UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
Report of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16 of
the Securities Exchange Act of 1934
For the month of September 2024
Commission File Number 001-42015
Solaris Resources Inc.
(Translation of registrant’s name into English)
Suite 555, 999 Canada Place
Vancouver, British Columbia, Canada V6C 3E1
(Address of principal executive offices)
Indicate by check mark whether the registrant
files or will file annual reports under cover of Form 20-F or Form 40F:
Form 20-F ☐ Form 40-F ☒
The following documents are being submitted herewith:
Cautionary Note to U.S. Investors Concerning Estimates of Measured,
Indicated and Inferred Resources
The Mineral Resource Estimate Update NI
43-101 Technical Report Warintza Project, Ecuador with an effective date of July 1, 2024, included as Exhibit 99.1 hereto (the “Technical
Report”), has been prepared and disclosed in accordance with Canadian National Instrument 43-101 — Standards of Disclosure
for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy and Petroleum classification
system. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an
issuer makes of scientific and technical information concerning mineral projects.
Canadian public disclosure standards, including
NI 43-101, differ from the requirements of the United States Securities and Exchange Commission (the “SEC”), and mineral reserve
and mineral resource information included in the Technical Report may not be comparable to similar information disclosed by U.S. companies.
In particular, and without limiting the generality of the foregoing, the Technical Report uses the terms “measured mineral resources,”
“indicated mineral resources” and “inferred mineral resources” as defined under Canadian regulations. The
requirements of NI 43-101 for the identification of “mineral reserves” are also not the same as those of the SEC, and reserves
reported by the Registrant in compliance with NI 43-101 may not qualify as “reserves” under SEC standards. While the SEC has
adopted amendments to its disclosure rules to modernize the mineral property disclosure requirements for issuers whose securities are
registered with the SEC under the U.S. Securities Exchange Act of 1934, as amended, including amendments to certain definitions to be
substantially similar to the corresponding standards under NI 43-101, there are still differences in these standards and definitions.
U.S. investors are cautioned not to assume that any part of a “measured mineral resource” or “indicated mineral resource”
will ever be converted into a “mineral reserve”. U.S. investors should also understand that “inferred mineral resources”
have a great amount of uncertainty as to their existence and as to their economic and legal feasibility. It cannot be assumed that all
or any part of “inferred mineral resources” exist, are economically or legally mineable or will ever be upgraded to a higher
category. Under Canadian rules, estimated “inferred mineral resources” may not form the basis of feasibility or pre-feasibility
studies except in rare cases. Information concerning mineral deposits set forth in the Technical Report may not be comparable with information
made public by companies that report in accordance with U.S. standards.
SIGNATURES
Pursuant to the requirements of the Securities
Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
|
Solaris Resources Inc. |
|
(Registrant) |
|
|
Date: September 5, 2024 |
By: |
/s/ Tom Ladner |
|
Name: |
Tom Ladner |
|
Title: |
VP Legal |
2
Exhibit
99.1
MINERAL RESOURCE ESTIMATE
UPDATE
NI 43-101 Technical Report
Warintza Project, Ecuador
Effective Date:
July 1, 2024
Prepared for:
Solaris Resources Inc.
Suite
555, 999 Canada Place
Vancouver, BC V6C 3E1
|
Qualified Person |
Company |
|
Mario E. Rossi |
GeoSystems International, Inc. |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Certificate of Qualified Person
I, Mario E. Rossi, do hereby certify that:
| 1. | I am currently employed as President and Principal Geostatistician by GeoSystems International, Inc. 2385
NW Executive Center Dr., Suite 100, Boca Raton, Florida, 33431, USA. |
| 2. | This certificate applies to the report titled “Mineral Resource Estimate Update - NI 43-101 Technical
Report, Warintza Project, Ecuador”, with an effective date of July 1, 2024 (the “Report”). |
| 3. | I am a graduate of the Universidad Nacional de San Juan, Argentina, with a Mining Engineering Degree in
1985. I am also a graduate of Stanford University, California, USA, with a MSc in Geostatistics in 1988. I have been practicing my profession
since 1985, and my relevant experience for the purpose of this Report includes work in resource estimation of several Cu-Mo-Au open-pit
mines and development projects. I have worked on and been involved with National Instrument 43-101 studies and reports on several projects,
including several porphyry copper projects in Chile, Perú, and Argentina, among others. |
| 4. | I am a Registered Member of the Society of Mining Engineers (SME) of the USA, RM# 2770000. |
| 5. | I am also a Fellow with the Australasian Institute of Mining and Metallurgy (AusIMM), Fellow# 205464. |
| 6. | I visited the Warintza Project in Ecuador from October 27 to 29, 2021, including the Project site, Solaris
offices in Patuca and Macas (Morona Santiago Province), the core logging and storage facilities in Quito, and ALS’s sample preparation
laboratory, also in Quito. |
| 7. | I am responsible for the overall content of this Report. |
| 8. | I am the author and QP of the previous Technical Report, entitled “NI 43-101 Technical Report for
the Warintza Project, Ecuador (Amended)”, with an effective date of April 1, 2022. |
| 9. | I am independent of Solaris Resources Inc. as defined in Section 1.5 of National Instrument 43-101. |
| 10. | I have read the definition of “Qualified Person” set out in National Instrument 43-101 and
certify that by reason of education, experience, independence, and affiliation with a professional association, I meet the requirements
of a Qualified Person as defined in National Instrument 43-101. |
| 11. | At the effective date of the Report, to the best of my knowledge, information, and belief, this Report
contains all the scientific and technical information that is required to be disclosed to make the Report not misleading. |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 12. | I have read the Report and National Instrument 43-101 - Standards for Disclosure of Mineral Projects
and Form 43-101F1. This Report has been prepared in compliance with that instrument and form. |
Dated this September 5, 2024 in Boca Raton, Florida, USA.
“Signed and Sealed”
Mario E. Rossi, RM-SME; Fellow, AusIMM; GeoSystems International, Inc.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table of Contents
1.0 |
Summary |
16 |
1.1 |
Introduction |
16 |
1.2 |
Property Description and Ownership |
16 |
1.3 |
Geology and Mineralization |
17 |
1.4 |
Mineral Resource Estimate |
17 |
1.5 |
Conclusions and Recommendations |
20 |
2.0 |
Introduction |
23 |
2.1 |
Terms of Reference |
23 |
2.2 |
Units, Currency, and Abbreviations |
23 |
3.0 |
Reliance on Other Experts |
29 |
3.1 |
Mineral Tenure, Surface Rights, Agreements, and Environmental
Information |
29 |
4.0 |
Property Description and Location |
30 |
4.1 |
Project Location and Area |
30 |
4.2 |
Licenses and Mineral Tenure |
31 |
4.3 |
Royalties |
31 |
4.4 |
Mineral Rights in Ecuador |
31 |
4.5 |
Environmental Obligations |
32 |
4.6 |
Permits |
33 |
|
Mining Title |
33 |
|
Environmental Registry |
33 |
|
Certificate of Intersection |
33 |
|
Forestry Permit |
33 |
|
Hazardous Waste Generator Registration |
33 |
|
Biotic Collection Permit |
33 |
|
Certification of Non-Affectation of Water Sources |
34 |
|
Permit to Use Water for Human Consumption |
34 |
|
Permit to Use Water for Industrial Use |
34 |
|
Sworn Declaration of Non-Impact to Infrastructure |
34 |
|
Annual Exploration Report |
34 |
|
Patent Payments |
34 |
|
Fuel Permit |
34 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
|
Mineral Transportation Permit |
34 |
|
Archeological Investigation Authorization |
35 |
4.7 |
Environmental Licensing for Advanced Exploration Phase |
35 |
5.0 |
Accesibility, Climate, Local Resources, Infrastructure, and Physiography |
36 |
5.1 |
Topography, Elevation, and Vegetation |
36 |
5.2 |
Access |
37 |
5.3 |
Proximity to Population Centre and Transport |
37 |
5.4 |
Infrastructure and Personnel |
37 |
6.0 |
History |
41 |
6.1 |
Property Ownership Changes |
41 |
6.2 |
Exploration by Previous Owners |
42 |
6.2.1 |
Surface Geochemistry |
42 |
6.2.2 |
Geophysics |
44 |
6.3 |
Historic Mineral Resource Estimates |
44 |
6.3.1 |
Mineral Resource Estimate (Ronning and Ristorcelli, 2006) |
45 |
6.3.2 |
Mineral Resource Estimate (Ronning and Ristorcelli, 2018) |
46 |
6.4 |
Historical Production |
47 |
7.0 |
Geological Setting and Mineralization |
48 |
7.1 |
Regional Geology |
48 |
7.1.1 |
Subandean and Cordillera del Cóndor Geology |
48 |
7.1.2 |
Regional Metallogeny |
50 |
7.2 |
Geologic Features of the Warintza Cluster |
51 |
7.3 |
Warintza Central |
52 |
7.4 |
Warintza East |
57 |
8.0 |
Deposit Types |
59 |
9.0 |
Exploration |
60 |
9.1 |
Introduction |
60 |
9.2 |
Geochemical Sampling |
60 |
9.3 |
Geophysical Surveys |
67 |
10.0 |
Drilling |
68 |
10.1 |
Drilling Procedures |
75 |
10.2 |
Core Handling Procedures |
76 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
11.0 |
Sample Preparation, Analyses, and Security |
78 |
11.1 |
Sample Preparation and Analyses |
80 |
11.1.1 |
2000-2001 Drilling Campaign |
80 |
11.1.2 |
2020-2021 Drilling Campaign |
81 |
11.1.3 |
2022-2024 Drilling Campaign Sampling Procedures |
82 |
11.2 |
Sample Security |
83 |
11.2.1 |
2000-2001 Drilling Campaign |
83 |
11.2.2 |
2020-2021 Drilling Campaign |
83 |
11.2.3 |
2022-2024 Drilling Campaign |
84 |
11.3 |
Quality Control and Quality Assurance Program |
85 |
11.3.1 |
2000-2001 Drilling Campaign |
85 |
11.3.2 |
2020-2021 Drilling Campaign |
86 |
11.3.3 |
2022-2024 Drilling Campaign |
92 |
11.4 |
Data Adequacy |
103 |
11.4.1 |
2000-2001 Drilling Campaign |
103 |
11.4.2 |
2020-2021 Drilling Campaign |
103 |
11.4.3 |
2022-2024 Drilling Campaign |
103 |
11.5 |
Author’s Opinion |
104 |
12.0 |
Data Verification |
105 |
12.1 |
Drill Hole Location Verification |
105 |
12.1.1 |
2020-2021 Drilling Campaign |
105 |
12.1.2 |
2022-2024 Drilling Campaign |
106 |
12.2 |
Geological Data Verification and Interpretation |
106 |
12.2.1 |
2000-2001 Drilling Campaign |
106 |
12.2.2 |
2020-2021 Drilling Campaign |
107 |
12.2.3 |
2022-2024 Drilling Campaign |
107 |
12.3 |
Assay Verification |
109 |
12.3.1 |
2000-2001 Drilling Campaign |
109 |
12.3.2 |
2020-2021 Drilling Campaign |
109 |
12.3.3 |
2022-2024 Drilling Campaign |
110 |
12.4 |
Data Adequacy |
111 |
12.4.1 |
2020-2021 Drilling Campaign |
111 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
12.4.2 |
2022-2024 Drilling Campaign |
111 |
13.0 |
Mineral Processing and Metallurgical Testing |
112 |
13.1 |
Resource Development, Inc., Test Work |
112 |
13.2 |
Current Testing |
115 |
13.2.1 |
Mineralogy / Comminution Test Work Completed |
115 |
13.3 |
Planned Metallurgical Test Work Scope (New Samples) |
121 |
13.4 |
Sample Representativity |
122 |
14.0 |
Mineral Resource Estimates |
123 |
14.1 |
Database |
123 |
14.2 |
Exploratory Data Analysis |
124 |
14.2.1 |
In-situ Bulk Density |
126 |
14.3 |
Geological Models and Estimation Domains |
126 |
14.3.1 |
Additional Interpreted Volumes |
136 |
14.3.2 |
Estimation Domain Definition |
137 |
14.3.2 |
In-situ Bulk Density Domains |
144 |
14.4 |
Outlier Grade Control |
146 |
14.5 |
Composites |
148 |
14.6 |
Spatial Clustering |
150 |
14.7 |
Contact Analysis |
151 |
14.8 |
Variography |
153 |
14.9 |
Block Model and Grade Estimation |
158 |
14.10 |
Validation |
164 |
14.10.1 |
Visual Validation |
164 |
14.11 |
Statistical Validation |
165 |
14.12 |
Classification of Mineral Resources |
168 |
14.13 |
Reasonable Prospects of Eventual Economic Extraction |
171 |
14.14 |
Mineral Resource Inventory |
172 |
14.15 |
Factors That May Affect the Mineral Resource Estimate |
175 |
15.0 |
Mineral Reserve Estimate |
176 |
16.0 |
Mining Methods |
177 |
17.0 |
RECOVERY Methods |
178 |
18.0 |
Project Infrastructure |
179 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
19.0 |
Market Studies and Contracts |
180 |
20.0 |
Environmental Studies, Permitting & Social OR Community Impact |
181 |
21.0 |
Capital and Operating Costs |
182 |
22.0 |
Economic Analysis |
183 |
23.0 |
Adjacent Properties |
184 |
24.0 |
Other Relevant Informtion |
187 |
25.0 |
Interpretation and Conclusions |
188 |
25.1 |
Risks and Uncertainties |
188 |
25.1.1 |
Risks and Uncertainties Affecting the Resource Estimate |
188 |
25.1.2 |
Risks and Uncertainties Affecting Potential Additional Discoveries |
189 |
26.0 |
Recommendations |
190 |
26.1 |
Drilling Program |
190 |
26.2 |
Pre-Feasibility Study |
190 |
27.0 |
REFERENCES |
191 |
27.1 |
Additional Internal Documentation and References |
193 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
List of Tables
Table
1: Warintza Mineral Resource at 0.25 % CuEq Cut-Off Grade, Effective July 1, 2024 |
18 |
Table
2: Warintza Mineralization Cut-Off Grade Sensitivity |
19 |
Table
3: Abbreviations and Measurement Units |
24 |
Table
4: Warintza Concessions |
31 |
Table
5: Exploration and Exploitation Phases |
32 |
Table
6: Summary of Surface Samples from the Warintza Property |
42 |
Table
7: Warintza Central Deposit Inferred Mineral Resource Estimate – Primary Zone |
45 |
Table
8: Warintza Central Deposit Inferred Mineral Resource Estimate – Enriched Zone |
46 |
Table
9: Warintza Central Deposit Inferred Mineral Resource Estimate – Total |
46 |
Table
10: Warintza Central Deposit Inferred Mineral Resource Estimate – Primary Zone |
47 |
Table
11: Warintza Central Deposit Inferred Mineral Resource Estimate – Enriched Zone |
47 |
Table
12: Warintza Central Deposit Inferred Mineral Resource Estimate – Total |
47 |
Table
15: Historical Sampling |
60 |
Table
16: Recent Surface Sampling |
62 |
Table
17: Summary of Drilled Meters by Year |
68 |
Table
18: 2020 to 2024 Assay Results |
68 |
Table
19: Collar Locations |
71 |
Table
20: Sample Composite Lengths Applied to Sample Based on Mineralized Zone Character |
80 |
Table
21: Table of Assays and QA/QC Samples Submitted |
80 |
Table
22: Sample Preparation Protocol from ALS Chemex Quito |
82 |
Table
23: Summary of the overall QA/QC Program to date for Warintza |
85 |
Table
24: Acceptance Criteria for Duplicates (Precision) |
87 |
Table
25: Acceptance Criteria for CRMs (Accuracy) |
87 |
Table
26: Acceptance Criteria for Blanks (Contamination) |
87 |
Table
27: Differences Between Reference Materials Expected, Measured Value and Overall Bias Condition (Source: GSI 2022) |
91 |
Table
28: Differences Between Reference Materials Expected, Measured Value and overall bias. Source: GSI 2024. |
97 |
Table
29: Comparison of Re-Assays (Ck) to Original (Or) Assay Data |
110 |
Table
30: Head Grades of Warintza Metallurgical Sample |
112 |
Table
31: Calculated Bond’s Work Index for Warintza Sample |
113 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table
32: Grind Time Requirements for Targeted Grind Size |
113 |
Table
33: Summary of Rougher Flotation Results |
114 |
Table
34: Second-Cleaner Concentrate Product Quality |
115 |
Table
35: QEMSCAN Bulk Mineralogy |
116 |
Table
36: QEMSCAN Cu Deportment |
117 |
Table
37: Cu Sulfide Liberation (Distribution % of Cu Sulfides) |
118 |
Table
38: Cu Sulfide Liberation (Distribution % of Pyrite) |
118 |
Table
39: Pyrite Liberation (Distribution % of Pyrite) |
119 |
Table
40: Head Assays for Samples and Master Composite |
119 |
Table
41: Detection Limits for Elements Assayed and Not Listed |
120 |
Table
42: Summarized SMC Test Results |
120 |
Table
43: Bond Ball Mill Work Index (BWi) Summarized Test Results |
121 |
Table
44: Ball Mill Work Index (BWi) Hardness/Resistance to Breakage Classification Ranges |
121 |
Table
45: Summary Warintza Drill Database |
123 |
Table
46: Lithology Codes Used in Modelling |
127 |
Table
47: Alteration Codes Used in Modelling |
127 |
Table
48: Mineralization Zone Codes Used in Modelling |
127 |
Table
49: Warintza Cu Estimation Domains |
141 |
Table
50: Warintza Mo Estimation Domains |
141 |
Table
51: Warintza Au Estimation Domains |
142 |
Table
52: Warintza In-situ Bulk Density Estimation Domains |
145 |
Table
53: Summary Outlier Restriction by Domain, Cu |
147 |
Table
54: Summary Outlier Restriction by Domain, Mo |
148 |
Table
55: Summary Outlier Restriction by Domain, Au |
148 |
Table
56: Cu Correlograms Models by Domain |
155 |
Table
57: Mo Correlograms Models by Domain |
156 |
Table
58: Au Correlograms Models by Domain |
157 |
Table
59: Cu Estimation Plans by Domain |
159 |
Table
60: Mo Estimation Plans by Domain |
160 |
Table
61: Au Estimation Plans by Domain |
161 |
Table
62: Values Used for Assignment When Not Estimated, Only Within The Drill Hole Influence Envelope, by Metal and Domain. |
162 |
Table
63: In-situ Bulk Density Estimation Plans by Domain |
163 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 64: In-situ Bulk Density
Assigned Values by Domain (after discarding data outside ±3*Standard Deviation) |
163 |
Table 65: Global Means by
Domain, Nearest-Neighbour Model, and Estimated Grades, Cu |
166 |
Table 66: Global Means by
Domain, Nearest-Neighbour Model and Estimated Grades, Mo |
166 |
Table 67: Global means by
Domain, Nearest-Neighbor Model, and Estimated Grades, Au |
167 |
Table 68: Summary Average
Distances (Closest; Farthest; and Average) of all 2m Composites Used to Estimate Blocks, by Resource Class. |
170 |
Table 69: Warintza Conceptual
Resource Pit Parameters |
171 |
Table 70: Warintza Mineral
Resource at 0.25 % CuEq Cut-Off Grade, Effective July 1, 2024 |
173 |
Table 71: Warintza MRE’s
Cut-Off Grade Sensitivity |
174 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
List of Figures
Figure
1: Location Map of the Warintza Project |
30 |
Figure
2: Monthly Average Rainfall, Warintza Project |
36 |
Figure
3: Regional Infrastructure Map |
39 |
Figure
4: Unsealed Airstrip Access at Warintza Village |
40 |
Figure
5: Property Soil and Rock Geochemistry Summarizing Cu Results |
43 |
Figure
6: Property Soil and Rock Geochemistry Summarizing Mo Results |
44 |
Figure
7: Location of the Warintza Cluster Within Zamora Batholith |
49 |
Figure
8: Simplified Geologic Map of Warintza Cluster |
50 |
Figure
9: Simplified Geologic Cross Section of Warintza Cluster |
52 |
Figure
10: Simplified Geologic Cross Section Through Warintza Central |
53 |
Figure
11: Historical Cu Soil and Rock Geochemistry Map of Warintza Cluster |
61 |
Figure
12: Historical Mo Soil and Rock Geochemistry Map of Warintza Cluster |
61 |
Figure
13: Warintza Soil and Stream Sediments Cu Anomalies |
63 |
Figure
14: Warintza Soil and Stream Sediments Mo Anomalies |
63 |
Figure
15: Caya Stream Sediment Anomalies |
64 |
Figure
16: Caya and Mateo Au in Soil Samples Geochemistry |
65 |
Figure
17: Caya and Mateo As in Soil Samples Geochemistry |
65 |
Figure
18: Caya and Mateo in Sb Soil Samples Geochemistry |
66 |
Figure
19: Caya and Mateo in Cu Soil Samples Geochemistry |
66 |
Figure
20: Caya and Mateo in Mo Soil Samples Geochemistry |
67 |
Figure
21: Drilling Completed |
76 |
Figure
22: Warintza Project, Central Core Shed Facilities in Quito, Ecuador |
78 |
Figure
23: Warintza Project. Lima Office, Peru (left) and Central Core Shed Facilities (right) in Quito, Ecuador. Source: GSI (2024). |
79 |
Figure
24: Warintza Project. Central Core Shed Facilities in Quito, Ecuador. Source: GSI (2024). |
79 |
Figure
25: Laboratory Sample Reception and Preparation - ALS Quito, Ecuador |
81 |
Figure
26: Sample Boxes Waiting to be Picked Up from Drilling Platform by Helicopter |
83 |
Figure
27: Samples in Patuca for Transport to Quito-Core Shed Facilities |
84 |
Figure
28: Samples Arrival to the ALS Laboratory - Quito, Ecuador |
84 |
Figure
29: ALS Chemex Contamination Chart Control for Au, Cu and Mo. (PB=pulp blank, CB= coarse blank) |
88 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 30: Control Charts
of Reference Materials for Au, Cu, and Mo - ALS Chemex Laboratory |
89 |
Figure 31: Control
Charts of Reference Materials for Au, Cu, and Mo - Bureau Veritas Laboratory |
90 |
Figure 32: ALS Chemex vs Bureau
Veritas Contamination Chart Control for Au, Cu and Mo (PB= pulp blank) |
93 |
Figure 33: ALS Chemex Contamination
Chart Control for Au, Cu and Mo (CB= coarse blank) |
94 |
Figure 34: ALS Chemex Contamination
Chart Control for Au, Cu and Mo (PB=pulp blank) |
95 |
Figure 35: ALS Chemex. Certificate
Reference Materials for Cu and Mo |
96 |
Figure 36: ALS Chemex vs Bureau
Veritas. Certificate Reference Materials for Cu and Mo. |
97 |
Figure 37: Certified Cu and
Mo reference materials used. ALS Chemex results are shown. Overall Bias Condition is Good. |
98 |
Figure 38: Field Duplicate
Control Charts Au – ALS Chemex Laboratory |
99 |
Figure 39: Field Duplicate
Control Charts Cu – ALS Chemex Laboratory |
100 |
Figure 40: Field Duplicate
Control Charts Mo – ALS Chemex Laboratory |
100 |
Figure 41: Pulp Duplicate
Control Charts Au – Bureau Veritas Laboratory |
101 |
Figure 42: Pulp Duplicate
Control Charts Cu – Bureau Veritas Laboratory |
102 |
Figure 43: Pulp Duplicate
Control Charts Mo – Bureau Veritas Laboratory |
102 |
Figure 44: Drilling Platform
PE-01, Drill Hole SLSE-08 |
106 |
Figure 45: Meterage Control
and Geology, Drill Hole SLSE-08 |
107 |
Figure 46: Review of Holes
Drilled in 2022-2023, Quito, 2024 |
108 |
Figure 47: Update of Re-Logged
Drillings and Review of 3D Models, Quito, 2024 |
108 |
Figure 48: Pulp Samples Selected
for Independent Re-Assaying |
110 |
Figure 49: QEMSCAN Cu Deportment |
117 |
Figure 50: Plan View of Warintza
Drill Holes |
123 |
Figure 51: Warintza Global
Histogram and Basic Statistics, Cu (%) |
124 |
Figure 52: Warintza Global
Histogram and Basic Statistics, Mo (%) |
125 |
Figure 53: Warintza Global
Histogram and Basic Statistics, Au (g/t) |
125 |
Figure 54: Box and Whisker
Plot, In-situ Bulk Density Values by Lithology |
126 |
Figure 55: Cross Section 9,648,060N
Showing Lithology, Final Interpreted Model |
128 |
Figure 56: Box and Whisker
Plot, Cu Grade by Lithology Codes |
129 |
Figure 57: Box and Whisker
Plots, Mo (L) and Au (R) Grades by Lithology Codes |
130 |
Figure 58: Cross Section 9,648,060N
Showing Alteration, Final Interpreted Model |
131 |
Figure 59: Box and Whisker
Plot, Cu Grade by Alteration Codes |
132 |
Figure 60: Box and Whisker
Plots, Mo (L) and Au (R) Grades by Alteration Codes |
133 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 61: Cross
Section 9,648,060N Showing Mineralization Zones (Minzone), Final Interpreted Model |
134 |
Figure 62: Box and Whisker
Plot, Cu Grade by Minzone Codes |
135 |
Figure 63: Box and Whisker
Plots, Au (left) and Mo (right) Grades by Minzone Codes |
136 |
Figure 64: 3D View to the
NNW Showing the 0.1% Total Cu Grade Shell (Red); Drill Hole Influence Envelope (Magenta); and the 10% Sulfate (Anhydrite/Gypsum)
Grade Shell (Yellow) |
137 |
Figure 65: Q-Q Plot, Cu, Example
of two lithologies that are grouped |
139 |
Figure 66: Q-Q Plot, Cu, Example
of two preliminary domains that cannot be grouped |
139 |
Figure 67: Cross Section 9,648,060N
Showing Cu Estimation Domains |
140 |
Figure 68: Box and Whisker
Plots with summary statistics, Cu Grades by Cu Estimation Domains |
142 |
Figure 69: Box and Whisker
Plots with summary statistics, Mo Grades by Mo Estimation Domains |
143 |
Figure 70: Box and Whisker
Plots with summary statistics, Au Grades by Au Estimation Domains |
144 |
Figure 71: Box and Whisker
Plots, Bulk Density Domains |
145 |
Figure 72: Probability Plot,
Cu, Estimation Domain 5, Warintza |
147 |
Figure 73: Conditional Cu
Grade Means by Composite Length (Blue), |
149 |
Figure 74: Histogram and Basic
Statistics, Cu, Domain 8, 2 m Composites |
149 |
Figure 75: Probability Plot,
Cu, Domain 8, 2 m Composites |
150 |
Figure 76: Declustered Histogram
and Basic Statistics, Cu, Domain 8, 2 m Composites |
151 |
Figure 77: Contact Profile,
Cu, Domains 8-9 Contact |
152 |
Figure 78: Contact Matrix,
Cu. In Red, Hard Contacts (No Sharing); In Green, Semi-Soft Contact (Share Only in The First Pass). |
152 |
Figure 79: Contact Matrix,
Mo. In Red, Hard Contacts (No Sharing); In Green, Semi-Soft Contact (Share Only in The First Pass). |
153 |
Figure 80: Contact Matrix,
Au. In Red, Hard Contacts (No Sharing); In Green, Semi-Soft Contact (Share Only in The First Pass). |
153 |
Figure 81: Correlogram Model,
Cu, Domain 13. Views of the Model Parameters (Left); Main Orientations for the Two Structures Modelled (Central); and Three Directions
with the Fitted Model, approximately on the main directions of anisotropy. |
154 |
Figure 82: Warintza Central
and Warintza East, Cu Grade Estimates and 2m Cu composites, Section N9648060, ±12.5m window |
164 |
Figure 83: Warintza Central
and Warintza East, Cu Grade Estimates and 2m Cu composites, 875m Plan View, ±7.5m window |
165 |
Figure 84: Drift Plots, Cu |
167 |
Figure 85: Drift Plots, Mo |
168 |
Figure 86: Drift Plots, Au |
168 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 87: Warintza Resource
Classification Plan View, Level 800 m |
170 |
Figure 88: Warintza Resource
Classification East West Section, N9648100 |
171 |
Figure 89: Map of Concessions,
Known Prospects and Mines Surrounding Warintza Property |
186 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
The purpose of this report is to disclose an updated
Mineral Resource Estimate (“MRE” or the “Resource”) for the Warintza Project (“Warintza” or the “Project”)
located in southeastern Ecuador and owned by Solaris Resources Inc. (“Solaris” or the “Company”).
Mario E. Rossi, FAusIMM, SME, IAMG, Principal
Geostatistician of Geosystems International Inc. (“GSI”), prepared this technical report (the “Report”). Mr. Rossi
is a Qualified Person (“QP”) pursuant to National Instrument 43-101 (“NI 43-101”) and is independent of Solaris
Resources under Section 1.5 of NI 43-101. Mr. Rossi has over 35 years of experience in mining and geostatistics, mineral resource and
reserves estimation, audits, and reviews in over 200 mining projects at various stages of development and operation. GSI is an independent,
international mining consulting practice offering services specializing in porphyry deposits from exploration through feasibility, mine
planning, and production.
This Report has an effective date of July 1, 2024.
All information and assumptions discussed in this Report were determined as of the effective date. In Section 1, tables and production
statistics are reported in metric units. All prices and costs used in this Report are based on US Dollars (USD).
The Report supersedes the prior Technical Report
titled “NI 43-101 Technical Report for the Warintza Project, Ecuador (Amended)” with an effective date of April 1, 2022 (the
“2022 MRE”).
| 1.2 | Property Description and Ownership |
The Warintza Project is located in southeastern
Ecuador, in the Province of Morona Santiago. It occupies the district of San Miguel de Conchay and San Antonio in the Limón Indanza
Canton and San Carlos de Limón in the San Juan Bosco Canton. In the Project area, there are communities that identify themselves
as belonging to the Shuar original peoples (96%) and to mixed ethnicity (4%).
The Project is situated 85 kilometers (“km”)
east of the major city of Cuenca in a rural part of the Cordillera del Cóndor, an inland mountain range forming the border between
Ecuador and Peru. The property is centered at 3º10’ S latitude and 78º17’ W longitude (PSAD-56 UTM Zone 17S: 800186E;
9648676N). The Project can be accessed by an unpaved road from the nearest national Highway 45, approximately 20 km from the Warintza
Project. An unsealed, approximately 550 meters (“m”) long, airstrip at the village of Warintza provides additional access
to the Project by airplane or helicopter.
The Project is 100% owned by Solaris and includes
nine metallic mineral concessions covering 268 square kilometers (“km²”) (“Warintza Property” or the “Property”).
Four concessions with an area of 10 km² are permitted for exploration activities, including drilling and path construction. There
are four additional concessions contiguous with the original concession and one concession to the northwest. In April 2024, the Company
announced an option to acquire up to a 100% interest in 10 new explorations concessions, comprising a land package of ~40 km² adjacent
to the Warintza Property and interpreted to host porphyry copper and epithermal gold potential.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
The climate of the Project is classified as tropical,
with an average annual temperature of 23.0°C and average annual rainfall of 1,827 millimetres (“mm”). Rainfall is significant
year-round but peaks in March, whereas the temperature is consistent year-round. From a mineral exploration point of view, the Property
can be explored year-round.
The terrain surrounding the Project is mountainous
to rolling hills and valleys, with elevations from 1,000 m to 2,700 m above mean sea level.
| 1.3 | Geology and Mineralization |
The Property is underlain by Jurassic supracrustal volcanic and sedimentary rocks of the Mishuallli Member of the Chapiza Formation, as
well as Jurassic granitoids of the Zamora Batholith. These rocks are intruded by a series of plutonic and porphyritic intrusions of intermediate
composition, from quartz-monzonite, through to granodiorite, to diorite, emplaced as outliers of the Zamora batholith in proximity to
its eastern contact with Misahualli volcanic and volcano-sedimentary rocks.
The Warintza porphyry cluster consists of six
known deposits. Porphyry copper bearing dikes and stocks at Warintza Central, the original discovery, were principally emplaced in precursor
plutonic stocks, whereas Warintza South and Warintza East intruded Misahuallí volcanic and volcano-sedimentary rocks. Late Jurassic
syn-mineralization porphyry that hosts the Warintza Central deposit is of similar age to other nearby porphyry and epithermal deposits
in the Zamora copper-gold belt (e.g., Fruta del Norte, Mirador).
Warintza Central is a calc-alkalic copper-molybdenum
porphyry deposit with copper mineralization (but not molybdenum) partly redistributed by supergene processes to form leached and underlying
supergene-enriched zones that both overlie primary mineralization. Warintza East has been further explored in the 2022-2024 period, with
now 40 drill holes. Other discoveries have been made on the Property, including Warintza Southeast, Warintza West, Warintza South and
Patrimonio but only partially drill-tested, with additional copper-molybdenum anomalies at El Trinche and elsewhere on the Property.
| 1.4 | Mineral Resource Estimate |
The MRE was prepared by the QP and includes estimates
of copper (“Cu”), molybdenum (“Mo”), and gold (“Au”) resources and was based on over 101,000 m of
diamond drilling data. Additionally, the QP also estimated in-situ bulk density values from 3,166 samples available.
Cu grades were estimated based on 16 separate
domains, while Mo was based on seven domains and Au on eight domains. These domains are, in turn, based on the underlying geologic model
prepared by Solaris, validated by the QP, and include a lithology model, an alteration model, and a mineralization model. Also, available
structural information was used in the interpretation of the Warintza geologic model by conditioning the three-dimensional shapes of the
interpreted lithologies, alterations, and mineralization types.
Detailed statistical and geostatistical analyses
were used to develop the grade estimation strategy, including the definition of an appropriate composite length; the restriction of outlier
grades (capping); contact (grade profile) analysis for all domains and for the three metals; the use of correlogram models to understand
and apply the continuity of grades within each domain; and the overall grade estimation strategy applied in the resource estimates.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
The grades estimated into the block model were
properly validated using statistical and visual tools, concluding that the grade estimates are reasonable.
Resource classification was implemented on the
nominal notion that at least two drill holes are required within distances of between 30 m and of 60 m, depending on the geologic domain,
to declare a block Measured mineral resources; blocks with two drill holes up to 100 m distance were classified as Indicated mineral resources.
And blocks with two drill holes within distances up to 220 m were classified as Inferred mineral resources. The final coding into the
resource model blocks of the classification was completed by interpreting by hand, on plan level, the Measured and Indicated Mineral Resource
areas. Additional conditions were imposed, such as no Measured mineral resources in the Warintza East. Also, there are no Measured or
Indicated mineral resources in El Trinche and Patrimonio areas.
The mineral resources have been developed according
to the 2014 CIM Definition Standards and were prepared according to CIM Best Practice Guidelines (CIM, 2019), reported in accordance with
Canadian Securities Administrators’ National Instrument 43-101. Mineral resources are not mineral reserves and do not have demonstrated
economic viability. There is no certainty that all or any part of the mineral resources will be converted into mineral reserves.
To assess the “Reasonable Prospects for
Eventual Economic Extraction,” the QP constrained the overall estimated grades by running a pit optimization on the block model.
The results of the pit optimization were used solely to test the “Reasonable Prospects for Eventual Economic Extraction” by
an open-pit and do not represent an attempt to estimate mineral reserves.
The open-pit mineral resources in the Warintza
Project within the constraining optimized pit shell are reported at a 0.25% CuEq cut-off grade, summarized in Table 1.
Table 1.
Table 2 presents Warintza’s mineralization
sensitivity analysis to several cutoff grades, including a higher 0.5% CuEq cutoff.
