Intensive activity continued throughout the quarter, with a strong focus on
upgrading the Mineral Resources at the Salamanca Uranium Project (SUP) and
advancing phase one of the Feasibility Study across a broad front with the aim
of completion in the December quarter. In addition, corporate activity resulted
in a non-binding MOU being signed with the Korea Electric Power Corporation
(KEPCO), to finance and develop the SUP, subject to positive due diligence.
Key Technical Developments
· RC drilling was completed in September with a total of 98 holes for 7,054
metres drilled during the quarter. The drilling successfully upgraded the
confidence levels at Sageras and Alameda South and discovered an extension to
the mineralisation at Sageras which remains open to the north-west.
· Updated Mineral Resources Estimates were announced in September for the
Sageras and Alameda South deposits. The combined Mineral Resources at these two
deposits increased by 10% to 29.8 Mlbs U3O8 with 93% now in the Measured and
Indicated categories.
· Tank leach metallurgical tests have produced very encouraging results with
93% uranium extraction achieved in acid batch leach tests for bulk samples from
Palacios and Alameda and 87% at Sageras.
· Very low acid consumption at Sageras (7-10kg/t), increasing slightly to
12-13 kg/t at Alameda, with 23-25 kg/t at the smaller Palacios deposit.
· Initial results from four, 50 day, static column leach tests on Sageras
bulk samples have returned similar extraction rates.
· A significant amount of other work toward the SUP Feasibility Study was
completed during the quarter including environmental, radiological, water
management, waste management and mining studies.
· Approximately 11.5 tonnes of "representative" core samples were selected
and dispatched to SGS in Perth for a variety of ore preparation tests including
communition, scrubbing and gravity flotation test work
· The combined RC drilling and diamond drilling programme for the Retortillo
and Santidad deposits is scheduled to commence in October with updated Mineral
Resources expected by the end of the year.
· A further 3,200 metres of diamond drilling is scheduled to commence in
October at the Sageras, Palacios North and Alameda South deposits to generate
more material for Phase 2 heap leach metallurgical test work.
Key Corporate Developments
· A non-binding MOU was signed with the Korea Electric Power Corporation
(KEPCO) to finance and develop the SUP which was announced on the 10th August.
· The Company exercised an option to extend the completion of the SUP
Feasibility Study by one year to the 25th November, 2011 as per clause 6.1 of
the Collaboration Agreement with ENUSA. This may result in the payment of an
additional EUR1 million option fee. The Company believes that this extension will
not have any material effect on the start-up date of the project.
· The Company completed a reorganisation of the Spanish entities which
involved the transfer of the Retortillo deposit between wholly owned
subsidiaries. A VAT charge was incurred on the transfer of A$3.6m, which has
had the effect of reducing the group's cash position to A$4.5m at the end of the
quarter - these funds were returned from the Spanish taxation authorities on the
11th October, 2010 - increasing the group's cash position to A$8.1 million.
· At the beginning of the quarter, Berkeley announced the appointment of BMO
Capital Markets Ltd (BMO) as Financial Advisors.
· Mr Matthew Syme announced his intention to resign as a Non-executive
Director of the Company which will take effect from the next Annual General
Meeting on the 29th November, 2010.
Berkeley Resources Managing Director, Mr Ian Stalker commented "This has been
another extremely busy and significant period for Berkeley. The upgrading of
the Mineral Resources, encouraging metallurgical test work results and the
positive progress on the Feasibility Study all confirm the potential of the
Salamanca Uranium Project."
Enquiries - Managing Director: Ian Stalker
Tel: +34 608 221 497
RBC Capital Markets: Martin Eales
Tel: +44 20 7029 7881
KEPCO PARTNERSHIP
Berkeley has entered into a non-binding Memorandum of Understanding (MOU) with
the Korea Electric Power Corporation (KEPCO), to finance and develop the SUP.
KEPCO is a Korean government invested diversified energy company with assets
over $US 80 billion and revenues of over $US 30 billion, on a consolidated basis
as of December 31, 2009. The company is involved in the generation, transmission
and distribution of electrical power from nuclear, hydro, coal, oil and LNG
sources worldwide. KEPCO provides electricity to almost all households in Korea
and operates twenty nuclear power plants in the country with six more under
construction. The company has over 30,000 employees and is listed on the Korean
Stock Exchange and the New York Stock Exchange.
Under the terms of the agreement announced to the ASX on the 10th August, KEPCO
would invest, at the Project level only, US$ 70 million for a 35% interest in
the Salamanca Uranium Project, which comprises of Aguila, Alameda, Retortillo
and Villar mining areas. KEPCO would also contribute funding of 35% for the
development of the Salamanca Uranium Project assets to bring them into
production as well as ongoing operating expenditure.
In return, this agreement provides that KEPCO would execute a proposed off-take
agreement to purchase 35% of the Salamanca Uranium Project's U308 production at
industry standard terms, based on a mix of spot and term prices.
The transaction is subject to the completion of a final 60 days due diligence by
KEPCO, execution and delivery of a Definitive Agreement (DA) within 30 days
thereafter and Berkeley and KEPCO Board approvals, as well as the receipt of
certain regulatory stock exchange approvals, if required.
MINERAL RESOURCES
Berkeley's Mineral Resources are grouped into five project areas: Águila,
Alameda, Retortillo, Villar and Gambuta.
Initial Mineral Resource Estimates for the Águila and Alameda Areas were
announced in February and March following completion of a confirmatory diamond
drilling programme at the Sageras, Palacios North and Alameda South deposits.
In June 2010, Berkeley commenced RC drilling at all three deposits to infill and
upgrade the resources and test for lateral and depth extensions. The resource
infill component of this programme was completed in August and following receipt
of the final chemical assays, AMC Consultants (UK) re-estimated the Mineral
Resources at the Sageras and Alameda South deposits which were announced on the
23rd September. Detailed outcomes include:
· Mineral Resources within Berkeley's projects now total 84.6 million tonnes
at 446 ppm for 83.2 Mlbs (37.7 Kt) U3O8, with 46% in the Measured and Indicated
categories (see Table 1).
· Combined Mineral Resources for the Phase 1 Feasibility Study deposits
(Sageras, Palacios North & Alameda South) have increased by 8% to 34.5 Mlbs
(15.7 Kt) U3O8, with 93% in the Measured and Indicated categories (see Table 2).
· Mineral Resources for the Sageras Deposit have increased by 16% and now
total 10.0 Mlbs (4.5 Kt) at an average grade of 405 ppm U3O8. These include 39%
Measured Resources and 57% Indicated Resources.
· Mineral Resources for the Alameda South Deposit have increased by 7% and
now total 19.8 Mlbs (9.0 Kt) at an average grade of 445 ppm U3O8. These include
92% Indicated Resources.
A summary of the five Resource Areas with a breakdown of the resource categories
is shown in Table 1.
Table 1 - Berkeley Mineral Resource Areas (200 ppm U3O8 cut-off)
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| Deposit | Resource |Tonnes | U3O8 | U3O8 | U3O8 |Category |Berkeley | U3O8 |
| | | | | | | | | |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| Name | Category | (Mt) |(ppm) | (t) |(Mlbs) | (%) | (%) |(Mlbs) |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| | Measured | 5.6 | 400 | 2,240 | 4.9 | 22% | 90% | 4.4 |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| |Indicated | 8.7 | 463 | 4,031 | 8.9 | 40% | 90% | 8.0 |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| | Subtotal | 14.3 | 439 | 6,271 | 13.8 | 62% | 90% | 12.4 |
| | M+I | | | | | | | |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| | Inferred | 9.8 | 387 | 3,794 | 8.4 | 38% | 90% | 7.5 |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| Águila | Total | 24.1 | 418 |10,065 | 22.2 | 100% | 90% | 20.0 |
| Area | | | | | | | | |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| |Indicated | 18.5 | 446 | 8,251 | 18.2 | 75% | 90% | 16.4 |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| | Inferred | 5.8 | 482 | 2,798 | 6.2 | 25% | 90% | 5.6 |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| Alameda | Total | 24.3 | 455 |11,049 | 24.4 | 100% | 90% | 21.9 |
| Area | | | | | | | | |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| Villar | Inferred | 5.0 | 446 | 2,239 | 4.9 | 100% | 90% | 4.4 |
| Area | | | | | | | | |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| |Indicated | 5.2 | 531 | 2,759 | 6.1 | 27% | 100% | 6.1 |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| | Inferred | 14.7 | 505 | 7,430 | 16.4 | 73% | 100% | 16.4 |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| Retortillo | Total | 19.9 | 512 |10,190 | 22.5 | 100% | 100% | 22.5 |
| Area | | | | | | | | |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| Gambuta | Inferred | 11.3 | 371 | 4,192 | 9.2 | 100% | 100% | 9.2 |
| Area | | | | | | | | |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| | Measured | 5.6 | 400 | 2,240 | 4.9 | 6% | | 4.4 |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| |Indicated | 32.4 | 464 |15,041 | 33.2 | 40% | | 30.4 |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| | Subtotal | 38.0 | 455 |17,282 | 38.1 | 46% | | 34.9 |
| | M+I | | | | | | | |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| | Inferred | 46.6 | 439 |20,453 | 45.1 | 54% | | 43.1 |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| Berkeley | Total | 84.6 | 446 |37,735 | 83.2 | 100% | | 78.0 |
| | | | | | | | | |
+------------+-----------+--------+-------+--------+--------+----------+----------+--------+
SALAMANCA URANIUM PROJECT
Berkeley's Feasibility Study process for the Salamanca Uranium Project commenced
in May 2009, following Cabinet approval of the Co-Operation Agreement between
Berkeley and ENUSA. The Study objective is to assess the viability of
restarting mining within the Salamanca State Reserves, based on a number of
known uranium deposits.
