)
Office of the Superintendent of Securities (Prince Edward Island)
Office of the Superintendent of Securities, Service Newfoundland and
Labrador
Autorité des marchés financiers
| Re: | Technical Report (the “Report”) entitled “Fortuna
Silver Mines Inc: Caylloma Mine, Caylloma District, Peru” with an effective date of December 31, 2023, prepared for Fortuna
Silver Mines Inc. (the “Company”) |
I, the undersigned, a Qualified Person as defined in National Instrument
43-101 – Standards of Disclosure for Mineral Projects, hereby consent to the public filing of the Report by the Company.
“Paul Weedon” |
|
Paul Weedon, MAIG |
|
Exhibit 99.4
CONSENT OF AUTHOR
February 16, 2024
VIA SEDAR+
British Columbia Securities Commission
Alberta Securities Commission
Financial and Consumer Affairs Authority of Saskatchewan
The Manitoba
Securities Commission
Ontario Securities Commission
Nova Scotia Securities Commission
Securities, Financial and Consumer Services Commission (New Brunswick)
Office of the Superintendent of Securities (Prince Edward Island)
Office of the Superintendent of Securities, Service Newfoundland and
Labrador
Autorité des marchés financiers
| Re: | Technical Report (the “Report”) entitled “Fortuna
Silver Mines Inc: Caylloma Mine, Caylloma District, Peru” with an effective date of December 31, 2023, prepared for Fortuna
Silver Mines Inc. (the “Company”) |
I, the undersigned, a Qualified Person as defined in National Instrument
43-101 – Standards of Disclosure for Mineral Projects, hereby consent to the public filing of the Report by the Company.
“Raul Espinoza” |
|
Raul Espinoza, FAusIMM (CP) |
|
Exhibit 99.5
CONSENT OF AUTHOR
February 16, 2024
VIA SEDAR+
British Columbia Securities Commission
Alberta Securities Commission
Financial and Consumer Affairs Authority of Saskatchewan
The Manitoba
Securities Commission
Ontario Securities Commission
Nova Scotia Securities Commission
Securities, Financial and Consumer Services Commission (New Brunswick)
Office of the Superintendent of Securities (Prince Edward Island)
Office of the Superintendent of Securities, Service Newfoundland and
Labrador
Autorité des marchés financiers
| Re: | Technical Report (the “Report”) entitled “Fortuna
Silver Mines Inc: Caylloma Mine, Caylloma District, Peru” with an effective date of December 31, 2023, prepared for Fortuna
Silver Mines Inc. (the “Company”) |
I, the undersigned, a Qualified Person as defined in National Instrument
43-101 – Standards of Disclosure for Mineral Projects, hereby consent to the public filing of the Report by the Company.
“Mathieu Veillette” |
|
Mathieu Veillette, P.Eng., P.E. |
|
Exhibit 99.6
CONSENT OF AUTHOR
February 16, 2024
VIA SEDAR+
British Columbia Securities Commission
Alberta Securities Commission
Financial and Consumer Affairs Authority of Saskatchewan
The Manitoba
Securities Commission
Ontario Securities Commission
Nova Scotia Securities Commission
Securities, Financial and Consumer Services Commission (New Brunswick)
Office of the Superintendent of Securities (Prince Edward Island)
Office of the Superintendent of Securities, Service Newfoundland and
Labrador
Autorité des marchés financiers
| Re: | Technical Report (the “Report”) entitled “Fortuna
Silver Mines Inc: Caylloma Mine, Caylloma District, Peru” with an effective date of December 31, 2023, prepared for Fortuna
Silver Mines Inc. (the “Company”) |
I, the undersigned, a Qualified Person as defined in National Instrument
43-101 – Standards of Disclosure for Mineral Projects, hereby consent to the public filing of the Report by the Company.
“Patricia Gonzalez” |
|
Patricia Gonzalez, MMSA (QP) |
|
Grafico Azioni Fortuna Mining (NYSE:FSM)
Storico
Da Ott 2024 a Nov 2024
Grafico Azioni Fortuna Mining (NYSE:FSM)
Storico
Da Nov 2023 a Nov 2024