Table 1: Warintza Mineral Resource
at 0.25 % CuEq Cut-Off Grade, Effective July 1, 2024
Notes to Table 1:
| 1. | The Mineral Resource Estimate was prepared in accordance with the Canadian Institute of Mining, Metallurgy
and Petroleum (“CIM”) Definition Standards for Mineral Resources and Mineral Reserves, adopted by the CIM Council on May 10,
2014. |
| 2. | Reasonable prospects for eventual economic extraction assume open-pit mining with conventional flotation
processing and were tested using Whittle and Minesight pit optimization software with the following assumptions: metal prices of US$4.00/lb
Cu, US$20.00/lb Mo, and US$1,850/oz Au; operating costs of US$1.50/t+US$0.02/t per bench mining, US$5.0/t milling, US$1.0/t G&A, and
recoveries of 90% Cu, 85% Mo, and 70% Au based on preliminary metallurgical testwork. |
| 3. | Metal price assumptions for copper, molybdenum and gold are based on a discount to the lesser of the
3-year trailing average (in accordance with US Securities and Exchange Commission guidance) and current spot prices for each metal. |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 4. | Mineral Resources include grade capping and dilution. Grade was interpolated by ordinary kriging populating
a block model with block dimensions of 25m × 25m × 15m. |
| 5. | Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. |
| 6. | Copper-equivalent grade calculation for reporting assumes metal prices of US$4.00/lb Cu, US$20.00/lb
Mo, and US$1,850/oz Au, and recoveries of 90% Cu, 85% Mo, and 70% Au based on preliminary metallurgical testwork and includes provisions
for downstream selling costs. CuEq formula: CuEq (%) = Cu (%) + 5.604 × Mo (%) + 0.623 × Au (g/t). |
| 7. | The Mineral Resources estimate was prepared by Mario E. Rossi, FAusIMM, RM-SME, Principal Geostatistician
of Geosystems International Inc., who is an Independent Qualified Person under NI 43-101. The Mineral Resources estimate is at a 0.25%
CuEq cut-off grade. |
| 8. | In Mr. Rossi’s opinion, there are currently no relevant factors or legal, political, environmental,
or other risks that could materially affect the potential development of Mineral Resources. |
| 9. | All figures are rounded to reflect the relative accuracy of the estimate and therefore may not appear
to add precisely. |
| 10. | The effective date of the mineral resource estimate is July 1, 2024. |
Table 2: Warintza Mineralization
Cut-Off Grade Sensitivity
Cut-off |
Category |
Tonnage |
Grade |
CuEq (%) |
|
(Mt) |
CuEq (%) |
Cu (%) |
Mo (%) |
Au (g/t) |
0.15% |
Measured |
246 |
0.61 |
0.45 |
0.02 |
0.05 |
Indicated |
836 |
0.44 |
0.30 |
0.02 |
0.04 |
M&I |
1,082 |
0.48 |
0.34 |
0.02 |
0.04 |
Inferred |
3,135 |
0.27 |
0.20 |
0.01 |
0.04 |
0.25%
(Base Case) |
Measured |
232 |
0.64 |
0.47 |
0.02 |
0.05 |
Indicated |
677 |
0.49 |
0.34 |
0.02 |
0.04 |
M&I |
909 |
0.53 |
0.37 |
0.02 |
0.05 |
Inferred |
1,426 |
0.37 |
0.27 |
0.01 |
0.04 |
0.35% |
Measured |
207 |
0.68 |
0.50 |
0.03 |
0.06 |
Indicated |
497 |
0.56 |
0.40 |
0.02 |
0.05 |
M&I |
704 |
0.60 |
0.43 |
0.02 |
0.05 |
Inferred |
640 |
0.47 |
0.34 |
0.02 |
0.05 |
0.50%
|
Measured |
157 |
0.76 |
0.56 |
0.03 |
0.06 |
Indicated |
269 |
0.69 |
0.50 |
0.03 |
0.05 |
M&I |
427 |
0.71 |
0.52 |
0.03 |
0.06 |
Inferred |
177 |
0.62 |
0.45 |
0.02 |
0.07 |
Notes to Table 2:
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 1. | The Mineral Resource Estimate was prepared in accordance with the Canadian Institute of Mining, Metallurgy
and Petroleum (“CIM”) Definition Standards for Mineral Resources and Mineral Reserves, adopted by the CIM Council on May 10,
2014. |
| 2. | Reasonable prospects for eventual economic extraction assume open-pit mining with conventional flotation
processing and were tested using Whittle and Minesight pit optimization software with the following assumptions: metal prices of US$4.00/lb
Cu, US$20.00/lb Mo, and US$1,850/oz Au; operating costs of US$1.50/t+US$0.02/t per bench mining, US$5.0/t milling, US$1.0/t G&A, and
recoveries of 90% Cu, 85% Mo, and 70% Au based on preliminary metallurgical testwork. |
| 3. | Metal price assumptions for copper, molybdenum and gold are based on a discount to the lesser of the
3-year trailing average (in accordance with US Securities and Exchange Commission guidance) and current spot prices for each metal. |
| 4. | Mineral Resources include grade
capping and dilution. Grade was interpolated by ordinary kriging populating a block model
with block dimensions of 25m x 25m x 15m. |
| 5. | Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. |
| 6. | Copper-equivalent grade calculation for reporting assumes metal prices of US$4.00/lb Cu, US$20.00/lb
Mo, and US$1,850/oz Au, and recoveries of 90% Cu, 85% Mo, and 70% Au based on preliminary metallurgical testwork and includes provisions
for downstream selling costs. CuEq formula: CuEq (%) = Cu (%) + 5.604 × Mo (%) + 0.623 × Au (g/t). |
| 7. | The Mineral Resources estimate was prepared by Mario E. Rossi, FAusIMM, RM-SME, Principal Geostatistician
of Geosystems International Inc., who is an Independent Qualified Person under NI 43-101. The Mineral Resources estimate is at a base case
of 0.25% CuEq cut-off grade and other estimates at varying cut-off grades are included only to demonstrate the sensitivity of the Mineral
Resources estimate and are not the QP’s estimate of the Mineral Resources for the property. |
| 8. | In Mr. Rossi’s opinion, there are currently no relevant factors or legal, political, environmental,
or other risks that could materially affect the potential development of Mineral Resources. |
| 9. | All figures are rounded to reflect the relative accuracy of the estimate and therefore may not appear
to add precisely. |
| 10. | The effective date of the mineral resource estimate is July 1, 2024. |
Cautionary Note
Mineral resources that are not mineral reserves
do not have demonstrated economic viability. The reported mineral resources include material classified as Inferred mineral resources
that have a lower level of confidence than Measured and Indicated mineral resources and, as such, cannot be converted to mineral reserves.
It is reasonably expected that most of the Inferred mineral resources could be upgraded to the Indicated category through further exploration.
| 1.5 | Conclusions and Recommendations |
Warintza is a highly prospective Cu-Mo-Au porphyry
deposit within the Cordillera del Cóndor. Exploration efforts in the belt have identified numerous porphyries, Au skarn, and epithermal
Au deposits, all related to Late Jurassic magmatism. Warintza is a typical cluster of porphyry systems that has the potential to become
an important Cu-Mo-Au resource, while the potential for other deposit types exists but have not been explored.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Warintza Central and Warintza East are the main
subjects of this MRE. Mineralization extensions are known at Warintza Southeast located southeast of Warintza East, and El Trinche and
Patrimonio, to the South and Southwest of Warintza Central.
After over 101,000 m of core drilling, which have
tested mainly the Warintza Central and Warintza East areas, with some additional drilling in El Trinche and Patrimonio areas, this MRE
confirms previous estimates and shows increased tonnage amenable to open-pit mining. It also shows that the mineralization is open in
several directions and that there are additional areas which have significant target footprints, adjacent and nearby to the MRE, that
require further exploration.
Infill drilling is required within both Warintza
Central and Warintza East, and to a more limited extent, El Trinche and Patrimonio. Drilling to date has mostly defined all limits of
mineralization, so the main priority is to further increase confidence. There is a reasonable expectation that additional drilling to
the southwest of Warintza Central may result in an increase in the known dimensions of the deposit.
Straightforward grass-roots exploration techniques
work well in the Cordillera del Cóndor. Numerous porphyry deposits have been discovered in the area by initial panned concentrate
stream sediment sampling, followed by prospecting, rock sampling, ridge soil sampling, grid soil sampling, and finally, scout drill-testing
of geochemical anomalies. At Warintza, there are additional targets that have yet to be investigated by drilling.
Early exploration at Warintza prior to Solaris’
involvement was hampered by community and social issues, and although this still presents a risk, efforts by the Company have allowed
for the development of a supportive relationship and advancement of the Project. The return of the surface rights covering the Shuar communities,
along with ongoing community consultation and community development efforts, have culminated in the Company entering into an Impact and
Benefits Agreement with the host communities.
Significant additional metallurgical testing is
currently ongoing, and a full characterization of Warintza’s mineralization is still pending. In the meantime, this MRE utilizes
the same metallurgical recovery assumptions as in past estimates. It is merited that, after completing a more detailed metallurgical characterization,
a Pre-Feasibility Study (“PFS”) be developed, which will require a more complete understanding of the mineralization’s
response to beneficiation methods. It has been assumed from the testing completed to date, plus comparisons to similar porphyry deposits,
it is likely that mineralization is amenable to conventional metallurgical processes.
Additional diamond core drilling for the Warintza
Central deposit is recommended. There are two simultaneous objectives: resource expansion and increase in resource confidence (categorization).
While there has been a significant upgrade in terms of Measured and Indicated categories, further infill drilling should be completed
to increase confidence in the central part of Warintza Central and Warintza East, mainly targeting the expected minable portions of the
deposit. If additional geologic information warrants it, targeting new areas of higher-grade mineralization (supergene enrichment or high-grade
primary mineralization) should be prioritized.
Recent drilling has extended near surface, high-grade
mineralization to the north, northwest and southeast of the MRE. The primary open vectors are to the northwest, southwest and to the southeast.
Drilling is underway from a step-out platform to the northwest to test the connection to West and Central.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
The
same approach is being taken with step-out platforms to the southwest. These represent opportunities
for a major expansion of the MRE in a significantly enlarged pit.
A geometallurgical program is recommended and
ongoing for flowsheet development and optimization, in addition to assessing the mineralization’s heterogeneity. Comminution variables
such as SAG power and Bond Mill indices should be tested for in different domains, as well as metallurgical recovery variability from
composites and variability tests. This program is expected to cost $4 million and will support the preparation of the PFS below.
Infill drilling, resource expansion drilling testing
lateral open extensions, geo-metallurgical and geotechnical drilling to support a PFS based on an updated mineral resource estimate should
be completed. The combined objectives are likely to require approximately an additional 60,000 m of drilling. Together, these drilling
programs are expected to cost approximately $20 million.
It is also recommended that a total of no less
than 5% of the meters drilled in mineralization be tested for in-situ bulk density.
Based on the results of the MRE for Warintza,
the QP recommends further developing the Project through the completion of a PFS. The PFS will form the basis for the mine development
plan and will include detailed scopes, schedules, and work plans for inputs to a Feasibility Study. It is recommended that the PFS be
advanced contemporaneously with, and not be contingent on positive results from, the aforementioned drilling and geometallurgical program.
In addition to the aforementioned drilling and geometallurgical program to support the PFS, Solaris has estimated a budget of $8 million
to complete the PFS. Solaris will continue to develop environmental, social, health, safety, and security programs in parallel to support
the exploration program and technical studies.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Solaris commissioned the Author to prepare this
Report on the Warintza Project in Ecuador to update the previous mineral resource estimate at the Project.
Essentially, all the technical data and much of
the Ecuadorian legal and regulatory information in this Report was obtained by the Author from employees or representatives of Solaris
Resources and its subsidiary, Lowell Mineral Exploration Ecuador S.A. (“Lowell”). This includes documents received and personal
communications in the form of face-to-face conversations, telephone conversations, and email.
Mr. Rossi visited the Warintza Project in Ecuador
from October 27 to 29, 2021. Mr. Rossi visited the Project site, Solaris’ offices in Macas and Quito, as well as the sample preparation
laboratory in Quito.
| 2.2 | Units, Currency, and Abbreviations |
Unless otherwise stated, all currencies are expressed
in USD with metric units applied throughout this Report. ‘Section’ and ‘Item’ have been used interchangeably in
this Report. Abbreviations and units are shown in Table 3.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 3:
Abbreviations and Measurement Units
% |
Percent |
% w/w |
% Of Solid Mass in Liquid Mass |
° |
Degrees |
°C |
Degrees Celsius |
µm |
Micron |
3D |
Three-Dimensional |
AAS |
Atomic Absorption Spectrometry |
AB |
Air Blast |
AG |
Auger |
Ag |
Silver |
ARD |
Acid Rock Drainage |
As |
Arsenic |
Au |
Gold |
BD |
Bulk Density |
BLEG |
Bulk Leach Extractable Gold |
BOCO |
Base of Complete Oxidation |
Capex |
Capital Expenditure |
BWI |
Bond’s work index |
CIM |
Canadian Institute of Mining, Metallurgy, and Petroleum |
cm |
Centimeter(s) |
CMP |
Composite |
CN |
Cyanide |
COEF |
Coefficient |
COG |
Cut-off Grade |
CRM |
Certified Reference Material |
CSV |
Comma Separated Value |
Cu |
Copper |
CuEq |
Copper equivalent |
CV |
Coefficient of Variation |
DBA |
Database Administrator |
DC |
Diamond Core |
DD |
Diamond Drill |
DFS |
Definitive Feasibility Report |
DH |
Drill Hole |
DDH |
Diamond Drill Hole |
EIA |
Environmental Impact Assessment |
EIS |
Environmental Impact Study |
EM |
Electromagnetic |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
EMP |
Environmental Management Plan |
EMS |
Environmental Management Systems |
EOH |
End of Hole |
EOM |
End of Month |
EPA |
Environmental Protection Agency (USA) |
EPCM |
Engineering, Procurement and Construction Management |
EPMA |
Electron Probe Microanalysis |
ESE |
East-Southeast |
ESIA |
Environmental And Social Impact Assessment |
EXP |
Exploration |
FA |
Fire Assay |
FS |
Feasibility Study |
g |
Gram(s) |
G&A |
General And Administration |
g/cm3 |
Grams Per Cubic Centimetre |
g/t |
Grams Per Tonne |
Ga |
Giga-Annum |
GIS |
Geographic Information System |
GPS |
Global Positioning System |
h |
Hour(s) |
ha |
Hectare(s) |
HSE |
Health, Safety, And Environment |
ICMC |
International Cyanide Management Code |
ICP AES |
Inductively Coupled Plasma Emission Spectrometry |
ICP MS |
Inductively Coupled Plasma Mass Spectrometry |
ID2 |
Inverse Distance Squared |
ID3 |
Inverse Distance Cubed |
IFC |
International Finance Corporation |
IFRS |
International Financial Reporting Standards |
ILR |
Intensive Leach Reactor |
IP |
Induced Polarization |
ISO |
International Standards Organization |
IT |
Information Technology |
JV |
Joint Venture |
K |
Thousand |
kg |
Kilogram(s) |
kL |
Kilolitre |
Km |
Kilometer(s) |
km² |
Square Kilometers |
koz |
Kilo Ounce/Thousand Ounce (Troy) |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
kt |
Thousand Tonnes |
kW |
Kilowatt |
L |
Litre |
lbs |
Pounds |
m |
Meter(s) |
m2 |
Square Meter(s) |
m3 |
Cubic Meter(s) |
M |
Million |
M+I |
Measured and Indicated |
Ma |
Million Years Ago |
MAMSL |
Meters Above Mean Sea Level |
masl |
Meters Above Sea Level |
mm |
Millimetre(s) |
Mo |
Molybdenum |
MOU |
Memorandum Of Understanding |
MRE |
Mineral Resource Estimate |
Mt |
Million Tonnes |
Mtpa |
Million Tonnes Per Annum |
N |
North |
NE |
Northeast |
NI 43-101 |
Canadian Securities Administrators National Instrument 43-101 |
NNE |
North-northeast |
NPV |
Net Present Value |
NSR |
Net Smelter Revenue |
OK |
Ordinary Kriging |
OPEX |
Operating Expenditure |
oz |
Ounce (Troy) |
oz/ton |
Troy Ounce Per Short Ton |
PAG |
Potentially Acid Generating |
Pb |
Lead |
pH |
Acidity Scale |
PFS |
Pre-Feasibility Study |
ppb |
Part Per Billion |
ppm |
Part Per Million |
PSAD-56 |
Provisional South American datum |
P80 |
80% Passing Through Grind Test |
Q1, Q2, Q3, Q4 |
Quarter One, Quarter Two, Quarter Three, Quarter Four |
QA/QC |
Quality Assurance/Quality Control |
QA |
Quality Assurance |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
QC |
Quality Control |
QEMSCAN |
Quantitative Evaluation of Materials by Scanning Electron Microscopy |
QP(s) |
Qualified Person(s) |
QQ |
Quantile-Quantile |
QSP |
Quartz Sericite Pyrite |
Qtz |
Quartz |
QV |
Quartz Veins |
RBU |
Remuneración Básica Unificada (Annual Ecuadorian Wage Calculation) |
RC |
Reverse Circulation |
RCD |
Reverse Circulation with Diamond Tail |
RF |
Revenue Factor |
RHS |
Right Hand Side |
RQD |
Rock Quality Designations |
Sb |
Antimony |
SBM |
Sub-Celled Block Model |
SCC |
Sericite-clay-chlorite |
SD |
Standard Deviation(s) |
SE |
Southeast |
SEC |
U.S. Securities and Exchange Commission |
SG |
Specific Gravity |
SGS |
SGS Laboratories |
SiO2 |
Silicon Dioxide (Silica) |
SMU |
Selective Mining Unit |
SOX |
Strongly Oxidized |
SQL |
Structured Query Language |
t |
Tonne(s) |
t/m3 |
Tonnes Per Cubic Metre |
TOFR |
Top of Fresh Rock |
Tpa |
Tonnes Per Annum |
TSF |
Tailings Storage Facility |
TSX |
Toronto Stock Exchange |
UCS |
Unconfined Compressive Strength |
US$ |
United States Dollars |
USB |
Universal Serial Bus |
UTM |
Universal Transverse Mercator |
VTEM |
Versatile Time-Domain Electromagnetic Surveying |
W |
West |
WOX |
Weakly Oxidized |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
XRD |
X-Ray Diffraction |
XRF |
X-Ray Fluorescence |
Zn |
Zinc |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 3.0 | Reliance on Other Experts |
For the purpose of this Report, the QP has relied
on Solaris Resources for information regarding legal and environmental information, as noted below.
| 3.1 | Mineral Tenure, Surface Rights, Agreements, and Environmental Information |
The QP has not reviewed the mineral tenure nor
verified the legal status, ownership of the Property or underlying property agreements. The QP has fully relied upon and disclaims responsibility
for information derived from Solaris experts derived as set out herein. This information is used in Section 4 of the Report.
The information regarding mineral tenure was reviewed
and verified by Solaris’ local Ecuadorian counsel, Robalino Abogados as of the effective date of this report.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 4.0 | Property
Description and Location |
| 4.1 | Project
Location and Area |
The
Warintza Property is in southeastern Ecuador in the province of Morona Santiago and the Limon Indaza Canton and San Carlos de Limón
in the San Juan Bosco Canton. It is located 235 km southeast of Ecuador’s capital, Quito (as the crow flies), and 85 km ESE from
the city of Cuenca (Figure 1). The Property is centered at 3º10’ S latitude and 78º17’ W longitude (PSAD-56 UTM Zone
17S: 800186E; 9648676N) within the Cordillera del Cóndor, a mountain range in the eastern Andes that locally forms the border
between Ecuador and Peru.
Figure
1: Location Map of the Warintza Project
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 4.2 | Licenses
and Mineral Tenure |
The
Property is covered by nine metallic mineral concessions that collectively cover approximately 268 km² (26,774 hectares) and represented
in Table 4. The mineral concessions are 100%-owned by Solaris.
Solaris
has entered into a “Cooperation, Benefits and Access Agreement for the Development of the Warintza Project” (also referred
to as Impact and Benefits Agreement), dated March 2022, and later updated in April 2024, with the local communities within the area of
influence of the Warintza Project that, among other things, grants Solaris access and use of surface rights at the Warintza Project.
Table
4: Warintza Concessions
Name |
Concession
Number |
Area
(Ha) |
Type |
Registration
Date |
Good
to Date |
CAYA
21 |
101083 |
2,499 |
Concession |
25/5/2010 |
7/2/2041 |
CAYA
22 |
101092 |
2,499 |
Concession |
25/5/2010 |
7/2/2041 |
CURIGEM
9 |
100081 |
4,049 |
Concession |
25/5/2010 |
27/10/2041 |
CURIGEM
9-1 |
10000938 |
950 |
Concession |
8/4/2022 |
15/12/2036 |
CLEMENTE |
90000337 |
1,601 |
Concession |
31/3/2017 |
31/3/2042 |
MAIKI
01 |
90000310 |
4,072 |
Concession |
8/3/2017 |
8/3/2042 |
MAIKI
02 |
90000311 |
4,304 |
Concession |
8/3/2017 |
8/3/2042 |
MAIKI
03 |
90000313 |
2,500 |
Concession |
31/3/2017 |
31/3/2042 |
MAIKI
04 |
90000314 |
4,300 |
Concession |
8/3/2017 |
8/3/2042 |
|
Grand Total |
26,774 |
|
|
|
A
2% net smelter royalty (NSR) is payable to South32 Royalty Investments Pty Ltd. (formerly BHP Billiton) on the Curigem 9, Curigem 9.1,
Caya 21, and Caya 22 concessions. In addition, the Government of Ecuador mandates an NSR of between 3% to 8% for its benefit, which is
negotiated and established in the exploitation agreement. To the Authors’ knowledge, there are no other royalties, back-in rights,
or other agreements or encumbrances of a similar nature on the Property.
| 4.4 | Mineral
Rights in Ecuador |
Concessions
have a term of 25 years and can be renewed for additional periods of 25 years if applications for renewal are submitted before the expiration
of the concessions. In order to maintain concessions in good standing, a fee must be paid by March 31 each calendar year for the Conservation
Patent. The fees are based on a calculated annual minimum wage, Remuneración Básica Unificada (“RBU”). For
each hectare, the Conservation Patent fees start at 2.5% of the RBU per annum for the Initial Exploration phase and increase to 5% for
the Advanced Exploration phase and increases further as the Project advances (Table 5). Caya 21, Caya 22 and Curigem 9 concessions
are in the Advanced Exploration phase, and the rest of the concessions are in the Initial Exploration phase.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Exploration
expenditures are required annually based on the area of the concessions, and required expenditures increase each year. Excess spending
can be carried over for a portion of the following year’s required expenditure.
The
annual Conservation Patent payments for the Property have been made as of the issuance of this Report and are valid until March 31, 2025.
In
December 2022, Solaris and the Government of Ecuador signed an Investment Contract for the Warintza Project which provides for the following
protections and incentives for the duration of the title of the Project which extends with renewal to 2066: security of investment, stability
of mining law, stability of taxes at a reduced income tax rate of 20% (25% previously), exemption from capital outflow tax (5% previously),
exemption from import duties (up to 5% previously), and detailed procedures for dispute resolution and international arbitration protection.
Table
5: Exploration and Exploitation Phases
Project
Stage |
Length
of Time |
RBU
per hectare |
Initial
Exploration |
Up
to four years from the time the concessionaire obtained all the previous administrative acts, according to Art. 26 of the Mining
Law. |
2.5% |
Advanced
Exploration |
Up
to four years, the application must be made prior to the end of the Initial Exploration Period. The application must include a waiver
of part of the surface initially granted. |
5% |
Economic
Evaluation |
Up
to two years, starting once the Initial Exploration Period or the Advanced Exploration Period has ended. May be extended, on application,
for up to an additional two years. |
5% |
Exploitation |
Commences
on the request of the concessionaire, which must be made prior to the end of the Economic Evaluation Period. Various requirements
and conditions apply. |
10% |
| 4.5 | Environmental
Obligations |
The
Warintza Project successfully completed a phase change of the environmental license from initial Exploration to Advanced Exploration
following the completion of an Environmental Impact Assessment (“EIA”) and community consultation process for Advanced Exploration
in late 2022. The Company continues to work with the Government of Ecuador on obtaining key permits and licenses for the advancement
of the Project and anticipates finalizing and submitting the EIA for the Exploitation phase of the Warintza Project for regulatory review
and approval in the second half of 2024, after more than three years of baseline environmental monitoring, data collection and studies
from prior permitting efforts. Currently, Caya 21, Caya 22 and Curigem 9 concessions are in the Advanced Exploration phase, and the rest
of the concessions are in the Initial Exploration phase.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
This
section provides a summary of the permits that must be acquired to conduct the work proposed for the property. Except as otherwise disclosed,
all such permits have been obtained.
Mining
Title
The
Undersecretary of Mines of the former Ministry of Non-Renewable Natural Resources resolved to grant the title of the concessions of Caya
21, Caya 22, and Curigem 9 (including Curigem 9.1 after the split of concession) for metallic minerals in favor of the Company and its
subsidiary, Lowell, on May 3, 2010, a document through which the Ecuadorian State confers in legal and due from the personal right to
prospect, explore, exploit, benefit, melt, refine, market, and close the mine of metallic mineral substances that may exist in said area.
Environmental
Registry
Environmental
Permits for initial exploration activities on Caya 21, Caya 22, and Curigem 9 (including Curigem 9.1 after the split of concession) with
test or reconnaissance drilling (scout drilling) issued through Environmental Registry No. 025, on May 22, 2019.
Certificate
of Intersection
The
Intersection Certificate granted on February 10, 2016, establishes that the Project does not conflict with the National System of Protected
Areas, State Forest Heritage, and Forests and Protective Vegetation.
Forestry
Permit
The
Ministry of the Environment approved the Forest Inventory and Economic Valuation of the Warintza Project on August 28, 2019.
Hazardous
Waste Generator Registration
The
Ministry of the Environment issued the Registry of Hazardous and/or Special Waste Generator No. SUIA-10-2019-MAE-DPAMS-00080 for the
Warintza Project, on December 2, 2019.
Biotic
Collection Permit
The
Ministry of the Environment authorized on February 19, 2021, the collection of wildlife to be carried out in the Warintza Project to
survey its baseline of the biotic component.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Certification
of Non-Affectation of Water Sources
The
former Secretary of Water granted the certificate of non-affectation of surface and underground sources, to the Warintza Project, on
November 20, 2018, where it was established that it could continue with the water use authorization process.
Permit
to Use Water for Human Consumption
The
former Secretary of Water granted the Warintza Project permission to use water for human consumption on March 26, 2019.
Permit
to Use Water for Industrial Use
The
former Secretary of Water granted the Warintza Project permission to use water for industrial consumption on April 16, 2019 and on February
27, 2024.
Sworn
Declaration of Non-Impact to Infrastructure
On
December 27, 2017, the legal representative of the Project declared that the initial exploration activities do not affect roads, public
infrastructure, telecommunications networks, military installations, or oil infrastructure, among others.
Annual
Exploration Report
Annually,
the Company reports the progress of exploration activities, machinery and equipment, facilities for activities, among others, to the
Regulation and Control Agency.
Patent
Payments
The
Company makes the payment for the Conservation Patents for a value of 5% of the Unified Basic Remuneration (UBR) for each mining hectare
of the Caya 21, Caya 22 and Curigem 9 concessions that are in the Advanced Exploration phase and 2.5% UBR for each mining hectare in
the Curigem 9-1 concession which is in the Initial Exploration phase of all its concessions to the Internal Revenue Service.
Fuel
Permit
The
Hydrocarbons Regulation and Control Agency granted the permit for the purchase and sale of fuel on December 2, 2019.
Mineral
Transportation Permit
The
Agency for the Regulation and Control of Energy and Non-Renewable Natural Resources grants the mineral transport permit to the Project
on a monthly basis.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Archeological
Investigation Authorization
On
June 8, 2024, the National Institute of Cultural Heritage granted the Archaeological Prospecting, Rescue, and Monitoring permit.
| 4.7 | Environmental
Licensing for Advanced Exploration Phase |
Environmental
Impact Studies of Caya 21, Caya 22 and Curigem 9 concessions were approved by the Ministry of Environment, Water and Ecological Transition,
which served to obtain the Environmental Licenses for the Advanced Exploration phase.
Environmental
Impact Study of Curigem 9.1 is under review by the Ministry of Environment, Water and Ecological Transition, which will serve to obtain
the Environmental License for the Advanced Exploration phase.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 5.0 | Accesibility,
Climate, Local Resources, Infrastructure, and Physiography |
| 5.1 | Topography,
Elevation, and Vegetation |
The
Warintza Property is located in an area of rugged terrain mixed with rolling hills and valleys, covered by heavy forest in areas and
scrub or cleared land in others, with a humid tropical climate. Elevations within the concessions range from a low of approximately 1000
m above sea level in the main drainage to a high of approximately 2,700 m on the ridge tops. Typical hillside slopes are between 25º
and 40º, with some local slopes that are nearly vertical.
The
closest town to the Project is General Leonidas Plaza Gutiérrez, also referred to as Limón Indanza. The nearest major population
centre is Macas. Small villages, including Warintza (~800 people) and Yawi (~400 people), occur proximal to the Property, with these
communities party to an Impact and Benefits Agreement with the Company.
The
Warintza area is classified as Af (tropical climate) in the Köppen-Geiger climate system. Over the course of a typical year, low
temperatures range from 8°C to 10°C, while high temperatures range from 17°C to 20°C. Approximate rainfall over the course
of a typical year averages 1,827 mm and is illustrated in Figure 2 below. From a mineral exploration point of view, the Warintza Property
can be explored year-round.
Figure
2: Monthly Average Rainfall, Warintza Project
Source:
www.worldweatheronline.com
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
The
nearest national Highway 45 is within approximately 20 km of the Warintza Project (Figure 3), with direct unpaved road access established
to support logistics transportation and delivery of supplies. An unsealed, approximately 550 m long, airstrip at the village of Warintza
provides additional good access to the Project (Figure 4) by airplane or helicopter.
The
Project site includes four remote camps that provide access to drill platforms for exploration drilling. The walk from the village to
the main campsite on the Project takes approximately one hour on a route that is four km long with an elevation gain of approximately
250 m.
| 5.3 | Proximity
to Population Centre and Transport |
The
closest town to the Project is General Leonidas Plaza Gutiérrez, also referred to as Limón Indanza. The nearest supply
center connected to the national transportation infrastructure is the town of Macas, which provides good road connections and a commercial
airport capable of handling commercial jet aircraft. Small aircrafts chartered in Macas can reach the airstrip at Warintza in approximately
30 minutes. The highly changeable weather and cloud cover can delay flights.
From
the western end of the airstrip, the Warintza Central deposit is accessible on foot via a series of trails that are the principal means
of transportation of crew and equipment. The exploration program is supported by road for transport of equipment, supplies, and core
to facilities, with occasional support by helicopters.
| 5.4 | Infrastructure
and Personnel |
The
Project is not connected to existing electrical power infrastructure; however, the national electric grid is located approximately 20
km to the northwest of the Project nearby national highway 45. Solaris signed an MOU in March 2022 with the State electric company, Electric
Corporation of Ecuador (“CELEC EP”), to supply low-cost, locally-sourced hydroelectric power to the Project. The author is
aware of CELEC EP updating the Ecuadorian environmental plan for a 2.4 GW Santiago hydroelectric project development, which is a forthcoming,
fully-permitted project on the northern property boundary of Warintza. It is highly likely that the Santiago hydroelectric power project
will be a possible source of power for mine operations.
No
studies have yet addressed the suitability of sites for infrastructure (e.g., tailings, processing plant sites) or the availability of
resources (e.g., water, power, personnel) at Warintza.
Given
the abundant rainfall and many streams on the Property, it is reasonable to assume that ample water supplies exist. The Author is not
aware of any studies relating to specific sources for possible mine process waters.
Solaris
employs many local residents in its exploration programs and has implemented training and education programs. However, there is no history
of mining in the immediate vicinity, and hence no mining
workforce is directly available. In a development scenario, a responsible operator would likely
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
utilize as much local labor as possible
and implement training programs to develop the skills required for mining, possibly incorporating personnel from the two major mines
in operation in the neighboring province of Zamora-Chinchipe.
Other
projects in Ecuador with similar terrain, climate, and access (e.g., Mirador and Fruta del Norte located 48 km and 70 km, respectively,
SSW of Warintza) have recently shown that similar conditions do not preclude mining. Detailed studies, however, are required to determine
the sufficiency of surface rights and the availability of power, water, personnel, and mining infrastructure sites at Warintza. These
are beyond the scope of this Report.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure
3: Regional Infrastructure Map
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 4: Unsealed Airstrip Access at Warintza
Village
Viewed Towards the Southwest. Warintza Central
Deposit Underlies the Ridge in the Centre
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
The following description of the Warintza Project history is largely
derived from Sivertz et al. (2006) and Ronning and Ristorcelli (2018).
| 6.1 | Property Ownership Changes |
Prior to 1994, no mineral exploration had been
reported in the Warintza area. In that year, Gencor Limited (“Gencor”) began grassroots exploration of the Pangui project
in southeastern Ecuador, which was directed at identifying Au mineralization in the Oriente foreland basin (Gendall et al., 2000). Following
corporate restructuring of Gencor in 1997, Billiton PLC (“Billiton”) continued the Pangui project. Between 1994 and 1999,
Billiton completed regional-scale geochemical and airborne magnetic-electromagnetic (EM) geophysical surveys over a large area and more
detailed mapping and geochemical surveys of targets within it, ultimately leading to the initial drilling of several of the 10 regional-scale
porphyry and skarn targets that were identified.
In April 2000, Billiton and Corriente Resources
Inc. (“Corriente”) entered into an agreement covering 230 km² of mineral concessions in the southeastern part of Ecuador,
which included Warintza. Under the agreement, Corriente could earn a 70% interest in each of the Billiton projects by completing a feasibility
study and meeting certain financial and work commitments (Corriente Resource Inc. Annual Information Form, 2000). At the completion of
each feasibility study, Billiton could elect to (a) back-in for a 70% interest by providing production financing, (b) retain a 30% working
interest, or (c) dilute to a 15% Net Profit Interest (“NPI”). Corriente also entered into an exploration management arrangement
whereby Lowell Mineral Exploration Ecuador S.A. could earn up to 10% of Corriente’s interest in certain properties in exchange for
managing the exploration of the properties.
In 2002, Corriente purchased 100% of three of
its optioned Ecuadorian properties (Mirador, San Carlos, and Panantza) from Billiton in return for a 2% NSR, of which 1% could be purchased
for $2 million. In November 2003, Corriente announced that it had purchased 100% of the remaining Ecuadorian concessions it held under
option from Billiton, including Warintza, for a 2% NSR with no buy-down and no back-in rights (Corriente Resources Inc. Annual Report,
2003).
By this time, Lowell had vested its 10% interest
in Corriente’s Ecuadorian properties, including Warintza, Mirador, San Carlos-Panantza. In 2004, Lowell swapped its 10% interest
in Corriente’s Ecuadorian properties for 100% interest in the Warintza Property (Corriente Resources Inc. Annual Report, 2004).
The four concessions (Caya 21, Caya 22, Curigem
9, and Curigem 9.1) were voluntarily placed under force majeure in 2006 by Lowell. Except for surface sampling in 2005-06, Lowell carried
out no significant exploration on the Warintza Property after its acquisition in 2004. Instead, Lowell’s efforts were directed toward
obtaining a social license for exploration and mining from the local Shuar communities.
In July 2013, Lowell Copper Inc. completed a reverse
takeover of Waterloo Resources Ltd. to form Lowell Copper Ltd. (“Lowell Copper”).
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
In October 2016, Lowell Copper merged with Gold
Mountain Mining Corporation and Anthem United Inc. to create a new company, JDL Gold Corp. (“JDL”).
