The information communicated within
this announcement is deemed to constitute inside information as
stipulated under the Market Abuse Regulations (EU) No. 596/2014
which is part of UK law by virtue of the European
Union (withdrawal) Act 2018. Upon the
publication of this announcement, this inside information is now
considered to be in the public domain.
12
March 2025
Clean Power Hydrogen
plc
("CPH2", the "Company" or the
"Group")
Level 2 of Site Acceptance
Test Completed
CPH2, the UK-based green hydrogen
technology and manufacturing company that has developed the
IP-protected Membrane-Free Electrolyser ("MFE"), is pleased to
announce that Level 2 of the Site Acceptance Test ("SAT") for its
MFE110 electrolyser at Northern Ireland Water's site in Belfast has
been successfully completed.
Following the successful Level 1 SAT
announced in February, the Level 2 SAT verified the functionality
of the MFE110 electrolyser and included end-to-end checks of
control loops, electrical and mechanical plant, instrument
calibration, and electrical installations in accordance with
requirements. The test also included functional testing of
Programmable Logic Control functions on the physical system to
ensure correct operation in line with the specified parameters. The
successful test was undertaken by Lagan MEICA Limited ("Lagan"),
the Contractor to Northern Ireland Water, and was overseen by
engineering design specialists, Arup.
Final commissioning of the MFE110
unit has now started with achievement of the final Level 3 SAT
expected in Q2 2025, marking the first time CPH2's scaled MFE
technology is fully operational and functioning at a customer's
site.
Jon
Duffy, CEO of CPH2 commented:
"We are delighted by the progress made at Northern Ireland
Water's site as the MFE110 undergoes Site Acceptance Testing.
Following the successful Level 2 SAT test, the team is making
significant strides toward achieving first production of hydrogen
and oxygen on a customer's site using MFE scaled technology. We
look forward to the final stage of the process, culminating in what
will be a proud moment for both the CPH2 and Northern Ireland Water
teams."
ENDS
For
more information, please contact:
Clean Power Hydrogen plc
|
via Camarco
|
Jon Duffy, Chief Executive
Officer
James Hobson, Chief Financial
Officer
|
|
|
|
Cavendish Capital Markets Limited - NOMAD &
Broker
|
|
Neil McDonald
|
+44 (0)131 220 9771
|
Peter Lynch
|
+44 (0)131 220 9772
|
Adam Rae
|
+44 (0)131 220 9778
|
|
|
Camarco PR
|
+ 44(0) 20 3 757 4980
|
Billy Clegg
|
|
Owen Roberts
|
|
Kirsty Duff
|
|
To find out more, please
visit: https://www.cph2.com
Overview of CPH2
CPH2 is the holding company of Clean
Power Hydrogen Group Limited which has almost a decade of dedicated
research and product development experience. This experience has
resulted in the creation of simple, safe and sustainable technology
which is designed to deliver a modular solution to the hydrogen
production market in a cost-effective, scalable, reliable and
long-lasting manner. The Group's strategic objective is to deliver
the lowest LCOH in the market in relation to the production of
green hydrogen. CPH2 is listed on the AIM market and trades under
the ticker LON:CPH2.