Berkeley's Feasibility Study is progressing in 2 separate phases:
1. Phase 1 is focusing on a tank leach scenario with a production rate of 2.1
Mlbs (0.95 Kt) of U3O8 per annum with the Sageras, Palacios North and Alameda
South deposits providing the initial feed to the Quercus Plant.
2. Phase 2 aims to increase the production rate up to 5 Mlbs (2.3 Kt) of U3O8
per annum by establishing heap leach operations at the various satellite
deposits.
A breakdown of the updated Mineral Resource Estimates for the three Phase 1
Feasibility Study deposits is shown in Table 2.
Table 2 - Phase 1 Feasibility Study Mineral Resources (200 ppm U3O8 cut-off)
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| Deposit | Resource |Tonnes | U3O8 | U3O8 | U3O8 |Category |Berkeley | U3O8 |
| | | | | | | | | |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| Name | Category | (Mt) |(ppm) | (t) |(Mlbs) | (%) | (%) |(Mlbs) |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| | Measured | 4.7 | 378 | 1,777 | 3.9 | 39% | 90% | 3.5 |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| |Indicated | 5.8 | 444 | 2,575 | 5.7 | 57% | 90% | 5.1 |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| | Subtotal | 10.5 | 414 | 4,352 | 9.6 | 96% | 90% | 8.6 |
| | M+I | | | | | | | |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| | Inferred | 0.7 | 268 | 188 | 0.4 | 4% | 90% | 0.4 |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| Sageras | Total | 11.2 | 405 | 4,539 | 10.0 | 100% | 90% | 9.0 |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| | Measured | 0.9 | 515 | 464 | 1.0 | 22% | 90% | 0.9 |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| |Indicated | 2.9 | 502 | 1,456 | 3.2 | 68% | 90% | 2.9 |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| | Subtotal | 3.8 | 505 | 1,919 | 4.2 | 90% | 90% | 3.8 |
| | M+I | | | | | | | |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| | Inferred | 0.4 | 531 | 212 | 0.5 | 10% | 90% | 0.4 |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| Palacios | Total | 4.2 | 508 | 2,132 | 4.7 | 100% | 90% | 4.2 |
| North | | | | | | | | |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| | Measured | 0.0 | 0 | 0 | 0.0 | 0% | 90% | 0.0 |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| |Indicated | 18.5 | 446 | 8,251 | 18.2 | 92% | 90% | 16.4 |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| | Subtotal | 18.5 | 446 | 8,251 | 18.2 | 92% | 90% | 16.4 |
| | M+I | | | | | | | |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| | Inferred | 1.7 | 433 | 736 | 1.6 | 8% | 90% | 1.5 |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| Alameda | Total | 20.2 | 445 | 8,987 | 19.8 | 100% | 90% | 17.8 |
| South | | | | | | | | |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| | Measured | 5.6 | 400 | 2,240 | 4.9 | 14% | 90% | 4.4 |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| |Indicated | 27.2 | 452 |12,282 | 27.1 | 78% | 90% | 24.4 |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| Phase | Subtotal | 32.8 | 443 |14,522 | 32.0 | 93% | 90% | 28.8 |
| 1 | M+I | | | | | | | |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| Feasibility | Inferred | 2.8 | 406 | 1,136 | 2.5 | 7% | 90% | 2.3 |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
| Study | Total | 35.6 | 440 |15,658 | 34.5 | 100% | 90% | 31.1 |
+-------------+-----------+--------+-------+--------+--------+----------+----------+--------+
A large amount of work was undertaken during the quarter in progressing the
first phase of the Feasibility Study which is on track to be completed in
November. A summary of the various works completed follows.
1. Drilling
The RC drilling programme was completed in September with a total of 98 holes
for 7,054 metres (Table 3) drilled during the quarter.
Table 3 - 3rd Quarter Drilling Totals
+-----------+-----------+--------+-------+--------+-------+--------+
| Deposit | DDH | RC | TOTAL |
+ +--------------------+----------------+----------------+
| | Holes |Metres |Holes |Metres |Holes |Metres |
+-----------+-----------+--------+-------+--------+-------+--------+
| Alameda | 1 | 63 | 12 | 1,372 | 13 | 1,435 |
| South | | | | | | |
+-----------+-----------+--------+-------+--------+-------+--------+
| Palacios | 1 | 90 | 10 | 1,112 | 11 | 1,202 |
| North | | | | | | |
+-----------+-----------+--------+-------+--------+-------+--------+
| Sageras | 0 | 0 | 76 | 4,570 | 76 | 4,570 |
+-----------+-----------+--------+-------+--------+-------+--------+
| Total | 2 | 153 | 98 | 7,054 | 100 | 7,207 |
+-----------+-----------+--------+-------+--------+-------+--------+
The drilling successfully in-filled the Inferred resource areas at Sageras and
Alameda South and identified a new zone of mineralisation at Sageras which was
not closed off prior to finalizing the updated resource.
The new mineralized zone was discovered in drill hole ZRC-012 which intersected
very high grade mineralisation from 44m depth over a 3 metre interval grading
7,027 ppm U3O8.
Follow up drilling has extended the mineralization over 250 metres to the
north-west where it is still open. A number of holes drilled to the north of
ZRC-012 also returned positive intersections but these were not included in the
September resource update as the assay results were received after the Mineral
Resource Estimate had been finalized.
10 RC holes (1,112m) were drilled at Palacios aimed at exploring the previously
untested area between the two main mineralised domains. The results were
disappointing with only 2 holes intersecting mineralisation extending below the
current resource model.
Diamond drilling continued during the quarter with one hole (MDD-017) completed
at Palacios North and one hole (ASD-057) completed at Alameda South. Both of
these holes were drilled to provide additional metallurgical material for heap
leach and comminution metallurgical test work.
A new 3,200m diamond drilling programme has been planned and submitted to the
Salamanca Mines Department as an extension of the previous diamond drilling for
the Palacios North, Sageras and Alameda South deposits. This programme has been
designed to generate an additional 20 tonnes of core for Phase 2 heap leach
column metallurgical test work and is due to commence in October.
The planned infill and metallurgical RC and diamond drilling programme at the
Retortillo and Santidad deposits is expected to commence in November following
positive approval by the Salamanca Mines Department.
A list of notable intersections for the quarter is shown in Table 4. The
diamond drill holes are presented as eU3O8 grades calculated from down hole
radiometrics whereas the RC holes are presented as U3O8 chemical assays.