In March 2017, JDL
merged with Luna Gold Corp. to form Trek Mining Inc. (“Trek”). In December 2017, Trek merged with NewCastle Gold Ltd. and
Anfield Gold Corp. to form Equinox Gold Corp. In August 2018, Equinox spun out its copper assets, including the Warintza Property, into
Solaris.
| 6.2 | Exploration by Previous Owners |
As described above, Warintza was a target that
was generated from grassroots exploration in the Cordillera del Cóndor initiated by Gencor in 1994. Records of this early work
at Warintza are unavailable, but according to Gendall et al. (2000), the first-pass exploration technique was panned concentrate stream
sediment sampling. Anomalous drainages were followed up with prospecting and mapping in creeks and soil sampling of ridges in easily accessible
areas. Collectively, these data sets led to the identification of four porphyry targets: Warintza Central, Warintza East, Warintza West,
and Warintza South.
Once Billiton awarded the continuation of the
exploration of the Warintza Project to Corriente, they proceeded to scout drill test the Warintza Central target, and based on early success,
ultimately drilled 33 core holes (6,530 m) in two campaigns: February-April 2000 (16 holes; 2,391 m) and July-August 2001 (17 holes; 4,140
m). Drilling confirmed Warintza Central as a supergene-enriched Cu-Mo porphyry deposit. At the same time, mapping and litho-geochemical
sampling were carried out over Warintza West (Vaca and León, 2001).
6.2.1 Surface Geochemistry
Analytical data for the surface samples
collected by previous operators (quantities summarized in Table 6) have been compiled into a database.
Table 6: Summary of Surface Samples
from the Warintza Property
Source: Equity (2019)
Sample Type |
Count |
Soil |
981 |
Rock channel |
256 |
Rock chip |
240 |
Rock panel |
15 |
Results for Cu and Mo soil and rock samples are
summarized in the figures below. Cu in soil and rock does not perfectly outline the Warintza Central deposit, but it does effectively
highlight the general area of the porphyry centre (Figure 5). Mo in soil and rock geochemistry is somewhat more restricted, but the patterns
are similar (Figure 6).
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
The soil sampling pattern in both figures demonstrates
the progression from ridge soil sampling to the establishment of a more detailed grid over the deposit. Rock samples are largely restricted
to stream drainages where outcrop exposures are more abundant. Overall, surface sampling is a highly effective tool to identify exposed
porphyry deposits, such as Warintza. Note that not all soil/rock anomalies have been drill-tested, and sampling is largely limited to
easily accessible areas.
Figure 5: Property Soil and Rock
Geochemistry Summarizing Cu Results
Source: Equity 2019
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 6: Property
Soil and Rock Geochemistry Summarizing Mo Results
Source: Equity (2019)
6.2.2 Geophysics
Internal program summary reports indicate
that an airborne magnetics-EM survey was flown in 1999. The data from this survey is not available.
| 6.3 | Historic Mineral Resource Estimates |
Following the 2000-2001 Warintza drilling, three
mineral resource estimates were prepared in 2001 and 2005 for the Warintza Central deposit (Vaca and León, 2001 and Suárez,
2005).
None of these early estimates were prepared in
accordance with NI 43-101 and all of them were superseded by later estimates prepared in accordance with NI 43-101. As such, they are
not considered significant and are not discussed further.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
6.3.1 Mineral Resource Estimate
(Ronning and Ristorcelli, 2006)
In 2006, Mine Development Associates prepared
a mineral resource estimate on the Warintza Central deposit for Lowell Copper Holdings Inc. (formerly known as Lowell Copper Inc.) (Ronning
and Ristorcelli, 2006). It is based on data from all 33 holes and 2,142 analyses of Cu, Mo, and Au. Au was not included in the resource
estimate as the Au grades were deemed too low to be of value.
The resource estimate used a geologically constrained
model, dividing the Cu mineralization into three zones: leached, supergene-enriched, and hypogene or primary. All the Mo mineralization
was modelled as primary, and it spans all three of the Cu zones. Only the supergene-enriched and primary zones were included in the mineral
resource estimation.
The Warintza Central mineral resource estimate
used kriging for estimation. Trials using two other estimation techniques—one employing a nearest-neighbor algorithm and the other
an inverse distance squared algorithm—were also completed. A comparison of the results led to the conclusion that at the current
drill spacing, the kriged model would give the most appropriate estimate.
Cu assays were capped at 1.5% Cu (primary) and
2.7% Cu (supergene-enriched). Only the primary zone was materially impacted by capping (reducing the mean grade by 4%), with no material
difference to the mean grade of the supergene-enriched zone.
Variograms were calculated using 10 m composites
for each Cu zone and for Mo, then used to estimate grades for individual blocks.
The 2006 mineral resource estimate used a
CuEq cut-off grade; CuEq was calculated using an in-situ value ratio of six Cu to one Mo. At a cut-off grade of 0.3% CuEq, the
Warintza Central deposit was estimated to contain an Inferred mineral resource of 195,000,000 tonnes grading 0.61% CuEq, or 0.42%
Cu, and 0.031% Mo. Table 7, Table 8, and Table 9 present Ronning and Ristorcelli’s (2006) Inferred mineral resource estimate
for the Warintza Central deposit.
Table 7:
Warintza Central Deposit Inferred Mineral Resource Estimate – Primary Zone
Source: Ronning and Ristorcelli (2006)
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 8:
Warintza Central Deposit Inferred Mineral Resource Estimate – Enriched Zone
Source: Ronning and Ristorcelli (2006)
Table 9:
Warintza Central Deposit Inferred Mineral Resource Estimate – Total
Source: Ronning and Ristorcelli (2006)
Mine Development Associates’
2006 mineral resource estimate was prepared in accordance with NI 43-101 and uses resource categories stipulated by NI 43-101. The Company
is not treating the 2006 historical estimate as a current mineral resource because it is superseded by the MRE presented herein (Section
14).
6.3.2 Mineral Resource Estimate
(Ronning and Ristorcelli, 2018)
In 2018, Mine Development Associates
updated their previous mineral resource estimate on the Warintza Central deposit for Equinox and Solaris (Ronning and Ristorcelli, 2018).
It was based on the same database and geological model as used in the 2006 estimate and used the same estimation parameters. The 2018
mineral resource estimate was identical to the 2006 estimate, except for rounding differences and the inclusion of estimates above different
cut-off grades (Table 10, Table 11, and Table 12).
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 10: Warintza Central Deposit
Inferred Mineral Resource Estimate – Primary Zone
Source: Ronning and Ristorcelli (2018)
Table 11: Warintza Central Deposit Inferred
Mineral Resource Estimate – Enriched Zone
Source: Ronning and Ristorcelli (2018)
Table 12: Warintza Central Deposit
Inferred Mineral Resource Estimate – Total
Source: Ronning and Ristorcelli (2018)
Mine Development Associates’
2018 mineral resource estimate was prepared in accordance with NI 43-101 and classifies resources in accordance with CIM Definition Standards
for Mineral Resources and Mineral Reserves (May 2014). The Company is not treating the 2018 historical estimate as a current mineral resource
because it is superseded by the MRE presented herein (Section 14).
No ore production has been reported for the Warintza
Property. There is no record of formal historical mining activity for the other target areas.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 7.0 | Geological Setting and Mineralization |
This section summarizes the regional geologic
setting and the salient geologic characteristics of the porphyry Cu-Mo-Au mineralization of the Warintza cluster located in the Cordillera
del Cóndor range in the Andes of southeastern Ecuador. The herein defined Warintza cluster comprises of a series of discrete and
partially coalescent porphyry Cu-Mo±Au deposits and prospects at Warintza Central, Warintza East, Warintza Southeast, Patrimonio,
Warintza West, and Warintza South, of which the Warintza Central Warintza East, Warintza Southeast and Patrimonio deposits are currently
at the most advanced exploration stage and included within this MRE. This section is based on a series of first-hand reviews of Warintza
core by the Author during the second half of 2021. This section first describes the geologic setting of the Zamora belt to be followed
by sections on the geology, alteration, and mineralization of the various target areas that compose the Warintza cluster, as per on-going
exploration.
7.1.1 Subandean and Cordillera
del Cóndor Geology
The Cordillera del Cóndor and Warintza cluster are located in the Subandean zone, a geologic domain underlining the eastern foothills
of the Andes (Figure 7). On the west, the Cordillera del Cóndor is flanked by the Paleozoic and Mesozoic metamorphic belts and
accreted terranes of the Cordillera Real (Aspden and Litherland, 1992; Litherland et al., 1994).
The Subandean zone was the site of rifting during
the Permo-Triassic, where red-beds and alkaline volcanic rocks accumulated (e.g., Mitu Group in Peru) and were followed by deposition
of carbonate sequences in the Late Triassic to Early Jurassic, as exemplified by the Pucará Group in central and northern Peru
and the stratigraphically equivalent Santiago Formation in southeastern Ecuador (Tschopp, 1953). In the Jurassic, an andesite-dominated,
calc-alkaline magmatic arc developed from Colombia, through Ecuador and into northern Peru, and gave rise to the Misahuallí Formation
in Ecuador (Litherland et al., 1994) and equivalent formations in northern Peru, along with a series of batholithic-sized intrusions.
The volcanic-dominated sequences of the arc are
considered partially equivalent to the Chapiza Formation, a continental red-bed package deposited farther east (Jaillard, 1997). Rocks
of the Jurassic arc and the Chapiza Formation are unconformably overlain by a sequence of shallowly dipping, fluvial quartz sandstone
of the Early Cretaceous Hollín Formation, which, in turn, is unconformably overlain by shale and limestone of the Napo Formation
(Tschopp, 1953).
The Hollín and Napo Formations extend eastward
beneath Cenozoic sedimentary strata of the Santiago basin, where they form part of the large hydrocarbon-bearing Oriente basin (Jaillard,
1997).
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 7: Location
of the Warintza Cluster Within Zamora Batholith
Source:
Modified from Drobe et al. (2013)
The main expressions of the Jurassic arc magmatism
along the Cordillera del Cóndor are the subduction-related, I-type, predominantly dioritic to granodioritic plutons of the >200
km-long, north-northeast-trending Zamora batholith (Litherland et al., 1994; Drobe et al., 2013; Leary et al., 2016). Early isotopic dating
by the K-Ar and Rb-Sr method yielded ages of ~190 to 170 Ma for main-stage batholith emplacement (Litherland et al., 1994), but more modern
dates by the Ar-Ar (hornblende) and U-Pb (zircon) methods have returned younger, Middle-Late Jurassic ages (~164-160 Ma; Chiaradia et
al., 2009; Drobe et al., 2013).
Extensive roof pendants of shallowly dipping and
metamorphosed, locally skarnified, volcano-sedimentary rocks within the Zamora batholith were included in the Late Triassic Piuntza unit
of the Santiago Formation, while similar sequences adjacent to the batholith were assigned to the Misahuallí unit of the Chapiza
Formation (Litherland et al., 1992, 1994). This stratigraphic convention is followed in this report. Volcanic rocks of the Misahuallí
sequence yield Ar–Ar ages between ~172 and 162 Ma (Middle Jurassic; Romeuf et al., 1995, Spikings et al., 2001). However, more recently,
rocks assigned to Misahuallí andesitic volcanism at Fruta del Norte were dated at ~157 to 154 Ma (Leary et al., 2016).
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
In conjunction, the Zamora batholith and Misahuallí
volcanic rocks are considered to represent the terminal events of a long-lived, subduction-related continental magmatic arc established
on the western margin of the Amazon craton, with the Zamora batholith representing the plutonic roots and the Misahuallí rocks
being the extrusive expressions, of the arc.
7.1.2 Regional Metallogeny
The principal ore deposits and prospects in the
Subandean zone of southeastern Ecuador are hosted by the Zamora batholith and its associated volcano-sedimentary rocks and form part of
a Jurassic metallogenic belt that extends from southern Colombia to northern Peru (Sillitoe and Perelló, 2005). With the exception
of Fruta de Norte (Leary et al., 2016), most deposits and prospects are of porphyry Cu or skarn Au-Cu type (Gendall et al., 2000; Fontboté
et al., 2004; Chiaradia et al., 2009; Drobe et al., 2013).
The Warintza cluster is part of the north-trending,
120 km-long, Late Jurassic Zamora Cu-Au belt (Drobe et al., 2013, Figure 8). The porphyry Cu and skarn mineralization in the region was
originally named the Pangui belt by Gendall et al., (2000) and included deposits along the Río Zamora from San Carlos- Panantza
deposits on the north to Mirador on the south, with Warintza as an eastern outlier. More recently, the belt has been expanded to comprise
the Au skarn mineralization at Nambija and the epithermal Au deposit at Fruta del Norte (Drobe et al., 2013; Leary et al., 2016).
Figure 8: Simplified
Geologic Map of Warintza Cluster
Source:
Solaris Resources Inc. (2022)
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
The northern deposits within the belt are Cu-Mo,
whereas the southern deposits are Cu-Au, the latter exemplified by Mirador. Most deposits are genetically associated with the late-stage,
plagioclase- and hornblende-bearing, andesitic to dacitic porphyry phases of the Zamora batholith, in part coeval with the calc-alkaline
andesitic volcanism of the Misahuallí unit. Late Jurassic U-Pb (zircon) and Re-Os (molybdenite) ages from 157 to 153 Ma for the
porphyry Cu-bearing subvolcanic intrusions and mineralization (Chiaradia et al., 2009; Drobe et al., 2013) confirm the comagmatic relationship
between these late-stage phases of the batholith and porphyry Cu formation.
| 7.2 | Geologic Features of the Warintza Cluster |
The Warintza cluster (Figure 9) comprises of a
series of discrete and partially coalescent porphyry Cu-Mo±Au deposits and prospects at Warintza Central, Warintza East, Warintza
Southeast, Patrimonio, Warintza West, and Warintza South, of which the Warintza Central, Warintza East, Warintza Southeast and Patrimonio
deposits are currently at the most advanced exploration stage and included within the MRE. A number of Cu-Mo soil geochemical anomalies
likely represent additional porphyry-style mineralization, thereby covering an area of approximately 30 km². A broadly east-west-trending,
approximate seven km-long, likely structurally controlled corridor of porphyry Cu centers is defined by the alignment of Warintza West,
Warintza Central, and Warintza East, whereas Warintza South is located approximately three km to the south. All deposits and prospects
display geologic features of the Cu-Mo clan, although Au is erratically present in some. For simplicity, in the following sections of
this Report, the term “porphyry Cu” implies a general Cu-Mo-(Au) association of principal metals.
Geologically, the Warintza cluster is associated
with a series of plutonic and porphyritic intrusions of intermediate composition, from quartz-monzonite, through granodiorite to diorite,
emplaced as outliers of the Zamora batholith in proximity to its eastern contact with Misahualli volcanic and volcano-sedimentary rocks.
Porphyry Cu-related contain variable proportions of plagioclase, biotite, and hornblende as principal phenocryst components.
With the exception of Warintza East, quartz is
a minor phenocryst phase in most productive intrusions, although some is present in certain late mineral phases at Warintza West. Porphyry
Cu-bearing dikes and stocks at Warintza Central were principally emplaced in precursor plutonic stocks, whereas Warintza South and Warintza
East intruded Misahuallí volcanic and volcano-sedimentary rocks.
Warintza West is hosted by a magmatic-hydrothermal
stockwork zone formed at the expense of a quartz-monzodioritic intrusion emplaced into a composite, dioritic to granodioritic pluton.
Although no isotopic ages are available for Warintza, the geologic relationships suggest that the porphyry Cu mineralization of the cluster
is part of the Zamora (Pangui) belt, a correlation also established in the literature (Gendall et al., 2000; Drobe et al., 2013; Leary
et al., 2016).
The geologic structure of the Warintza cluster
is poorly defined to date. The marked east-west alignment of porphyry Cu centers from Warintza West, through Warintza Central, to Warintza
East implies an important, structural control on porphyry Cu emplacement.
The internal east-west-trending lithologic, alteration,
and mineralization grains at Warintza Central and Warintza East also evidence significant structural control during porphyry Cu evolution.
Regional, likely fault-related, topographic lineaments controlling the distribution of major rivers and tributaries are apparent on satellite
images available for the region, including the Piuntz river that runs along the
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
northern border of Warintza Central. However, detailed structural mapping, in progress,
is hampered by the large vegetation cover and the deeply weathered state of the rocks at the surface.
In any case, since their emplacement in the Late
Jurassic, rocks of the Warintza cluster and associated porphyry Cu mineralization are inferred to have been involved in the far-field
deformation associated with the accretion of oceanic terranes to the Ecuadorian forearc from the Late Cretaceous to the Paleocene (Vallejo
et al., 2006), producing the rapid uplift, unroofing, and exhumation of the Cordillera Real at ~75-60 Ma (Spikings et al., 2001), with
corresponding structural implications.
Figure 9:
Simplified Geologic Cross Section of Warintza Cluster
Source: Solaris
Resources Inc. (2022)
Main lithologic units
The east-trending Warintza Central porphyry Cu
deposit is hosted by composite stocks that form two principal pre-mineralization units, namely upper quartz-monzodiorite and lower diorite
bodies (Figure 10).
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 10: Simplified
Geologic Cross Section Through Warintza Central
Source:
Solaris Resources Inc. (2022)
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Both were emplaced into volcanic and volcano-sedimentary
assemblages of the Misahuallí sequence. The upper quartz-monzodiorite body is typically fine-grained, equigranular in texture,
although hydrothermal alteration has amply modified original rock-forming constituents. In the case of the lower dioritic body, drilling
has shown its original hornblende- and biotite-bearing composition at depth. Contacts between the two units have not been observed due
to the intense hypogene alteration and supergene effects, the latter including a rubble zone at the transition from sulfate-leached (gypsum)
to sulfate-stable (anhydrite) environments. Geological relationships suggest that both the lower diorite body and the upper quartz-monzodiorite
bodies likely represent composite precursor intrusions with respect to the porphyry Cu mineralization. An intrusion of this size was almost
certainly constructed by multiple magma pulses injected in relatively quick succession, such that early phases may have been still plastic
when the successively younger phases were emplaced, with the consequent masking of internal contacts.
To the east, the Warintza Central stocks are in
contact with rocks assigned to the Misahuallí sequence, a predominantly andesitic unit with locally thin interbeds of calcareous
and siliceous sedimentary strata, as well as volcaniclastic and coarse-grained fragmental materials. Coarse-grained andesite porphyry
dominates with depth and likely represents classic subvolcanic Misahuallí rocks. A few poorly constrained marker beds could be
taken to imply a relatively shallowly dipping attitude of the whole sequence, in agreement with descriptions of Misahuallí rocks
elsewhere in the area and regionally (Litherland et al., 1994).
Numerous dike-like porphyry-bodies are present
at Warintza Central and eastern extensions. These are typically characterized by coarse-grained textures with predominance of plagioclase
and hornblende phenocrysts, plus additional proportions of quartz eyes, all set in a fine-grained to aphanitic groundmass of similar compositions.
Andesitic and dacitic compositions predominate. The porphyry dikes are of varied dimensions, including thin, meter-wide intercepts in
drill holes that locally coalesce to form larger bodies. Two principal phases are present: 1) early, intermineral phases are andesitic
to daciandesitic in composition, are variably altered, and are cut by pyrite- and/or chalcopyrite-bearing porphyry-style veinlets of EDM,
A, B, C, and D types (see below); 2) late mineral phases are typically dacitic and characterized by well-defined quartz eyes, aphanitic
groundmass, and by a fresher appearance in which weak illitic mica predominates. Veinlets are typically absent in these later phases,
although pyritic D and later polymetallic varieties occur locally.
Drilling has confirmed that much of the Warintza
Central deposit is floored by a large, coarse-grained, porphyritic to sub-equigranular, magnetite-stable, plagioclase-, biotite-, and
hornblende-bearing stock of granodioritic composition. This body typically cuts and truncates mineralization and veinlets hosted by all
rocks described above. However, veinlets with epidote, pyrite, biotite, and trace chalcopyrite are locally present, hence its late-mineralization
timing.
Hydrothermal breccias are rare at Warintza Central,
and only a few late-mineralization phreatomagmatic pebble dikes associated with late-stage porphyry dikes have been identified. Nevertheless,
poorly developed composite bodies of aplite, irregular, and abnormally thick quartz veinlets and wavy quartz segregations, coarse-grained
pegmatoidal pods of anhydrite—plus gray-green micaceous aggregates and patches of anhydrite with or without chalcopyrite and pyrite—are
all common. Because these zones are typically entirely contained in diorite, they are tentatively interpreted to be the product of local
magmatic-hydrothermal fluid ponding and concentration during stock evolution.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Alteration and Mineralization
Except for the late-mineralization dikes and the
basal granodiorite, all other rocks at Warintza Central underwent various assemblages of sequential potassic and green-gray mica (mixed
chlorite and fine-grained muscovite) alteration during Cu-Mo-Au introduction, before being overprinted by predominantly pyritic fine-grained
white mica (sericite) and irregularly distributed base-metal veinlets. Supergene sulfide leaching and enrichment affected the shallow
parts of the deposit.
The following tentative sequence of alteration-mineralization
and accompanying veinlet events (e.g., Sillitoe, 2010) are apparent:
| 1) | Early, pre-mineralization biotitization of all ferromagnesian components in diorite porphyry at depth
(and likely of upper quartz-monzodiorite body at higher elevations), accompanied by incipient formation of early biotite (“EB”)
and biotite-bearing halo type-veinlets of early dark micaceous (“EDM”) affiliation. This Cu poor event introduced trace chalcopyrite
in addition to pyrite. |
| 2) | Intermediate, pervasive, bulk halo-type alteration characterized by the coalescence of EDM veinlets in
two principal assemblages controlled by original rock composition: i) gray-green mica assemblages predominantly in the diorite stock and
ii) gray mica, andalusite, and K-feldspar assemblages in the upper, quartz-monzodiorite body. This event was rich in Cu and introduced
the bulk of the disseminated chalcopyrite. Pyrite is also present, and both chalcopyrite and pyrite (and corresponding cpy:py ratios)
are zonally distributed, displaying vertical and lateral zonation and defining specific sulfide domains, in which pyrite always formed
first and was followed by deposition of chalcopyrite. |
| 3) | Intermineral introduction of classic A and B quartz-veinlets carrying lower amounts of Cu in the form
of chalcopyrite, although Mo as molybdenite was the principal metal component of B veinlets. Pyrite is always conspicuously present and
where both chalcopyrite and pyrite occur together, chalcopyrite formed always second to pyrite. Both A and B veinlets cut earlier-formed
EDM veinlets and associated halos. |
| 4) | Late-intermineral, predominantly veinlet-controlled green-gray mica assemblages with chalcopyrite and
pyrite. These veinlets are important contributors to the Cu metal endowment of Warintza Central, being characterized by sulfide-bearing
centerlines with additional quartz, medium- to fine-grained gray mica and chlorite, and variably developed halos of similar components.
Chalcopyrite is characteristically present along the centerline of the veinlets, defining millimetric hairline fractures and sub centimeter-wide
veinlets. In places, these veinlets can be continuous or semi-continuous for up to several meters of core-length. These veinlets are similar
to the C-type veinlets of Gustafson and Quiroga (1995). C-type veinlets are normally seen overprinting EDM halos and crosscutting A and
B veinlets. At the edges and deeper parts of Warintza Central, magnetite-bearing, pyrite veinlets with one or more of epidote, chlorite,
and albite cut through A and B quartz veinlets, suggesting their C-equivalent timing of emplacement. |
| 5) | Late, pyrite-dominated D veins and veinlets with associated fine-grained white mica (sericite) alteration
halos. This event was Cu destructive and transformed some or all the pre-existing |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| | chalcopyrite into pyrite, as defined
by the observed paragenetic relationships between these two minerals. |
| | |
| 6) | Terminal-stage, characterized by erratic hairline fractures and thin veinlets of quartz and carbonate
with polymetallic base-metal mineralization and associated fine-grained white mica (sericite) alteration halos. |
Notably, the majority of the quartz-bearing A
and B veinlets occur in the shallower parts of the system and assist in definition of an east-trending and steep zone of moderate-intensity
quartz stockworks, predominantly in the quartz-monzodiorite body. Anhydrite is present in most veinlet types, and hydrothermal magnetite
accompanies the C-veinlets in deeper parts at Warintza Central and extensions to the east. In such cases, magnetite is paragenetically
late with respect to chalcopyrite and pyrite. Deep seated biotite-stable EDM veinlets in diorite also contain various proportions of magnetite.
Hypogene Sulfide Zoning
A well-defined geometry is present at Warintza
Central, in which upper and shallower parts of the deposit are invariably dominated by pyrite over chalcopyrite. This is apparent in all
intermineral alteration-mineralization events, including early EDM halos as well as A-, B-, and C- veinlets. Middle and central (interior)
parts of Warintza Central are richer in chalcopyrite and typically contain cpy>py to cpy=py ratios in all Cu-producing events. Rocks,
particularly diorite, are totally replaced by texturally destructive halo-type alteration with abundant disseminated chalcopyrite. C veinlets,
which assist to increase bulk Cu contents, are also dominated by chalcopyrite. A and B veinlets also contain chalcopyrite, albeit in minor
proportions.
In all cases, chalcopyrite followed pyrite in
paragenetic sequence. Deeper parts of the system are characterized by lower sulfide contents in all Cu productive alteration-mineralization
phases. Chalcopyrite and pyrite continue to be present, but the proportion of the total volume of sulfides is radically lower, and the
Cu tenor decreases gradually with depth. A and B veinlets are erratic and scarce and, where present, are essentially free of sulfides
or carry very limited amounts.
Laterally, the same features are observed, with
Cu grades decreasing gradually due to the dominance of pyrite over chalcopyrite and the lower total sulfide contents in all assemblages.
To the south, drilling at the El Trinche has shown this target area to be part of the pyritic halo of Warintza Central, with EDM, A, B,
C, and D veinlets all carrying predominantly pyrite, albeit locally accompanied by minor proportions of chalcopyrite.
Supergene Effects
The upper parts of Warintza Central developed
a first cycle, immature supergene chalcocite blanket beneath an irregular leached capping zone. The latter can be as thin as a couple
of meters but, where better developed, is followed at depth by a formal and thicker chalcocite blanket. Importantly, the metal values
of the leached capping are identical to the Cu and Mo values of the soil geochemistry, indicating that much of the soil anomaly over Warintza
Central is in-situ and a reflection of the mineralization at depth.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Rocks affected by meteoric waters are typically
porous, with open fractures and veinlets of all types characterized by abundant cavities due to the sequential hydration of the original
anhydrite, its transformation to gypsum, and eventual washing out.
Extensions to the East
The eastern extensions, as explored by numerous
holes, share the same geologic and mineralization elements of Warintza Central with the bulk of the Cu as chalcopyrite contained in associations
dominated by east-trending swarms of C-type veinlets. Garnet-bearing prograde skarn and the epidote-chlorite-magnetite-pyrite-chalcopyrite
retrograde skarn assemblages formed at the expense of certain volcano-sedimentary horizons in the Misahuallí sequence and confirm
their relatively proximal position within the thermal aureole of Warintza Central.
On the basis of its geology and alteration-mineralization
features, Warintza East is interpreted as a separate center along the Warintza trend (Figs 3 and 5). Here, the causative porphyry phases
are of predominantly felsic composition and characterized by discrete, coarse-grained, quartz–eye-rich, rhyodacitic bodies intruding
sequences of thinly-bedded to laminated, shallowly-dipping, fine-grained volcaniclastic rocks of the Misahuallí sequence and assemblages
the Andesitic Center (Andesite Porphyry Center of the resource model), to be described below. The rhyodacitic bodies display moderately
to intense, Mo-bearing quartz-stockworks of predominantly B-type veinlets. Copper values are notably lower in the rhyodacite than in the
adjacent andesitic country rocks, the latter containing more abundant chalcopyrite, thereby suggesting that Warintza East is characterized
by a zoned mineralization pattern, with a Mo-rich center and a Cu-Mo halo.
Andesite Porphyry Center
Part of the area between Warintza Central and
Warintza East comprises a composite, predominantly andesite-bearing intrusion, in which coarse-grained porphyritic andesite is typically
intruded by fine-grained, aphanitic dikes of similar composition. Both are entirely transformed to fine-grained assemblages of hydrothermal
biotite. A fine-to medium-grained porphyry is common at depth in most holes drilled in the eastern part of Warintza East. It is grossly
zoned texturally, with a coarser-grained texture in its central parts and contains a multitude of thin, hairline-like fractures and veinlets
with one or more of chlorite, biotite and quartz which are in turn cut by sulfide-poor, A- and Mo-bearing B-type veinlets. This phase
typically intrudes the basal volcaniclastic horizons which are transformed to garnet and pyroxene skarn in its vicinity. Garnet and pyroxene
skarns formed by this intrusion in the basal volcaniclastic horizons are undistinguishable from similar garnet and pyroxene skarn developed
at the expense of sedimentary and volcanosedimentary rocks of the Triassic-Jurassic country rock formations in the vicinity of Warintza
East.
Large sections of magmatic-hydrothermal breccia
are common where intrusions of the complex approach Mishuallí country rocks, and centimeter- to meter-sized lithic clasts and blocks
hosted by the andesitic igneous matrix of the intrusive phase are characteristic. This center has been previously named Mafic Complex
in internal reports and formalized as Andesite Porphyry in the resource model for Warintza Central.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
The Andesite
Porphyry Center is early intermineral in timing because it contains clasts of prograde garnet skarn, A-type veinlets, and anhydrite relicts,
as well as blocks of felsic porphyry with delicate UST-textured and wormy quartz veinlets. It is locally cut by sulfide-bearing, A-type
quartz veinlets, centimeter-wide aplite vein-dikes, and anhydrite-cemented hydrothermal breccia bodies. Through-going C veinlets with
pyrite, chalcopyrite, and magnetite are common. To the west, diorite and intermineral dikes of Warintza Central cut rocks of the Andesite
Porphyry Center and its contained veinlets, while the felsic dikes of Warintza East intrude it to the east.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
The Warintza Central deposit is a Cu-Mo porphyry
associated with calc-alkalic igneous rocks. Porphyry deposits are typically large tonnage, low-grade, hypogene resources, featuring (1)
localization of Cu- and Mo-bearing sulphide in veinlet networks and as disseminated grains in altered wall rocks, (2) alteration and ore
mineralization occurring at one to four km depth and related to magma emplaced at size to eight plus km depth, typically above subduction
zones, (3) multi-phase intrusive rock complexes emplaced immediately before, during, and/or immediately after mineralization, and (4)
zones of phyllic-argillic and marginal propylitic alteration that overlap or surround potassic alteration (Berger et al., 2008).
Oxidation and acid leaching of primary mineralization
may produce zones of (supergene) enrichment near the base of a weathered zone (Hartley and Rice, 2005; Sillitoe, 2005) that, in some deposits,
are important to their economic viability. Porphyry deposits associated with calc-alkalic rocks are typically larger than those associated
with alkalic rocks, both in terms of alteration footprint and metal endowment.
The deposit model for porphyry Cu-Mo deposits
is relatively well-developed and accepted (e.g., Lowell and Guilbert, 1970; and more recent reviews by Sillitoe, 2000; Richards, 2003;
Richards, 2005; Sillitoe and Thompson, 2006) and lends itself to several exploration methods. Geological mapping and diamond drilling
can define alteration patterns, vein network densities, multi-phase intrusive centers, and geochemical zonation that can help establish
the viability of porphyry mineralization and/or establish vectors toward (higher grade) mineralization. The relatively large footprint
of these deposits is amenable to surface geochemical methods, such as soil, silt, and/or rock geochemistry surveys. Disseminated sulphide
mineralization and, in some systems, magnetite-destructive alteration can respond to ground-based induced polarization (“IP”)
and ground- or air-based magnetic surveys. The spectral scanning method—both airborne and on drill core—is a more recently
developed method that produces more objective maps of alteration and vein patterns.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Some of the early regional exploration work by
Billiton that led to the discovery of the Warintza mineralization has been alluded to earlier in this Report. For example, Billiton commissioned
a regional helicopter magnetic and electromagnetic survey that was flown over the region in January to February 1999. They found that
the areas now known to contain porphyry deposits are partially encircled by resistivity highs and are centered on reduced-to-pole magnetic
lows.
No exploration was conducted on the Project between
2006 and 2019.
The Project has a historical analytical database
including information from stream sediment, soil, and rock sampling. Surface samples were collected by the previous operators and are
summarized in Table 13.
Table 13:
Historical Sampling
Historical Data |
Sample Type |
Count |
Soil |
981 |
Rock |
511 |
Stream Sediment |
241 |
Results for historical and recent Cu and Mo soil
and rock samples are summarized in the figures below. Cu effectively highlights general areas of the porphyry centers. Mo in soil and
rock is somewhat more restricted, but the patterns are similar to the Cu ones (Figure 11 and Figure 12). Zinc (“Zn”) in soil
and rock samples form an external halo surrounding the Cu and Mo anomalies. The combined Warintza Central-Warintza East area is characterized
by a well-defined concentric zoning, with a central zone with Zn values lower than 200 parts per million (“ppm”) Zn in soils
and a halo averaging 800 ppm Zn.
The soil sampling pattern for historic samples
progressed from ridge soil sampling to a more detailed grid over the deposit. Surface sampling has effectively outlined outstanding drill
targets at Warintza East, Warintza West, and Warintza South, which have been successfully tested.
A reinterpretation of the historical stream sediment
data was carried out, which allowed delimiting of the Yawi anomaly with dimensions of 5 km x 2.5 km with anomalous values of
450 ppm Cu and 86 ppm Mo.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 11: Historical Cu Soil and Rock Geochemistry
Map of Warintza Cluster
Source: Solaris Resources
Inc. (2022)
Figure 12:
Historical Mo Soil and Rock Geochemistry Map of Warintza Cluster
Source:
Solaris Resources Inc. (2022)
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
From 2020, an extensive program
of geological mapping and surface sampling was conducted at the Warintza Property. Geological mapping was performed at a 10K scale, and
rock samples were taken mainly from outcrops in creeks. Soil samples were collected at 100 m and 50m spacing in order to identify Cu-Mo
porphyry centers and Au occurrences. Rock chip sampling was also performed where outcropping is altered and mineralized rocks were found.
Soil sampling patterns differ from a regular grid to one that follows topographic contours in steep terrain. Surface samples collected
in recent campaigns are summarized in Table 14.
Table 14:
Recent Surface Sampling
Surface Sampling |
Sample Type |
Count |
Analysis |
Soil |
9535 |
Aqua regia - ICP MS |
Stream Sediments |
379 |
Aqua regia - ICP MS |
Rock |
5659 |
4 Acids ICP MS |
Recent soil sampling results expand Warintza East
and Warintza South anomalies, see Figure 13 and Figure 14. Rock sampling in the Warintza East extension yielded Mo anomalous values between
10 and 50 ppm Mo. Rock samples within the Warintza South anomaly returned values between 400 ppm and 2900 ppm Cu, 15 to
180 ppm Mo ppm, and 0.5 to 2 ppm Au.
Soil samples at Patrimonio average 764 ppm Cu
and 89 ppm Mo, comparable in copper values to Warintza East (887 ppm Cu, 87 ppm Mo) and Warintza Central (816 ppm Cu, 288 ppm Mo), with
lower molybdenum values than Central. Rock chip samples from weathered outcrop at Patrimonio returned values of up to 1.6% Cu (averaging
0.18% Cu), 630 parts ppm Mo (averaging 104 ppm Mo) and 0.16 g/t Au (averaging 0.1 g/t Au).
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 13:
Warintza Soil and Stream Sediments Cu Anomalies
Source: Solaris Resources
Inc. (2024)
Figure
14: Warintza Soil and Stream Sediments Mo Anomalies
Source:
Solaris Resources Inc. (2024)
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
At Caya, a reinterpretation of the historical
data was completed, and an anomaly of 5 km x 2.5 km was defined with Cu values ranging to 50 ppm, Mo values range from five to 260 ppm,
and Au varies from 400 to 4,300 part per billion (“ppb”), see Figure 15. Recent follow-up soil and rock sampling in the southern
part of the anomaly has identified a flat-lying volcano-sedimentary layer that has a high permeability over at least 300m in thickness.
In this portion of the anomaly, an area of 0.7km x 1.3km features anomalous gold, and arsenic and antimony in soil and rock samples, and
a concentration of dickite clay and vuggy silica, characteristic of high sulphidation systems, see Figure 16; Figure 17; and Figure 18,
respectively.
