VANCOUVER, BRITISH COLUMBIA ("Roca" or "the Company") provides the following update on the exploration drilling activities at the MAX Molybdenum project. Drilling to date has identified extensions to known mineralization and results indicate the potential for additional porphyry systems at depth.

Five diamond drill holes totaling approximately 4,800 metres were completed. All holes were collared from a common underground drill station within the No.1 Adit, east of the deposit at a location that does not impede production mining.

The Company has now received assays from the first two holes and a portion of the third hole of this initial program. The results are summarized with the following brief geological interpretation. The remaining drill cores are yet to be sampled and assayed.

Hole MX07-01 was drilled at a -45 degree dip and on mine grid (Azimuth 230 degrees) to cross cut the lowest part of the known MAX deposit to test continuity of higher grade zones and to assess the mineralized alteration envelope below the limits of previous drilling. The hole returned an impressive intersection of 186m (610ft) grading 0.27% Mo (0.45% MoS2), including several higher grade intervals. This intersection occurs in an area of limited prior drilling which was previously assigned a lower grade, significantly expanding the high grade potential of the deposit at depth. Core sampling returned the following selected assay results;


----------------------------------------------------------
Drill Hole #  From (m)  To (m) Interval (m)   Mo(%) MoS2(%)
----------------------------------------------------------
MX07-01         228.0   414.0        186.0    0.27    0.45
----------------------------------------------------------
including       247.6   270.3         22.7    0.29    0.48
----------------------------------------------------------
including       276.0   294.0         18.0    0.40    0.66
----------------------------------------------------------
including       300.0   318.0         18.8    0.27    0.46
----------------------------------------------------------
including       323.8   336.0         12.2    0.68    1.13
----------------------------------------------------------
including       340.5   361.5         21.0    0.54    0.90
----------------------------------------------------------

Further, significant molybdenite (MoS2) mineralization occurred throughout the remainder of the hole, as shown in the following selected results indicating that the alteration/mineralization envelope continues at depth.


----------------------------------------------------------
Drill Hole #  From (m)  To (m) Interval (m)   Mo(%) MoS2(%)
----------------------------------------------------------
MX07-01         441.0   471.0         30.0    0.12    0.21
----------------------------------------------------------
                486.0   558.0         72.0    0.13    0.22
----------------------------------------------------------
including       505.1   513.0          7.9    0.33    0.55
----------------------------------------------------------

Relative to the trend of the MAX Mine HG production zone, the true width of the drill intervals is estimated to be 65% of the intervals shown above. Additional drilling to explore this extension of the deposit will be collared from new locations within the mine workings.

Hole MX07-02 was drilled at a -62 degree dip oriented on the mine grid, below the SE flank of the MAX deposit and returned significant intercepts shown below;


----------------------------------------------------------
Drill Hole #  From (m)  To (m) Interval (m)   Mo(%) MoS2(%)
----------------------------------------------------------
MX07-02          33.0    51.0         18.0    0.11    0.19
----------------------------------------------------------
                176.4   219.2         42.8    0.10    0.17
----------------------------------------------------------
                497.0   528.0         31.0    0.08    0.13
----------------------------------------------------------

Relative to the trend of the HG zone, true width of the intervals shown above is estimated to be 43% of intersected lengths in MX07-02.

Drill Hole MX07-03 was drilled at -74 degree dip from the same collar as MX07-01, and -02 however at a different Azimuth (210 degrees) and intersected a number of high grade feeder structures all hosted within low grade mineralization, including the following selected results;


----------------------------------------------------------
Drill Hole #  From (m)  To (m) Interval (m)   Mo(%) MoS2(%)
----------------------------------------------------------
MX07-03         125.7   135.0          9.3    0.13    0.21
----------------------------------------------------------
                151.0   156.0          5.0    1.11    1.86
----------------------------------------------------------
                404.9   410.3          5.4    0.59    0.99
----------------------------------------------------------
                419.8   428.6          8.8    0.88    1.47
----------------------------------------------------------
                511.0   519.3          8.3    0.15    0.25
----------------------------------------------------------
                536.9   543.6          6.7    0.23    0.38
----------------------------------------------------------

Assay results have been completed for only the upper 540m of this 1500m deep hole. Relative to the trend of the HG zone, true width is estimated to be 21% of intersected lengths shown above.

The significance of the intercepts in MX07-03 is that they occur north of Mine Section 8 and above an area of Mine Sections 6 and 7 which has not been drilled previously. These intervals suggest a deep target, the upper fingers of which may be represented by these higher grade structures. Like other targets identified, this area must be drilled from a station on the West side of the MAX deposit, in the area of current mine development, in order to properly orient drilling.

A 15cm fragment of intrusive rock, with chilled margins and containing well mineralized (estimated greater than 0.5% MoS2) disseminated molybdenite, was observed within a younger, non-mineralized leucocratic quartz feldspar porphyry in the upper part of drill hole MX07-03. The origin of this mineralized fragment may be a separate, as yet undiscovered, molybdenite deposit at depth, however this is not yet confirmed by thin-section petrographic assessment. A possibly similar, weakly mineralized porphyry phase also appears to separate the two high grade molybdenite intervals in this hole between depths of 405 and 428.6 metres.

All three holes have intersected strong hydrothermal alteration and textural variations within intrusive rocks that may be indicative of multiple phases of intrusion which are spatially associated with molybdenite mineralization. Further evidence of this includes the identification of multiple episodes of molybdenite mineralization based on the cross cutting relationships of various quartz-MoS2 veinlets seen in drill core. Additional research, including petrographic analyses, is planned to fully document these features but these early indications of a multiple phase intrusive and mineralizing event provide compelling evidence for molybdenite mineralization at depth below the MAX deposit and further exploratory work is warranted.

Assay results for the remainder of MX07-03 and MX07-04/05 will be reported once they have been completed.

Sampling and logging of the drill holes was conducted under the supervision of Paul Ransom, P.Geo., a qualified person as defined by NI43-101. The sampling program included quality control procedures, including the use of blanks and duplicates in addition to internal quality control at the assay laboratory, ACME Analytical of Vancouver, BC, an ISO 9001:2000 accredited laboratory.

Mr. Scott E. Broughton, P.Eng. is the Qualified Person responsible for the preparation of this news release.

ROCA MINES INC.

Scott E. Broughton, P.Eng. - President & CEO

The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release.

Contacts: Roca Mines Inc. Doug Fosbrooke Investor Relations (604) 684-2900 (604) 684-2902 (FAX) Email: info@rocamines.com Website: www.rocamines.com

Grafico Azioni ROK Resources (TSXV:ROK)
Storico
Da Mag 2024 a Giu 2024 Clicca qui per i Grafici di ROK Resources
Grafico Azioni ROK Resources (TSXV:ROK)
Storico
Da Giu 2023 a Giu 2024 Clicca qui per i Grafici di ROK Resources