Table 4 - Notable Intersections
+----------+---------+--------+------+----------+-------+
| Deposit | RC | From | To |Interval | U3O8 |
+ +---------+--------+------+----------+-------+
| |Hole ID | (m) | (m) | (m) |(ppm) |
+----------+---------+--------+------+----------+-------+
| Alameda |ASR-037 | 77 | 81 | 4 |1,204 |
| South | | | | | |
+----------+---------+--------+------+----------+-------+
| Alameda |ASR-039 | 15 | 25 | 10 | 731 |
| South | | | | | |
+----------+---------+--------+------+----------+-------+
| Alameda |ASR-041 | 36 | 39 | 3 |2,647 |
| South | | | | | |
+----------+---------+--------+------+----------+-------+
| Alameda |ASR-045 | 25 | 35 | 10 | 840 |
| South | | | | | |
+----------+---------+--------+------+----------+-------+
| Alameda |ASR-047 | 20 | 28 | 8 |1,187 |
| South | | | | | |
+----------+---------+--------+------+----------+-------+
| Alameda |ASR-047 | 29 | 57 | 28 |1,728 |
| South | | | | | |
+----------+---------+--------+------+----------+-------+
| Alameda |ASR-051 | 113 | 116 | 3 |1,341 |
| South | | | | | |
+----------+---------+--------+------+----------+-------+
| Alameda |ASR-052 | 57 | 62 | 5 |1,585 |
| South | | | | | |
+----------+---------+--------+------+----------+-------+
| Alameda |ASR-052 | 75 | 81 | 6 |2,691 |
| South | | | | | |
+----------+---------+--------+------+----------+-------+
| Alameda |ASR-052 | 84 | 95 | 11 | 506 |
| South | | | | | |
+----------+---------+--------+------+----------+-------+
| Alameda |ASR-052 | 107 | 114 | 7 |1,417 |
| South | | | | | |
+----------+---------+--------+------+----------+-------+
| Alameda |ASR-053 | 17 | 25 | 8 | 658 |
| South | | | | | |
+----------+---------+--------+------+----------+-------+
| Alameda |ASR-056 | 69 | 71 | 2 |3,041 |
| South | | | | | |
+----------+---------+--------+------+----------+-------+
| Alameda |ASR-058 | 45 | 56 | 11 | 814 |
| South | | | | | |
+----------+---------+--------+------+----------+-------+
| Sageras |SGR-025 | 26 | 31 | 5 |1,325 |
+----------+---------+--------+------+----------+-------+
| Sageras |ZMR-015 | 45 | 50 | 5 |7,146 |
| West | | | | | |
+----------+---------+--------+------+----------+-------+
| Sageras |ZMR-016 | 41 | 48 | 7 |3,649 |
| West | | | | | |
+----------+---------+--------+------+----------+-------+
| Sageras |ZMR-017 | 27 | 49 | 22 |1,188 |
| West | | | | | |
+----------+---------+--------+------+----------+-------+
|Palacios |MDR-025 | 70 | 75 | 5 | 876 |
| North | | | | | |
+----------+---------+--------+------+----------+-------+
| | | | | | |
+----------+---------+--------+------+----------+-------+
| Deposit | DDH | From | To |Interval |eU3O8 |
+ +---------+--------+------+----------+-------+
| |Hole ID | (m) | (m) | (m) |(ppm) |
+----------+---------+--------+------+----------+-------+
| Alameda |ASD-057 | 34 | 40 | 7 |1,852 |
| South | | | | | |
+----------+---------+--------+------+----------+-------+
|Palacios |MDD-017 | 7 | 22 | 15 | 406 |
+----------+---------+--------+------+----------+-------+
A full table of intersections for the quarter is included in the Appendix. They
have been calculated using a nominal 200 ppm U3O8 lower cut-off and a minimum
thickness of at least 1 metre. All intersections correlate well with the
historical drill hole data in both thickness, location down the hole and grade.
2. Metallurgical Test Work
During the year over 14,500 kg of representative diamond drill core was sent to
the SGS Metallurgical Laboratories in Perth, Australia for a comprehensive
metallurgical test work campaign supervised by Aker Solutions, Orway Mineral
Consultants (WA) Pty Ltd and Kappes Cassiday. The material was selected on the
basis of lithology, oxidation and grade from the Sageras, Palacios North and
Alameda South deposits.
The primary objective of the Phase 1 metallurgical test work is to optimise the
process conditions for treating the uranium ore at Sageras, Alameda and Palacios
in a tank leach configuration. The results of the current work will be used for
the re-commissioning of the Quercus Processing Plant at a capacity of 2.1 Mlb
(0.95 Kt) of U3O8 per annum.
The Phase 1 test work campaign commenced in March 2010 and is scheduled to be
completed in the 4th quarter 2010 with the following test work finalised or
still in progress:
· Tank leaching;
· Heap leaching;
· Comminution & ore upgrade;
· Leach agitator test work;
· Thickening and filtration test work;
· Effluent neutralisation.
The key results from the test work completed to date are summarised below:
· Leach recoveries greater than 93% at Palacios and Alameda and 87% at
Sageras using an acid based process at high slurry densities of 1.6 to 1.8;
· A relatively coarse grind in the leach of P80 (750 microns);
· Rapid leach times - approximately 10 to 12 hours at Alameda and 14 hours
at Sageras;
· Ambient leach temperatures of 20ºC;
· Low sulfuric acid consumptions of 7 to 10 kg/t at Sageras, 12 to 13 kg/t
at Alameda and 23 to 25 kg/t at Palacios;
· Minimal recovery of impurities with the acid leach;
· A simplified extraction flow sheet, similar to that employed in uranium
acid leach processing elsewhere in the world;
· Reduction of environmental issues with the generation of a "dry" leach
residue.
· Encouraging results have also been returned from column leach test work
on four Sageras variability samples with leach yields between 83 and 90%.
Tank Leach
The current dynamic leach test work has delivered uranium extraction rates in
excess of 93% at Alameda and Palacios and 87% at Sageras. All of the tests to
date have employed a coarse grind to the leach feed of P80 (750 microns) with
the aim of minimizing energy requirements in the comminution circuit without
sacrificing yield.
Typical process conditions are presented in Table 5.
Table 5 - Leach Process Conditions for Palacios, Alameda and Sageras
+----------------+--------+----------+---------+---------+
| Material | Units |Palacios |Alameda |Sageras |
+----------------+--------+----------+---------+---------+
| Recovery | % | 93 | 93 | 87 |
+----------------+--------+----------+---------+---------+
| Sulfuric acid |(kg/t) | 23 - | 12 - | 7 - 10 |
| | | 25 | 13 | |
+----------------+--------+----------+---------+---------+
| Pyrolusite |(kg/t) | 1.9 | 2.5 | 2.5 |
+----------------+--------+----------+---------+---------+
| Temperature | (ºC) | 20 | 20 | 20 |
+----------------+--------+----------+---------+---------+
| Slurry | | 1.7 - | 1.7 - | 1.7 - |
| Specific | | 1.8 | 1.8 | 1.8 |
| Gravity | | | | |
+----------------+--------+----------+---------+---------+
| Leach Time | (h) | 6 - 8 | 10 - | 12 - |
| | | | 12 | 14 |
+----------------+--------+----------+---------+---------+
Heap Leach
Column leach test work employing 100mm diameter by 2m length columns on four
Sageras lithologies has returned comparable extraction rates to the tank leach
process (87% extraction). Acid consumptions are slightly higher than those in
the tank leach at 14 and 15 kg/tonne respectively.
Ore Upgrade Test work
The material from Palacios demonstrated outstanding upgrade to a simple crush,
scrub and screen process during ore preparation where a total of 57% of the
uranium was concentrated into 15% of the feed weight (or 72% of the uranium was
concentrated in 37% of the weight).
Engineering Related Test work
A significant component of the test work is focused on developing relevant
engineering data to include in the Phase 1 Feasibility Study due for completion
in the 4th quarter.
The tank leach test work completed to date has supported the conceptual flow
sheets using a relatively simple acid leach process common to many existing
uranium operations.
Process Flowsheet
The process flowsheets have been configured from the results of test work
conducted to date.
Process engineering data has been obtained for the following test work:
1. Comminution - Table 6 summarises the comminution results for the Alameda
and Sageras Ore.
Table 6 - Comminution Result Summary
+------------+---------+---------+----------+----------+---------+---------+----------+---------+----------+----------+
| Composite | UCS | CWI | SMC Results (-31.5+26.5mm) |Abrasion | BRMWI | BRMWI | |
| Sample |Results |(kWh/t) | | Index |(kWh/t) | Product | |
| | (Mpa) | | | | | Size | |
| | | | | | | (P80 | |
| | | | | | | µm) | |
+ + + + + + + +----------+
| | | | | | | | |
+ + + +-----------------------------------------+ + + +----------+
| | | | A | | | | B | A | Dwi | |
| | | | | | | | | x |(kWh/m³) | |
| | | | | | | | | b | | |
+ + + + + + + + + + +----------+
| | | | | | | | | | | |
+------------+---------+---------+----------+----------+---------+---------+----------+---------+----------+----------+
| Alameda | 46 | 8.4 | 54.5 | 0.54 | 29.5 | 10.12 | 0.1136 | 20.8 | 801 | |
+------------+---------+---------+----------+----------+---------+---------+----------+---------+----------+----------+
|Transition | 12 | 7.1 | 40.3 | 0.92 | 37.1 | 7.14 | 0.0725 | 15.2 | 789 | |
+------------+---------+---------+----------+----------+---------+---------+----------+---------+----------+----------+
| Primary | 55 | 8.7 | 57.8 | 0.45 | 26.1 | 10.83 | 0.1233 | 22.1 | 804 | |
+------------+---------+---------+----------+----------+---------+---------+----------+---------+----------+----------+
| Sageras | 48 | 8.4 | 56.8 | 1.01 | 57.2 | 5.11 | 0.0405 | 12.4 | 811 | |
+------------+---------+---------+----------+----------+---------+---------+----------+---------+----------+----------+
|Transition | 31 | 6.2 | 38.2 | 1.75 | 66.9 | 3.75 | 0.0218 | 10.6 | 833 | |
+------------+---------+---------+----------+----------+---------+---------+----------+---------+----------+----------+
| Primary | 53 | 9.1 | 62.4 | 0.79 | 48.3 | 5.51 | 0.0461 | 12.9 | 805 | |
+------------+---------+---------+----------+----------+---------+---------+----------+---------+----------+----------+
2. Leach agitator selection - Table 7 lists the leach agitator test work
results for the Palacios and Sageras ore at a 70% slurry concentration.