At Mateo, 3km x 1.4km of copper-molybdenum enrichment
in soil samples, with Cu values ranging from 100 to 4,500 ppm Cu and molybdenum values between 10 and 315 ppm Mo, see Figure 19 and Figure
20, respectively. The northern portion of Mateo exhibits arsenic and antimony anomalous values in soils, see Figure 17 and Figure 18,
respectively. This northern portion on Mateo may be an extension of the Caya epithermal anomaly and most likely indicates telescoping
or overprinting of early, porphyry Cu-Mo type, deep mineralization, and late, shallow, epithermal mineralization. Detailed mapping and
sampling is underway to refine the target in support of drilling.
Figure
15: Caya Stream Sediment Anomalies
Source:
Solaris Resources Inc. (2021)
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure
16: Caya and Mateo Au in Soil Samples Geochemistry
Source:
Solaris Resources Inc. (2024)
Figure 17:
Caya and Mateo As in Soil Samples Geochemistry
Source:
Solaris Resources Inc. (2024)
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure
18: Caya and Mateo in Sb Soil Samples Geochemistry
Source:
Solaris Resources Inc. (2024)
Figure
19: Caya and Mateo in Cu Soil Samples Geochemistry
Source:
Solaris Resources Inc. (2024)
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 20:
Caya and Mateo in Mo Soil Samples Geochemistry
Source:
Solaris Resources Inc. (2024)
A ZTEM AFMAG EM and magnetic survey was carried
out by Geotech Ltd. between August-October 2020. This advanced airborne ZTEM survey covered approximately 1,666 line-km over the entire
Warintza and area land package, totaling 268 km².
In 2021, Solaris retained Condor Consulting Inc.,
recognized experts in the field of airborne EM, to perform detailed modelling and interpretation of the previously completed advanced
airborne ZTEM survey.
Condor carried out a full 3D inversion of the
EM and magnetic results using commercial and proprietary software, producing enhanced images based on a greatly expanded dataset, including
a considerable amount of additional drilling since the prior interpretation and detailed geology, weathering, and density models for the
Project.
In general, the refined high conductivity volumes
capture mineralization closer to surface and correlate more closely to networked sulfide mineralization in stockwork veining, with the
anomalies now starting at surface and better reflecting the vertical zonation of the Warintza porphyries from higher density stockwork
veining to lower density veining and disseminated mineralization.
After drilling several of the target areas, it
has been observed that portions of the higher-grade sulfides are conductive.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
The Warintza Property was first drilled in two
campaigns executed by Lowell and Corriente during 2000 and 2001. 33 diamond drill holes were completed at Warintza Central for a total
of 6,530 m, see Table 15.
Solaris initiated a new drilling campaign in February
2020 which is still underway. Drill hole assays and data completed for this Report include 163 drills holes and 101,259 m drilled.
Table 15:
Summary of Drilled Meters by Year
Campaign |
Number of Drillholes |
Meters Drilled |
2000 |
16 |
2,391 |
2001 |
17 |
4,139 |
2020 |
16 |
14,400 |
2021 |
56 |
48,650 |
2022 |
42 |
26,062 |
2023 |
14 |
4,150 |
2024 |
2 |
1,468 |
Totals |
163 |
101,259 |
Table 16:
2020 to 2024 Assay Results
Hole ID |
From
(m) |
To
(m) |
Interval
(m) |
Cu
(%) |
Mo
(%) |
Au
(g/t) |
SLSE-08 |
8 |
544 |
536 |
0.35 |
0.02 |
0.04 |
SLSE-07 |
632 |
1069 |
437 |
0.29 |
0.02 |
0.04 |
SLSE-06 |
0 |
484 |
484 |
0.33 |
0.02 |
0.04 |
SLSE-05 |
0 |
714 |
714 |
0.26 |
0.01 |
0.05 |
SLSE-04 |
0 |
892 |
892 |
0.43 |
0.01 |
0.04 |
SLSE-03 |
38 |
856 |
818 |
0.29 |
0.02 |
0.03 |
SLSE-15 |
124 |
1,034 |
910 |
0.31 |
0.02 |
0.04 |
SLSE-14 |
24 |
718 |
694 |
0.29 |
0.02 |
0.04 |
SLSE-13 |
4 |
622 |
618 |
0.22 |
0.01 |
0.03 |
SLSE-12 |
0 |
508 |
508 |
0.29 |
0.02 |
0.04 |
SLSE-11 |
112 |
600 |
488 |
0.3 |
0.01 |
0.03 |
SLSE-10 |
78 |
576 |
498 |
0.33 |
0.01 |
0.05 |
SLSE-09 |
0 |
773 |
773 |
0.18 |
0.03 |
0.03 |
SLS-54 |
0 |
1093 |
1093 |
0.45 |
0.02 |
0.04 |
SLS-53 |
10 |
967 |
957 |
0.39 |
0.01 |
0.03 |
SLS-52 |
42 |
1019 |
977 |
0.39 |
0.01 |
0.03 |
SLS-51 |
36 |
1048 |
1012 |
0.38 |
0.01 |
0.06 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Hole ID |
From
(m) |
To
(m) |
Interval
(m) |
Cu
(%) |
Mo
(%) |
Au
(g/t) |
SLS-50 |
336 |
458 |
122 |
0.14 |
0.04 |
0.03 |
SLS-49 |
50 |
867 |
817 |
0.5 |
0.02 |
0.04 |
SLS-47 |
48 |
859 |
811 |
0.41 |
0.02 |
0.05 |
SLS-46 |
48 |
680 |
632 |
0.27 |
0.01 |
0.03 |
SLS-45 |
44 |
608 |
564 |
0.37 |
0.01 |
0.03 |
SLS-44 |
6 |
524 |
518 |
0.16 |
0.05 |
0.03 |
SLS-43 |
138 |
350 |
212 |
0.17 |
0.03 |
0.03 |
SLS-42 |
52 |
958 |
906 |
0.42 |
0.02 |
0.06 |
SLS-41 |
0 |
592 |
592 |
0.42 |
0.02 |
0.06 |
SLS-40 |
8 |
1056 |
1048 |
0.39 |
0.01 |
0.03 |
SLS-39 |
28 |
943 |
915 |
0.49 |
0.01 |
0.04 |
SLS-38 |
58 |
880 |
822 |
0.28 |
0.01 |
0.05 |
SLS-37 |
28 |
896 |
868 |
0.39 |
0.05 |
0.05 |
SLS-36 |
2 |
1082 |
1080 |
0.33 |
0.01 |
0.04 |
SLS-35 |
48 |
968 |
920 |
0.53 |
0.02 |
0.04 |
SLS-34 |
52 |
712 |
660 |
0.36 |
0.02 |
0.06 |
SLS-33 |
40 |
762 |
722 |
0.55 |
0.03 |
0.05 |
SLSE-02 |
0 |
1160 |
1160 |
0.2 |
0.01 |
0.04 |
SLS-32 |
0 |
618 |
618 |
0.38 |
0.02 |
0.05 |
SLS-31 |
8 |
1008 |
1000 |
0.68 |
0.02 |
0.07 |
SLS-30 |
2 |
374 |
372 |
0.57 |
0.06 |
0.06 |
SLSE-01 |
0 |
1213 |
1213 |
0.21 |
0.01 |
0.03 |
SLS-29 |
6 |
1190 |
1184 |
0.58 |
0.02 |
0.05 |
SLS-28 |
6 |
638 |
632 |
0.51 |
0.04 |
0.06 |
SLS-27 |
22 |
484 |
462 |
0.7 |
0.04 |
0.08 |
SLS-26 |
2 |
1002 |
1000 |
0.51 |
0.02 |
0.04 |
SLS-25 |
62 |
444 |
382 |
0.62 |
0.03 |
0.08 |
SLS-24 |
10 |
962 |
952 |
0.53 |
0.02 |
0.04 |
SLS-19 |
6 |
420 |
414 |
0.21 |
0.01 |
0.06 |
SLS-23 |
10 |
558 |
548 |
0.31 |
0.02 |
0.06 |
SLS-22 |
86 |
324 |
238 |
0.52 |
0.03 |
0.06 |
SLS-21 |
2 |
1031 |
1029 |
0.63 |
0.02 |
0.04 |
SLS-20 |
18 |
706 |
688 |
0.35 |
0.04 |
0.05 |
SLS-18 |
78 |
875 |
797 |
0.62 |
0.05 |
0.06 |
SLS-17 |
12 |
506 |
494 |
0.39 |
0.02 |
0.06 |
SLS-16 |
20 |
978 |
958 |
0.63 |
0.03 |
0.06 |
SLS-15 |
2 |
1231 |
1229 |
0.48 |
0.01 |
0.04 |
SLS-14 |
0 |
922 |
922 |
0.79 |
0.03 |
0.08 |
SLS-13 |
6 |
468 |
462 |
0.8 |
0.04 |
0.09 |
SLS-12 |
22 |
758 |
736 |
0.59 |
0.03 |
0.07 |
SLS-11 |
6 |
694 |
688 |
0.39 |
0.04 |
0.05 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Hole ID |
From
(m) |
To
(m) |
Interval
(m) |
Cu
(%) |
Mo
(%) |
Au
(g/t) |
SLS-10 |
2 |
602 |
600 |
0.83 |
0.02 |
0.12 |
SLS-09 |
122 |
220 |
98 |
0.6 |
0.02 |
0.04 |
SLS-08 |
134 |
588 |
454 |
0.51 |
0.03 |
0.03 |
SLS-07 |
0 |
1067 |
1067 |
0.49 |
0.02 |
0.04 |
SLS-06 |
8 |
892 |
884 |
0.5 |
0.03 |
0.04 |
SLS-05 |
18 |
936 |
918 |
0.43 |
0.01 |
0.04 |
SLS-04 |
0 |
1004 |
1004 |
0.59 |
0.03 |
0.05 |
SLS-03 |
4 |
1014 |
1010 |
0.59 |
0.02 |
0.1 |
SLS-02 |
0 |
660 |
660 |
0.79 |
0.03 |
0.1 |
SLS-01 |
1 |
568 |
567 |
0.8 |
0.04 |
0.1 |
SLS-61 |
2 |
932 |
930 |
0.62 |
0.03 |
0.07 |
SLS-60 |
44 |
873 |
829 |
0.5 |
0.01 |
0.04 |
SLS-59 |
2 |
513 |
511 |
0.54 |
0.04 |
0.07 |
SLS-58 |
102 |
843 |
741 |
0.48 |
0.03 |
0.06 |
SLS-57 |
0 |
926 |
926 |
0.49 |
0.02 |
0.08 |
SLS-56 |
48 |
606 |
558 |
0.33 |
0.01 |
0.03 |
SLS-63 |
0 |
472 |
472 |
0.6 |
0.02 |
0.12 |
SLS-62 |
10 |
910 |
900 |
0.33 |
0.02 |
0.07 |
SLS-66 |
0 |
622 |
622 |
0.32 |
0.02 |
0.05 |
SLS-64 |
78 |
518 |
440 |
0.32 |
0.04 |
0.04 |
SLS-68 |
44 |
660 |
616 |
0.34 |
0.02 |
0.04 |
SLS-67 |
42 |
646 |
604 |
0.4 |
0.02 |
0.05 |
SLS-65 |
88 |
374 |
286 |
0.38 |
0.04 |
0.06 |
SLSE-19 |
0 |
580 |
580 |
0.24 |
0.01 |
0.03 |
SLSE-18 |
30 |
524 |
494 |
0.16 |
0.01 |
0.04 |
SLSE-17 |
0 |
914 |
914 |
0.32 |
0.01 |
0.04 |
SLSE-16 |
8 |
720 |
712 |
0.36 |
0.02 |
0.05 |
SLS-70 |
26 |
290 |
264 |
0.38 |
0.03 |
0.11 |
SLS-69 |
52 |
898 |
846 |
0.2 |
0.02 |
0.03 |
SLSE-25 |
0 |
300 |
300 |
0.21 |
0.02 |
0.03 |
SLSE-24 |
10 |
420 |
410 |
0.23 |
0.01 |
0.04 |
SLSE-23 |
0 |
746 |
746 |
0.36 |
0.02 |
0.04 |
SLSE-22 |
26 |
1080 |
1054 |
0.18 |
0.01 |
0.03 |
SLSE-21 |
0 |
1040 |
1040 |
0.26 |
0.01 |
0.04 |
SLSE-20 |
0 |
900 |
900 |
0.24 |
0.01 |
0.03 |
SLSE-16 |
8 |
720 |
712 |
0.36 |
0.02 |
0.05 |
SLSE-28 |
8 |
309 |
301 |
0.54 |
0.02 |
0.07 |
SLS-74 |
6 |
230 |
224 |
0.28 |
0.03 |
0.04 |
SLS-73 |
12 |
228 |
216 |
0.4 |
0.02 |
0.11 |
SLS-72 |
48 |
878 |
830 |
0.39 |
0.02 |
0.08 |
SLS-71 |
30 |
524 |
494 |
0.33 |
0.01 |
0.08 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Hole ID |
From
(m) |
To
(m) |
Interval
(m) |
Cu
(%) |
Mo
(%) |
Au
(g/t) |
SLS-75 |
16 |
42 |
26 |
0.38 |
0.02 |
0.11 |
SLSE-32 |
4 |
638 |
634 |
0.21 |
0.01 |
0.02 |
SLSE-31 |
26 |
310 |
284 |
0.44 |
0.02 |
0.05 |
SLSE-30 |
34 |
309 |
275 |
0.4 |
0.01 |
0.05 |
SLSE-29 |
20 |
309 |
289 |
0.31 |
0.02 |
0.05 |
SLSE-27 |
48 |
294 |
246 |
0.43 |
0.02 |
0.07 |
SLSE-26 |
0 |
310 |
310 |
0.34 |
0.02 |
0.05 |
SLSE-28 |
8 |
309 |
301 |
0.54 |
0.02 |
0.07 |
SLSP-01 |
16 |
160 |
144 |
0.34 |
0.03 |
0.09 |
SLSP-02 |
18 |
294 |
276 |
0.29 |
0.02 |
0.07 |
SLSP-04 |
30 |
204 |
174 |
0.25 |
0.02 |
0.06 |
SLSP-03 |
0 |
310 |
310 |
0.1 |
0.01 |
0.04 |
SLST-03 |
16 |
1044 |
1028 |
0.24 |
0.01 |
0.03 |
SLSN-02 |
0 |
200 |
200 |
0.43 |
0.02 |
0.1 |
SLSN-01 |
42 |
219 |
177 |
0.36 |
0.01 |
0.07 |
SLST-02 |
44 |
202 |
158 |
0.22 |
0 |
0.03 |
SLST-01 |
36 |
204 |
168 |
0.16 |
0 |
0.05 |
Notes to Table 16:
| 1. | Grades are uncut and true widths have not been determined. |
Table 17:
Collar Locations
Hole ID |
Easting |
Northing |
Elevation
(m) |
Depth
(m) |
Azimuth
(degrees) |
Dip
(degrees) |
EMM-008 |
799538 |
9647858 |
1485 |
270 |
269 |
-65 |
EMM-010 |
799400 |
9647961 |
1504 |
262 |
306 |
-69 |
SLS-01 |
799765 |
9648034 |
1571 |
805 |
0 |
-80 |
SLS-02 |
799765 |
9648033 |
1571 |
744 |
0 |
-89 |
SLS-03 |
800187 |
9648062 |
1568 |
1090 |
270 |
-80 |
SLS-04 |
800189 |
9648063 |
1568 |
1150 |
0 |
-90 |
SLS-05 |
800125 |
9648032 |
1566 |
1063 |
230 |
-80 |
SLS-06 |
800127 |
9648034 |
1566 |
1069 |
45 |
-79 |
SLS-07 |
800190 |
9648063 |
1568 |
1067 |
55 |
-80 |
SLS-08 |
800256 |
9648099 |
1556 |
824 |
20 |
-80 |
SLS-09 |
800265 |
9648212 |
1475 |
500 |
0 |
-89 |
SLS-10 |
799765 |
9648033 |
1571 |
691 |
270 |
-75 |
SLS-11 |
800187 |
9648061 |
1568 |
861 |
270 |
-65 |
SLS-12 |
800124 |
9648033 |
1566 |
783 |
286 |
-62 |
SLS-13 |
799673 |
9648031 |
1492 |
469 |
0 |
-80 |
SLS-14 |
799768 |
9648033 |
1571 |
1020 |
90 |
-80 |
SLS-15 |
800188 |
9648060 |
1568 |
1231 |
223 |
-80 |
SLS-16 |
800124 |
9648033 |
1566 |
1033 |
270 |
-77 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Hole ID |
Easting |
Northing |
Elevation
(m) |
Depth
(m) |
Azimuth
(degrees) |
Dip
(degrees) |
SLS-17 |
799766 |
9648032 |
1571 |
789 |
180 |
-80 |
SLS-18 |
799684 |
9648127 |
1460 |
875 |
100 |
-70 |
SLS-19 |
799673 |
9648031 |
1492 |
588 |
235 |
-81 |
SLS-20 |
800126 |
9648035 |
1566 |
816 |
0 |
-75 |
SLS-21 |
800190 |
9648062 |
1568 |
1032 |
70 |
-70 |
SLS-22 |
799681 |
9648128 |
1460 |
562 |
270 |
-60 |
SLS-23 |
799764 |
9648033 |
1571 |
571 |
270 |
-61 |
SLS-24 |
800127 |
9648033 |
1566 |
963 |
90 |
-75 |
SLS-25 |
799681 |
9648125 |
1460 |
514 |
220 |
-71 |
SLS-26 |
800191 |
9648062 |
1568 |
1032 |
70 |
-60 |
SLS-27 |
799673 |
9648030 |
1492 |
677 |
45 |
-70 |
SLS-28 |
799767 |
9648034 |
1571 |
835 |
50 |
-75 |
SLS-29 |
800127 |
9648034 |
1566 |
1190 |
78 |
-70 |
SLS-30 |
799671 |
9648029 |
1492 |
552 |
0 |
-65 |
SLS-31 |
799768 |
9648032 |
1571 |
1025 |
97 |
-80 |
SLS-32 |
800381 |
9648301 |
1409 |
831 |
0 |
-89 |
SLS-33 |
799869 |
9648007 |
1633 |
764 |
0 |
-81 |
SLS-34 |
800383 |
9648302 |
1408 |
1057 |
78 |
-60 |
SLS-35 |
800127 |
9648034 |
1566 |
995 |
78 |
-60 |
SLS-36 |
799768 |
9648032 |
1571 |
1089 |
97 |
-60 |
SLS-37 |
799963 |
9648111 |
1501 |
929 |
0 |
-90 |
SLS-38 |
800383 |
9648302 |
1408 |
923 |
90 |
-56 |
SLS-39 |
800257 |
9648097 |
1559 |
943 |
145 |
-80 |
SLS-40 |
800126 |
9648032 |
1566 |
1056 |
105 |
-75 |
SLS-41 |
799767 |
9648032 |
1571 |
792 |
115 |
-70 |
SLS-42 |
800383 |
9648303 |
1409 |
1061 |
55 |
-80 |
SLS-43 |
799870 |
9648315 |
1414 |
761 |
110 |
-74 |
SLS-44 |
799964 |
9648110 |
1501 |
676 |
0 |
-75 |
SLS-45 |
800258 |
9648097 |
1559 |
970 |
117 |
-70 |
SLS-46 |
800126 |
9648032 |
1566 |
883 |
125 |
-70 |
SLS-47 |
799963 |
9648108 |
1501 |
859 |
135 |
-71 |
SLS-49 |
800383 |
9648302 |
1409 |
867 |
135 |
-73 |
SLS-50 |
799871 |
9648314 |
1414 |
769 |
80 |
-76 |
SLS-51 |
799869 |
9648005 |
1631 |
1048 |
85 |
-70 |
SLS-52 |
800258 |
9648098 |
1556 |
1019 |
110 |
-75 |
SLS-53 |
800125 |
9648032 |
1566 |
968 |
170 |
-83 |
SLS-54 |
800382 |
9648301 |
1407 |
1094 |
160 |
-74 |
SLS-55 |
799946 |
9647926 |
1646 |
792 |
118 |
-70 |
SLS-56 |
800127 |
9648034 |
1566 |
920 |
88 |
-50 |
SLS-57 |
800383 |
9648304 |
1407 |
964 |
40 |
-71 |
SLS-58 |
799945 |
9647928 |
1647 |
843 |
40 |
-70 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Hole ID |
Easting |
Northing |
Elevation
(m) |
Depth
(m) |
Azimuth
(degrees) |
Dip
(degrees) |
SLS-59 |
799768 |
9648032 |
1571 |
513 |
65 |
-69 |
SLS-60 |
800256 |
9648097 |
1556 |
874 |
190 |
-81 |
SLS-61 |
800187 |
9648061 |
1568 |
967 |
255 |
-72 |
SLS-62 |
800180 |
9648287 |
1438 |
943 |
55 |
-60 |
SLS-63 |
800383 |
9648304 |
1407 |
498 |
15 |
-61 |
SLS-64 |
800179 |
9648288 |
1438 |
571 |
25 |
-65 |
SLS-65 |
800347 |
9648416 |
1346 |
401 |
290 |
-71 |
SLS-66 |
800380 |
9648303 |
1407 |
689 |
253 |
-50 |
SLS-67 |
800177 |
9648286 |
1438 |
673 |
230 |
-76 |
SLS-68 |
800178 |
9648288 |
1438 |
662 |
332 |
-85 |
SLS-69 |
800348 |
9648413 |
1346 |
944 |
200 |
-70 |
SLS-70 |
800350 |
9648416 |
1346 |
291 |
20 |
-65 |
SLS-71 |
800551 |
9648379 |
1347 |
568 |
330 |
-71 |
SLS-72 |
800553 |
9648378 |
1347 |
878 |
25 |
-80 |
SLS-73 |
800529 |
9648509 |
1259 |
294 |
0 |
-89 |
SLS-74 |
799575 |
9648231 |
1337 |
237 |
131 |
-80 |
SLS-75 |
800531 |
9648518 |
1261 |
607 |
60 |
-86 |
SLSE-01 |
801482 |
9648202 |
1129 |
1213 |
260 |
-45 |
SLSE-02 |
801482 |
9648203 |
1128 |
1191 |
276 |
-49 |
SLSE-03 |
800749 |
9648146 |
1282 |
909 |
270 |
-44 |
SLSE-04 |
800749 |
9648145 |
1282 |
893 |
256 |
-46 |
SLSE-05 |
800750 |
9648148 |
1282 |
737 |
330 |
-65 |
SLSE-06 |
801482 |
9648203 |
1128 |
1078 |
285 |
-54 |
SLSE-07 |
800752 |
9648146 |
1282 |
1069 |
83 |
-50 |
SLSE-08 |
801482 |
9648204 |
1129 |
959 |
305 |
-70 |
SLSE-09 |
801485 |
9648200 |
1129 |
774 |
271 |
-80 |
SLSE-10 |
800749 |
9648148 |
1282 |
691 |
300 |
-50 |
SLSE-11 |
800749 |
9648147 |
1282 |
862 |
285 |
-60 |
SLSE-12 |
801484 |
9648199 |
1129 |
981 |
245 |
-46 |
SLSE-13 |
801485 |
9648198 |
1129 |
800 |
215 |
-45 |
SLSE-14 |
801652 |
9648047 |
1211 |
872 |
300 |
-75 |
SLSE-15 |
801160 |
9648195 |
1362 |
1070 |
82 |
-62 |
SLSE-16 |
801651 |
9648045 |
1211 |
845 |
225 |
-45 |
SLSE-17 |
801488 |
9648199 |
1129 |
1011 |
105 |
-71 |
SLSE-18 |
801654 |
9648047 |
1211 |
1019 |
40 |
-65 |
SLSE-19 |
801488 |
9648201 |
1129 |
816 |
48 |
-65 |
SLSE-20 |
801487 |
9648199 |
1129 |
906 |
90 |
-64 |
SLSE-21 |
801654 |
9648046 |
1211 |
1071 |
90 |
-82 |
SLSE-22 |
801453 |
9647975 |
1216 |
1083 |
165 |
-80 |
SLSE-23 |
801487 |
9648201 |
1129 |
748 |
0 |
-80 |
SLSE-24 |
801651 |
9648046 |
1211 |
722 |
250 |
-65 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Hole ID |
Easting |
Northing |
Elevation
(m) |
Depth
(m) |
Azimuth
(degrees) |
Dip
(degrees) |
SLSE-25 |
801496 |
9648124 |
1166 |
300 |
200 |
-89 |
SLSE-26 |
801596 |
9648136 |
1150 |
310 |
269 |
-89 |
SLSE-27 |
801573 |
9648047 |
1217 |
294 |
346 |
-89 |
SLSE-28 |
801433 |
9647870 |
1163 |
309 |
208 |
-89 |
SLSE-29 |
801463 |
9647912 |
1182 |
309 |
144 |
-81 |
SLSE-30 |
801388 |
9647873 |
1184 |
309 |
149 |
-81 |
SLSE-31 |
801396 |
9647783 |
1183 |
311 |
82 |
-80 |
SLSE-32 |
801483 |
9648241 |
1170 |
861 |
1 |
-78 |
SLSEM-01 |
801453 |
9647977 |
1216 |
290 |
330 |
-89 |
SLSEM-02 |
801253 |
9647980 |
1252 |
275 |
0 |
-90 |
SLSEM-03 |
801715 |
9647936 |
1196 |
271 |
0 |
-88 |
SLSEM-04 |
801967 |
9647827 |
1113 |
210 |
0 |
-90 |
SLSEM-05 |
800869 |
9647804 |
1466 |
306 |
0 |
-89 |
SLSEM-06 |
801965 |
9647691 |
1048 |
301 |
0 |
-89 |
SLSEM-07 |
801920 |
9647965 |
1080 |
300 |
0 |
-90 |
SLSEM-08 |
801768 |
9647717 |
1082 |
303 |
90 |
-90 |
SLSES-01 |
800272 |
9647497 |
1547 |
300 |
131 |
-69 |
SLSES-02 |
800170 |
9647410 |
1557 |
298 |
23 |
-69 |
SLSN-01 |
800554 |
9648380 |
1347 |
219 |
200 |
-90 |
SLSN-02 |
800515 |
9648401 |
1319 |
201 |
80 |
-90 |
SLSN-03 |
800499 |
9648300 |
1384 |
200 |
75 |
-90 |
SLSN-04 |
800779 |
9648570 |
1218 |
206 |
0 |
-90 |
SLSN-08 |
800532 |
9648511 |
1259 |
224 |
60 |
-70 |
SLSP-01 |
799426 |
9647625 |
1518 |
310 |
316 |
-60 |
SLSP-02 |
799425 |
9647624 |
1518 |
310 |
260 |
-66 |
SLSP-03 |
799352 |
9647453 |
1617 |
310 |
40 |
-65 |
SLSP-04 |
799364 |
9647811 |
1521 |
309 |
144 |
-59 |
SLST-01 |
800203 |
9647530 |
1596 |
861 |
335 |
-60 |
SLST-02 |
800205 |
9647530 |
1596 |
835 |
12 |
-62 |
SLST-03 |
800203 |
9647530 |
1596 |
1124 |
330 |
-51 |
W-01 |
800175 |
9648285 |
1444 |
213 |
0 |
-90 |
W-02 |
800276 |
9648310 |
1396 |
103 |
135 |
-70 |
W-03 |
800065 |
9648197 |
1444 |
184 |
0 |
-90 |
W-04 |
800172 |
9648203 |
1473 |
251 |
0 |
-90 |
W-05 |
800267 |
9648211 |
1475 |
153 |
0 |
-90 |
W-06 |
800062 |
9648106 |
1502 |
152 |
0 |
-90 |
W-07 |
799984 |
9648187 |
1455 |
217 |
0 |
-90 |
W-08 |
800182 |
9648040 |
1588 |
138 |
0 |
-90 |
W-09 |
800384 |
9648303 |
1411 |
146 |
0 |
-90 |
W-10 |
800500 |
9648300 |
1385 |
135 |
0 |
-90 |
W-11 |
800514 |
9648400 |
1329 |
150 |
0 |
-90 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Hole ID |
Easting |
Northing |
Elevation
(m) |
Depth
(m) |
Azimuth
(degrees) |
Dip
(degrees) |
W-12 |
800523 |
9648516 |
1259 |
76 |
0 |
-90 |
W-13 |
800958 |
9647984 |
1410 |
92 |
0 |
-90 |
W-14 |
800753 |
9648092 |
1295 |
88 |
0 |
-90 |
W-15 |
799877 |
9648168 |
1499 |
155 |
0 |
-90 |
W-16 |
800637 |
9648069 |
1326 |
138 |
235 |
-70 |
W-17 |
799767 |
9648190 |
1427 |
152 |
0 |
-90 |
W-18 |
799871 |
9648318 |
1417 |
220 |
0 |
-90 |
W-19 |
799996 |
9648312 |
1365 |
198 |
0 |
-90 |
W-20 |
799967 |
9648106 |
1501 |
186 |
0 |
-90 |
W-21 |
799880 |
9648126 |
1523 |
214 |
0 |
-90 |
W-22 |
799764 |
9648116 |
1478 |
227 |
0 |
-90 |
W-23 |
800259 |
9648100 |
1562 |
201 |
0 |
-90 |
W-24 |
800169 |
9648101 |
1548 |
248 |
0 |
-90 |
W-25 |
800125 |
9648037 |
1566 |
360 |
0 |
-90 |
W-26 |
800258 |
9648001 |
1630 |
213 |
0 |
-90 |
W-27 |
800246 |
9647906 |
1696 |
201 |
0 |
-90 |
W-28 |
800145 |
9647898 |
1729 |
230 |
0 |
-90 |
W-29 |
800059 |
9647905 |
1687 |
297 |
0 |
-90 |
W-30 |
799967 |
9648001 |
1611 |
367 |
0 |
-90 |
W-31 |
799871 |
9648017 |
1629 |
250 |
0 |
-90 |
W-32 |
799764 |
9648032 |
1578 |
305 |
0 |
-90 |
W-33 |
799667 |
9648029 |
1496 |
270 |
0 |
-90 |
Notes to Table 17:
| 1. | The coordinates are in WGS84 17S Datum. |
The current drilling program executed by Solaris
uses Kluane Drilling, man-portable, hydraulic rigs. The historical campaigns were carried out between February to April 2000 and from
July to August 2001, starting with a core diameter of NTW (2.21” diameter), but in some cases, BTW (1.66” diameter) was used.
In the current drilling program executed by Solaris, core diameters start with HTW (2.80” diameter) down to 500 m depth, NTW to
approximately 900 m depth, and finally with BTW for greater depths.
Down hole surveys are made using equipment
such as Ez TrackTM, Devishot, and Gyro, which are operated by the drilling company. Measurements are taken every 50 m in all drill
holes. The Rocktest company performs quality control of the previous measurements using Gyro GT3 equipment, performing measurements
every 20 m on descent and every 10 m on ascent in approximately 70% of the drill holes.
The drilling grid has an average spacing of 150
m. However, in an effort to minimize environmental disturbance and maximize efficiencies, several holes were drilled in different directions
from the same platforms.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 21:
Drilling Completed
Source: Solaris Resources Inc. (2024)
| 10.2 | Core Handling Procedures |
Core is placed in the core boxes and each box
is labeled with the drill hole ID and box number. In addition, a core meterage control, basic geotechnical survey, and geological “quicklog”
are performed at a station near each platform. Core boxes are packed with plastic film and moved to a loading platform to later be transferred
by helicopter and truck to the Solaris core shed facilities in Quito.
At the core shed, the following processes are
completed:
| 1. | Control of drilling interval measurements |
| 2. | Core is marked every 2 m for sampling |
| 3. | Photographic record of the core complete with drilling intervals and sampling intervals is done |
| 4. | Core photos are uploaded onto the Imago software data-room |
| 5. | Structural logging using IQ Logger and Class structural logging system |
| 6. | Point load tests with PLT-measuring equipment every 10 m |
| 7. | Geotechnical logging of recovery parameters, RQD, number of fractures, geotechnical intervals, IRS, GSI,
and others |
| 8. | Sampling of half core for assays |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 9. | Geological mapping using the Anaconda mapping system, including lithology, primary and secondary alteration
minerals, mineral species in mineralized zones, vein description, and density, etc. |
Core is stored in racks at the core facility,
and the geotechnical data is collected in detail as described above.
Samples for specific gravity are selected and
cut at 10 to 15 cm samples every 20 m, considering that the core is sufficiently resistant to the cutting process. SG samples are sent
to the Bureau Veritas laboratory in Lima, where the paraffin-coated, water-immersion method is used to measure SG.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 11.0 | Sample Preparation, Analyses, and Security |
Corriente Resources Inc. explored Warintza Central,
drilling in 33 diamond drill holes (6,502.37 m)1 in two campaigns from February-April 2000 (16 DDH) and July-August 2001 (17
DDH). The total samples taken were 2,142.
During 2020 and 2021, Lowell (Solaris Resources)
drilled a total of 58,011.17 m in 66 drill holes. The total number of samples taken was 28,915 through December 2021.
The QP reviewed Lowell’s (Solaris Resources)
exploration work at the Project site, as well as all other installations where sample preparation and storage are completed both in Macas
and Quito (Ecuador, see Figure 22).
Additionally, the QP visited ALS’ sample
preparation laboratory in Quito in late November 2021 and the assaying laboratory in Lima (Perú) in February 2022.
Figure 22:
Warintza Project, Central Core Shed Facilities in Quito, Ecuador
Source:
GSI (2021)
Between 2022 and 2024, Lowell (Solaris Resources) drilled a total of 97,010 m in 141 holes. The number of samples taken was approximately
47,165, until March 27, 2024 (closing of database review by the QP).
| 1 | One drill hole (W-02) was only sampled to 75 m depth, although
it was drilled to 102.62 m. |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
In February 2024, the core shed facilities were visited in Quito, Ecuador, to review databases, drillhole logging processes,
and 3D geological modeling (Figure 23 and Figure 24).
Figure 23:
Warintza Project. Lima Office, Peru (left) and Central Core Shed Facilities (right) in Quito, Ecuador.
Source: GSI (2024).
Figure 24:
Warintza Project. Central Core Shed Facilities in Quito, Ecuador. Source:
GSI (2024).
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 11.1 | Sample Preparation and Analyses |
11.1.1 2000-2001 Drilling Campaign
Diamond drill core was sampled at regular one-meter
intervals that do not honor lithological contacts. The splitting of the core was performed using a diamond bladed core saw at the exploration
camp. Broken or soft core was sampled using a scoop to divide half the contents of the core box. The one-meter samples were bagged and
labeled with sample IDs. The Bondar-Clegg preparation facility in Quito crushed and pulverised each sample before sending a 100 g pulp
to North Vancouver, Canada. Using instructions from Lowell (Solaris Resources), the one-meter samples submitted were composited into larger
samples designed to honor the mineralized zones (Table 18). The compositing length procedure was rigorously adhered to resulting in composites
that mixed material types. The analytical results correspond to the composited intervals. Each hole has a record of the original one-meter
samples taken and the relative composite assignment. It is unclear at which stage the composites are combined, but based on the description,
it seems to be between crushing and pulverization.
The Bondar-Clegg preparation facility received
core samples and prepared 2,142 pulps to ship for analysis (Table 19). Pulps were generated by first crushing core to -10 mesh that were
then split in quarters up to a maximum weight of 250 g. One quarter split was pulverised to -150 mesh (106 micron), of which 100 g were
shipped to the analytical lab for Au and multi-element analysis. Au was determined from a 30 g aliquot by fire assay with AAS finish.
Cu, Mo, Zn, lead (“Pb”), and silver (“Ag”) were determined by an ore grade method, using a three-acid digest and
AAS finish (Vaca and León, 2001). Ag and Pb were only analyzed in the first campaign and results are available for 775 samples.
Table 18: Sample Composite Lengths
Applied to Sample
Based on Mineralized Zone Character
Source: Equity (2019)
Table 19: Table of Assays and
QA/QC Samples Submitted
Source: Equity (2019)
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
11.1.2 2020-2021 Drilling Campaign
Drill holes were sampled initially on a 2 m interval
in mineralization and 5 m intervals in waste/barren rock. Currently, sampling is done at a fixed 2 m length.
Core is sawed in half for most of the competent
rock. If necessary, a guillotine is used in softer areas, such as oxidized intervals. Core is cut following an axis line drawn by the
geologist. According to protocol, the sample is always taken from the right side of the core.
Field duplicates are cut in half, obtaining a
quarter core. A record is created with the sampling sequence, technical person in charge, bag number, codes, quality assurance/quality
control (“QA/QC”), weight, and number of total samples of the bag. The sealed samples are placed inside the bags (usually
three samples per bag) and sealed with disposable plastic ties (Figure 25).
Figure 25:
Laboratory Sample Reception and Preparation - ALS Quito, Ecuador
Sample
Weighing and Internal Code Assignment
Source:
GSI (2021)
The main laboratory of the Warintza Project is ALS Chemex, a commercial
laboratory that has ISO/IEC 17025:2017 certification (Accredited Laboratory No. 670) valid from March 2010 to March 2026. The certification
includes all the facilities that Lowell (Solaris Resources) uses for the treatment of the samples. The certifying body is the Standards
Council of Canada (“SCC”). Sample preparation (Table 20) is
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
performed at ALS Quito, Ecuador. The analytical determinations are made in ALS Lima, Peru, from the pulps sent internally by
the laboratory in Ecuador.
Table 20: Sample Preparation
Protocol from ALS Chemex Quito
Source: GSI (2022)
The analysis suite in ore grade corresponds to
the determination of Au, Mo, Ag, Pb, Zn, and total Cu, Sequential Cu, Cyanide-soluble Cu2; all these determinations by atomic
absorption3 for the samples every 2 m of the drillings, while a suite of trace elements, by ICP4, is requested
for all samples, only for the first drill hole within the same platform. GeoSystems visited the ALS facilities in both countries to review
the treatment of the Warintza samples, finding everything in accordance with Lowell’s and ALS’ protocols.
The secondary laboratory of the Warintza Project
is Bureau Veritas (“BV”), based in Quito, Ecuador, and Lima, Peru. It is a commercial laboratory that has ISO/IEC 17025:2017
accreditation (Certificate Number: 2185.02) valid from July 2021 to April 2023. The accrediting entity is A2LA for the Ecuador headquarters,
while INACAL accredited the services of Bureau Veritas (former Inspectorate Services Perú S.A.C) in Lima, Peru, valid from June
2019 to June 2023.
Lowell (Solaris Resources) has a pulp sampling
procedure to select intervals to be sent for grade control. These pulps are separated based on the results obtained by ALS and for this
purpose are chosen as follows: 1% low-grade samples (<0.25% Cu), 2% medium-grade samples (0.25-0.6% Cu), and 3% of high-grade samples
(>0.6% Cu). The master fraction envelopes returned by ALS are picked, and the samples are changed to a new envelope with new numerical
encoding. The secondary laboratory facilities were not visited by the QP. The shipment of pulp from the Lowell (Solaris Resources) facilities
in Ecuador to the BV laboratory in Lima is made through the headquarters that BV has in Quito.
11.1.3 2022-2024 Drilling Campaign
Sampling Procedures
The sampling procedure is carried out in the same
way as in 2020-2021, with a sampling interval every 2 m. ALS Chemex has been maintained as the principal laboratory with two headquarters,
one in Quito, Ecuador, and the other in Lima, Peru. Based in Quito, Ecuador, Bureau Veritas has been maintained as the
| 2 | This analysis was carried out between the dates 07/28/2020 to
08/19/2021. |
| 3 | AA analyses for Au, Cu, Mo, Pb, and Zn were used from 06/05/2020
to the present, and Sequential Copper was used from 06/23/2021 to the present. |
| 4 | ICP61a detection limits were used between 02/12/2021 to 03/23/2021.
ICP61m was used from 06/05/2020 to present. |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
secondary laboratory.
The sampling process and the sending of samples to the different laboratories follow the same protocols previously defined for 2020-2021.
ALS certifications remain valid as described in
2020-2021. Bureau Veritas updated its certifications until September 12, 2027, through INACAL under NTP-ISO/IEC 17025:2017 General Requirements
for the Competence of Testing and Calibration Laboratories.
Lowell (Solaris Resources) has updated various
protocols; one of the changes in the analysis requests is the definitive withdrawal of the service for the variable Soluble Copper (Cu-AA17)
in Cyanide since the Sequential Copper analysis (Cu-PKG06LI) has been considered the most relevant for soluble species. On the other hand,
Hg analysis using the Hg-MS42 method by ICP-MS has been added in 2024.
11.2.1 2000-2001 Drilling Campaign
The sample shipment was packed to the Warintza
airstrip along footpaths. The shipments were flown via chartered aircraft to Macas and carried by commercial transport directly to the
preparation facility in Quito (Vaca and León, 2001).
11.2.2 2020-2021 Drilling Campaign
Core boxes (pallets) from the Warintza Project
are transported by helicopter (Figure 26) from the drill platforms to Patuca (Morona-Santiago). Then, the samples are transported by truck
(Figure 27) to the Quito logging facility for processing. The core samples are then transported to the ALS laboratory in Quito for crushing
and pulverizing (Figure 28).
Figure 26:
Sample Boxes Waiting to be Picked Up from Drilling Platform by Helicopter
Source:
GSI (2021)
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 27:
Samples in Patuca for Transport to Quito-Core Shed Facilities
Source:
GSI (2021)
Figure 28:
Samples Arrival to the ALS Laboratory - Quito, Ecuador
Source:
GSI (2021)
The laboratory sends the pulps through courier
service to ALS Lima, Peru, where all the analytical determinations are made. The chain of custody from the moment the samples leave the
Warintza Project until their analysis in the ALS laboratory was reviewed by the QP during its visit in November 2021 to Ecuador and in
February 2022 to Peru. The documentation of each drilling is correctly managed and stored by the Lowell (Solaris Resources) team. The
chain of custody was also validated in the primary laboratory. No deviations were found that affect the quality and integrity of the samples
during the different transfers.
11.2.3 2022-2024 Drilling Campaign
No visual inspections were carried out in the
field or laboratories because the chain of custody remained the same as in 2020-2021. The QP has verified only through the control of
procedures that there are no significant changes in the chain of custody of the samples and considers that the implemented procedures
are safe and guarantee the origin of the samples.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
In summary, the QP has verified the chain of custody
of the samples from the field to the ALS main laboratory and is satisfied that the procedures in place are safe and guarantee sample provenance.
| 11.3 | Quality Control and Quality Assurance Program |
The global QA/QC program (Table 21) implemented
to date for the Warintza Project exceeds the recommended 15-20% percentage of control samples (29%). The results of the program are acceptable
and sufficient to guarantee the reliability of the grades of the deposit.
Table 21: Summary of the overall
QA/QC Program to date for Warintza
Source: GSI (2024)
11.3.1 2000-2001 Drilling Campaign
The first drill campaign did not include a QA/QC
monitoring program. The second drill program utilized a QA/QC monitoring program that included the use of reference materials and pulp
duplicates with a one in 20 insertion rate for each type. There is no documentation stating which stage of the sample stream the QA/QC
samples were inserted and by which party, either Lowell (Solaris Resources) or Bondar-Clegg personnel. The QA/QC sample ID numbers are
consistent with the sample ID series used to create the composites for analysis.
The reference materials were identified using
the fifth digit of the sample ID. The duplicates were identified with a ‘1’ in the final character and correspond with the
parent sample with the same sample ID but with a final character of ‘0’ (Ronning and Ristorcelli, 2018). Quality assurance
for Cu was monitored with three different internal Billiton reference materials that had been round robin tested at five laboratories.
Reference materials to evaluate the accuracy of Mo or Au analyses were not used. 12 pulps of each type were submitted to five laboratories,
including Bondar-Clegg, Chemex, Loring Labs, SGS, and CIMM. The internal reference materials utilized by Billiton have no background information
available to the current author, with the descriptions compiled from Ronning and Ristorcelli (2018). The source material, homogenization
method, analytical method, and locations of the laboratories used to create the reference materials are unknown.
The reference material performance is good with
all reference materials passing within three standard deviations except one. The 1.5% failure rate is within acceptable range. There is
a slight positive bias of the Cu analyses that should be monitored in future
drill programs. This could result from a mismatch of the analytical method where there is incongruence between the digest used for core
versus the round-robin analysis, or this could be intra lab drift.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
There were 65 pulp duplicates inserted during
the second drill campaign. The pulp duplicates have very good agreement for Cu and Mo as expected with intra lab pulp duplicates that
monitor the analytical reproducibility. Cu has an average relative standard deviation of two, which suggests very good precision of the
paired results. The average relative standard deviation for Mo pairs is five, which suggests the agreement is acceptable.
11.3.2 2020-2021 Drilling Campaign
In the Warintza Project, Lowell (Solaris Resources)
determined by protocol the minimum insertion of 20% of control samples for the QA/QC with its main laboratory (ALS), with the following
characteristics:
| 1. | Field Duplicate (“FD”), which is a quarter core |
| 2. | Pulp Blank (“PB”): sterile commercial material (quartz), certified, with fine granulometry |
| 3. | Coarse Blank (“CB”): sterile commercial material (quartz), with coarse granulometry |
| 4. | Certified Reference Material-High grade (“CRM”) |
| 5. | Certified Reference Material-Low grade (CRM) |
This 2020-2021 program used a total of 7,217 control
samples for the elements Au, Cu, and Mo. The blank and CRM commercial material were procured from Target Rock Perú.
The program is completed with a check of 6% of
samples (pulps) for each drill hole that are sent to a secondary laboratory, Bureau Veritas. For the 2020-2021 program, 1,662 pulps were
selected, with results to date of 663 samples. Pulps are selected from cores, duplicates, reference materials, and ALS-inserted blanks.
The QA/QC program for this 2020-2021 campaign
contains 31% of control samples, 25% insertions rate for the primary ALS laboratory, plus 6% checks with the secondary laboratory, BV.
The details of sample preparation, insertion of
sample types, control, and follow-up forms, etc., are detailed in the Core Sampling and Pulp Sampling procedures.
Lowell (Solaris Resources) controls the results
of the QA/QC program monthly, issuing a report for each drill hole and producing a bi-monthly report with results for all drill holes
within a given date range. Lowell’s internal calculations and graphs are performed following a protocol executed by an external manager,
who is also responsible for inserting the samples.
The QP reviewed Warintza’s global QA/QC database
and performed QA calculations for the entire 2020-2021 program. Inconsistencies in the CRM and BK type assignment, as well as erroneous
original vs. duplicate sample numbering, were corrected in the database for both ALS and BV samples.
The acceptance criteria used in the Warintza QA/QC
program are presented in Table 22, Table 23, and Table 24. In the case of MPRD, only 10% of the population is expected to be above the
proposed limits.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 22: Acceptance Criteria for Duplicates
(Precision)
Table 23: Acceptance Criteria for CRMs (Accuracy)
Table 24: Acceptance Criteria for Blanks
(Contamination)
All out-of-range controls are reviewed with the
laboratory involved, meetings are held to agree on corrective measures for nearby samples within the batch, and the agreed methodology
is documented with internal reports.
For field duplicates, the QP evaluated the QA/QC
after filtering the database using the five times the detection limit criterion (5 * DL).
Blanks
No contamination was detected in any of the laboratories
(sample preparation and assaying) for Cu, Mo, and Au, including the secondary BV laboratory. These blanks are not blind to the laboratory
since they are quartz.
Only in the case of Au, ALS Chemex had an error
rate of 0.2%, corresponding to five samples out of 2,044 assayed blanks. Figure 29 shows graphically the results of the contamination
checks.
The conclusion is that there does not appear to
be any contamination that can impact the mineral resource estimate.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 29:
ALS Chemex Contamination Chart Control for Au, Cu and Mo. (PB=pulp blank, CB= coarse blank)
CRMs
Only a summary of the control work related to
CRMs is presented here. The reader is referred to the references for more detailed information.
Control charts in terms of Standard Deviations
(SD) are shown in Figure 30 for ALS and in Figure 31 for Bureau Veritas.
With
respect to ALS, there are two reference materials (CRM) that exceed 10% of samples with greater than 3 SD, STRT-03 for Cu (high grade),
and PORF-08 for Mo (low Mo). The PORF-08 presents a relative standard deviation RSD >10% in ALS and >6% in BV.
In
the ALS laboratory, a high variability of STRT-03 for Au (high-grade Au CRM) is also observed with 8% samples >3SD and RSD>8%.
This behavior of STRT-03 was also observed in the Bureau Veritas results with
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
54% of samples for Cu >3SD. In general, the bias does
not exceed the absolute value of 5% in all the CRMs analyzed, both in ALS and in BV, so the results are accepted as good.
Figure 30:
Control Charts of Reference Materials for Au, Cu, and Mo
- ALS Chemex Laboratory
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 31:
Control Charts of Reference Materials for Au, Cu, and Mo
- Bureau Veritas Laboratory
For both ALS and BV laboratories, global bias
is good at less than 5%. The difference for all CRMs between their expected values compared to the measured averages is less than 5%
(Table 25).
In general, ALS values tend to be slightly higher
than Mo CRMs, while BV generally obtains lower values for both Cu and Mo.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 25: Differences Between Reference
Materials Expected, Measured Value and
Overall Bias Condition (Source: GSI 2022)
Duplicate Samples
The precision of the field duplicate (quarter
core) is acceptable based on the overall relative error for Au (24%) and Cu (16%). The population with relative differences between the
MPRD means less than 30%, is 75% for Au, and 86% for Cu.
Low precision is observed in Mo field duplicates
with an overall relative error of 39% and only 48% of the population with MPRD less than 30%. The linear correlation coefficient between
the original sample and the field duplicate are Au=0.77, Cu=0.95, and Mo=0.72.
The precision of pulp duplicates is acceptable
considering that the relative errors obtained are Au 16%, and both Cu and Mo, 12%. BV has 60% of the population, with MPRD less than 15%.
ALS has 94% of the population for Cu and 73% of the population for Mo, with an MPRD less than 10%.
The linear correlation coefficients between the
original samples analyzed by ALS and the pulp duplicates analyzed by BV are Au=0.99, Cu=0.98, and Mo=0.99.
The accuracy of Mo results improves significantly
when pulp duplicates are analyzed. No evidence was found to indicate that the analytical technique was not adequate, a validation of the
concentrations with different methods was performed (ASA vs ICP), and no differences greater than 20% were observed between the methods.
The QP believes that the lack of precision of Mo is a consequence of the use of quarter cores.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
11.3.3 2022-2024 Drilling Campaign
Lowell (Solaris Resources) uses the same sample
insertion procedures from 2020-2021, as well as the QA/QC program acceptance criteria. These were previously described in Table 20; Table
21; and Table 22.
This 2022-2024 program used 4,737 control samples
of Au, Cu, and Mo. The QA/QC program contains 27% control samples, with an insertion rate of 26% for the ALS primary laboratory, plus
1% of controls for the secondary laboratory, BV. This percentage is lower than that defined by protocol (6%). Solaris explained that at
the time of the review the BV laboratory had had technical problems with its databases and reportability had a delay of more than three
months.
Few existing data sets (53 samples) were reviewed.
In addition, requests to improve the QA/QC of the BV secondary laboratory was made, which included inserting blanks only of pulps and
CRMs, which are new in both cases (that is, they do not come from a previous ALS analysis), to avoid dragging sources of error.
Lowell (Solaris Resources) monitors the results
of the QA/QC program monthly, now using FUSION software, issuing a report for each well drilled and producing a quarterly report and an
annual report with results for all wells drilled. At the time of the QP review, there was one annual report for 2022 and four quarterly
reports for 2023. The annual report for 2023 and the first quarter of 2024 were in progress during the QP visit.
Warintza’s global QA/QC database was reviewed
and QA calculations for the entire 2022-2024 program were completed. Inconsistencies in the CRM and BK type assignment, as well as erroneous
original vs. duplicate sample numbering, were corrected in the database for both ALS and BV samples.
Blanks
No contamination was detected in any of the laboratories
(sample preparation and assaying) for Cu, Mo, and Au, including the secondary BV laboratory. These blanks are not blind to the laboratory
since they are quartz.
Only in the case of Au, did ALS Chemex have an
error rate of 0.3%, corresponding to six samples out of 2145 assayed blanks; Figure 32; Figure 33; and Figure 34 show graphically the
results of the contamination checks.
The conclusion is that there does not appear to
be any contamination that can impact the mineral resource estimate.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 32:
ALS Chemex vs Bureau Veritas Contamination Chart Control for Au, Cu and Mo (PB= pulp blank)
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 33:
ALS Chemex Contamination Chart Control for Au, Cu and Mo (CB= coarse blank)
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 34:
ALS Chemex Contamination Chart Control for Au, Cu and Mo (PB=pulp blank)
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
CRMs
Only a summary of the control work related to
Certificate Reference Material (CRM) is presented here. The reader is referred to the references for more detailed information.
Concerning ALS, eleven reference materials (CRM)
were introduced. Only three exceed 10% of samples with greater than 3SD: STRT-03 for Cu (high grade), PORF-01 (low grade), and PORF-02
(medium grade). As of March 2022, the CRM is not used to control Au and Cu (STRT-03); however, new CRMs have been added mainly to control
the medium grades of Cu and Mo.
Seven reference materials were used to control
accuracy regarding Mo. Only two CRMs exceed 10% of samples above three standard deviations: PORF-01 (low Mo grade) in ALS and BV (Figure
35 and Figure 36, respectively); and PORF-02 (low-medium Mo grade). The low-grade Mo CRM has values very close to the detection
limit and is even within the laboratory’s quantification limit, so it has been suggested that these laws should not be controlled. Control
charts include samples from 2020 to 2024. Only some CRMs are shown for reference.
Figure 35:
ALS Chemex. Certificate Reference Materials for Cu and Mo
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 36:
ALS Chemex vs Bureau Veritas. Certificate Reference Materials for Cu and Mo.
The global bias generally does not exceed the
absolute value of 5% in all CRMs analyzed by Cu and Mo, both in ALS and BV, so the results are accepted as good. Table 26, Figure 36 and
Figure 37 shows the results for ALS Chemex.
Table 26:
Differences Between Reference Materials Expected, Measured Value and overall bias.
Source: GSI 2024.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 37:
Certified Cu and Mo reference materials used. ALS Chemex results are shown. Overall Bias Condition is
Good.
Duplicate Samples
The precision of the field duplicate (quarter
core “FD”) is acceptable based on the overall relative error for Au (27%) and Cu (18%). The population with relative differences
between the MPRD means less than 30%, is 71% for Au, and 82% for Cu.
Low precision is observed in Mo field duplicates
with an overall relative error of 41% and only 44% of the population with MPRD less than 30%.
The linear correlation coefficient between the
original sample and the field duplicate are Au=0.53, Cu=0.95, and Mo=0.66. In general, the lack of precision of the Mo continues to increase
due to the type of sample used as a duplicate.
The QP reiterated the immediate change in the
methodology for inserting duplicates, starting to incorporate coarse and fine rejections into the protocol.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 38, Figure 39, and Figure 40 present the
Au, Cu, and Mo plots, respectively, for ALS results (field duplicates). Control charts, including scatterplots, Q-Q plots, AMPRD vs %
population, and MPRD vs mean grade from 2020 to 2024 year.
Figure 38:
Field Duplicate Control Charts Au – ALS Chemex Laboratory
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 39:
Field Duplicate Control Charts Cu – ALS Chemex Laboratory
Figure 40:
Field Duplicate Control Charts Mo – ALS Chemex Laboratory
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
The precision of pulp duplicates (“SL”)
is not acceptable considering that the relative errors obtained are Au (24%). BV has 51% of the population, with MPRD less than 15%.
Precision is also low for Mo (global relative
error = 16%), with 59% of the population with MPRD being less than 10%.
Cu is the only element with acceptable precision
behavior between the BV and ALS laboratories. With a value at the limit of 10% global relative error, 97% of the population is below 10%
MPRD.
The linear correlation coefficients between the
original samples analyzed by ALS and the pulp duplicates analyzed by BV are Au=0.87, Cu=1, and Mo=0.99.
Figure 41, Figure 42, and Figure 43 present the
Au, Cu, and Mo plots, respectively, for BV results (pulp duplicates “SL”).
Figure 41:
Pulp Duplicate Control Charts Au – Bureau Veritas Laboratory
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 42:
Pulp Duplicate Control Charts Cu – Bureau Veritas Laboratory
Figure 43:
Pulp Duplicate Control Charts Mo – Bureau Veritas Laboratory
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
11.4.1 2000-2001 Drilling Campaign
In the QP’s opinion, the sample preparation,
security, and analytical procedures were adequate for the purpose of resource estimation, and the quality assurance and quality control
program included regular insertion of reference materials and pulp duplicates into the sample stream. The reference materials were monitored
for Cu and had acceptable performance. The reproducibility of the duplicates indicated acceptable analytical precision.
11.4.2 2020-2021 Drilling Campaign
It is the opinion of the QP’s that sample
preparation, safety, and analytical procedures are adequate for resource estimation. The QP reviewed the QA/QC protocols, monthly and
bi-monthly reports, and the database used in this resource estimate. Also, the QP determined, during its visit to ALS Quito, that the
QA/QC samples are not blind to the laboratory.
The QP performed its own global QA/QC calculations,
some of which have been presented in this report, concluding that they are satisfactory. The QP considers that the reference materials
for Au, Cu, and Mo have an acceptable performance; there is little or no cross-contamination in the preparation and analysis processes,
and the reproducibility of the field and pulp duplicates indicate an acceptable analytical precision, mainly for Au and Cu, much lower
for Mo.
The analytical precision between the ALS and BV
laboratories is acceptable. The overall number of check samples employed in the program exceeds the industry standards.
Additionally, two independent consulting companies
(Wood PLC and Analytical Solutions) reviewed Warintza’s QA/QC program between June and August 2021. The QP agrees with their recommendations
with regards to field duplicates, which should be eliminated from the program and replaced with coarse duplicates (after the first stage
of size reduction). This is because the style of mineralization introduces a bias mainly related to the style and shape of the Mo veinlets.
This causes poor repeatability of Mo results.
11.4.3 2022-2024 Drilling Campaign
In the opinion of the QP, sample preparation,
safety, and analytical procedures have been satisfactorily updated, and a substantial improvement has been achieved by systematizing the
control sample databases and related graphs in FUSION. The results are suitable for resource estimation.
The quality assurance and control protocols, quarterly
and annual reports, and the database used in this new resource estimate were reviewed. The QP maintains his observation that QA/QC samples
are not blind to the laboratory.
The QP updated its own global QA/QC calculations,
some of which have been presented in this Report, concluding that they are satisfactory. The QP considers that the reference materials
for Au, Cu, and Mo have acceptable performance; there is little or no cross-contamination in the preparation and analysis
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
processes, and the reproducibility of field and
pulp duplicates indicates acceptable analytical precision, mainly for Au and Cu, much lower for Mo.
Analytical precision between the ALS and BV laboratories
is acceptable. The total number of control samples used in the program exceeds industry standards.
Previous recommendations regarding non-use of
field duplicates still apply. In addition, the sample insertion methodology suggested in 2021 be implemented as soon as possible.
It is the opinion of this QP that sample preparation,
security, and analytical procedures used provide reasonable support for the reliability of the sample database for the Warintza deposits
under investigation such that it supports mineral resource estimation without limitation on confidence classification.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
During 2020 and 2021, Lowell (Solaris Resources)
drilled over 58,000 m in 66 drill holes. The total number of samples was 28,915. The QP reviewed Lowell’s work in the Warintza Project
area and throughout the Quito and Lima facilities.
The QP also audited 30% of Lowell’s global database,
which includes the 33 old and 66 recent holes. The geological databases (lithology, alteration, and mineralization), Collar, survey, assay,
bulk density, PLT, RQD, were delivered in CSV format, exported from Datamine’s Fusion X system.
Lowell (Solaris Resources) has well-documented
protocols for activities from drilling, sample processing, and shipping to the laboratory. The QP reviewed over 10 different procedures
related to sample transport and storage, obtaining geotechnical, geological, physical, geochemical parameters, QA/QC protocols, database
administration, and others.
From 2022 to 2024, Lowell (Solaris Resources)
drilled over 36,783 m in 69 drill holes. The total number of samples was approximately 18,392.
The QP reviewed 10% of the global data in all
processes starting April 1, 2022, and ending with the cut-off date of the visit to Lima (February 26, 2024). In some cases, information
from the year 2021 that the QP had previously audited was reviewed again to corroborate that the migration to the implemented database
management software (FUSION) did not present errors or omissions.
The QP also reviewed protocol updates, new procedure
versions, and new implementations in Datamine’s FUSION system.
The protocols related to sample preparation, analysis,
transportation, and quality control were updated between August and September 2023 and January 2024. All protocols remain in force and
are evolving through continuous improvement methodology based on feedback from the internal teams from Lowell (Solaris Resources) and
external consultants. The QP has reviewed all protocols, suggesting opportunities for improvement that the entire team has considered.
| 12.1 | Drill Hole Location Verification |
12.1.1 2020-2021 Drilling Campaign
Lowell (Solaris Resources) conducted a new, detailed
topographic survey of the old drill hole collars. The QP checked 30% of the topography certificates against the Collar database and 30%
of the gyroscope survey reports. Minor inconsistencies (less than 1% of the
total data) were found and corrected, mainly referring to the final depth of the drill holes, which is acceptable.
The
QP flew over the Warintza platforms by helicopter and spent one day at the Piunts camp and the PE-01 platform in Warintza East to control
the drilling activities and check the SLSE-08 coordinates. At the
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
time of the visit, Kluane Drilling Ltd.’s drilling and sampling
were observed (Figure 44). The planned coordinates were compared with a handheld GPS. No significant differences
were found.
Figure 44:
Drilling Platform PE-01, Drill Hole SLSE-08
12.1.2 2022-2024 Drilling Campaign
No field verification was carried out on the drill
hole location during this period. However, all the topography/collar and survey certificates for the platforms have been reviewed to verify
that the databases migrated to FUSION correctly.
| 12.2 | Geological Data Verification and Interpretation |
12.2.1 2000-2001 Drilling Campaign
Geological data from drill core logs and historical
surface maps were used to build a new 3D geological model. In general, there is good section-to-section and section-to-surface map correlation
of geology, indicating that both the drill hole database and surface mapping has good integrity. Core recovery averaged 94%. There is
no relationship between recovery and Cu or Mo grade. While on the site visit, Cu was verified at an outcrop exposure located approximately
80 m west of drill hole W12. The rock sample database includes two samples from this area that returned elevated Cu. This large creek
exposure is cut by abundant quartz veins and pyrite veins with secondary chalcocite consistent with the supergene enriched zone of the
Warintza Central deposit.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
12.2.2 2020-2021 Drilling Campaign
Lowell uses the Anaconda method to describe Warintza’s
geology, which consists of a detailed description of lithology, alteration, mineralization styles, type of veinlets, percentages of minerals,
visual estimation of grades, among others. The descriptions are made digitally with Excel forms that contain validated fields.
Lowell (Solaris Resources) also re-logged the
old drill holes (W1-W33) using the same methodology. This information was reviewed by the QP in Quito. The QP also visited the PE-01 platform
and reviewed the geological monitoring activities, presence of mineralization, and sample packing process for samples from drill hole
SLSE-08 (Figure 45).
Figure 45:
Meterage Control and Geology, Drill Hole SLSE-08
Working protocols, registries, digitization, and
information storage were reviewed at the Piunts camp. The documentation is stored on a Google drive, which is backed up from the offices
in Peru through a local server.
12.2.3 2022-2024 Drilling Campaign
Lowell (Solaris Resources) continued to use the
Anaconda method to describe the geology of Warintza until drilling in 2023. Beginning in 2024, the methodology is based on logging new
drill holes with a more optimized and automated template through FUSION data entry. This is intended to ensure that the record focuses
on describing the estimation units of the resource model.
A database administrator in Lima supervises the
validation control within the automation and standardization process of the new registration method. The QP reviewed the migration of
information from Excel files to FUSION, and the geological observations materialized in different memoranda between the work teams in
Lima and Quito.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Additionally, five new drill holes drilled between
2022 and 2023 were reviewed. During this review,
some sections were re-logged, the database was updated, and the 3D geological models
were
subsequently updated with Leapfrog (Figure 46 and Figure 47).
Figure 46: Review of Holes
Drilled in 2022-2023, Quito, 2024
Figure 47:
Update of Re-Logged Drillings and Review of 3D Models, Quito, 2024
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
12.3.1 2000-2001 Drilling Campaign
The following checks were completed, and in some
cases, corrections were made to ensure that no sample composite interval exceeds the total depth of its hole. Values below the detection
limit were converted into one-half the analytical method detection limit. 15% of the compiled assay values were checked against assay
files provided directly by ALS. No differences in the values were identified. The QA/QC data was compiled and charted to validate the
results and is here considered sufficient for an early-stage project.
10 core samples were collected during the 2019
site visit and compared with historical results for the same core depth intervals. Seven of 10 Cu and Mo re-assays were ~10% lower than
the original analyses, whereas duplication of Au assays was somewhat better. Correlation between original analyses and 2019 re-assays
is strong for Cu (0.98), Mo (0.95), and Au (0.99). Results of the 2019 re-assay program are less precise than the re-assay program published
by Ronning and Ristorcelli (2018), which generally show a <10% difference but are nonetheless considered satisfactory.
12.3.2 2020-2021 Drilling Campaign
The QP reviewed 30% of the assay intervals for
Au, Cu, Mo, Ag, Pb, and Zn grades. A first check was carried out against laboratory certificates in CSV and PDF format, both from ALS
Chemex and Bureau Veritas. No significant differences were observed, although there are inconsistencies with the values of
soluble Cu obtained through the sequential Cu method. Lowell (Solaris Resources) does not use soluble Cu values when the sum of sequential
Cu differs with the total Cu value by 30% or more.
A second check was carried out on the drill cores
through a visual control of the presence of mineralization and estimation of the metal content versus chemical analysis.
Sampling intervals and detection limits of all
techniques were also checked, and some inconsistencies were detected and corrected in the scripts that convert the lower detection limit
to half its value. The database follows this methodology (DL/2), which Lowell (Solaris Resources) has well documented in its procedures.
Additionally, six pulp samples (Figure 48) were
taken from two drill holes for an independent analysis for Cu. The samples were sent by the QP to the ALS Chemex laboratory in Ireland.
The results show a correlation of 0.999, and the grade differences are within ±2% (Table 27).
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 48:
Pulp Samples Selected for Independent Re-Assaying
Drill Hole SLS-02: Samples PM-00606, PM-00701,
PM00851
Drill Hole SLS-34: Samples PM-23428, PM-23472,
PM-23569
Table 27: Comparison of Re-Assays
(Ck) to Original (Or) Assay Data
12.3.3 2022-2024 Drilling Campaign
A total of 10% of the assay intervals for Au,
Cu, Mo, Ag, Pb, and Zn grades were reviewed. A first check was carried out against laboratory certificates in CSV and PDF format, both
from ALS Chemex and Bureau Veritas. No significant differences were observed, although there are inconsistencies with the values of total
Cu obtained through the sequential Cu method.
Lowell does not use soluble Cu values when the
sum of sequential Cu differs from the total Cu (AA) value by 30% or more. Sampling intervals and detection limits of all techniques were
also checked.
A second check was carried out in Quito on the
drill cores, using visual control of the presence of mineralization and estimation of the metal content versus chemical analysis.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
12.4.1 2020-2021 Drilling Campaign
The data from the 2020-2021 drilling campaign
is considered by the Author to be adequate for the purpose of resource estimation. Data collection methodologies are well documented through
protocols. All stages of the drilling process, core processing, and QA/QC are completed following such protocols.
The QP has reviewed the accuracy of drill hole
collars and sample locations, down-hole deviation, the accuracy and internal consistency of lithological and alteration data, and the
accuracy and precision of analytical information. The verification activities included a search for factual errors, completeness of the
lithological and assay data, and suitability of the primary data. As part of the database verification activities, the assay information
and certificates obtained directly from the analytical laboratory have been examined as well.
In addition, six pulp samples have been chosen
and sent for re-assaying, confirming the grades observed in the database within a reasonable degree of accuracy.
The QP’s inspections included reviews of
the geological and sample information that are used in the preparation of the mineral resource estimate. The QP is confident that the
available information and sample density allow preparation of a reasonable estimate of the geometries, tonnage, and grade continuity of
the mineralization in accordance with the level of confidence established by the mineral resource categories in the CIM Definition Standards.
The database fairly represents the primary information and is suitable to support estimation of a mineral resource.
12.4.2 2022-2024 Drilling Campaign
The author considers data from the 2022-2024 drilling
campaign adequate for resource estimation. Data collection methodologies maintained since 2020 have been updated and continue to be well
documented through protocols. All stages of the drilling process, core processing, and quality control are completed following such enhanced
protocols.
The accuracy of collars for new wells drilled
between 2022 and 2024, along with sample locations, deviations, final well footage, and the accuracy and internal consistency of lithology,
alteration, and mineralization, were also reviewed.
During the verification of the analytical information,
possible factual errors were reviewed, and the digital certificates in Excel and PDF issued by the laboratories were examined against
the values reported in the database.
The QP inspections included reviews of geological
information and sampling conducted during the preparation of the mineral resource estimate. The QP is confident that the available information
and sample density will allow the preparation of a reasonable estimate of the geometries, tonnage, and grade continuity of mineralization
following the confidence level established by the mineral resource categories in the CIM Definition Standards. The database fairly represents
primary information and is suitable to support mineral resource estimation.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 13.0 | Mineral Processing and Metallurgical Testing |
There have been no changes to the Section since
the 2022 Technical Report. It is reproduced here for completeness.
| 13.1 | Resource Development, Inc., Test Work |
In 2002, Corriente commissioned Resource Development
Inc. (“RDI”) to do preliminary metallurgical testing of three samples of material, one of which was from Warintza Central
(Resource Development Inc., 2002). The RDI draft report does not describe the samples, nor their sources, in detail. It does state that
“Approximately 75 kg of each sample consisting of analytical rejects of RC cuttings were received for the study.” There has
been no RC drilling at Warintza, so that description cannot be correct for the sample from Warintza. It is likely that the samples consisted
of coarse reject material from the analytical laboratory’s preparation facility. The Warintza sample contained only 0.028% acid
soluble Cu.
The discussion that follows in the remainder of
this section is adapted and abridged from RDI (2002). Whereas the RDI discussion dealt with samples from three projects, only the results
for the Warintza sample are used herein. In descriptions of procedures, the plural term (“samples”) refers to all the samples,
and the singular refers only to the Warintza sample.
The primary objectives of the RDI study were to
determine the hardness of the samples, the recoverability of Cu and Au into a Cu concentrate, and the grade of the concentrate. The scope
of the test program included sample preparation and head analyses of the samples, Bond’s ball mill Work Index determination, rougher
flotation tests at three grind sizes, and a cleaner test on each sample to access product quality.
The Warintza sample contained 437 ppm Mo, but
no work was done to assess the recoverability of the Mo.
The samples were crushed to -10 mesh, blended
and split into 2 kg charges for flotation test work. A 2 kg charge was pulverized and split for chemical analyses and x-ray fluorescence
(“XRF”) analyses. The head grade analyses of the Warintza sample for Cu, Au, and Ag are shown in Table 28.
Table 28: Head Grades of Warintza Metallurgical
Sample
Cu, % |
0.732 |
Cu (acid soluble), % |
0.028 |
Au, g Au/tonne |
0.21 |
Ag, g Ag/tonne |
3.09 |
Notes: Adapted from part of Table 1 of RDI (2002) |
The samples that RDI received for metallurgical
testing were not suitable for Bond’s ball mill work index determinations as they were too finely crushed. RDI did receive a separate
sample of drill core
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
from another of Corriente’s porphyry deposits. Using a Bond’s work index determined for that material,
RDI used an indirect method to calculate Bond’s work indexes for the Warintza and other samples. The results for Warintza appear
in Table 29. RDI classified the material as “moderately hard.”