Table 7 - Palacios and Sageras Agitation Test work Results
+---------------+---------+----------+---------+
| Description | Units |Palacios |Sageras |
+---------------+---------+----------+---------+
| Power /unit | kW/m3 | 4.73 | 4.2 |
| vol | | | |
+---------------+---------+----------+---------+
| Torque/unit | N.m/m3 | 90.2 | 78 |
| volume | | | |
+---------------+---------+----------+---------+
| Tip Speed | m/s | 4.18 | 3.98 |
+---------------+---------+----------+---------+
| Superficial | m/min | 24.4 | 23 |
| Velocity | | | |
+---------------+---------+----------+---------+
| Specific | | 1.9 | 1.9 |
| Gravity | | | |
+---------------+---------+----------+---------+
3. Pre-leach and post-leach thickening - Table 8 shows the dynamic pre-leach
thickening results for the Palacios and Sageras Ore.
Table 8 - Palacios and Sageras Dynamic Pre - Leach Thickening Results
+----------+----------+--------+------------+----------+--------+
| Feed |Flocculant | Underflow |
+------------------------------+------------+-------------------+
| Flux | Calc. |Liquor | Dose | Meas. | Yield |
| | Solids | RR | | Solids | |
+----------+----------+--------+------------+----------+--------+
|(t/(m2h) |(%(w/w)) | (m/h) | (g/t) |(%(w/w)) |Stress |
| | | | | | (Pa) |
+----------+----------+--------+------------+----------+--------+
| 1 | 25 | 3.37 | 25 | 67 | 320 |
+----------+----------+--------+------------+----------+--------+
Table 9 shows the dynamic post-leach thickening results for the Sageras Ore.
Table 9 - Sageras Dynamic Post -Leach Thickening Results
+----------+----------+--------+------------+----------+--------+
| Feed |Flocculant | Underflow |
+------------------------------+------------+-------------------+
| Flux | Calc. |Liquor | Dose | Meas. | Yield |
| | Solids | RR | | Solids | |
+----------+----------+--------+------------+----------+--------+
|(t/(m2h) |(%(w/w)) | (m/h) | (g/t) |(%(w/w)) |Stress |
| | | | | | (Pa) |
+----------+----------+--------+------------+----------+--------+
| 1 | 25 | 3.37 | 25 | 67 | 320 |
+----------+----------+--------+------------+----------+--------+
4. Residue filtration - Table 10 lists the residue filter parameters for the
combined Palacios and Sageras Ore.
Table 10 - Residue Filtration Parameters
+---------------------+--------------+--------------+
| Description | Units | Filter |
| | | Parameters |
+---------------------+--------------+--------------+
| Average Filtration | t/m2h | 1.1 |
| Flux | | |
+---------------------+--------------+--------------+
| Form Moisture | % H2O | 26 |
+---------------------+--------------+--------------+
| Discharge Moisture | % H2O | 19-21 |
+---------------------+--------------+--------------+
| Discharge Cake | Mm | 28 |
| Thickness | | |
+---------------------+--------------+--------------+
| Wash Efficiency | % | 96 |
+---------------------+--------------+--------------+
5. Effluent Neutralisation - A short pilot plant campaign is planned at the
Australian Nuclear Science and Technology Organization (ANSTO) for the 4th
quarter 2010 that will examine the treatment of acid mine drainage liquors for
removal of heavy metals and radionuclides.
Engineering
The following Phase 1 feasibility study process and engineering packages have
been completed:
· Design Basis
· Mass balance
· Process Control Flow Diagram
· Process Block Flow Diagram
· Equipment List
· Plant Layouts
· Motor List
· Operating Cost
The capital cost for the Phase 1 feasibility study process and engineering
packages is still in progress. The following 3 trade-off studies have also been
undertaken and the results will be incorporated into the process design:
1. CCD Versus Belt Filtration Option
2. Ammonium Hydroxide Versus Sodium Carbonate Strip Option
3. Continuous Ion Exchange and Solvent Extraction Versus 2 Solvent Extraction
Modules Option
Future Work
The current phase of the tank leach testwork programme is expected to be
completed in the 4th quarter 2010. Future work is aimed at:
· Identifying whether improved recoveries of uranium can be achieved for
Sageras;
· Progressing the heap leach Phase 2 testwork on Alameda and Sageras;
· Completing the pilot plant campaign at ANSTO in order to obtain process
and engineering data for the design of mine acid rock drainage and pit waters;
· Completing the Phase 1 Feasibility Study in the 4th quarter 2010;
· Securing further drill core of approximately 20 tonnes as part of the
Phase 2 Feasibility Study Pilot Plant campaign.
3. Environmental Studies
In February 2010 Berkeley initiated, under the supervision of Golder Associates,
a series of baseline studies to determine the current status of the areas that
will be potentially affected by the planned mining activities in the State
Mining Reserves at Águila and Alameda. These studies consisted of field
activities as well as literature reviews of the potentially affected areas and
their surroundings. In performing these studies, Berkeley has contracted well
known experts within each particular field of expertise. The studies will form
the basis for the ESIA, designing protective measures where required to minimise
the impact of the planned mining activities.
A summary of the key elements completed during the quarter are summarised below:
· Land-use and landscape. The landscape characterisation study was
completed by AIA Consultants during the quarter and the results of all soil
sampling conducted have been received.
· Climate and Meteorology. The weather station was relocated by INGEMISA
from Alameda to Sageras to complete the climate data set.
· Air Quality. The first data from air quality monitoring programme has
been collected, this includes deposited dust from 8 separate monitoring
locations surrounding both Alameda and Aguila and PM10 medium volume monitoring
at the same location plus at the townships of La Alameda de Gardon and Saelices
el Chico.
· Noise. The next monitoring campaign will be performed in October.
· Surface Water Quality. The bi-monthly surface monitoring programme
continued at 7 locations identified up and down stream of the proposed
operations at Águila and Alameda. The fourth sampling campaign was performed in
August. It was not possible to sample the Carpio de Azaba and Arroyo de la
Mimbre creek as there was no flowing water in the creek. This is normal as the
creek only is seasonal and dries out during the summer months.
· Groundwater Quality. During the quarter, the previously indentified and
sampled public wells and springs in the area were re-sampled. In addition,
on-site groundwater continued to be characterised as part of the hydro
geological work being conducted by INGEMISA and Aquaterra.
· Flora and Fauna Monitoring and assessment of flora and fauna has been
completed and reports received from all consultants.
The study of aquatic flora and fauna was conducted by IPROMA SL and included
sampling of fish, aquatic plants and sediments in the rivers at both Aguila and
Alameda. A second round of sampling is scheduled for October.
The study concerning vegetation and flora studies for the areas of Alameda and
Sageras/Palacios was conducted by the Catedratico Botanical University of
Salamanca.
The study concerning fauna (mammals, fish, and reptiles) has been assigned to
the University of Salamanca.
The study concerning local birds was conducted by Estudios Zoologicos Iberia SL
and includes a special focus on the Black Stork
· Socio-Economic Baseline. The Socio-Economical baseline study was assigned
to the University of Salamanca. The study particularly mentions projects that
are being developed in the area and possible interventions by the regional
authorities, Junta de Castilla y León, considering the planned mine sites are
within protected areas.
A summary of all monitoring completed to date will be collated for inclusion in
the Feasibility Study. Monitoring will continue to allow for a full 12 months
of data to be collected which will capture any seasonal variations. The
complete set of baseline monitoring will be available for including in the
permitting and approvals process.
4. Radiological Studies
The radiation assessment for the Feasibility Study is being conducted by Paulka
Radiation & Environment. All methodology employed in the assessment has been
based on international standards recognised by the European Union and
international best practice guidance material have been incorporated where
applicable.
The first part of the assessment has been the design and implementation of a
baseline monitoring programme to characterise the current radiological aspects
of the project. The monitoring programme includes parameters for radionuclides
in dust, radon, gamma dose, radionuclides in soils, ground and surface waters
and biota. The baseline monitoring programme commenced in February 2010 and is
approximately 70% complete. During the quarter the following monitoring was
conducted:
· Water sampling continued as part of the environmental baseline with
radionuclide's analysed as additional parameters.
· Soil samples were collected from all areas of proposed infrastructure.
· Dust deposition, airborne dust, radon and gamma radiation monitoring
continues at each of the 8 selected sites described in the environmental
baseline section.
· High Volume air sampling was conducted in the villages of Alameda de Gardon
and Saelices el Chico.
· Radon emanation monitoring and soil sampling was conducted at each of the 8
dust sampling sites.
The remainder of the assessment involves the identification and quantification
of any radiation risks the project may have with regard to workers, the public
and the environment. The following tasks were completed during the quarter:
· A radon modelling consultant engaged.
· Worst case estimates of dust and radon in villages of Alameda de Gardon and
Saelices el Chico were completed. This showed that "members of the public"
exposures from the project were below applicable limits
· ERICA assessments of impacts to aquatic biota from discharge of treated
water to the river and from dust depositing into ecosystems were completed.
Both assessments showed the risk to be low.
· Radiation design criteria provided to engineers
· Initial HAZOP level 2 study completed.
5. Water Management
The water management programme continued to progress well during the quarter
with the completion of the field investigation component and commencement of the
detailed analysis of the collected data.