Table 29: Calculated
Bond’s Work Index for Warintza Sample
XF, µm (80% passing feed size) |
1382 |
XP, µm (80% passing product size) |
133 |
Work Index |
17.54 |
Notes: Adapted from part of Table 4 of RDI (2002) |
A series of laboratory grind tests
were undertaken to establish the time required to obtain targeted grinds of P80 (80% passing) of 65, 100, and 150 mesh for each sample.
In each case, approximately 2 kg of material were ground in a laboratory rod mill at 50% solids for 10, 20, 30, and 45 minutes. The ground
material was then de-slimed on a 400-mesh screen, and the products were dried. The plus 400 mesh fraction was dry screened from 20 to
400 mesh. The screen fractions were weighed, and the particle size distribution was determined. The grind time requirements for the Warintza
sample appear in Table 30.
Table 30:
Grind Time Requirements for Targeted Grind Size
Mesh Size |
Grind Time, Minutes |
P80 = 65 mesh |
20 |
P80 = 100 mesh |
27 |
P80 = 150 mesh |
45 |
Notes: Adapted from part of Table 5 of RDI (2002) |
Following the grind studies, bench-scale rougher
flotation tests were performed at three grind sizes: P80 of 65, 100, and 150 mesh. A simple reagent suite was employed, consisting of
lime as a pH modifier, potassium amyl xanthate (“PAX”) as a collector, and methyl isobutyl carbonyl (“MIBC”) as
a frother.
The test procedure consisted of grinding a 2 kg
sample with 250 g/T lime in a laboratory rod mill at 50% solids for a known time to obtain the desired particle size. The ground pulp
was transferred to a flotation cell, and the pH was adjusted with an additional 20 to 75 g/t lime to obtain a pH of ±8. Collector
(60 g/T PAX) and frother (15 g/T MIBC) were added to the pulp and conditioned for one minute. Two concentrates were collected at cumulative
times of one and four minutes. The flotation pulp was again conditioned for two minutes with additional collector (20 g/T PAX) and frother
(5 g/T MIBC), and a third concentrate was collected at six minutes. The concentrates and flotation tailings were filtered, dried, pulverized,
and submitted for Cu analyses. Au and Ag analyses were also obtained for the tailings. The test results for Warintza material are summarized
in Table 31.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 31: Summary
of Rougher Flotation Results
Grind,
P80
mesh |
Recovery
(10 minutes) |
Feed |
Tailing |
Rougher
Flotation
Conc.
Grade,
%
Cu |
Wt.,
grams |
Cu,
% |
Au,
% |
Calculated
%
Cu |
Assayed
g
Au/T |
Assayed
g Au/T
|
|
65 |
16.75 |
94.4 |
72.3 |
0.809 |
0.21 |
<0.07 |
4.56 |
100 |
13.84 |
94.2 |
71.3 |
0.804 |
0.21 |
<0.07 |
5.47 |
150 |
14.03 |
94.0 |
71.3 |
0.777 |
0.21 |
<0.07 |
5.21 |
Notes: Copied from part of Table
6 of RDI (2002) |
|
|
|
|
|
|
|
|
|
According to RDI (2002), the highlights of the
test results were:
| 1. | The Cu recoveries for Warintza material were in the 94% range
in ten minutes of flotation. |
| 2. | The majority of the Cu (75% to 90%) floated in four minutes
of flotation time. |
| 3. | The recovery of Cu was independent of the grind size within
the range investigated. |
| 4. | The Au recoveries were calculated based on feed and flotation
tailing assays. |
The Au recovery from the Warintza sample was 71%.
The Au may be associated with Cu minerals.
One open-circuit cleaner flotation test was performed
on each sample to determine the quality of the possible product. No attempt was made to optimize the process conditions in the cleaner
circuit. The test conditions for the cleaner flotation were selected based on RDI’s previous experiences treating primary Cu ores.
The test procedure consisted of floating a rougher
concentrate at a primary grind of P80 of 100 mesh with lime, PAX, and MIBC for ten minutes. The rougher concentrates were reground for
15 minutes in a laboratory ball mill. The pH of the ground pulp was adjusted to 10.5 with lime and conditioned for one minute with 10
g/T PAX and 5 g/T MIBC. The first cleaner concentrate was collected for four minutes. The first cleaner concentrate was re-cleaned in
second-cleaner flotation at pH>10.5 and three timed concentrates collected for cumulative times of 0.5, 1, and 2.5 minutes. The products
were analyzed for Cu, and the first second-cleaner concentrate was also analyzed for Au.
The product quality of the second-cleaner 0.5
minute and 2.5-minute concentrate products are shown in Table 32.
.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 32: Second-Cleaner
Concentrate Product Quality
|
0.5 Minute Product |
2.5 Minute Product |
Cu, % |
15.1 |
11.93 |
g Au/T |
1.23 |
|
Notes: Adapted from part of Table 7 of RDI (2002). |
In commenting on the test results, RDI (2002)
noted that:
| 1. | Concentrate grades in the Warintza sample were postulated to have been lower than
might have been achieved, due to the presence of pyrite, which also floats readily and may have gone into the concentrate with the Cu
minerals. A higher flotation pH, greater than 11, may be required to depress the pyrite in the concentrate. |
| 2. | Additional testing may be required to optimize the regrind time and cleaner flotation
process conditions to determine the quality of product that can be produced in the second cleaner concentrate. |
RDI (2002) stated that, based on its
experience of other similar primary Cu deposits, it is likely that a Cu concentrate assaying 24% to 28% Cu could be produced. RDI indicated
a need for additional testing.
13.2.1 Mineralogy / Comminution
Test Work Completed
In 2022, Warintza commissioned a preliminary metallurgical test work program with FLSmidth USA Inc. for the Warintza Project, utilizing
core from the latest exploration drilling campaign. The test work program is in early stages, and only mineralogy and comminution test
work are complete at the time of this report. The metallurgical flotation test work plan is outlined below.
In early 2024, Ausenco was appointed to conduct
metallurgical studies and process plant design for the Project. Activities are focused on throughput definition, metallurgical recovery
for copper, molybdenum and gold to supplement the test work completed in 2023, in addition to tailings testing and process plant design.
Mineralogy Report
Warintza submitted seven core samples to FLSmidth
USA Inc. for a metallurgical test work program, which included mineralogy and liberation analysis, comminution test work, and flotation
test work. The samples were combined into one master composite utilizing equal weight per sample to form the master composite.
The master composite went through a 25-minute
grind cycle and resulting P80 of 138 microns. Polished sections were prepared from this sample for QEMSCAN analysis. Table 33 presents
the QEMSCAN bulk mineralogy of the master composite sample. Gangue mineralogy matches well with the XRD data. Quartz
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
and muscovite are
in main gangue phases. K-feldspar, plagioclase, clays, and chlorite are the minor gangue phases detected. Traces of calcite, iron, oxides,
biotite, rutile, and apatite are also present. Pyrite and chalcopyrite are the main sulfides. Traces of bornite, chalcocite, and covellite
are present.
Table 33:
QEMSCAN Bulk Mineralogy
Chalcopyrite is the main Cu bearing sulfide followed
by chalcocite, covellite, and bornite. Traces of Cu bearing gangue phases are present, but the sum of all non-sulfide Cu represents less
than 1% of the Cu in the sample. Table 34 and Figure 49 present the Cu
deportment of the master composite.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 34: QEMSCAN Cu Deportment
Figure 49: QEMSCAN
Cu Deportment
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Bright phase searches were conducted to prepare
maps of particles containing sulfide minerals. These particles were separated into liberation classes for Cu sulfides (all Cu sulfides
grouped together) and pyrite. Definitions for these classes are:
| ● | Liberated
– Surface area percent of mineral > 80% |
| ● | Middling
– Surface area percent of mineral > 20% |
| ● | Locked
– Surface area percent of mineral > 0% |
| ● | Encapsulated
– Surface area percent of mineral = 0% |
| ● | Barren
– No mineral interest present |
The results of the liberation analysis separated
into the liberation classes above can be found in Table 35. The particle sizes are electronic and not physical sized fractions. The data
is not as robust as measurements on physically sized material due to the potential of stereological biases, but it provides a good rapid
indication of the liberation and mineral grain sizes. The results illustrate that 73% of the Cu sulfides are liberated and 17% are in
middling. This is a high level of liberation of Cu sulfides.
Table 35: Cu Sulfide Liberation
(Distribution % of Cu Sulfides)
The liberation analysis for the distribution percent
of pyrite in the Cu sulfide can be found in Table 36. Less than 0.5% of pyrite is contained in liberated and middling categories of Cu
sulfides. There are no strong associations of pyrite and Cu sulfides that could lead to low concentrate grades.
Table 36: Cu Sulfide Liberation
(Distribution % of Pyrite)
Approximately 99% of pyrite is liberated or in
middling particles (Table 37). Pyrite is significantly coarser than the chalcopyrite. 47% of pyrite is in particles coarser than 100 microns
while only 12% of Cu sulfides are on particles coarser than 100 microns.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 37: Pyrite Liberation (Distribution
% of Pyrite)
Gangue mineralogy of all samples is dominated
by quartz and muscovite. Clays are present in each sample but in amounts that should not cause concerns during grinding and flotation.
Self-floating gangue minerals were not detected. The major sulfide minerals are chalcopyrite and pyrite. There is a presence of secondary
Cu sulfide in the master composite but in low amounts (<0.1 wt%) The Cu sulfides are well liberated and do not show a high level of
association with pyrite. It is expected that high concentrate grades should be achievable without high iron contamination from pyrite.
Assay Report
The master composite was assayed and
measured by ICP-OES for all elements except for Au, which was measured via fire assay. Additional elements were assayed but not
listed in the table because each element tested below the detection limit. Table 38 illustrates the assay results for each sample
and master composite. Table 39 illustrates the detection limit for elements assayed and not listed.
Table 38: Head Assays for Samples and Master
Composite
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 39: Detection Limits for Elements
Assayed and Not Listed
SMC and BWi Test work
The comminution test work included an SMC test
and Bond ball mill work index on the master composite by SMC testing Pty Ltd. and JKTech. The SMC Test was conducted on the -31.5 mm/+26.5
mm size fraction of the master composite.
Table 40 provides the summary results
from the SMC test.
Table 40: Summarized SMC Test Results
After completing the SMC Test, the entirety of
the master composite sample was stage-crushed to 100%, passing 19.0 mm in preparation for the BWi test. After crushing, the material was
thoroughly blended, and the BWi test was ran to specifications provided in the original test practices as outlined in Angove & Dunne
(1997), Kaya & Thompson (2003), and Mosher & Tague. The BWi test feed sample was screened and stage-crushed to minus 3.35 mm (6
Mesh) as per test specification. The BWi results were run with a closing size of 150 microns. Several quality control measures, as well
as rigorous closing criteria listed below, were followed.
| 2. | Average grams per mill revolution less than 3% for last three cycles with inflection |
| 3. | Within five to 10 grams of undersize target weight |
| 4. | Circulating load ratio 2.47 or higher |
| 5. | Only last cycle wet screened for product P80 size (semi-log interpolated) |
The BWi test results are summarized in Table 41, while the scale ranges for the classification of the BWi are shown in Table 42.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 41: Bond Ball Mill Work Index (BWi)
Summarized Test Results
Table 42: Ball Mill Work Index (BWi) Hardness/Resistance
to Breakage
Classification Ranges
| 13.3 | Planned Metallurgical Test Work Scope (New Samples) |
Grind Studies
Master composite and variability
samples to determine Laboratory grind times and curves on each sample to achieve the target P80. Three varying grind times will be used.
Floatation Testing:
One master composite:
| § | Reagent
screening tests to select appropriate depressants and collectors. |
| § | Primary
grind evaluation to determine recovery vs. grind size. |
| § | Cleaner
floatation testing to determine appropriate regrind sizes and cleaner circuit configurations. |
Eight variability samples for
evaluation of optimized flotation kinetics.
Master Composite Rougher Kinetic Flotation
Testing
Kinetic rougher floatation tests are planned to
delineate a robust reagent scheme on the master composite. Depressants for non-sulfide gangue will be evaluated. Lime will be evaluated
for pyrite depression. Collectors and xanthates will also be evaluated.
Reagent screening will be followed by a primary
grind size floatation series at the selected reagent scheme. Three grind size rougher flotation tests with P80 values ranging between
53 um to 150 um will be conducted.
The rougher flotation tests will be conducted
in kinetic format with four products (three concentrates and final tailings). Products will be assayed for Cu, Au, Mo, Ag, Fe, total sulfur
(St), and sulfide sulfur.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
A confirmation rougher test on the master composite
will be conducted for product size by size analyses on the combined rougher concentrate and tailings. Mineralogical characterization of
select floatation products may be beneficial and will be recommended.
Master Composite Cleaner Floatation Testing
A preliminary cleaner flotation test will be performed
on rougher concentrate generated from 4 kg of ore to determine regrinding characteristics in the laboratory regrinds mills. Cleaner flotation
is expected to be conducted through three stages of cleaning. Three grind size P80 values will be targeted: no regrind, 53, and 25 μm.
All batch cleaner floatation tests will be conducted
in open-circuit, and products will be assayed for Cu, Au, Ag, Mo, Fe, and S. Final concentrates will also be assayed for the 29 element
ICP suite. Mineralogical characterization of select flotation products may be beneficial and will be recommended.
Individual Variability Rougher Kinetic Flotation
Testing
The appropriate floatation parameters delineated
from the master composite tests will be used in the test work on individual samples to determine ore variability. The rougher flotation
tests to determine optimal parameters will be conducted in kinetic format with four products (three concentrates and final tailings).
Products will be assayed for Cu, Au, Mo, Ag, Fe, Sulfide Total, and Sulfide Sulfur.
| 13.4 | Sample Representativity |
The test samples used in the previous and the
current testing program are believed to be representative of the mineralization style and type present at Warintza.
At this stage of testing and development, there
are no known processing factors or deleterious elements that could have a significant effect on potential economic extraction.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 14.0 | Mineral Resource Estimates |
The Warintza exploration database consists of
163 inclined surface diamond drill holes for a total of over 101,250 m of drilling as shown in Table 43. Drill hole information available
up to March 31, 2024 were included in the MRE.
As shown in Figure 50, drill holes have varying
orientations. Most drill holes are surveyed at 30 m intervals down the hole using a Reflex single shot camera. The sampling interval is
mostly 2 m down the hole but with samples from older drill holes at 5 m, 1 m, and other lengths. There are 40,080 samples in the exploration
drill hole database used for this Resource estimate.
Table 43: Summary Warintza Drill
Database
Figure 50:
Plan View of Warintza Drill Holes
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
There are also 3,166 in-situ bulk density measurements
collected using a wax-coated, water immersion method. These measurements were used to estimate and assign densities to the block model
as explained below.
There is also a partial amount of sequential Cu
assays, which have been assayed since the 2020 campaign. The total Cu values obtained from the sequential Cu analysis was compared to
the independent (Atomic Absorption) total Cu value. The percentage ratios of soluble Cu were estimated to correlate with the mineralogy
of the enriched and primary species. It should be noted that there is no significant Cu oxide mineralization in Warintza, as described
before. For this reason, the usefulness of the sequential Cu information is limited because it is expected that, based on current mineralogical
information, all the mineralization within Warintza would be processed as sulphide mineralization. Therefore, sequential Cu assays aid
in the definition of mineralization zones but otherwise do not have a direct impact on resource estimates or reporting.
Subsequently, the database was reviewed for an
evaluation and confirmation of intervals, final depths, survey control, drilling intersections, and 3D geological model. The solids of
mineralized zones (variable ZMIN) were also reviewed based on the grades of total Cu and soluble Cu. The minimum modelled thickness was
also controlled, which is currently 5 m.
| 14.2 | Exploratory Data Analysis |
The Cu grade distribution in assays is, as expected,
characteristic of a porphyry Cu-Mo-Au deposit. Figure 51, Figure 52, and Figure 53 show the global raw histogram and basic statistics
for Cu, Mo, and Au grades, respectively.
Figure 51: Warintza Global Histogram and
Basic Statistics, Cu (%)
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 52: Warintza Global Histogram and
Basic Statistics, Mo (%)
Figure 53: Warintza Global Histogram and
Basic Statistics, Au (g/t)
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
14.2.1 In-situ Bulk Density
There are 3,166 values in the database for in-situ
bulk density. These samples have been obtained using the immersion method. A box plot of in-situ bulk density values by lithology is presented
in Figure 54.
Figure 54: Box and Whisker Plot,
In-situ Bulk Density Values by Lithology
| 14.3 | Geological Models and Estimation Domains |
The Warintza geologic model is composed of models
for three main geologic variables: lithology, alteration, and mineralization zones.
The logging from the drill hole intervals is pre-processed
within the software Leapfrog to define the units to be modelled, using a 5 m minimum width for each unit and discarding those logged lithologies,
alterations, and mineralization zones that have little or no volumetric representation.
This pre-processing of geologic codes results
in the modelling codes shown in Table 44, Table 45, and Table 46 for lithology, alteration, and mineralization zones, respectively. Note
that for each alphanumeric logging code, a numeric code has been assigned, which is used then for all further analysis in the drill hole
data and block model.
The drill holes were backtagged (flagged)
with the information from the three-dimensional models of lithology, alteration, and mineralization zone. This created in the
database a new field with geologic codes, which was compared to the original logged information. The percent coincidence was
obtained for each pairing of lithology, alteration, and minzone
codes (original logged vs backtagged from interpreted models) and found the differences acceptable. The detailed information is available
as backup.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
In the modelling and definition of the estimation
domains that follow, the backtagged codes were used to ensure consistency with the 3D geologic models.
Table 44: Lithology Codes Used in Modelling
Table 45: Alteration Codes Used
in Modelling
Table 46: Mineralization Zone Codes
Used in Modelling
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
The final models for lithology, alteration, and
mineralization zones were obtained using the software Leapfrog and are discussed below.
Figure 55, Figure 56, and Figure 57 show a cross
section from the final lithology model and the box and whisker plots for Cu, Mo, and Au for each of the modelled lithology codes, respectively.
In these statistics, the backtagged codes were used, as explained above.
Note that, for Cu, the Quartz-monzodiorite (QMD),
the Diorite (D), and the Volcanics (V) are the units with the highest grades, while the Granodiorite (GD) is the host, mostly barren rock.
Although with some specific differences, similar
comments can be made for Mo and Au, although Au has, in relative terms, the highest grades in the Breccia (Bx), a smaller unit that has
less Cu and Mo.
Figure 55: Cross Section 9,648,060N Showing
Lithology, Final Interpreted Model
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 56:
Box and Whisker Plot, Cu Grade by Lithology Codes
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 57:
Box and Whisker Plots, Mo (L) and Au (R) Grades by Lithology Codes
The analysis of the relationship of grades and
alteration is simpler since there are less alteration codes. Figure 58 shows a cross section of the final alteration model, while Figure
59 and Figure 60 show the box and whiskers plots for Cu, and Mo and Au, respectively.
As expected, propylitic alteration has a low or
very low content of all three metals. In the case of Cu, the clay-sericite alteration is also low grade, but not so much for Mo and Au.
With respect to the other alteration types, the controls are subtle and highlight the importance of modelling the behavior of each in
the context of (intersections with) lithologies and mineralization zones.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 58: Cross Section 9,648,060N Showing
Alteration, Final Interpreted Model
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 59: Box and Whisker Plot, Cu Grade
by Alteration Codes
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 60: Box and Whisker Plots, Mo (L)
and Au (R) Grades by Alteration Codes
The mineralization zone model (Minzone) is shown
in Figure 61. Note that the highest-grade zones are near the surface (in blue, secondary enrichment zone) and in red, where chalcopyrite
predominates over pyrite (Cpy > Py). This primary unit forms the core of Warintza Central and appears in Warintza East, although with
a much more limited volume compared to the 2022 model. This is one of the more significant changes in the mineralization zone model from
2022 to the current model and limits the extent of the better grade mineralization.
The Cu, Mo and Au grades by mineralization type
are shown in the box and whiskers plots in Figure 62 and Figure 63, respectively. As expected, the supergene and the Cpy>Py units are
the highest-grade units. Note that the supergene unit is a relatively low-enrichment zone, “immature” as described in Section
7. Still, it is volumetrically significant and contributes to an expected favourable mining scenario, being near surface.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 61: Cross Section 9,648,060N Showing
Mineralization Zones (Minzone),
Final Interpreted Model
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 62: Box and Whisker Plot, Cu Grade
by Minzone Codes
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 63: Box and Whisker Plots, Au (left)
and Mo (right) Grades by Minzone Codes
14.3.1 Additional Interpreted Volumes
Three other volumes (three-dimensional solids)
were interpreted independently of the geologic interpretations themselves, although to some extent conditioned by them, as well as structural
information, thus ensuring consistency between all interpreted solids.
The additional interpretations were:
| 1. | A grade shell at a 0.1% Total Cu; |
| 2. | A grade shell at 10% Sulfates; and, |
| 3. | A “drill hole influence” envelope to include all drillholes and extending (nominally) 200m
in lateral directions, and 40m in the vertical direction. |
In the case of the Cu 0.1% grade shell, while
it was used explicitly to control estimation in any way, it was used to ensure that the estimation process, search directions and ranges,
and other estimation plan parameters are consistent with the more mineralized areas of the deposit. The validation of the estimated grades
is expected to perform better within this grade shell, the more significant volume in the deposit.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
The 10% sulfate (gypsum) grade shell was completed
to aid in the definition of additional zones within the deposit that merit further geometallurgical investigations, as it is known that
in the type of deposits, sulfates can be an issue when present in high enough quantities in a concentrator. There is no other intent or
use for this solid at the time of writing this Report, as the updated geometallurgical studies are still ongoing.
The “drill hole influence” envelope
is intended to avoid extrapolation of grades beyond reasonable distances and is used as an aid to the estimation domains to control the
extent of the estimated model. It is an additional tool that helps avoid undue extrapolation of the estimated grades. There are no blocks
with estimated grades outside this drill hole influence envelope.
Figure 64 shows a three-dimensional view, looking
towards the NNW, of the three solids. Note how the 0.1% Cu grade shell (in red) is always inside the “drill hole influence”
envelope (in magenta), while the model shows significant areas of sulfates (anhydrite/gypsum), mainly in Warintza Central.
Figure 64:
3D View to the NNW Showing the 0.1% Total Cu Grade Shell (Red); Drill Hole Influence Envelope (Magenta);
and the 10% Sulfate (Anhydrite/Gypsum) Grade Shell (Yellow)
14.3.2 Estimation Domain Definition
Estimation of grades proceeds within domains defined
based on geological and statistical considerations. The definition and modelling of these domains is an important step in mineral resource
estimation.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Estimation domains are the geological equivalent
to geostatistical stationary zones and are defined as a volume of rock with mineralization controls that result in approximately homogeneous
distributions of mineralization. The spatial distributions of grade exhibit consistent statistical properties. This does not mean that
the grades are constant within the domains; however, the geological and statistical properties of the grades facilitate its prediction.
The process of defining the estimation domains
begin with a detailed statistical analysis of the grades within each lithology, alteration, and minzone unit separately. A similar process
was followed for the in-situ bulk density information. The workflow can be summarized as:
| 1. | Development of the grade domains begins with geologic knowledge. The various logged codes are grouped
and re-grouped based on a combination of data abundance, geologic knowledge, and sometimes statistical analysis. This results in the geologic
variables that are modelled, as explained above. |
| 2. | Next, initial estimation domains based on all possible combinations of the geologic attributes are defined.
These are all the possible intersections of each of the geologic variables in the model. In the case of Warintza, there are six different
alteration codes, six different mineralization codes, and nine different lithology codes to consider for a theoretically possible 324
combination. However, data abundance and geologic considerations will filter out many these. For Warintza, most initial combinations with
less than 1% of the total number of intervals in the database were grouped with others according to geologic criteria. |
| 3. | The subsequent step is to statistically analyze the distribution of grades of the initial domains. The
main purpose is to remove or group domains according to geologic considerations. The main statistical tools used is quantile-quantile
(Q-Q) plots, which allow for a direct comparison of grade distributions within each proposed domain, although some specific histograms
and probability plots were also used. The Q-Q plots, in combination with geologic criteria and abundance of information, allows to combine
the initial domains. |
| 4. | This iterative process is repeated until a final set of domains that clearly separates different types
of mineralization is found. While labour-intensive, this process ensures that the most important geologic and statistical aspects are
combined into estimation domains that are the basis for the grade estimation that follows. |
The examples shown below of two Q-Q plots for
Cu used in the intermediate iterations illustrate a case where two distributions are considered similar, and, therefore, can be grouped
as a single domain (Figure 65), and a case where the opposite occurs, the two distributions are clearly different and cannot be grouped
(Figure 66).
The Q-Q plot is frequently used because it presents,
in a graphical and most evident manner, the degree of similarity between two distributions. Still, in cases that are not as clear-cut
as the one shown below, a degree of subjectivity is involved in the decision to group or not two sub-domains.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 65:
Q-Q Plot, Cu, Example of two lithologies that are grouped
Figure 66: Q-Q Plot, Cu, Example
of two preliminary domains that cannot be grouped
The process resulted in the definition of different
estimation domains for Cu, Mo, Au, and in-situ bulk density. While it is sometimes appropriate to use the same set of estimation domains
for all estimated variables, in the case of Warintza, since the underlying geologic controls are different for Mo, Au, and the in-situ
bulk density variables, it is appropriate to define separate estimation domains.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
The Cu domains defined are shown in Figure
67 and Table 47 (Cu, 16 domains), Table 48 (Mo, 7 domains), and Table 49 (Au, 8 domains). The corresponding
box-and-whisker plots for Cu, Mo, and Au are shown in Figure 68, Figure 69, and Figure 70, respectively.
Note that, as expected, the low- and high-grade
units are well differentiated, with, for example, the mostly barren Cu unit 16 capturing the Granodiorite lithology (GD). Domains 5, 8,
and 14 capture the best combination of lithology, alteration, and minzone, and thus are higher grades than the other units. On the other
hand, Domains 1 and 4 are the lowermost in terms of Cu grades. Similar analysis can be done for Mo and Au.
Compared to the 2022 MRE model, the significant
increase of drilling added in this 2024 model allows for a more detailed definition of estimation domains, thus avoiding smoothing and
further extrapolation of grades into volumes not interpreted as well mineralized. Overall, the domains defined are consistent with the
known geology and discriminates well between volumes of different mineralization and corresponding grade ranges.
Figure 67:
Cross Section 9,648,060N Showing Cu Estimation Domains
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 47: Warintza Cu Estimation
Domains
Table 48: Warintza Mo Estimation Domains
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 49: Warintza Au Estimation
Domains
Figure 68:
Box and Whisker Plots with summary statistics, Cu Grades by Cu Estimation Domains
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 69: Box and Whisker Plots
with summary statistics, Mo Grades by Mo Estimation Domains
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 70: Box and Whisker Plots with summary
statistics, Au Grades by Au Estimation Domains
14.3.2 In-situ Bulk Density Domains
The same process was applied to the bulk density
data combining the information available by lithology, alteration, and mineralization zone. This resulted in six domains being defined
for in-situ bulk density, which are shown in Table 50. Figure 71 shows the basic statistics and the box and whisker plots for each domain.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Note that, as expected, the lower bulk density
values are found in units closer to the surface, including the sericite-clay alteration and in the leached zone, at less than 2.5 m3/t.
At deeper levels of the deposit, bulk density values are in the 2.7 to 2.75 m3/t range, which is typical for the types of rocks
found at Warintza.
Table 50: Warintza In-situ Bulk Density
Estimation Domains
Figure 71: Box and Whisker Plots, Bulk Density
Domains
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 14.4 | Outlier Grade Control |
Extreme or unusual values (outliers) in grade
distributions are grades that deviate from the general tendency of most other grades in the deposit and can be spatially and statistically
isolated. In the discussion that follows, outliers are valid assayed samples, not a consequence of spurious or erroneous data collection,
and are defined in terms of geological and statistical populations.
The determination of what values are considered
outliers is subjective. The key concept applied is that these outlier values do not have the spatial continuity in the deposit as other
lower grade mineralization, and therefore must be restricted to avoid overestimation of mineral resources.
Outlier values are commonly examined on a log-normal
cumulative frequency plot on a domain basis. Breaks at the high end of the distribution may represent outlier populations. For example,
Figure 72 shows the log-normal probability plot of Cu grade for Estimation Domain 5. In this case, for grades higher than 2.20%, the distribution
appears to break up and exhibits a slight slope change, represented by about 1.5% of the total samples.
To limit the influence of the outlier data, two
methods can be used:
| 1. | All samples above the specified grade cut-off are reset to
the top value defined; this is known as “capping”, and modifies the actual values used in the estimation. It applies the
same spatial influence on all data at the time of estimation. This is a popular method in the industry to control outlier values, but
it is less desirable in this QP’s opinion because it can still locally overestimate grades at the time of estimation since the
spatial influence of all data is the same. |
| 2. | Instead of modifying the sample grades themselves, a differential
spatial influence can be used at the time of estimation. That is, outlier grades are used only to a limited spatial extent (influencing
only the block they are located within, for example), mimicking the geologic concept of not overextending the influence (continuity)
of the outlier grades. This restriction is applied on composites used at the time of estimation. |
Practitioners sometimes apply a combination of
the two previous options, which may involve capping grades prior to compositing, and then restricting the spatial influence of the outlier
grades after compositing at the time of estimation.
Either way, restricting outlier grades removes
metal from the sample distribution and limits the influence of the outliers. There may still be a region of high estimates around the
outliers, yet there may be isolated high grades. The local estimates are checked on a case-by-case basis, always bearing in mind the impact
of this restriction on the overall distribution for each domain.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 72: Probability Plot, Cu,
Estimation Domain 5, Warintza
The summary of the outlier grades analysis
and as applied in the grade estimation process is shown in Table 51, Table 52, and Table 53 for Cu, Mo, and Au, respectively.
The impact of applying a high-grade restriction at the time of estimation can only be quantified after the model is obtained and is
based on the difference between the model with restrictions and the model without restrictions.
Table 51: Summary Outlier Restriction by
Domain, Cu
Cu
Domain |
Outlier Threshold
Grade (%) |
Number of 2m composites
Above Threshold |
% of Total 2m composites
Impacted |
1 |
0.50 |
10 |
0.80% |
2 |
2.00 |
8 |
0.04% |
3 |
2.00 |
6 |
0.40% |
4 |
0.80 |
14 |
0.45% |
5 |
2.20 |
5 |
0.92% |
6 |
2.50 |
5 |
0.18% |
7 |
1.40 |
5 |
0.37% |
8 |
2.50 |
8 |
0.76% |
9 |
1.20 |
4 |
0.06% |
10 |
2.50 |
3 |
0.06% |
11 |
0.25 |
16 |
59.3% |
12 |
0.55 |
6 |
1.10% |
13 |
1.10 |
11 |
0.20% |
14 |
1.60 |
3 |
0.14% |
15 |
0.55 |
9 |
17.31% |
16 |
0.05 |
19 |
47.50% |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 52: Summary Outlier Restriction
by Domain, Mo
Mo Domain |
Outlier Threshold
Grade (%) |
Number of 2m composites
Above Threshold |
% of Total 2m composites
Impacted |
1 |
0.02 |
11 |
18.03% |
2 |
0.20 |
5 |
0.04% |
3 |
0.20 |
0 |
0.00% |
4 |
0.30 |
8 |
0.06% |
5 |
0.30 |
5 |
0.03% |
6 |
0.10 |
4 |
0.22% |
7 |
0.15 |
0 |
0.00% |
Table 53: Summary Outlier Restriction
by Domain, Au
Au Domain |
Outlier Threshold
Grade (%) |
Number of 2m composites
Above Threshold |
% of Total 2m composites
Impacted |
1 |
0.15 |
5 |
0.43% |
2 |
0.75 |
20 |
0.08% |
3 |
0.25 |
11 |
3.12% |
4 |
1.00 |
5 |
0.03% |
5 |
0.80 |
5 |
0.12% |
6 |
0.10 |
11 |
1.26% |
7 |
0.30 |
19 |
0.51% |
8 |
0.70 |
4 |
0.14% |
After applying the capping to the original samples,
2 m long composites were prepared from the original assay data, truncated at the contacts between domains.
No significant correlation between assayed Cu
grades and assay length is observed, see Figure 73. The compositing process was done truncating the composites at estimation domain contacts,
and called for re-distributing into the prior composites the minor pieces of core that were left near the contacts, so that no sample
mass is lost. Nonetheless, and given that most of the samples are either 1m or 2m in length, about 99.6% of the total composites are exactly
2m long.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 73: Conditional Cu Grade Means by
Composite Length (Blue),
Coefficient of Variation in orange (Second Y-Axis), All Warintza Samples
Given that composites are the same length as
most of the samples (or a multiple), their basic statistics compared to the original samples do not change significantly. As examples,
Figure 74 shows the histogram and basic statistics for Cu, domain 8, 2 m composites. Figure 75 shows the corresponding probability plot.
Figure 74: Histogram and Basic Statistics,
Cu, Domain 8, 2 m Composites
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 75:
Probability Plot, Cu, Domain 8, 2 m Composites
Data are rarely collected randomly, and, in a
spatial sense, each sampled interval does not represent the same volume across the deposit. In the case of Warintza, since multiple holes
are drilled from a single platform, this effect is exacerbated, and the spatial aggregation of data can be significant, particularly for
the upper intervals in the drill holes.
Therefore, there is a need to adjust the histograms
and summary statistics to be representative of the entire volume of interest. Declustering techniques are, except for kriging itself,
geometric methods that assign each datum a weight based on closeness to surrounding data. These weights are greater than zero and sum
to one. The composite distribution and all summary statistics are calculated with the weights to obtain more representative statistics.
The cell declustering method (Deutsch, 1989)
was applied to the 2 m composite for all three metals and by estimation domain. Figure 76 shows the declustered histogram and basic statistics
of the composites for domain 8 and should be compared to Figure 74. Note how the average grade is slighter lower after declustering.
This is typical in positively skewed distributions since most of the redundancy occurs in higher grade zones. However, in this example
(estimation domain 8), the impact of clustering is considered minor.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 76:
Declustered Histogram and Basic Statistics, Cu, Domain 8, 2 m Composites
The treatment and definition of boundaries have
implications on resource estimation, such as dilution, lost ore, or a mixture of geological populations. The treatment of boundaries at
the time as grade estimation is of practical importance. The terms hard and soft boundaries are used to describe whether the change in
grade distribution across the contact is abrupt or not, respectively.
Conventional grade estimation usually treats the
boundaries between geological units as hard boundaries, whereby no mixing occurs across the boundary. Soft boundaries allow grades from
neighbouring domains to be used. Sometimes, soft and hard boundaries can be predicted or expected from geological knowledge but should
always be confirmed with statistical contact analysis (Rossi and Deutsch, 2014).
The behavior of grade distributions across contacts
is analyzed by finding pairs of data in the two estimation domains of interest at pre-defined distances.
In this work, pairs within pre-specified distances
were found using a three-dimensional search of nearby assay intervals belonging to a different unit, see Figure 77, which shows the Cu
grade trends near the contact between Domains 8 and 9, as an example.
This process was completed exhaustively for all
combinations of domains and for each metal, although there are instances where the domains have no contacts. The analysis of grade trends
near contacts
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
defines whether the grade estimation for any given unit should incorporate composites of a neighboring unit.
Figure 77:
Contact Profile, Cu, Domains 8-9 Contact
The summary of all possible contacts and the strategy
they indicate should be implemented at the time Cu grade estimation is summarized as a contact matrix in Figure 78. The hard contacts
(no data sharing) are represented by cells shaded in red; the semi-soft contacts are represented in green and indicate that composites
from both domains should be shared in the first estimation (shortest) pass only; the soft contacts are highlighted in magenta and indicate
that composites should be shared in the first two passes. There are no cases when composites are shared across contacts in all three-grade
estimation passes. From Figure 78, only Domains 6 and 8 share data in the first estimation pass, all others are hard boundaries (no sharing).