Long term groundwater monitoring continued at Palacios, Sageras and Alameda and
short term low rate hydraulic testing was undertaken between the proposed
Palacios pits and the Agueda River and in the catchment divide between Sageras
East and the restored Mina Fe open pit. Groundwater tracer tests were also
completed at Sageras and Alameda.
Detailed analysis of the field data facilitated updating of the conceptual hydro
geological model and a revised prediction of potential groundwater inflows into
the proposed pits at Palacios, Sageras and Alameda. The revised groundwater
inflows are not excessive and should be easily managed during mining activities.
Elevated hydraulic conductivity in the southern area of Alameda may yield more
significant inflows, but the potential exists to install dewatering bores in
this area to intercept water prior to entering the open pit. These dewatering
bores could also provide a necessary water supply for the mining operation at
Alameda.
Pit wall pore pressure modelling was undertaken in order to assess whether
depressurisation might be required to achieve pit wall stability and to provide
input into the geotechnical pit slope design studies being completed by AMC
Consultants (UK). The modelling predicts that under natural/free draining
conditions, the proposed open pit walls will drain with time, although, the rate
of mining in some areas may lead to the local development of saturated pit wall
conditions which may require depressurisation. However,the modelling of
depressurisation options indicates that the straightforward installation of pit
wall drain holes can achieve the depressurisation required to support design pit
wall angles.
During the quarter, preliminary surface water management plans and a project
water balance were prepared, which are key aspects of the water management study
and distributed to the other project team members.
The on-going work includes finalising the site water management plan and
preparation of the Feasibility Study report.
6. Waste Characterisation
A review of anticipated waste rock characteristics was conducted during the
quarter. A total of 45 waste rock samples were selected from the Alameda,
Sageras, and Palacios deposits and shipped to SGS-CEMI in Vancouver for
geochemical characterization. All static test results have been received and
reviewed. Five samples have been identified for kinetic testing, which is
currently ongoing.
A total of 8 residue samples (7 leach products and 1 water treatment plant
residue) and 7 feed samples were also selected for geochemical characterization.
All static test results for the leach product and feed samples have been
received and reviewed.
Two residue samples have been identified for kinetic testing, which is to be
initiated shortly.
The main findings to date can be summarized as follows:
· The environmental characteristics of the three deposits are similar.
· Oxidized material is non acid generating, sulphide material is mostly
potentially acid generating, and NORM is both.
· The sulphur threshold between potentially acid generating and non acid
generating material appears to be between 0.2 and 0.4%. This is to be verified
by the ongoing kinetic testing for possible use in waste rock management.
· Ore and residue are potentially acid generating.
· A number of metals and sulphate have been identified as being potentially
leachable, especially under acidic conditions.
Waste Rock Dumps
Based on the preferred processing option and final open pit designs, waste rock
dumps (WRD) have been designed and costed for the maximum allocated volumes from
Sageras, Palacios North and Alameda South.
The optimisation of these preliminary designs will be largely based on the mine
scheduling for backfilling which is currently being developed by Berkeley and
AMC Consultants (UK). Following the optimisation, WRD's will be optimised and
the final decision for water diversion and water catchment provided as part of
the basic design.
Tailings Management Facility
Based on the preferred processing option and final open pit designs, a TMF has
been designed for the allocation of the tailings streams at Águila and Alameda.
The cost estimates have been finalised for the tailings/waste dumps management
with a cost per rehabilitation/rehandling and restoration of 0.63 EUR/t (O&W)
moved.
7. Mining Studies
The geotechnical studies for Feasibility Study were finalized during the
quarter. The outcomes include:
· New overall pit slope angle in a range of 45º to 50º
· General configuration of berms, batter angles and roads: 2 lifts of 6m
benches divided by a 1m inter-berm. Batter angle of 90º and berm widths of 6m
Preliminary pit designs and associated mining schedules have been generated
during the quarter, reviewing the mining sequences and the potential to increase
annual production to over 5 Mlbs per year.
Visits from Spanish mining contractor companies included PEAL, ALGRAN and
Francisco Cerezo. The information provided from these contractors was used to
further refine the pit optimization
A study was undertaken by a Blasting Consulting firm to work out the best way to
control dust during blasting. A summary of the outcomes include:
· Optimised blasting design developed.
· Burden: increase to 5.3m.
· Bench height: 6m is correct, never more than 9 m.
· Stemming: at least 4m (for a 6m bench) with selected gravel.
· Use of Key Performance Indicators in blasting.
· Development of a quality control procedure in blasting.
· Possible use of pulverized water canyons to create a fog over the
blasting area.
Contact was made with the Spanish division of Caterpillar to obtain detailed
noise emission data for the various mining equipment to be used. This
information will be included in the Environmental section of the Feasibility
Study.
A full version of this announcement including images can be downloaded from
Berkeley's website at www.berkeleyresources.com.au.
APPENDIX
Palacios North DDH Intersections (e-grades)
+---------+---------+----------+-----------+-------+---------+-----+-------+-------+----------+-------+
| Hole |Easting |Northing |Elevation |Depth |Azimuth |Dip | From | To |Interval |eU3O8 |
| ID | | | | | | | | | | |
+---------+---------+----------+-----------+-------+---------+-----+-------+-------+----------+-------+
| | (m) | (m) | (m) | (m) | (º) |(º) | (m) | (m) | (m) |(ppm) |
+---------+---------+----------+-----------+-------+---------+-----+-------+-------+----------+-------+
|MDD-017 | 701469 | 4500686 | 630.5 |90.05 | 118 |-70 | 6.70 |21.74 | 15.04 | 406 |
+---------+---------+----------+-----------+-------+---------+-----+-------+-------+----------+-------+
| | | | | | | |23.82 |25.11 | 1.29 | 414 |
+---------+---------+----------+-----------+-------+---------+-----+-------+-------+----------+-------+
| | | | | | | |26.35 |28.62 | 2.27 | 598 |
+---------+---------+----------+-----------+-------+---------+-----+-------+-------+----------+-------+
| | | | | | | |29.65 |32.53 | 2.88 |1,431 |
+---------+---------+----------+-----------+-------+---------+-----+-------+-------+----------+-------+
| | | | | | | |34.92 |37.56 | 2.64 | 999 |
+---------+---------+----------+-----------+-------+---------+-----+-------+-------+----------+-------+
| | | | | | | |44.26 |45.31 | 1.05 | 765 |
+---------+---------+----------+-----------+-------+---------+-----+-------+-------+----------+-------+
Alameda South DDH Intersections (e-grades)
+---------+---------+----------+-----------+-------+---------+-----+-------+-------+----------+-------+
| Hole |Easting |Northing |Elevation |Depth |Azimuth |Dip | From | To |Interval |eU3O8 |
| ID | | | | | | | | | | |
+---------+---------+----------+-----------+-------+---------+-----+-------+-------+----------+-------+
| | (m) | (m) | (m) | (m) | (º) |(º) | (m) | (m) | (m) |(ppm) |
+---------+---------+----------+-----------+-------+---------+-----+-------+-------+----------+-------+
|ASD-057 | 689211 | 4500748 | 737.8 |62.75 | 0 |-90 |33.54 |40.26 | 6.72 |1,852 |
+---------+---------+----------+-----------+-------+---------+-----+-------+-------+----------+-------+
| | | | | | | |42.67 |45.64 | 2.97 | 525 |
+---------+---------+----------+-----------+-------+---------+-----+-------+-------+----------+-------+
Palacios North RC Intersections (chemical assays)
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| Hole |Easting |Northing |Elevation |Depth |Azimuth |Dip |From | To |Interval | U3O8 |
| ID | | | | | | | | | | |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | (m) | (m) | (m) | (m) | (º) |(º) | (m) |(m) | (m) |(ppm) |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|MDR-018 | 701319 | 4500569 | 654.8 | 126 | 57.27 |-60 | 45 | 46 | 1 | 244 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 52 | 53 | 1 | 812 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 57 | 60 | 3 | 601 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 70 | 71 | 1 | 449 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 91 | 92 | 1 | 970 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|MDR-019 | 701227 | 4500585 | 656.2 | 175 | 118 |-60 | 41 | 42 | 1 | 512 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 77 | 78 | 1 |1,568 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 161 |165 | 4 | 352 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 168 |172 | 4 | 245 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|MDR-020 | 701430 | 4500358 | 658.8 | 85 | 360 |-90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|MDR-021 | 701277 | 4500585 | 659.3 | 163 | 118 |-60 | 54 | 55 | 1 | 204 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 56 | 57 | 1 | 311 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 142 |143 | 1 | 625 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 146 |147 | 1 |1,012 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|MDR-022 | 701582 | 4500419 | 644.0 | 82 | 360 |-90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|MDR-023 | 701481 | 4500394 | 658.3 | 80 | 360 |-90 | 46 | 47 | 1 | 607 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|MDR-024 | 701277 | 4500964 | 629.1 | 80 | 118 |-60 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|MDR-025 | 701355 | 4500997 | 625.5 | 100 | 118 |-60 | 56 | 57 | 1 | 255 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 59 | 60 | 1 | 212 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 67 | 68 | 1 | 283 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 70 | 75 | 5 | 876 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 87 | 88 | 1 | 522 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|MDR-026 | 701309 | 4500768 | 654.5 | 120 | 118 |-60 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|MDR-027 | 701298 | 4501055 | 615.5 | 100 | 118 |-60 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
Sageras RC Intersections (chemical assays)
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| Hole |Easting |Northing |Elevation |Depth |Azimuth | Dip |From | To |Interval | U3O8 |
| ID | | | | | | | | | | |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | (m) | (m) | (m) | (m) | (º) | (º) | (m) |(m) | (m) |(ppm) |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|SGR-025 | 700522 | 4501842 | 645.4 | 50 | 0 | -90 | 13 | 16 | 3 | 234 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 26 | 31 | 5 |1,325 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|SGR-026 | 700481 | 4501909 | 647.4 | 53 | 0 |-90 | 29 | 30 | 1 | 404 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|SGR-027 | 700593 | 4501949 | 648.6 | 50 | 0 |-90 | 15 | 16 | 1 | 241 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 23 | 26 | 3 | 219 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 37 | 38 | 1 | 286 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|SGR-028 | 700656 | 4502018 | 644.7 | 40 | 0 | -90 | 11 | 20 | 9 | 597 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 23 | 26 | 3 | 772 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 34 | 35 | 1 | 248 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|SGR-029 | 700693 | 4501983 | 639.1 | 46 | 0 | -90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-------+-------------------------------+
|SGR-030 | 700726 | 4501968 | 635.3 | 50 | 0 | -90 | 5 | 6 | 1 | 248 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|SGR-031 | 700694 | 4501848 | 636.0 | 56 | 0 | -90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-------+-------------------------------+
|SGR-032 | 700591 | 4501800 | 643.3 | 40 | 0 | -90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-------+-------------------------------+
|SGR-033 | 700734 | 4502090 | 636.3 | 40 | 0 | -90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-------+-------------------------------+
|SGR-034 | 700770 | 4502208 | 640.8 | 50 | 0 | -90 | 6 | 17 | 11 | 417 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 20 | 21 | 1 | 231 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 24 | 26 | 2 | 442 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 34 | 35 | 1 | 837 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|SGR-035 | 700515 | 4502015 | 654.2 | 40 | 0 | -90 | 17 | 18 | 1 | 209 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 21 | 22 | 1 | 582 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 24 | 30 | 6 | 304 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|SGR-036 | 700723 | 4502228 | 646.7 | 50 | 0 | -90 | 31 | 36 | 5 | 261 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 41 | 42 | 1 | 212 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|SGR-037 | 700546 | 4502114 | 654.4 | 43 | 0 | -90 | 22 | 31 | 9 | 645 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|SGR-038 | 700699 | 4502426 | 649.9 | 91 | 0 | -90 | 49 | 50 | 1 | 338 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 58 | 59 | 1 | 244 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 66 | 70 | 4 | 907 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|SGR-039 | 700512 | 4502159 | 653.3 | 43 | 0 | -90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-------+-------------------------------+
|SGR-040 | 700675 | 4502553 | 660.0 | 91 | 0 | -90 | 46 | 47 | 1 | 266 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|SGR-041 | 700529 | 4502228 | 654.2 | 40 | 0 | -90 | 19 | 20 | 1 | 555 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|SGR-042 | 700644 | 4502584 | 664.4 | 117 | 224 | -75 | 47 | 48 | 1 | 309 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 73 | 77 | 4 | 440 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|SGR-043 | 700663 | 4502743 | 664.6 | 100 | 0 | -90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-------+-------------------------------+
|SGR-044 | 700585 | 4502813 | 655.3 | 70 | 0 | -90 | 13 | 18 | 5 | 363 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|SGR-045 | 700578 | 4502662 | 663.7 | 100 | 0 | -90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-------+-------------------------------+
|SGR-046 | 701102 | 4503306 | 683.2 | 45 | 0 | -90 | Condemnation |
| | | | | | | | hole, not |
| | | | | | | | mineralized |
+---------+---------+----------+-----------+-------+---------+-------+-------------------------------+
|SGR-047 | 700677 | 4503085 | 665.6 | 50 | 0 | -90 | Condemnation |
| | | | | | | | hole, not |
| | | | | | | | mineralized |
+---------+---------+----------+-----------+-------+---------+-------+-------------------------------+
|SGR-048 | 701196 | 4503505 | 684.4 | 50 | 0 | -90 | Condemnation |
| | | | | | | | hole, not |
| | | | | | | | mineralized |
+---------+---------+----------+-----------+-------+---------+-------+-------------------------------+
|SGR-049 | 700849 | 4503451 | 668.7 | 50 | 0 | -90 | 42 | 43 | 1 | 298 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|SGR-050 | 701289 | 4503700 | 686.4 | 63 | 0 | -90 | 39 | 40 | 1 | 208 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 46 | 47 | 1 | 302 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|SGR-051 | 700769 | 4503904 | 691.1 | 55 | 0 | -90 | Condemnation |
| | | | | | | | hole, not |
| | | | | | | | mineralized |
+---------+---------+----------+-----------+-------+---------+-------+-------------------------------+
|SGR-052 | 701599 | 4503602 | 697.3 | 51 | 0 | -90 | Condemnation |
| | | | | | | | hole, not |
| | | | | | | | mineralized |
+---------+---------+----------+-----------+-------+---------+-------+-------------------------------+
|SGR-053 | 700296 | 4503601 | 674.0 | 58 | 0 | -90 | Condemnation |
| | | | | | | | hole, not |
| | | | | | | | mineralized |
+---------+---------+----------+-----------+-------+---------+-------+-------------------------------+
|SGR-054 | 701797 | 4503302 | 695.2 | 50 | 0 | -90 | Condemnation |
| | | | | | | | hole, not |
| | | | | | | | mineralized |
+---------+---------+----------+-----------+-------+---------+-------+-------------------------------+
|SGR-055 | 700288 | 4503434 | 668.1 | 80 | 0 | -90 | Condemnation |
| | | | | | | | hole, not |
| | | | | | | | mineralized |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| Hole |Easting |Northing |Elevation |Depth |Azimuth | Dip |From | To |Interval | U3O8 |
| ID | | | | | | | | | | |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | (m) | (m) | (m) | (m) | (º) | (º) | (m) |(m) | (m) |(ppm) |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|ZMR-011 | 699633 | 4502977 | 675.9 | 90 | 0 | -90 | 34 | 35 | 1 | 269 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 43 | 44 | 1 | 348 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 64 | 65 | 1 | 213 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 71 | 72 | 1 | 206 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|ZMR-014 | 699582 | 4502884 | 666.9 | 74 | 0 |-90 | 42 | 43 | 1 | 218 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 46 | 47 | 1 | 256 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 56 | 57 | 1 | 264 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 60 | 61 | 1 | 444 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|ZMR-015 | 699493 | 4502865 | 658.2 | 80 | 0 |-90 | 17 | 18 | 1 | 672 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 22 | 26 | 4 | 576 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 34 | 36 | 2 |1,889 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 45 | 50 | 5 |7,146 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 52 | 55 | 3 | 762 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|ZMR-016 | 699511 | 4502883 | 659.6 | 71 | 0 |-90 | 23 | 24 | 1 | 278 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 26 | 27 | 1 | 309 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 41 | 48 | 7 |3,649 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 51 | 56 | 5 | 707 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 70 | 71 | 1 |1,046 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|ZMR-017 | 699477 | 4502846 | 656.4 | 67 | 0 |-90 | 18 | 19 | 1 | 274 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 22 | 25 | 3 | 442 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 27 | 49 | 22 |1,188 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 53 | 54 | 1 | 222 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 59 | 63 | 4 | 549 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|ZMR-018 | 699459 | 4502829 | 654.5 | 61 | 0 |-90 | 6 | 8 | 2 | 224 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 18 | 21 | 3 | 200 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 25 | 26 | 1 | 203 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 29 | 31 | 2 | 298 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 34 | 37 | 3 | 745 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 44 | 45 | 1 | 465 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 55 | 56 | 1 | 253 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|ZMR-019 | 699654 | 4502816 | 674.1 | 70 | 0 |-90 | 36 | 39 | 3 | 202 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 43 | 44 | 1 | 308 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 47 | 51 | 4 | 274 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 53 | 54 | 1 | 406 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|ZMR-020 | 699406 | 4502846 | 651.4 | 67 | 0 |-90 | 0 | 3 | 3 | 233 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 9 | 12 | 3 | 463 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 25 | 27 | 2 | 516 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 34 | 35 | 1 | 331 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|ZMR-021 | 699422 | 4503101 | 655.2 | 63 | 0 |-90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-------+-------------------------------+
|ZMR-022 | 699373 | 4503045 | 651.5 | 60 | 0 | -90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-------+-------------------------------+
|ZMR-023 | 699471 | 4503159 | 662.4 | 60 | 0 | -90 | 29 | 31 | 2 | 371 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 34 | 38 | 4 | 343 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
| | | | | | | | 44 | 45 | 1 | 281 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|ZMR-024 | 699474 | 4502990 | 662.6 | 54 | 0 | -90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-------+-------------------------------+
|ZMR-025 | 699334 | 4502918 | 651.1 | 40 | 0 | -90 | 14 | 15 | 1 | 223 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|ZMR-026 | 699528 | 4503217 | 669.7 | 61 | 0 | -90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-------+-------------------------------+
|ZMR-027 | 699300 | 4502881 | 647.2 | 42 | 0 | -90 | 12 | 13 | 1 | 258 |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
|ZMR-028 | 699219 | 4502966 | 644.1 | 60 | 0 | -90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-------+-------------------------------+
|ZMR-029 | 699481 | 4503026 | 664.2 | 80 | -44 | -70 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-------+------+-----+----------+-------+
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| Hole |Easting |Northing |Elevation |Depth |Azimuth |Dip |From | To |Interval | U3O8 |