The corresponding contact matrices for Mo and
Au are shown in Figure 79 and Figure 80, respectively. In the case of Mo, Domains 2 and 6, and Domains 4 and 7, share composites in the
first estimation pass only (Figure 79). In the case of Au, Domains 4 and 7, and 6 and 8, share composites in the first pass (Figure 80).
Figure 78: Contact Matrix, Cu. In Red, Hard
Contacts (No Sharing); In Green, Semi-Soft Contact (Share Only in The First Pass).
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 79: Contact Matrix, Mo. In Red, Hard
Contacts (No Sharing); In Green, Semi-Soft Contact (Share Only in The First Pass).
Figure 80: Contact Matrix, Au. In Red,
Hard Contacts (No Sharing); In Green, Semi-Soft Contact (Share Only in The First Pass).
The software SAGE 2001 (Isaaks. 1999) was used
to obtain the required variogram models, necessary for estimating resource grades using ordinary kriging. The estimator used was the correlogram,
which is robust because of the use of lag-specific mean and variance values in its calculation. In practice, it has become a popular option
when dealing with grade variables.
The experimental correlograms were obtained on
37 directions, every 30° in the horizontal and dip planes, and dipping -30°; -60°; and vertical. Down-the-hole correlograms
were also obtained to assist in defining the nugget effect in all cases.
Except for three Cu domains (Domains 11; 15;
and 16); one Mo domain (Domain 1); and two Au domain (Domains 3 and 6), all the remaining Cu, Mo, and Au domains have their own correlogram
model. An example is shown graphically in Figure 81. In Table 54, the main correlogram model parameters are shown for all modelled Cu
domains; Table 55 and
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 56 show the corresponding information for the Mo and Au correlogram models. Domains without correlogram
models were estimated using the Inverse Distance Squared (ID2) method.
The correlogram models are described using Minesight’s-GSLib
rotation convention, which can be summarized as (Z/X/Y, L/R/L). The first three letters indicate the order of the rotation: the first
rotation is around the Z axis; the second rotation is around the X axis; and the third rotation is around the Y axis. The second group
of three letters indicates the rotation directions. The first letter indicates a left L hand rotation around the first rotation axis.
The second letter indicates a right R hand rotation around the second rotation axis. The third letter indicates a right R hand rotation
around the third rotation axis.
Figure 81: Correlogram Model, Cu, Domain
13. Views of the Model Parameters (Left); Main Orientations
for the Two Structures Modelled (Central); and Three Directions with the Fitted
Model, approximately
on the main directions of anisotropy.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 54: Cu Correlograms Models by Domain
Cu Correlogram Models, Minesight’s GSLib Rotation Conventions |
Domain |
Model Type |
Nugget |
Variance
Structure 1 |
Rotation First
Structure
(Z/X/Y) |
Ranges First
Structure,
m (Y/X/Z) |
Variance
Structure 2 |
Rotation
Second
Structure
(Z/X/Y) |
Ranges Second
Structure, m
(Y/X/Z) |
1 |
Exponential w/ Practical Range |
0.050 |
0.474 |
-60/34/19 |
48/26/13 |
0.476 |
-25/8/9 |
102/1172/375 |
2 |
Exponential w/ Practical Range |
0.160 |
0.227 |
-78/53/27 |
14/27/30 |
0.613 |
-11/-3/-75 |
196/1088/372 |
3 |
Exponential w/ Practical Range |
0.250 |
0.506 |
-96/-62/-7 |
99/59/5 |
0.244 |
-25/15/23 |
384/61/1057 |
4 |
Exponential w/ Practical Range |
0.250 |
0.497 |
5/0/76 |
60/9/4 |
0.253 |
-78 /113/80 |
1310/111/152 |
5 |
Exponential w/ Practical Range |
0.140 |
0.821 |
-40/-12/-40 |
179/117/9 |
0.039 |
-21/-6/-13 |
218/50/27 |
6 |
Exponential w/ Practical Range |
0.200 |
0.385 |
18/-9/32 |
67/9/46 |
0.415 |
65/13/1 |
207/64/1630 |
7 |
Exponential w/ Practical Range |
0.250 |
0.487 |
26/-86/30 |
82/37/19 |
0.263 |
-61/-30/52 |
3251/63/165 |
8 |
Exponential w/ Practical Range |
0.200 |
0.479 |
80/-15/71 |
113/45/16 |
0.321 |
43/57/-77 |
532/26/44 |
9 |
Exponential w/ Practical Range |
0.080 |
0.407 |
-58/52/-2 |
6/117/15 |
0.513 |
43/24/-39 |
217/524/4090 |
10 |
Exponential w/ Practical Range |
0.200 |
0.362 |
-31/34/5 |
28/27/10 |
0.438 |
12/-1/41 |
84/617/1577 |
12 |
Exponential w/ Practical Range |
0.050 |
0.677 |
-35/-13/161 |
84/2/18 |
0.273 |
27/30/114 |
1516/106/76 |
13 |
Exponential w/ Practical Range |
0.150 |
0.067 |
22/-15/13 |
51/70/32 |
0.783 |
80/10/-13 |
155/115/1210 |
14 |
Exponential w/ Practical Range |
0.300 |
0.316 |
-89/-32/41 |
20/14/15 |
0.384 |
18/5/-14 |
173/213/1817 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 55: Mo Correlograms Models by Domain
Mo Correlogram Models, Minesight’s GSLib Rotation Conventions |
Domain |
Model Type |
Nugget |
Variance
Structure 1 |
Rotation First
Structure
(Z/X/Y) |
Ranges First
Structure,
m (Y/X/Z) |
Variance
Structure 2 |
Rotation
Second
Structure
(Z/X/Y) |
Ranges Second
Structure, m (Y/X/Z) |
2 |
Exponential w/ Practical Range |
0.300 |
0.344 |
-75/-19/5 |
33/45/5 |
0.356 |
-7/22/-91 |
202/1211/431 |
3 |
Exponential w/ Practical Range |
0.450 |
0.422 |
-22/88/-26 |
32/47/2 |
0.128 |
88/29/76 |
2476/30/1971 |
4 |
Exponential w/ Practical Range |
0.500 |
0.320 |
5/11/-54 |
15/41/9 |
0.180 |
-11/-10/-12 |
358/690/1150 |
5 |
Exponential w/ Practical Range |
0.300 |
0.457 |
-37/18/-72 |
83/183/6 |
0.243 |
12/10/37 |
455/4035/1227 |
6 |
Exponential w/ Practical Range |
0.100 |
0.571 |
-74/-10/-17 |
42/30/3 |
0.329 |
-14/18/25 |
190/42/1256 |
7 |
Exponential w/ Practical Range |
0.150 |
0.383 |
-100/10/37 |
7/19/16 |
0.467 |
19/8/12 |
457/3308/330 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 56: Au Correlograms Models by Domain
Au Correlogram Models, Minesight’s GSLib Rotation Conventions |
Domain |
Model Type |
Nugget |
Variance
Structure 1 |
Rotation First
Structure
(Z/X/Y) |
Ranges First
Structure, m
(Y/X/Z) |
Variance
Structure 2 |
Rotation
Second
Structure
(Z/X/Y) |
Ranges Second
Structure, m
(Y/X/Z) |
1 |
Exponential w/ Practical Range |
0.400 |
0.542 |
-187/45/74 |
13/22/4 |
0.058 |
-6/49/94 |
1063/36/4228 |
2 |
Exponential w/ Practical Range |
0.300 |
0.580 |
-59/-9/-27 |
38/30/3 |
0.120 |
-56/91/-45 |
415/136/347 |
4 |
Exponential w/ Practical Range |
0.300 |
0.497 |
-5/25/-9 |
38/25/3 |
0.203 |
-83/30/-4 |
535/272/348 |
5 |
Exponential w/ Practical Range |
0.016 |
0.710 |
-29/-30/27 |
42/15/10 |
0.274 |
-33/6/4 |
117/343/967 |
6 |
Exponential w/ Practical Range |
0.450 |
0.363 |
-44/-1/88 |
26/3/115 |
0.187 |
20/74/43 |
378/45/215 |
7 |
Exponential w/ Practical Range |
0.300 |
0.452 |
-101/75/26 |
8/63/33 |
0.248 |
3/-5/14 |
255/1421/499 |
8 |
Exponential w/ Practical Range |
0.200 |
0.609 |
-77/58/22 |
137/10/11 |
0.191 |
17/48/-12 |
324/375/92 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 14.9 | Block Model and Grade Estimation |
The block model is defined in Datamine using a
25 x 25 x 15 m parent block size with a minimum 5 x 5 x 5 m sub-cell size and with the following limits, which refer to the southwest,
lower corner of the block:
Minimum Easting: |
798,010E |
Maximum Easting: |
802,610E |
Minimum Northing: |
9,646,310N |
Maximum Northing: |
9,649,910N |
Minimum Elevation: |
-70 m |
Maximum Elevation: |
2,610 m |
Blocks are flagged with a code for each lithology,
alteration, mineralization zone, and estimation domain. Ordinary kriging (OK) and Inverse Distance Squared (ID2) are used to
estimate Cu, Mo, and Au grades.
Sulfuric-soluble Cu and Cyanide-soluble Cu have
also been estimated into the model, although they do not feature in the Resource inventory. They were estimated using the same correlogram
models and search parameters as Total Cu (Cu). The sulfuric-soluble Cu (CuS) and Cyanide-soluble Cu (CuCn) were only used to fine-tune,
as explained above, the mineralization zones’ interpretation and model.
Grades were estimated into blocks using the 2
m composites within the corresponding domain, although, in some cases, as described above, composites were partially shared across domains.
In all cases, grade estimation was performed on parent blocks, using a 3 x 3 x 3 discretization grid, and the estimated grades assigned
to the sub cells within the parent block.
High grade restrictions were applied using the
spatial influence limit feature available in Minesight. The threshold grades used in the restriction are shown in Table 51, Table 52,
and Table 53 above. The influence distance used in all cases was 19 m (radius) from the outlier composite.
There were four passes for all domains estimated
using OK, the first three conditioned to blocks within the 0.1% Cu grade shell, the fourth conditioned to the drill hole influence envelope.
In the case of the domains estimated using ID2, a single, isotropic search conditioned by the drill hole influence envelope
was applied.
In the case of the OK estimations, search orientations
were guided by the correlogram models, and the search distances in every case were guided by variography but optimized to reflect a correct
balance of estimated blocks in each estimation pass.
Since drill hole coverage is uneven, not all
blocks are estimated due to the limitation imposed by the search ellipsoids. Non-estimated blocks were assigned the grade
corresponding to the 25th percentile of the 2 m composite distribution. This was done only within the drill hole
influence envelope. The grade estimation plans for all domains are shown in Table
57, Table 58, and Table 59, for Cu, Mo, and Au,
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
respectively. The assigned values for those blocks
that remained unestimated after four passes (only within the drill hole influence envelope) are shown in Table 60.
Table 57: Cu Estimation Plans by Domain
Cu Kriging Plans, Minesight’s GSLib Rotation Conventions |
Domain |
Pass |
Estimator |
Search in Y, X,
and Z (m) |
Search Angle Rotation,
Minesight’s GSlib
Convention |
Min #
Comp |
Max #
Comp |
Min #
of
DDH |
1 |
1 |
OK |
60/100/80 |
-25/8/9 |
4 |
8 |
2 |
2 |
OK |
100/160/120 |
-25/8/9 |
4 |
10 |
2 |
3 |
OK |
120/220/160 |
-25/8/9 |
2 |
12 |
1 |
4 |
OK |
180/330/240 |
-25/8/9 |
2 |
12 |
1 |
2 |
1 |
OK |
60/100/80 |
-11/-3/-75 |
4 |
8 |
2 |
2 |
OK |
100/160/120 |
-11/-3/-75 |
4 |
10 |
2 |
3 |
OK |
120/220/160 |
-11/-3/-75 |
2 |
12 |
1 |
4 |
OK |
180/330/240 |
-11/-3/-75 |
2 |
12 |
1 |
3 |
1 |
OK |
80/60/100 |
-25/15/23 |
4 |
8 |
2 |
2 |
OK |
120/100/160 |
-25/15/23 |
4 |
10 |
2 |
3 |
OK |
160/120/220 |
-25/15/23 |
2 |
12 |
1 |
4 |
OK |
240/180/330 |
-25/15/23 |
2 |
12 |
1 |
4 |
1 |
OK |
100/60/80 |
-78/113/80 |
4 |
8 |
2 |
2 |
OK |
160/100/120 |
-78/113/80 |
4 |
10 |
2 |
3 |
OK |
220/120/160 |
-78/113/80 |
2 |
12 |
1 |
4 |
OK |
330/180/240 |
-78/113/80 |
2 |
12 |
1 |
5 |
1 |
OK |
100/80/60 |
-21/-6/-13 |
4 |
8 |
2 |
2 |
OK |
160/120/100 |
-21/-6/-13 |
4 |
10 |
2 |
3 |
OK |
220/160/120 |
-21/-6/-13 |
2 |
12 |
1 |
4 |
OK |
330/240/180 |
-21/-6/-13 |
2 |
12 |
1 |
6 |
1 |
OK |
80/60/100 |
65/13/1 |
4 |
8 |
2 |
2 |
OK |
120/100/160 |
65/13/1 |
4 |
10 |
2 |
3 |
OK |
160/120/220 |
65/13/1 |
2 |
12 |
1 |
4 |
OK |
240/180/330 |
65/13/1 |
2 |
12 |
1 |
7 |
1 |
OK |
100/60/80 |
-61/-30/52 |
4 |
8 |
2 |
2 |
OK |
160/100/120 |
-61/-30/52 |
4 |
10 |
2 |
3 |
OK |
220/120/160 |
-61/-30/52 |
2 |
12 |
1 |
4 |
OK |
330/180/240 |
-61/-30/52 |
2 |
12 |
1 |
8 |
1 |
OK |
100/60/80 |
43/57/-77 |
4 |
8 |
2 |
2 |
OK |
160/100/120 |
43/57/-77 |
4 |
10 |
2 |
3 |
OK |
220/120/160 |
43/57/-77 |
2 |
12 |
1 |
4 |
OK |
330/180/240 |
43/57/-77 |
2 |
12 |
1 |
9 |
1 |
OK |
60/80/100 |
43/24/-39 |
4 |
8 |
2 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Cu Kriging Plans, Minesight’s GSLib Rotation Conventions |
Domain |
Pass |
Estimator |
Search in Y, X,
and Z (m) |
Search Angle Rotation,
Minesight’s GSlib
Convention |
Min #
Comp |
Max #
Comp |
Min #
of
DDH |
|
2 |
OK |
100/120/160 |
43/24/-39 |
4 |
10 |
2 |
|
3 |
OK |
120/160/220 |
43/24/-39 |
2 |
12 |
1 |
|
4 |
OK |
180/240/330 |
43/24/-39 |
2 |
12 |
1 |
10 |
1 |
OK |
60/80/100 |
12/-1/-41 |
4 |
8 |
2 |
2 |
OK |
100/120/160 |
12/-1/-41 |
4 |
10 |
2 |
3 |
OK |
120/160/220 |
12/-1/-41 |
2 |
12 |
1 |
4 |
OK |
180/240/330 |
12/-1/-41 |
2 |
12 |
1 |
11 |
1 |
ID2 |
300/300/300 |
0/0/0 |
2 |
4 |
2 |
12 |
1 |
OK |
100/80/60 |
27/30/114 |
4 |
8 |
2 |
2 |
OK |
160/120/100 |
27/30/114 |
4 |
10 |
2 |
3 |
OK |
220/160/120 |
27/30/114 |
2 |
12 |
1 |
4 |
OK |
330/240/180 |
27/30/114 |
2 |
12 |
1 |
13 |
1 |
OK |
80/60/100 |
80/10/-13 |
4 |
8 |
2 |
2 |
OK |
120/100/160 |
80/10/-13 |
4 |
10 |
2 |
3 |
OK |
160/120/220 |
80/10/-13 |
2 |
12 |
1 |
4 |
OK |
240/180/330 |
80/10/-13 |
2 |
12 |
1 |
14 |
1 |
OK |
60/80/100 |
18/5/-14 |
4 |
8 |
2 |
2 |
OK |
100/120/160 |
18/5/-14 |
4 |
10 |
2 |
3 |
OK |
120/160/220 |
18/5/-14 |
2 |
12 |
1 |
4 |
OK |
180/240/330 |
18/5/-14 |
2 |
12 |
1 |
15 |
1 |
ID2 |
300/300/300 |
0/0/0 |
2 |
4 |
2 |
16 |
1 |
ID2 |
300/300/300 |
0/0/0 |
2 |
4 |
2 |
Table 58: Mo Estimation Plans by Domain
Mo Kriging Plans, GSLib Rotation Conventions |
Domain |
Pass |
Estimator |
Search in Y, X,
and Z |
Search Angle
Rotation, GSlib
Convention |
Min #
Comp |
Max #
Comp |
Min #
of DDH |
1 |
1 |
ID2 |
300/300/300 |
0/0/0 |
2 |
12 |
2 |
2 |
1 |
OK |
60/100/80 |
-7/22/-91 |
4 |
8 |
2 |
2 |
OK |
100/160/120 |
-7/22/-91 |
4 |
10 |
2 |
3 |
OK |
120/220/160 |
-7/22/-91 |
2 |
12 |
1 |
4 |
OK |
180/330/240 |
-7/22/-91 |
2 |
12 |
1 |
3 |
1 |
OK |
100/60/80 |
88/29/76 |
4 |
8 |
2 |
2 |
OK |
160/100/120 |
88/29/76 |
4 |
10 |
2 |
3 |
OK |
220/120/160 |
88/29/76 |
2 |
12 |
1 |
4 |
OK |
330/180/240 |
88/29/76 |
2 |
12 |
1 |
4 |
1 |
OK |
60/80/100 |
-11/-10/-12 |
4 |
8 |
2 |
2 |
OK |
100/120/160 |
-11/-10/-12 |
4 |
10 |
2 |
3 |
OK |
120/160/220 |
-11/-10/-12 |
2 |
12 |
1 |
4 |
OK |
180/240/330 |
-11/-10/-12 |
2 |
12 |
1 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Mo Kriging Plans, GSLib Rotation Conventions |
Domain |
Pass |
Estimator |
Search in Y, X,
and Z |
Search Angle
Rotation, GSlib
Convention |
Min #
Comp |
Max #
Comp |
Min #
of DDH |
|
4 |
OK |
180/240/330 |
-11/-10/-12 |
2 |
12 |
1 |
5 |
1 |
OK |
60/100/80 |
12/10/37 |
4 |
8 |
2 |
2 |
OK |
100/160/120 |
12/10/37 |
4 |
10 |
2 |
3 |
OK |
120/220/160 |
12/10/37 |
2 |
12 |
1 |
4 |
OK |
180/330/240 |
12/10/37 |
2 |
12 |
1 |
6 |
1 |
OK |
80/60/100 |
-14/18/25 |
4 |
8 |
2 |
2 |
OK |
120/100/160 |
-14/18/25 |
4 |
10 |
2 |
3 |
OK |
160/120/220 |
-14/18/25 |
2 |
12 |
1 |
4 |
OK |
240/180/330 |
-14/18/25 |
2 |
12 |
1 |
7 |
1 |
OK |
80/100/60 |
19/8/12 |
4 |
8 |
2 |
2 |
OK |
120/160/100 |
19/8/12 |
4 |
10 |
2 |
3 |
OK |
160/220/120 |
19/8/12 |
2 |
12 |
1 |
4 |
OK |
240/330/180 |
19/8/12 |
2 |
12 |
1 |
Table 59: Au Estimation Plans by Domain
Au Kriging Plans, GSLib Rotation Conventions |
Domain |
Pass |
Estimator |
Search in Y, X,
and Z |
Search Angles
Rotation, GSlib
Convention |
Min #
Comp |
Max #
Comp |
Min #
of DDH |
1 |
1 |
OK |
100/80/120 |
-6/49/94 |
4 |
8 |
2 |
2 |
OK |
140/120/170 |
-6/49/94 |
4 |
10 |
2 |
3 |
OK |
160/120/220 |
-6/49/94 |
2 |
12 |
1 |
4 |
OK |
240/120/220 |
-6/49/94 |
2 |
12 |
1 |
2 |
1 |
OK |
100/60/80 |
-56/91/-45 |
4 |
8 |
2 |
2 |
OK |
160/100/120 |
-56/91/-45 |
4 |
10 |
2 |
3 |
OK |
220/120/160 |
-56/91/-45 |
2 |
12 |
1 |
4 |
OK |
330/180/240 |
-56/91/-45 |
2 |
12 |
1 |
3 |
1 |
ID2 |
300/300/300 |
0/0/0 |
2 |
12 |
2 |
4 |
1 |
OK |
100/60/80 |
-83/30/-4 |
4 |
8 |
2 |
2 |
OK |
160/100/120 |
-83/30/-4 |
4 |
10 |
2 |
3 |
OK |
220/120/160 |
-83/30/-4 |
2 |
12 |
1 |
4 |
OK |
330/180/240 |
-83/30/-4 |
2 |
12 |
1 |
5 |
1 |
OK |
60/80/100 |
-33/6/4 |
4 |
8 |
2 |
2 |
OK |
100/120/160 |
-33/6/4 |
4 |
10 |
2 |
3 |
OK |
120/160/220 |
-33/6/4 |
2 |
12 |
1 |
4 |
OK |
180/240/330 |
-33/6/4 |
2 |
12 |
1 |
6 |
1 |
ID2 |
300/300/300 |
0/0/0 |
2 |
12 |
2 |
7 |
1 |
OK |
60/100/80 |
3/-5/14 |
4 |
8 |
2 |
2 |
OK |
100/160/120 |
3/-5/14 |
4 |
10 |
2 |
3 |
OK |
120/220/160 |
3/-5/14 |
2 |
12 |
1 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Au Kriging Plans, GSLib Rotation Conventions |
Domain |
Pass |
Estimator |
Search in Y, X,
and Z |
Search Angles
Rotation, GSlib
Convention |
Min #
Comp |
Max #
Comp |
Min #
of DDH |
|
4 |
OK |
180/330/240 |
3/-5/14 |
2 |
12 |
1 |
8 |
1 |
OK |
80/100/60 |
17/48/-12 |
4 |
8 |
2 |
2 |
OK |
120/160/100 |
17/48/-12 |
4 |
10 |
2 |
3 |
OK |
160/220/120 |
17/48/-12 |
2 |
12 |
1 |
4 |
OK |
240/330/180 |
17/48/-12 |
2 |
12 |
1 |
Table 60:
Values Used for Assignment When Not Estimated, Only Within The Drill Hole Influence Envelope, by Metal
and Domain.
Table 61 shows the estimation plan for in situ
Bulk Density. Given the short search distances used, many blocks have no bulk density estimates. The orientations of the search ellipsoids
were guided by variogram maps run on two of the domains that had enough data. The data was previously “cleaned” by removing
all data outside the ±3*SD (standard deviations) limit with respect to the mean for each domain.
Bulk density is estimated into the block model
using the Inverse Distance Squared (ID2) method. The arithmetic averages of each domain are used to assign in-situ bulk density
to un-estimated blocks, shown in Table 62.
The average bulk density value is lower for the
upper portions of the deposit, which is reasonable considering that the upper levels of the deposit are subject to increased weathering
and, in general, supergene processes which weaken the rock. This is not unusual in these types of deposits.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 61: In-situ Bulk Density Estimation
Plans by Domain
In-situ Bulk Density Estimation Plans |
Domain |
Pass |
Distance
(Y/X/Z) |
Search
Angles
Rotation,
GSlib
Convention |
Min # Comp |
Max # Comp |
Min # DDH |
1 |
1 |
20 |
20 |
30 |
-98/-67/7 |
4 |
12 |
2 |
2 |
30 |
30 |
40 |
-98/-67/7 |
4 |
12 |
2 |
3 |
40 |
40 |
60 |
-98/-67/7 |
2 |
12 |
1 |
2 |
1 |
20 |
20 |
30 |
-98/-67/7 |
4 |
12 |
2 |
2 |
30 |
30 |
40 |
-98/-67/7 |
4 |
12 |
2 |
3 |
40 |
40 |
60 |
-98/-67/7 |
2 |
12 |
1 |
3 |
1 |
30 |
20 |
20 |
-100/-42/15 |
4 |
12 |
2 |
2 |
45 |
30 |
30 |
-100/-42/15 |
4 |
12 |
2 |
3 |
60 |
40 |
40 |
-100/-42/15 |
2 |
12 |
1 |
4 |
1 |
30 |
20 |
20 |
-98/-67/7 |
4 |
12 |
2 |
2 |
45 |
30 |
30 |
-98/-67/7 |
4 |
12 |
2 |
3 |
60 |
40 |
40 |
-98/-67/7 |
2 |
12 |
1 |
5 |
1 |
20 |
20 |
30 |
-98/-67/7 |
4 |
12 |
2 |
2 |
30 |
30 |
40 |
-98/-67/7 |
4 |
12 |
2 |
3 |
40 |
40 |
60 |
-98/-67/7 |
2 |
12 |
1 |
6 |
1 |
30 |
20 |
20 |
-124/-84/10 |
4 |
12 |
2 |
2 |
45 |
30 |
30 |
-124/-84/10 |
4 |
12 |
2 |
3 |
60 |
40 |
40 |
-124/-84/10 |
2 |
12 |
1 |
Table 62: In-situ Bulk Density Assigned
Values by Domain (after discarding data outside ±3*Standard Deviation)
Domain |
In-situ Bulk
Density
Assigned Value |
1 |
2.90 |
2 |
2.80 |
3 |
2.72 |
4 |
2.38 |
5 |
2.61 |
6 |
2.78 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
14.10.1 Visual Validation
Cross sections, longitudinal sections, and plan
views were used to check whether the block estimated grades in relation to the nearby composites are reasonable; whether the composited
assay data itself was reasonable; whether the oxide/transition/sulfide surfaces; the topographic surfaces; the lithological, alteration,
and mineralized envelopes were correctly tagged onto the block model; the 0.1% Cu grade shell and the drill hole influence envelope are
correctly identified in the block model; and, finally, whether the estimated and assigned in-situ bulk density values and final estimated
Au grades are reasonable. No evidence of any block being wrongly assigned or estimated was found. Two examples are shown in Figure 82
and Figure 83.
Figure 82: Warintza Central and Warintza
East, Cu Grade Estimates and 2m Cu composites, Section N9648060, ±12.5m window
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 83: Warintza Central and Warintza
East, Cu Grade Estimates and 2m Cu composites, 875m Plan View, ±7.5m window
| 14.11 | Statistical Validation |
The comparison of the global averages and basic
statistics between the block model at a cut-off grade of 0 g/t Au and the declustered composites were obtained for each domain. The relative
differences between the average estimated grades and the NN-declustered composites are acceptable for most domains for all three variables,
Cu, Mo, and Au, as shown in Table 63, Table 64, and Table 65, respectively.
Note that those domains for which the differences
are more important is either because they are low grades, such that the relative differences are more significant, or because there are
few blocks and estimates considered in the averaging. Such is the case for Cu, Domain 1, with 12% relative difference between the NN
model and the OK estimates (Table 63). Domain 1 is not only low grade but represents less than 10% of the total estimated volume
in the model. In the case of Mo (Table 64), the relative differences are inflated due to the low Mo values (in %) as shown.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 63: Global Means by Domain, Nearest-Neighbour
Model, and
Estimated Grades, Cu
Table 64: Global Means by Domain, Nearest-Neighbour
Model and
Estimated Grades, Mo
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 65: Global means by Domain, Nearest-Neighbor
Model, and
Estimated Grades, Au
Drift Plots
It is important to check whether the estimated
grades reproduce the same grade trends observed in the declustered composites. This can be accomplished by plotting declustered drill
hole composite grades (nearest neighbor model) vs. block model averages based on the three main Cartesian coordinates and considering
significantly large volumes at a time. The slices (swaths) are defined considering block sizes in each direction. In this case, the width
was two blocks (50 m) in the Easting and Northing directions and two levels (30 m) in the elevation direction.
These graphs were obtained globally and by domain
for Cu, Mo, and Au in each of the three directions, considering the first two estimation passes. The global drift plots are shown in Figure
84, Figure 85, and Figure 86, respectively, as examples of the good reproduction of grade trends in the three main directions.
Figure 84: Drift Plots, Cu
From Left to Right: Easting; Northing; and Elevation,
Average Cu Nearest Neighbor (NN) Model Grades
(Green Line) and Average Cu Estimated Grades (Red Line).
Swaths are 50 m; 50 m; and 30 m wide, respectively
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 85: Drift Plots, Mo
From Left to Right: Easting; Northing; and Elevation,
Average Mo Nearest Neighbor (NN) Model Grades (Green Line) and Average Mo Estimated Grades Red Line).
Swaths are 50 m; 50 m; and 30 m wide, respectively
Figure 86: Drift Plots, Au
From Left to Right: Easting; Northing; and Elevation,
Average Au Nearest Neighbor (NN) Model Grades (Green Line) and Average Au Estimated Grades (Red Line).
Swaths are 50 m; 50 m; and 30 m wide, respectively
| 14.12 | Classification of Mineral Resources |
The MRE is classified into Measured, Indicated
and Inferred categories. The classification was done after considering observed continuity of mineralization, continuity of the geological
units/domains, knowledge of lithological, alteration, and structural controls on mineralization, and reliability of the sampled data.
Variogram models were used to support the assessment of grade continuity. Also, consideration was given to the quality of the geological
model, including the lack of true width information, which in this case does not affect the confidence on the geologic model given that
it is a 3D interpretation of large volumes. The classification thus reflects not only drill spacing and drill hole data quality, but also
confidence level in the continuity of the grade and the geometry of the deposit.
It is the opinion of this QP that the sample preparation,
security, and analytical procedures used provide reasonable support for the reliability of the sample database for the Warintza deposits
under investigation such that it supports mineral resource estimation without limitation on confidence classification.
The Measured, Indicated and Inferred mineral resources
are classified in a manner that is consistent with the May 10, 2014 CIM Definition Standards for Mineral Resources and Mineral Reserves.
Mineral resources that are not mineral reserves do not have demonstrated economic viability. In Mr. Rossi’s opinion, there are currently
no relevant factors or legal, political, environmental, or other risks that could materially affect the potential development of the mineral
resources.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
The implementation of the resource classification
process was completed in several steps:
| 1. | An initial estimation run using the Cu kriging plans was implemented. Measured mineral resources were
defined where there are at least two drill holes and four composites minimum within 40 and 80 m distance, depending on geologic domain
and orientation. Indicated mineral resources were defined where there are at least two drill holes and four composites minimum within
60 and 120 m distance, depending on geologic domain and orientation. Inferred mineral resources were estimated within an envelope of drill
hole influence, defined nominally as 200 m in the horizontal directions, and 40 m in the vertical direction. The result is an indicator
for each block in the model, flagging that it could have been estimated under those specific conditions, which is the basis for the resource
classification. |
| 2. | A manual interpretation and adjustment of the initial classification was then done on plan views (by bench).
The interpretation was intended to: |
| a. | Restrict further the measured and indicated areas to avoid extrapolating in certain areas, as well as
eliminating those volumes that were small and had no continuity. |
| b. | Eliminate isolated blocks marked as potentially Indicated (avoid the “spotted dog” issue),
converting them from Measured to Indicated, or from Indicated to Inferred, that is, further downgrading the classification. |
| c. | Eliminate blocks marked as potentially Indicated in areas where there were isolated drilling platforms.
In these areas, grade estimation is based on multiple drill holes, but all drilled from one or two platforms. The affected areas were
El Trinche, Patrimonio, and outlying areas of Warintza East, which are classified as Inferred. |
Additional restrictions were imposed based on
elevation to account for where drill holes become sparser at depth. The additional restrictions implemented were:
| 1. | There are no Measured mineral resources below the 850 m elevation. Any estimated block flagged as Indicated
below 680 m elevation was classified as Indicated. |
| 2. | There are no Indicated mineral resources below the 680 m elevation Any estimated block flagged as Indicated
below 680 m elevation was classified as Inferred. |
| 3. | Only blocks within the drill hole influence envelope had estimated grades and a corresponding classification. |
After applying all the steps described above,
the final classification of the blocks can be checked and characterized, for each class, as shown in Table 66. These statistics, obtained
from the final resource block model, shows that for the Measured category, there were on average almost seven 2 m composites used in the
estimation, from over three drill holes. The closest distance is 23 m; the farthest is just over 51 m; and the average distance of all
2 m composites used to estimate the block is just over 37 m.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Similarly, for the Indicated category, distances
range from 41 to 82 m, with an average just over 64 m. No less than 62 m composites and three drill holes on average were used. Note that
Table 66 does not include assigned grades, which, by default, are classified as Inferred mineralization.
Table 66:
Summary Average Distances (Closest; Farthest; and Average) of all 2m Composites Used to
Estimate Blocks,
by Resource Class.
A plan view (level 800 m) of Warintza’s
resource classification and drill hole traces is shown in Figure 87, with Measured blocks in red; Indicated blocks in green; and Inferred
blocks in blue. Also, shown in red, is the outline of the resource pit used to report the mineral resources and in purple is the drill
hole influence envelope. A cross section (N9648100) is shown in Figure 88, also showing the Resource pit used to define the mineral resources
and the drill hole influence envelope, see Section 14.13 below.
Figure 87: Warintza Resource Classification
Plan View, Level 800 m
Measured Blocks in Red; Indicated Blocks in Green;
Inferred Blocks in Blue; Waste/Not Estimated in
Gray; Red Outline is Resource Pit; Purple Outline is the Drill Hole Influence Envelope
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 88: Warintza Resource Classification
East West Section, N9648100
Measured Blocks in Red; Indicated Blocks in Green;
Inferred Blocks in Blue; Waste/Not Estimated in
Gray; Red Outline is Resource Pit; Purple Outline is Drill Hole Influence Envelope
| 14.13 | Reasonable Prospects of Eventual Economic Extraction |
The Warintza mineralization is assumed amenable
to open-pit mining and milling and recovery through a concentrator (flotation plant) with a Mo recovery circuit. Au is assumed to be recoverable
in a Cu concentrate and payable as a credit. All these assumptions are common for these types of Cu-Mo-Au porphyry deposits.
Warintza was evaluated for reasonable prospects
for eventual economic extraction by constraining the mineral resources within a pit shell optimized in Whittle and MSOPit (MineSight).
The assumptions used in preparing the conceptual pit include mining, processing, and general and administration costs; metallurgical recoveries;
metal prices including provisions for downstream selling costs; a single global slope angle for the ultimate pit walls; and other technical
parameters. The primary assumptions are shown in Table 67 and correspond approximately to a 0.1 % Cu breakeven economic cut-off.
Table 67: Warintza Conceptual Resource Pit
Parameters
Parameter |
Value |
Cu price (USD/lb) |
4.00 |
Mo price (USD/lb) |
20.00 |
Au Price (USD/ounce) |
1,850 |
Mining Cost (USD/tonne) |
1.50 |
Incremental Mining Cost (USD/vertical every 15m) |
0.02 |
Process Cost (USD/tonne of ore) |
5.00 |
Cu Recovery (%) |
90 |
Mo Recovery (%) |
85 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Au Recovery (%) |
70 |
General and Administration (USD/tonne) |
1.00 |
Overall and Global Ultimate Pit Slope Angle (degrees) |
45º |
| 14.14 | Mineral Resource Inventory |
The effective date of the MRE is July 1, 2024.
Resources are presented based on CuEq grades, as well as the individual metals. The calculation of the CuEq grade is based on both metallurgical
recoveries and metal prices, the same shown in Table 67 above. The CuEq formula used is:
Appropriate conversion factors for the metals
involved need to be applied. The resulting final factors are:
This equation reflects the following adjustments
that were made to the Cu Price used:
| 2. | TC/RC: 80 $/dmt and 0.08 $/lb-Cu. |
| 3. | Freight and selling cost of 120 $/t for Cu concentrates. |
Table 68 summarizes the in-pit mineral
resources in the Warintza deposit and within the constraining optimized pit shell, reported at a 0.25% CuEq cut-off grade.