| ID | | | | | | | | | | |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | (m) | (m) | (m) | (m) | (º) |(º) | (m) |(m) | (m) |(ppm) |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-030 | 699500 | 4503044 | 664.1 | 81 | -44 |-70 | 22 | 25 | 3 | 332 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 29 | 30 | 1 | 822 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 45 | 46 | 1 | 328 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-031 | 699179 | 4502894 | 643.4 | 60 | 0 |-90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-032 | 699146 | 4502826 | 635.6 | 60 | 0 |-90 | 40 | 41 | 1 | 212 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 42 | 43 | 1 | 219 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-033 | 699264 | 4502847 | 643.2 | 40 | 0 |-90 | 7 | 8 | 1 | 278 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-034 | 699203 | 4502739 | 648.1 | 40 | 0 |-90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-035 | 699113 | 4502762 | 644.8 | 60 | 0 |-90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-036 | 699044 | 4502626 | 640.1 | 60 | 0 |-90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-037 | 698906 | 503087 | 650.0 | 61 | 0 |-90 | 21 | 22 | 1 | 251 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-038 | 698961 | 4503142 | 643.5 | 60 | 0 |-90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-039 | 698854 | 4503033 | 649.7 | 60 | 0 |-90 | 13 | 14 | 1 | 275 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-040 | 699010 | 4503194 | 648.0 | 57 | 0 |-90 | 24 | 25 | 1 | 229 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-041 | 698696 | 4502870 | 671.5 | 60 | 0 |-90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-042 | 698753 | 4502922 | 661.7 | 60 | 0 |-90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-043 | 699116 | 4503301 | 653.6 | 60 | 0 |-90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-044 | 699067 | 4503241 | 646.7 | 60 | 0 |-90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-045 | 699085 | 4502686 | 640.5 | 61 | 0 |-90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-046 | 699473 | 4503095 | 661.3 | 51 | 0 |-90 | 5 | 11 | 6 | 238 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 13 | 18 | 5 | 339 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 23 | 25 | 2 | 324 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 30 | 32 | 2 | 376 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-047 | 699490 | 4503116 | 664.2 | 54 | 0 |-90 | 9 | 10 | 1 | 217 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-048 | 699507 | 4503133 | 667.4 | 51 | 0 |-90 | 13 | 15 | 2 | 438 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 17 | 19 | 2 | 269 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 25 | 27 | 2 | 255 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-049 | 699521 | 4503084 | 667.4 | 51 | 0 |-90 | 12 | 13 | 1 | 322 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 15 | 23 | 8 | 460 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 38 | 39 | 1 | 248 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-050 | 699444 | 4503140 | 658.5 | 57 | 0 |-90 | 0 | 3 | 3 | 295 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 6 | 8 | 2 | 295 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 10 | 18 | 8 | 363 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 22 | 28 | 6 | 327 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 30 | 33 | 3 | 340 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 40 | 44 | 4 | 226 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-051 | 699493 | 4503187 | 665.3 | 54 | 0 |-90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-052 | 699454 | 4503079 | 658.2 | 51 | 0 |-90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-053 | 699521 | 4503148 | 671.0 | 51 | 0 |-90 | 18 | 22 | 4 | 291 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 24 | 25 | 1 | 215 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 30 | 31 | 1 | 204 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-054 | 699451 | 4503217 | 658.5 | 51 | 0 |-90 | 9 | 10 | 1 | 203 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 12 | 13 | 1 | 263 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-055 | 699418 | 4503181 | 658.0 | 51 | 0 |-90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-056 | 699379 | 4503150 | 653.2 | 51 | 0 |-90 | 0 | 3 | 3 | 204 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 9 | 10 | 1 | 297 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 26 | 28 | 2 | 264 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-057 | 699340 | 4503103 | 649.1 | 51 | 0 |-90 | 0 | 4 | 4 | 327 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 8 | 9 | 1 | 328 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-058 | 699383 | 4503080 | 653.8 | 51 | 0 |-90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| Hole |Easting |Northing |Elevation |Depth |Azimuth |Dip |From | To |Interval | U3O8 |
| ID | | | | | | | | | | |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | (m) | (m) | (m) | (m) | (º) |(º) | (m) |(m) | (m) |(ppm) |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-059 | 699618 | 4502781 | 669.7 | 66 | 0 |-90 | 21 | 25 | 4 | 592 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 32 | 33 | 1 | 299 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 37 | 38 | 1 | 332 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-061 | 699376 | 4503006 | 652.2 | 60 | 134 |-60 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-062 | 699436 | 4503038 | 659.4 | 60 | 134 |-60 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-063 | 699685 | 4503102 | 690.7 | 79 | 0 |-90 | 54 | 55 | 1 | 236 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 78 | 79 | | 258 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-064 | 699685 | 4503066 | 691.7 | 79 | 0 |-90 | 37 | 38 | 1 | 792 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-065 | 699607 | 4503101 | 681.6 | 66 | 0 |-90 | 49 | 50 | 1 | 291 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-066 | 699545 | 4503095 | 672.3 | 81 | 0 |-90 | 17 | 25 | 8 | 415 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 60 | 61 | 1 | 368 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 71 | 72 | 1 | 351 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-067 | 699615 | 4503062 | 681.6 | 78 | 0 |-90 | 25 | 32 | 7 | 324 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 68 | 69 | 1 | 225 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 71 | 74 | 3 | 525 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-068 | 699615 | 4502994 | 674.5 | 80 | 0 |-90 | 22 | 23 | 1 |1,153 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 25 | 29 | 4 | 496 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 34 | 35 | 1 | 243 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 39 | 40 | 1 | 252 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 42 | 50 | 8 | 261 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 60 | 70 | 10 | 341 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ZMR-069 | 699413 | 4503326 | 655.5 | 60 | 314 |-60 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-070 | 699041 | 4502795 | 631.2 | 36 | 0 |-90 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-071 | 699153 | 4503031 | 638.8 | 60 | 134 |-60 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-072 | 699097 | 4502927 | 638.1 | 60 | 134 |-60 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-073 | 699227 | 4503121 | 642.6 | 60 | 134 |-60 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+-------------------------------+
|ZMR-074 | 699314 | 4503216 | 649.2 | 63 | 314 |-60 | Not mineralized |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
Alameda South RC Intersections (chemical assays)
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| Hole |Easting |Northing |Elevation |Depth |Azimuth |Dip |From | To |Interval | U3O8 |
| ID | | | | | | | | | | |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | (m) | (m) | (m) | (m) | (º) |(º) | (m) |(m) | (m) |(ppm) |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-035 | 689223 | 4501390 | 746.9 | 110 | 103 |-60 | 54 | 55 | 1 | 226 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 60 | 63 | 3 | 306 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 65 | 66 | 1 | 236 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 70 | 74 | 4 | 376 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 78 | 81 | 3 | 206 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 84 | 85 | 1 | 613 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-036 | 689080 | 4501112 | 747.9 | 147 | 103 |-70 | 40 | 41 | 1 | 212 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 47 | 48 | 1 | 270 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 50 | 51 | 1 | 257 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 80 | 81 | 1 | 805 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 84 | 86 | 2 | 440 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 94 | 95 | 1 | 360 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 97 | 98 | 1 | 237 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 115 |118 | 3 | 232 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 129 |130 | 1 | 209 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 139 |140 | 1 | 269 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| Hole |Easting |Northing |Elevation |Depth |Azimuth |Dip |From | To |Interval | U3O8 |
| ID | | | | | | | | | | |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | (m) | (m) | (m) | (m) | (º) |(º) | (m) |(m) | (m) |(ppm) |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-037 | 689192 | 4501445 | 745.1 | 94 | 103 |-60 | 23 | 25 | 2 | 485 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 29 | 33 | 4 | 443 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 50 | 55 | 5 | 501 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 70 | 72 | 2 | 406 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 77 | 81 | 4 |1,204 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-038 | 689344 | 4501256 | 756.1 | 79 | 103 |-60 | 49 | 50 | 1 | 204 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 54 | 60 | 6 | 291 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 64 | 66 | 2 | 268 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-039 | 689084 | 4501165 | 748.0 | 147 | 103 |-60 | 15 | 27 | 12 | 636 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 46 | 48 | 2 | 437 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 63 | 64 | 1 |2,252 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 77 | 79 | 2 |1,138 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 87 | 89 | 2 | 629 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 94 | 95 | 1 | 289 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 98 | 99 | 1 | 310 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 103 |105 | 2 | 307 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-040 | 689350 | 4501297 | 753.1 | 70 | 103 |-60 | 52 | 55 | 3 | 209 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-041 | 689362 | 4501363 | 751.9 | 73 | 103 |-60 | 22 | 24 | 2 | 888 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 32 | 33 | 1 | 867 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 36 | 39 | 3 |2,647 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 47 | 50 | 3 | 399 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-042 | 689307 | 4501377 | 747.2 | 79 | 103 |-60 | 25 | 26 | 1 | 253 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 28 | 32 | 4 |1,246 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 41 | 42 | 1 | 523 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 