Table 69 shows Warintza’s sensitivity to
CuEq cutoff grade within the Resource pit. It includes 157 Mt at 0.76% CuEq (Measured) and 269 Mt at 0.69% CuEq (Indicated) for 427 Mt
at 0.71% CuEq (Measured & Indicated) and an additional 177 Mt at 0.62% CuEq (Inferred) at a higher cut-off grade of 0.50% CuEq which
reflects the at or near surface supergene and higher-grade hypogene mineralization.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 68: Warintza Mineral Resource
at 0.25 % CuEq Cut-Off Grade, Effective July 1, 2024
Notes to Table 68:
| 1. | The Mineral Resource Estimate was prepared in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”)
Definition Standards for Mineral Resources and Mineral Reserves, adopted by the CIM Council on May 10, 2014. |
| 2. | Reasonable prospects for eventual economic extraction assume open-pit mining with conventional flotation processing and were tested
using Whittle and Minesight pit optimization software with the following assumptions: metal prices of US$4.00/lb Cu, US$20.00/lb Mo, and
US$1,850/oz Au; operating costs of US$1.50/t+US$0.02/t per bench mining, US$5.0/t milling, US$1.0/t G&A, and recoveries of 90% Cu,
85% Mo, and 70% Au based on preliminary metallurgical testwork. |
| 3. | Metal price assumptions for copper, molybdenum and gold are based on a discount to the lesser of the 3-year trailing average (in
accordance with US Securities and Exchange Commission guidance) and current spot prices for each metal. |
| 4. | Mineral Resources include grade capping and dilution. Grade was interpolated by ordinary kriging populating a block model with
block dimensions of 25m x 25m x 15m. |
| 5. | Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. |
| 6. | Copper-equivalent grade calculation for reporting assumes metal prices of US$4.00/lb Cu, US$20.00/lb Mo, and US$1,850/oz Au, and
recoveries of 90% Cu, 85% Mo, and 70% Au based on preliminary metallurgical testwork and includes provisions for downstream selling costs.
CuEq formula: CuEq (%) = Cu (%) + 5.604 × Mo (%) + 0.623 × Au (g/t). |
| 7. | The Mineral Resources estimate was prepared by Mario E. Rossi, FAusIMM, RM-SME, Principal Geostatistician of Geosystems International
Inc., who is an Independent Qualified Person under NI 43-101. The Mineral Resources estimate is at a base case of 0.25% CuEq cut-off grade. |
| 8. | In Mr. Rossi’s opinion, there are currently no relevant factors or legal, political, environmental, or other risks that could
materially affect the potential development of Mineral Resources. |
| 9. | All figures are rounded to reflect the relative accuracy of the estimate and therefore may not appear to add precisely. |
| 10. | The effective date of the mineral resource estimate is July 1, 2024. |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Table 69: Warintza MRE’s
Cut-Off Grade Sensitivity
Cut-off |
Category |
Tonnage |
Grade |
CuEq (%) |
|
(Mt) |
CuEq (%) |
Cu (%) |
Mo (%) |
Au (g/t) |
0.15% |
Measured |
246 |
0.61 |
0.45 |
0.02 |
0.05 |
Indicated |
836 |
0.44 |
0.30 |
0.02 |
0.04 |
M&I |
1,082 |
0.48 |
0.34 |
0.02 |
0.04 |
Inferred |
3,135 |
0.27 |
0.20 |
0.01 |
0.04 |
0.25%
(Base Case) |
Measured |
232 |
0.64 |
0.47 |
0.02 |
0.05 |
Indicated |
677 |
0.49 |
0.34 |
0.02 |
0.04 |
M&I |
909 |
0.53 |
0.37 |
0.02 |
0.05 |
Inferred |
1,426 |
0.37 |
0.27 |
0.01 |
0.04 |
0.35% |
Measured |
207 |
0.68 |
0.50 |
0.03 |
0.06 |
Indicated |
497 |
0.56 |
0.40 |
0.02 |
0.05 |
M&I |
704 |
0.60 |
0.43 |
0.02 |
0.05 |
Inferred |
640 |
0.47 |
0.34 |
0.02 |
0.05 |
0.50%
|
Measured |
157 |
0.76 |
0.56 |
0.03 |
0.06 |
Indicated |
269 |
0.69 |
0.50 |
0.03 |
0.05 |
M&I |
427 |
0.71 |
0.52 |
0.03 |
0.06 |
Inferred |
177 |
0.62 |
0.45 |
0.02 |
0.07 |
Notes to Table 69:
| 1. | The Mineral Resource Estimate was prepared in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (“CIM”)
Definition Standards for Mineral Resources and Mineral Reserves, adopted by the CIM Council on May 10, 2014. |
| 2. | Reasonable prospects for eventual economic extraction assume open-pit mining with conventional flotation processing and were tested
using Whittle and Minesight pit optimization software with the following assumptions: metal prices of US$4.00/lb Cu, US$20.00/lb Mo, and
US$1,850/oz Au; operating costs of US$1.50/t+US$0.02/t per bench mining, US$5.0/t milling, US$1.0/t G&A, and recoveries of 90% Cu,
85% Mo, and 70% Au based on preliminary metallurgical testwork. |
| 3. | Metal price assumptions for copper, molybdenum and gold are based on a discount to the lesser of the 3-year trailing average (in
accordance with US Securities and Exchange Commission guidance) and current spot prices for each metal. |
| 4. | Mineral Resources include grade capping and dilution. Grade was interpolated by ordinary kriging populating a block model with
block dimensions of 25m x 25m x 15m. |
| 5. | Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. |
| 6. | Copper-equivalent grade calculation for reporting assumes metal prices of US$4.00/lb Cu, US$20.00/lb Mo, and US$1,850/oz Au, and
recoveries of 90% Cu, 85% Mo, and 70% Au based on preliminary metallurgical testwork and includes provisions for downstream selling costs.
CuEq formula: CuEq (%) = Cu (%) + 5.604 × Mo (%) + 0.623 × Au (g/t). |
| 7. | The
Mineral Resources estimate was prepared by Mario E. Rossi, FAusIMM, RM-SME, Principal Geostatistician of Geosystems International Inc.,
who is an Independent Qualified Person under NI 43-101. The Mineral |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Resources
estimate is at a base case of 0.25% CuEq cut-off grade and other estimates at varying cut-off grades are included only to demonstrate
the sensitivity of the Mineral Resources estimate and are not the QP’s estimate of the Mineral Resources for the property.
| 8. | In Mr. Rossi’s opinion, there are currently no relevant factors or legal, political, environmental, or other risks that could
materially affect the potential development of Mineral Resources. |
| 9. | All figures are rounded to reflect the relative accuracy of the estimate and therefore may not appear to add precisely. |
| 10. | The effective date of the mineral resource estimate is
July 1, 2024. |
Cautionary Note
Mineral resources that are not mineral reserves
do not have demonstrated economic viability. Mineral resources do not account for mine selectivity, mining loss, and dilution. The reported
mineral resources include material classified as Inferred mineral resources that have a lower level of confidence than Measured and Indicated
mineral resources and, as such, have not been converted to mineral reserves. It is reasonably expected that most of the Inferred mineral
resources could be upgraded to the Indicated category through further exploration.
| 14.15 | Factors That May Affect the Mineral Resource Estimate |
Other than as discussed in other sections of this
Report, there are no known environmental, permitting, legal, title, taxation, socio-economic, marketing, political, or other relevant
issues that may materially affect the mineral resource estimates. Other relevant factors that may materially affect the mineral resources,
including mining, metallurgical recovery, and infrastructure, are reasonably well understood according to the assumptions presented in
this Report.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 15.0 | Mineral Reserve Estimate |
Not applicable at the current stage of the Project.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Not applicable at the current stage of the Project.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Not applicable at the current stage of the Project.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 18.0 | Project Infrastructure |
Not applicable at the current stage of the Project.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 19.0 | Market Studies and Contracts |
Not applicable at the current stage of the Project.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 20.0 | Environmental Studies, Permitting & Social OR Community Impact |
Not applicable at the current stage of the Project.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 21.0 | Capital and Operating Costs |
Not applicable at the current stage of the Project.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Not applicable at the current stage of the Project.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Two large porphyry Cu-Au districts occur within
the same mineralized belt as the Warintza cluster. Mirador and San Carlos-Panantza porphyry clusters share geological characteristics
with Warintza (Figure 89). The following sections on Mirador and San Carlos-Panantza are summarized from publicly available reports and
research literature.
Mirador District
The Mirador District, located some 40 km south
of the Warintza cluster, has two main porphyry deposits – Mirador and Mirador Norte – as well as some lesser mineralized structures
that comprise the Mirador District (Drobe et al., 2013). These deposits are characterized by disseminated to blebby chalcopyrite, which
is most abundant within potassically altered plutonic rocks of the Zamora Batholith. Chalcocite-bearing, supergene-enriched zones overly
the primary mineralization as at Warintza. Radiometric age dating (Drobe et al., 2013) indicates that the main Zamora Batholith granodiorite
host rocks are ca. 164 Ma, whereas the causative subvolcanic intrusive rocks are approximately 8 million years younger.
The Mirador mine is currently owned and operated
by EcuaCorriente S.A., a wholly-owned subsidiary of CRCC-Tongguan Investment Co. Ltd., which is a joint venture formed between China Railway
Construction Corporation (“CRCC”) and Tongling Non Ferrous Metal Group.
Mirador commenced commercial production on July
18, 2019, and has a current projected mine life of 30 years (Harris, 2019). The mine is expected to produce 11 Mt of Cu concentrates
annually, containing 137 Mlbs of Cu, 34,000 ounces of Au, and 394,000 ounces of Ag for 30 years. The Cu concentrates it
produces will be exported to China. Mirador hosts probable reserves of 3.18 Mt of Cu, 3.39 million ounces of Au, and 27.11 million
ounces of Ag.
San Carlos-Panantza
San Carlos-Panantza deposits are located approximately
18 km west of Warintza. San Carlos-Panantza contain mainly hypogene Cu with minor overlying oxide and secondary enrichment horizons (Drobe
et al., 2007). Typical hypogene mineralization consists of disseminated chalcopyrite and molybdenite within quartz veins, whereas higher-grade
zones (>0.8% Cu) are associated with more concentrated chalcopyrite with pyrite and locally magnetite (Drobe et al., 2007).
The San Carlos-Panantza porphyry Cu deposits are
currently owned and operated by EcuaCorriente S.A., a wholly-owned subsidiary of CRCC-Tongguan Investment Co. Ltd., which is a joint venture
formed between CRCC and Tongling Non Ferrous Metal Group. The concessions that cover the San Carlos-Panantza deposits are directly adjacent
to the concessions covering the Warintza deposit.
Corriente Resources Inc.’s Panantza and
San Carlos Cu Project Preliminary Assessment Report, dated October 30, 2007 (Technical Report, Mirador Copper-Gold Project 30,000 TPD
Feasibility Study) contains historical estimates for the two deposits.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
The reported San Carlos historical Inferred mineral
resource estimate is 600 Mt of 0.59% Cu for 7,738 Mlbs of Cu at a 0.4% Cu cut-off. The reported Panantza historical Inferred mineral
resource estimate is 463Mt of 0.66% Cu for 6,688 Mlbs of Cu at a 0.4% Cu cut-off. Between the two deposits, there have been 22,580 m of
drilling in 79 holes.
The historical estimates in the Corriente report
are thought to be relevant and reliable as of their date of issue. The following summary of assumptions, parameters and methods is an
abridged version of disclosure provided in the summary of the Corriente report:
Corriente engaged Mine Development Associates
(“MDA”) in April 2007 to provide a block-model based mineral resource estimate for Panantza in order to provide a current
resource estimate. In addition, MDA was asked to provide a block-model based mineral resource estimate for San Carlos so that the mining
potential of both projects could be evaluated using block-model based mine scheduling and floating pit cones. In working with MDA, Corriente
re-estimated the resources of both deposits by developing block models incorporating the 2006 drill data for Panantza and using new geology
solid models for San Carlos. The resource estimate excludes oxide copper mineralization within the leached zone of the deposits.
The historical estimates use mineral resource
categories prescribed by NI 43-101 and are the most recent estimates available to Solaris. To be updated to current mineral resources,
Solaris anticipates the assumptions used to derive the historical estimates would need to be updated to be more appropriate for current
times. A qualified person has not done sufficient work to classify the historical estimates as current mineral resources and Solaris is
not treating the historical estimates as current mineral resources.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
Figure 89: Map
of Concessions, Known Prospects and Mines Surrounding Warintza Property
Source:
Solaris Resources Inc. (2024)
The Author of the Report has been unable to verify
the foregoing information, and the information is not necessarily indicative of the mineralization on the Warintza Project.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 24.0 | Other Relevant Informtion |
No other relevant information.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 25.0 | Interpretation and Conclusions |
Warintza is a highly prospective Cu-Mo-Au porphyry
deposit within the Cordillera del Cóndor. Exploration efforts in the belt have identified numerous porphyries, Au skarn, and epithermal
Au deposits, all related to Late Jurassic magmatism. Warintza is a typical porphyry system that has the potential to become a world-class
Cu-Mo-Au resource, while the potential for other deposit types exists but have not been explored.
After four years and over 101,000 m of core drilling,
which have tested mainly the Warintza Central, Warintza East, and partially the El Trinche and Patrimonio areas, this MRE shows a very
significant tonnage amenable to open-pit mining. It also shows that there are several additional deposits which have significant target
footprints, adjacent and nearby to Warintza proper, that require further exploration.
Infill drilling is required within both Warintza
Central and Warintza East to increase further resource confidence, as the overall dimensions of the mineralization in the core areas of
the deposit has now been largely delimited.
Straightforward grass-roots exploration techniques
work well in the Cordillera del Cóndor. Numerous porphyry deposits have been discovered in the area by initial panned concentrate
stream sediment sampling, followed by prospecting, rock sampling, ridge soil sampling, grid soil sampling, and finally, scout drill-testing
of geochemical anomalies. At Warintza, there are additional targets that have yet to be investigated by drilling.
Early exploration at Warintza prior to Solaris’
involvement was hampered by community and social issues, and although this still presents a risk, efforts by the Company have allowed
for the development of a supportive relationship and advancement of the Project. The return of the surface rights covering the Shuar communities,
along with ongoing community consultation and community development efforts, have culminated in the Company entering into an Impact and
Benefits Agreement with the host communities.
Metallurgical testing is ongoing, and a full characterization
of Warintza’s mineralization is still pending. It is merited that, beginning in the second half of 2024, an economic study be developed,
which will benefit from a more complete understanding of the mineralization’s response to beneficiation methods. From the testing
completed to date, plus comparisons to similar porphyry deposits, it is expected that Warintza mineralization is amenable to conventional
metallurgical processes.
| 25.1 | Risks and Uncertainties |
25.1.1 Risks and Uncertainties
Affecting the Resource Estimate
The factors that normally create risk in a resource
estimate are not unusual and common to many exploration-stage projects. Additional infill drilling is required. To date, drilling has
confirmed prior models and assumptions regarding geological and grade continuity, with the exception of Warintza East, initially with
relatively sparse information and now more delimited. This is an example of normal exploration risk,
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
and, in fact, the uncertainty implies both downside
risk and upside potential when drilling new areas or extensions of the existing mineralization.
The reported mineral resources can be impacted
by social, political, and government affairs, issues that remain a risk. While at this point in time, Solaris has done considerable work
to ensure that this risk is minimized, social and political factors external to the Company’s control can materially impact the
prospects for economic exploitation of Warintza.
Other technical issues, such as the lack of a
formal quality control monitoring program for the older holes (2000 campaign), have been largely resolved by confirming the characteristics
of the mineralization with new drilling. The 2001 drill campaign (holes W-17 through W-33) did include a formal quality control monitoring
program. While relatively conventional for that time, they were incomplete and less rigorous than is currently recommended for such programs.
This is considered a minor risk and, after the additional drilling, has no impact on the mineral resource estimate or classification.
25.1.2 Risks and Uncertainties
Affecting Potential Additional Discoveries
The Warintza Property contains targets
for future exploration that could lead to the discovery of additional mineralization having the potential to add to the current resource
estimates. There is no certainty; however, that future exploration will lead to significant discoveries as part of normal exploration
risk.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
The QP recommends a drill program to provide improved
drilling coverage targeting open lateral extensions, upgrading mineral resources and converting remaining uncategorized blocks within
the pit shell to support completion of a PFS. The main objective is to increase resource confidence (categorization). If additional geologic
information warrants it, targeting new areas of higher-grade mineralization (supergene enrichment or high-grade primary mineralization)
should be prioritized.
Recent drilling has extended near surface, high-grade
mineralization to the north, northwest and southeast of the MRE. The primary open vectors are to the northwest, southwest and to the southeast.
Drilling is underway from a step-out platform to the northwest to test the connection to West and Central. The same approach is being
taken with step-out platforms to the southwest. These represent opportunities for a major expansion of the MRE in a significantly enlarged
pit.
A geometallurgical program is recommended and
ongoing for flowsheet development and optimization, in addition to assessing the mineralization’s heterogeneity. Comminution variables
such as SAG power and Bond Mill indices should be tested for in different domains, as well as metallurgical recovery variability from
composites and variability tests. This program is expected to cost $4 million and will support the preparation of the PFS below.
Infill drilling, resource expansion drilling testing
lateral open extensions, geo-metallurgical and geotechnical drilling to support a PFS based on an updated mineral resource estimate should
be completed. The combined objectives are likely to require approximately an additional 60,000 m of drilling. Together, these drilling
programs are expected to cost approximately $20 million.
It is also recommended that a total of no less than 5% of the meters
drilled in mineralization be tested for in-situ bulk density.
| 26.2 | Pre-Feasibility Study |
Based on the results of the MRE for Warintza,
the QP recommends further developing the Project through the completion of a PFS. The PFS will form the basis for the mine development
plan and will include detailed scopes, schedules, and work plans for inputs to a Feasibility Study. It is recommended that the PFS be
advanced contemporaneously with, and not be contingent on positive results from, the aforementioned drilling and geometallurgical program.
In addition to the aforementioned drilling and geometallurgical program to support the PFS, Solaris has estimated a budget of $8 million
to complete the PFS. Solaris will continue to develop environmental, social, health, safety, and security programs in parallel to support
the exploration program and technical studies.
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 1. | Arias, W., Core shed facilities and sample preparation laboratories visit at the Warintza project. Wood
PLC. June 14, 2021. 1-5 pp. |
| 2. | Aspden J.A., Litherland M., (1992) The geology and Mesozoic collisional history of the Cordillera Real,
Ecuador. Tectonophysics 205:187-204 |
| 3. | Berger, B. R., Ayuso, R. A., Wynn, J. C., and Seal, R. R., 2008, Preliminary model of porphyry Cu deposits:
US Geological Survey Open-File Report 2008-1321, 55 p. |
| 4. | Bloom, L., Solaris Drill Core Quality Control Procedures. Analytical Solutions Ltd. Canada. June 29, 2021.
1- 7pp. |
| 5. | Bloom, L., Recommendations for Warintza Drill Core Duplicates. Analytical Solutions Ltd. Canada. August
25, 2021. 1- 19pp. |
| 6. | Chiaradia M, Vallance J, Fontboté L, Stein H, Schaltegger U, Coder J, Richards J, Villeneuve M,
Gendall I (2009) U-Pb, Re-Os, and 40Ar/39Ar geochronology of the Nambija Au-skarn and Pangui porphyry Cu deposits,
Ecuador: Implications for the Jurassic metallogenic belt of the Northern Andes. Mineralium Deposita 44:371-387 |
| 7. | CIM, 2003, Estimation of Mineral Resources and Mineral Reserves Best Practice Guidelines: Adopted by CIM
Council on November 23, 2003, 10 p. |
| 8. | CIM, 2014, CIM Definition Standards for Mineral Resources and Mineral Reserves: Prepared by the CIM Standing
Committee on Reserve Definitions, Adopted by CIM Council May 10, 2014, 10p. |
| 9. | Corriente Resource Inc. Annual Information Form, 2000. |
| 10. | Corriente Resources Inc. Annual Report 2003, 24p. |
| 11. | Corriente Resources Inc. Annual Report 2004, 24 p. |
| 12. | Deustch, C.V., 1989, “DECLUS: a FORTRAN 77 Program for Determining Optimum Spatial Declustering
Weights”, Computers & Geosciences, 15(3): 325-332. |
| 13. | Donoso, A., 2019, Legal Report Lowell (Solaris Resources) Mineral Exploration Ecuador S.A. |
| 14. | Drobe J, Lindsay D, Stein H, Gabites J (2013) Geology, mineralization, and geochronological constraints
of the Mirador Cu-Au porphyry district, southeast Ecuador. Economic Geology 108:11-35 |
| 15. | Drobe, J., Hoffert, J., Fong, R., Haile, J., and Collins, J., 2008, Technical Report, Mirador Cu-Au Project
30,000 TPD Feasibility Study. |
| 16. | Equity Exploration Consultants Ltd. Resource Estimate of the Warintza Central Ci-Mo Porphyry Deposit.
Warintza Project, Cordillera del Cóndor, Ecuador. Prepared for Solaris Inc. Authors: Trevor Rabb, Darcy Baker & Eleanor Black.
Effective Date: December 13, 2019. Report Date: December 18, 2019. Revised Date: February 13, 2020, 94 pp. |
| 17. | Fontboté L, Vallance J, Markowski A, Chiaradia M (2004), Oxidized Au skarns in the Nambija district,
Ecuador. Society of Economic Geologists Special Publication 11:341-357 |
| 18. | Gendall IR, Quevedo LA, Sillitoe RH, Spencer RM, Puente CO, Leon JP, Povedo RR (2000) Discovery of a Jurassic
porphyry Cu belt, Pangui area, southern Ecuador. SEG Newsletter 43(1):8-15 |
| 19. | GeoSystems International, Inc.: NI 43-101 Technical Report for the Warintza Project, Ecuador (Amended),
Effective Date April 1, 2022, QP M.E. Rossi, 161 pp. |
| 20. | Gustafson, LB, Quiroga J (1995) Patterns of mineralization and alteration below the porphyry Cu orebody
at El Salvador, Chile. Economic Geology 90:2-16 |
| 21. | Harris, P., 2019, EcuaCorriente starts Mirador production. |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 22. | Hartley, A. J., and Rice, C. M., 2005, Controls on supergene enrichment of porphyry Cu deposits in the
Central Andes – a review and discussion: Mineralium Deposita, v. 40, p. 515–525. |
| 23. | Isaaks, E.H., 1999, “SAGE2001 User’s Manual”, Software License and Documentation. |
| 24. | Jaillard E (1997) Síntesis estratigráfica y sedimentológica del Cretáceo y
Paleógeno de la Cuenca Oriental del Ecuador. Informe final del convenio ORSTOM-Petroproducción, Paris, ORSTOM, 164 p |
| 25. | Leary S, Sillitoe RH, Stewart PW, Roa KJ, Nicolson, BE (2016) Discovery, geology, and origin of the Fruta
del Norte epithermal Au-Ag deposit, southeastern Ecuador. Economic Geology 111:1043-1072 |
| 26. | Litherland M, Fortey NJ, Beddoe-Stephens B (1992) Newly discovered Jurassic skarn fields in the Ecuadorian
Andes. Journal of South American Earth Sciences 6:67-75 |
| 27. | Litherland M, Aspden JA, Jemielita RA (1994) The metamorphic belts of Ecuador. Overseas Memoir of the
British Geological Survey, no. 11, 147 pp |
| 28. | Lowell, D. J., 2005, Warintza Project: Internal report for Lowell (Solaris Resources) Mineral Exploration,
15 p. |
| 29. | Lowell, J. D., and Guilbert, J. M., 1970, Lateral and vertical alteration-mineralization zoning in porphyry
ore deposits: Economic Geology, v. 65, p. 373–408. |
| 30. | Puente, C., 2001, Warintza Este, Exploración Geológica Previa a la fase de Perforaciones,
Provincia de Morona Santiago, SE Ecuador. |
| 31. | Richards, J. P., 2003, Tectono-magmatic precursors for porphyry Cu-(Mo-Au) deposit formation: Economic
Geology, v. 98, p. 1515–1533. |
| 32. | Richards, J. P., 2005, Cumulative factors in the generation of giant calc-alkaline porphyry deposits,
in Super porphyry Cu and Au deposits – a global perspective: PGC Publishing, p. 7–26. |
| 33. | Roa, K. J., 2017, NI 43-101 Technical Report on the Lost Cities – Cutucu Exploration Project, Province
of Morona-Santiago, Ecuador. |
| 34. | Romeuf N, Aguirre L, Soler P, Féraud G, Jaillard E, Ruffet G (1995) Middle Jurassic volcanism in
the Northern and Central Andes. Revista Geológica de Chile 22:245-259 |
| 35. | Ronning, P., and Ristorcelli, S., 2006, Technical Report, Warintza Project, Ecuador: Lowell (Solaris Resources)
Mineral Exploration LLC, 138 p. |
| 36. | Ronning, P., and Ristorcelli, S., 2018, Technical Report, Warintza Project, Ecuador: Equinox Gold Corp.
and Solaris Copper Inc., 128 p. |
| 37. | Sillitoe, R. H., 2000, Au-rich porphyry deposits: descriptive and genetic models and their role in exploration
and discovery: Reviews in Economic Geology, v. 13, p. 315–345. |
| 38. | Sillitoe, R. H., 2005, Supergene oxidized and enriched porphyry Cu and related deposits: Society of Economic
Geology 100th Anniversary Volume, p. 723–768. |
| 39. | Sillitoe, R. H., and Thompson, J. F. H., 2006, Changes in mineral exploration practice: consequences for
discovery: Society of Economic Geologists Special Publication, v. 12, p. 193–219. |
| 40. | Sillitoe, RH (2010) Porphyry Cu systems. Economic Geology 105:3-41 |
| 41. | Sillitoe RH, Perelló J (2005) Andean Cu province: Tectonomagmatic settings, deposit types, metallogeny,
exploration, and discovery. Economic Geology 100th Anniversary Volume, 845-890 |
| 42. | Spikings RA, Winkler W, Seward D, Handler R (2001) Along-strike variations in the thermal and tectonic
response of the continental Ecuadorian Andes to the collision with heterogeneous oceanic crust. Earth Planet Science Letters 186:57-73. |
| 43. | Sivertz, G., Ristorcelli, S., Hardy, S., and Hoffert, J., 2006, Technical Report Update on the Cu, Au,
and Ag Resources and Pit Optimizations, Mirador Project, Ecuador: Corriente Resources Inc., 144 p. |
| 44. | Tschopp HJ (1953) Oil explorations in the Oriente of Ecuador, 1938–1950. Bulletin of the American
Association of Petroleum Geologists 37:2303-2347 |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 45. | Vaca, E., and León, J., 2001, Proyecto Warintza, Anomalías Central y Oeste; Evaluación
Inicial y Recomendaciones de las Fases de Perforación. |
| 46. | Vallejo CF, Spikings R, Luzieux L, Winkler W, Chew D, Page L (2006). The early interaction between the
Caribbean Plateau and the NW South American Plate. Terra Nova 18:64-269. |
| 27.1 | Additional Internal Documentation and References |
| 47. | GeoSystems International, Inc.: Warintza Project, Informe Visita a Proyecto y Laboratorio de Preparación.
de Muestras, ALS, Quito, Ecuador. Preparado para Lowell (Solaris Resources) Mineral Exploration Ecuador S.A., Solaris Inc. November 4,
2021, 50 pp. |
| 48. | GeoSystems International, Inc.: Warintza Project. Informe de Visita a Laboratorio de Análisis de
Muestras, ALS Chemex Lima, Perú. Preparado para Lowell (Solaris Resources) Mineral Exploration Ecuador S.A., Solaris Inc. February
3, 2022, 3 pp. |
| 49. | GeoSystems International, Inc.: Memo Informe Visita Febrero 24; 8 Marzo 2024, 18pp. |
| 50. | GeoSystems International, Inc.: Memo Revisión Base de Datos, 31 Marzo 2024, 12pp. |
| 51. | GeoSystems International, Inc.: Modelo_ZMIN_28-03-2024. |
| 52. | GeoSystems International, Inc.: Modelo_ZMIN_31-03-2024. |
| 53. | GeoSystems International, Inc.: Modelo_ALTER_14-04-2024. |
| 54. | GeoSystems International, Inc.: Modelo_LITO_15-04-2024. |
| 55. | GeoSystems International, Inc.: QA/QC program: Precision Evaluation Report. Principal Lab ALS. Field Duplicate
(FD) Analysis. A. Carrazana, 2024-05-04. |
| 56. | GeoSystems International, Inc.: QA/QC program: Accuracy Evaluation Report. Principal Lab ALS. Certified
Reference Materials (CRM) Analysis. A. Carrazana. 2024-05-04. |
| 57. | GeoSystems International, Inc.: QA/QC program: Contamination Evaluation Report. Principal Lab ALS. Blanks
(BK) Analysis. A. Carrazana. 2024-05-04. |
| 58. | GeoSystems International, Inc.: QA/QC program: Precision Evaluation Report. Interlaboratory Check Assays
Analysis Pulp Duplicate (PB). A. Carrazana. 2024-04-21. |
| 59. | GeoSystems International, Inc.: QA/QC program: Accuracy Evaluation Report. Secondary Lab BV. Certified
Reference Materials (CRM) Analysis. A. Carrazana. 2024-04-26. |
| 60. | GeoSystems International, Inc.: QA/QC program: Contamination Evaluation Report. Secondary Lab BV. Blanks
(BK) Analysis. A. Carrazana. 2024-04-20. |
| 61. | Lowell Mineral Exploration: Guía de Métodos de Ensayos Geoquímicos y Físicos.
Testigos de Perforación. Proyecto Warintza. Fecha: 01 Setiembre 2021. 1-11 pp. |
| 62. | Lowell Mineral Exploration: PROCEDIMIENTO DE REGISTRO Y RESPALDO FOTOGRÁFICO A SONDAJES DDH. PROYECTO
WARINTZA. Fecha: mayo 2020 v1, actualización octubre 2021. 1-16 pp. |
| 63. | Lowell Mineral Exploration: PROCEDIMIENTO DE MUESTREO (TESTIGOS DE PERFORACIÓN). PROYECTO WARINTZA.
Fecha: mayo 2020 v1, octubre 2020 v2, actualización octubre 2021. 1-20 pp. |
| 64. | Lowell Mineral Exploration: PROCEDIMIENTO DE MUESTREO DE PULPAS. PROYECTO WARINTZA. Fecha: octubre 2020
v1, actualización agosto 2021. 1-12 pp. |
| 65. | Lowell Mineral Exploration: PROCEDIMIENTO DE PERFORACIÓN. PROYECTO WARINTZA. Fecha: mayo 2020 v1,
actualización octubre 2021. 1-13 pp. |
| 66. | Lowell Mineral Exploration: Protocolo de QA/QC. Manual de cálculos y fórmulas. PROYECTO
WARINTZA. Noviembre 2021 v1. 1-13 pp. |
| 67. | Lowell Mineral Exploration: PMW-BOD-PRO-001-A3_Procedimiento Control y Regularización de Testigos
de Perforacion_V3. |
| MRE Update - NI 43-101 Technical Report, Warintza Project, Ecuador Effective Date: July 1, 2024 |
| |
| 68. | Lowell Mineral Exploration: PMW-BOD-MAN-014-A3_Guia de metodos de ensayos Geoquimicos y fisicos_V2. |
| 69. | Lowell Mineral Exploration: PMW-BOD-PRO-011-A3_Procedimiento de Corte de Testigos_V2 |
| 70. | Lowell Mineral Exploration: PMW-BOD-PRO-012-A4_Procedimiento de Muestreo y Envío a Laboratorio_V3. |
| 71. | Lowell Mineral Exploration: PMW-BOD-PRO-013-A2_Procedimiento Traslado de muestras_V1. |
| 72. | Lowell Mineral Exploration: PMW-BOD-PRO-015-A3_Procedimeinto de Muestreo de Pulpas_V2. |
| 73. | Lowell Mineral Exploration: PMW-BOD-PRO-010-A1_Procedimiento Elaboración de tablas Qa-Qc_V1. |
| 74. | Lowell Mineral Exploration: PMW-BOD-PRO-003-A4 _Procedimiento Mapeo Estructural_V3. |
| 75. | Lowell Mineral Exploration: PMW-BOD-PRO-004-A2_Procedimiento de Modelamiento Estructural_V1. |
| 76. | Lowell Mineral Exploration: PMW-BOD-PRO-005-A2_PLT. |
| 77. | Lowell Mineral Exploration: PMW-BOD-PRO-005-A2_Procedimiento Ensayo de carga puntual_V2. |
| 78. | Lowell Mineral Exploration: PMW-BOD-PRO-006-A3_Procedimiento Mapeo Geotecnico_V2. |
| 79. | Lowell Mineral Exploration: PMW-BOD-PRO-009-A3_Procedimiento para la toma de muestras de densidad de roca_V3_V3. |
| 80. | Lowell Mineral Exploration: PMW-BOD-PRO-018-A3_Procedimiento de Logueo Geológico a Detalle_V2. |
| 81. | Lowell Mineral Exploration: PMW-BOD-PRO-023-A1_Procedimiento de Modelamiento Geologico_V1. |
| 82. | Lowell Mineral Exploration: PROC_Mapeo_WARINTZA_MAYO2020_v01. |
| 83. | Lowell Mineral Exploration: PROC_MapWARINTZA_01022024. |
| 84. | Lowell Mineral Exploration: PROCESO PARA EL LOGUEO DE RECURSOS FUSION 20240320. |
| 85. | Lowell Mineral Exploration: Annual: EC_WA_QAQC_2022_MAR_DIC_2022. |
| 86. | Lowell Mineral Exploration: EC_WA_QAQC_2023_I_TRIMESTRE_2023. |
| 87. | Lowell Mineral Exploration: EC_WA_QAQC_2023_II_TRIMESTRE_2023. |
| 88. | Lowell Mineral Exploration: EC_WA_QAQC_2023_III_TRIMESTRE_2023. |
| 89. | Lowell Mineral Exploration: EC_WA_QAQC_2023_IV_TRIMESTRE_2023. |
| 90. | Lowell Mineral Exploration: Gravedad especifica SPG03 con parafina (6). |
| 91. | Lowell Mineral Exploration: Acreditación 17025 ALS-Marzo 2022-2026. |
| 92. | Lowell Mineral Exploration: ALS Geochemistry Certificate Lima ISO 17025. |
| 93. | Lowell Mineral Exploration: Certificate A2LA 2185-05_UIO Bureau Veritas. |
| 94. | Lowell Mineral Exploration: INSPECTORATE SEDE CALLAO Certificado Renovación Nov. |
| 95. | Lowell Mineral Exploration: INSPECTORATE SEDE MILLER Certificado RENOVACIN_nov. |
Page 194
Exhibit 99.2
CONSENT OF QUALIFIED PERSON
I, Mario E. Rossi, consent to the public filing
of the technical report titled “Mineral Resource Estimate Update - NI 43-101 Technical Report Warintza Project, Ecuador” with
an effective date of July 1, 2024 (the “Technical Report”) by Solaris Resources Inc.
I consent to the use of any extracts from, or
a summary of, the Technical Report in the news release of Solaris Resources Inc. titled “Solaris Reports In-Pit Mineral Resources
Including Higher Grade Mineralization; Over 30,000m Drilling in H2/24 Targeting Open Extensions and Infill to Upgrade Resources; Concurrent
District Exploration” dated July 22, 2024 (the “Written Disclosure”).
I certify that I have read the Written Disclosure
and that the Written Disclosure fairly and accurately represents the information in the Technical Report.
Dated September 5, 2024.
“Signed and Sealed” |
|
Mario E. Rossi, RM-SME; Fellow, AusIMM; GeoSystems International, Inc. |
Grafico Azioni Solaris Resources (AMEX:SLSR)
Storico
Da Nov 2024 a Dic 2024
Grafico Azioni Solaris Resources (AMEX:SLSR)
Storico
Da Dic 2023 a Dic 2024