46 | 47 | 1 | 334 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-043 | 689296 | 4501323 | 750.4 | 91 | 103 |-60 | 25 | 29 | 4 | 610 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 42 | 43 | 1 | 200 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 47 | 48 | 1 | 255 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 56 | 61 | 5 | 375 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 64 | 66 | 2 | 548 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-044 | 689144 | 4501254 | 750.2 | 130 | 103 |-60 | 25 | 26 | 1 | 670 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 48 | 52 | 4 | 383 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 54 | 57 | 3 | 222 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 59 | 61 | 2 | 361 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 66 | 69 | 3 | 849 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 78 | 81 | 3 | 815 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 95 | 96 | 1 | 248 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 98 | 99 | 1 | 248 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 110 |111 | 1 | 238 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-045 | 689145 | 4501152 | 750.9 | 103 | 103 |-60 | 25 | 37 | 12 | 787 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 39 | 45 | 6 | 578 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 47 | 48 | 1 | 238 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 50 | 51 | 1 | 209 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 53 | 54 | 1 | 705 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 56 | 58 | 2 | 498 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 62 | 64 | 2 | 459 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 73 | 75 | 2 | 351 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 78 | 79 | 1 | 268 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 85 | 86 | 1 | 228 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 94 | 95 | 1 | 276 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| Hole |Easting |Northing |Elevation |Depth |Azimuth |Dip |From | To |Interval | U3O8 |
| ID | | | | | | | | | | |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | (m) | (m) | (m) | (m) | (º) |(º) | (m) |(m) | (m) |(ppm) |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-046 | 689026 | 4501068 | 745.0 | 151 | 103 |-60 | 54 | 57 | 3 | 672 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 62 | 65 | 3 | 278 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 67 | 69 | 2 | 212 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 114 |115 | 1 |2,900 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 122 |123 | 1 | 211 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 135 |139 | 4 | 256 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 144 |145 | 1 | 363 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 147 |149 | 2 | 300 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-047 | 689196 | 4501190 | 752.8 | 109 | 0 |-90 | 20 | 62 | 42 |1,401 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 67 | 68 | 1 | 344 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-048 | 689024 | 4501028 | 744.8 | 156 | 103 |-65 | 62 | 64 | 2 | 285 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 81 | 86 | 5 | 242 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 92 | 93 | 1 | 567 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 98 |105 | 7 | 528 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 108 |115 | 7 | 589 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 133 |138 | 5 | 743 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 149 |152 | 3 | 360 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-049 | 689285 | 4501277 | 753.9 | 95 | 0 |-90 | 74 | 75 | 1 | 219 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-050 | 688854 | 4500655 | 720.0 | 135 | 103 |-65 | 22 | 26 | 4 | 242 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 46 | 61 | 15 | 431 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 64 | 67 | 3 | 267 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 131 |132 | 1 | 450 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-051 | 688979 | 4500986 | 742.3 | 177 | 103 |-60 | 36 | 37 | 1 | 325 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 40 | 41 | 1 | 342 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 46 | 47 | 1 | 295 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 104 |105 | 1 |3,219 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 113 |125 | 12 | 537 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 161 |163 | 2 | 315 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 173 |174 | 1 | 474 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-052 | 689002 | 4500873 | 736.6 | 134 | 103 |-65 | 11 | 13 | 2 | 228 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 15 | 21 | 6 | 356 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 29 | 33 | 4 | 295 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 40 | 41 | 1 | 512 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 47 | 48 | 1 | 309 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 53 | 62 | 9 |1,229 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 69 | 70 | 1 | 223 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 71 | 72 | 1 | 272 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 75 | 81 | 6 |2,691 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 84 | 99 | 15 | 481 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 107 |114 | 7 |1,417 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 121 |129 | 8 | 258 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-053 | 688983 | 4500750 | 727.3 | 96 | 103 |-60 | 5 | 7 | 2 | 448 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 13 | 25 | 12 | 494 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 36 | 39 | 3 | 250 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 44 | 46 | 2 | 340 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 48 | 55 | 7 | 443 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 57 | 59 | 2 | 264 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 83 | 85 | 2 | 966 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| Hole |Easting |Northing |Elevation |Depth |Azimuth |Dip |From | To |Interval | U3O8 |
| ID | | | | | | | | | | |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | (m) | (m) | (m) | (m) | (º) |(º) | (m) |(m) | (m) |(ppm) |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-054 | 688896 | 4500748 | 723.8 | 142 | 103 |-60 | 3 | 4 | 1 | 210 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 9 | 14 | 5 | 417 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 23 | 25 | 2 | 375 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 32 | 34 | 2 | 206 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 42 | 43 | 1 | 802 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 50 | 52 | 2 | 469 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 81 | 82 | 1 | 288 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 85 | 88 | 3 | 252 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 90 |101 | 11 | 341 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 109 |110 | 1 | 285 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 114 |115 | 1 | 226 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-055 | 688906 | 4500717 | 723.1 | 112 | 103 |-60 | 18 | 19 | 1 | 430 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 25 | 28 | 3 | 639 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 31 | 32 | 1 | 301 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 37 | 38 | 1 | 243 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 50 | 52 | 2 | 574 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 77 | 82 | 5 | 216 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 88 | 90 | 2 | 245 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 93 | 97 | 4 | 474 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-056 | 688912 | 4500642 | 722.6 | 100 | 103 |-60 | 25 | 29 | 4 | 305 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 38 | 44 | 6 | 380 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 69 | 71 | 2 |3,041 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 77 | 79 | 2 | 434 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 81 | 82 | 1 | 202 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-058 | 688977 | 4500664 | 724.8 | 80 | 103 |-60 | 17 | 24 | 7 | 286 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 29 | 30 | 1 | 353 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 32 | 33 | 1 | 263 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 35 | 39 | 4 | 273 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 45 | 56 | 11 | 814 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 60 | 69 | 9 | 244 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-059 | 688884 | 4500591 | 724.3 | 94 | 135 |-60 | 20 | 21 | 1 | 296 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 25 | 29 | 4 | 374 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 42 | 44 | 2 | 394 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 50 | 51 | 1 | 241 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 56 | 58 | 2 | 295 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-060 | 688885 | 4500564 | 727.3 | 120 | 103 |-60 | 28 | 29 | 1 | 209 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
|ASR-061 | 688853 | 4500598 | 721.7 | 87 | 103 |-65 | 8 | 9 | 1 | 202 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 21 | 22 | 1 | 377 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 33 | 36 | 3 | 786 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 40 | 44 | 4 | 958 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 66 | 72 | 6 | 227 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
| | | | | | | | 82 | 83 | 1 | 463 |
+---------+---------+----------+-----------+-------+---------+-----+------+-----+----------+-------+
SUPPLEMENTARY INFORMATION
The uranium grades reported in this release that are annotated with a sub-prefix
"e" have been reported as uranium equivalent grades derived from down-hole gamma
ray logging results and so they should be regarded as approximations only.
The Berkeley drill holes were logged with a GeoVista total count gamma tool. The
gamma tool was calibrated in Adelaide at the Department of Water, Land and
Biodiversity Conservation in calibration pits constructed under the supervision
of CSIRO. The various calibration factors were calculated by David Wilson BSc
MSc MAusIMM from 3D Exploration Ltd based in Perth, Western Australia.
Drill intersections are calculated using a 200 ppm U3O8 / eU3O8 lower cut-off
with a minimum one metre intersection.
The Mineral Resources are presented in accordance with the 2004 Edition of the
"Australasian Code for Reporting of Exploration Results, Mineral Resource and
Ore Reserves" (JORC Code).
The information in this report that relates to the metallurgical test work
results is based on information compiled by Mr Grenvil Dunn, who is a Chemical
Engineer and a Member of the South African Institute of Mining and Metallurgy.
Mr Dunn is a Technical Consultant with Orway Mineral Consultants who are
consultants of Berkeley Resources. Mr Dunn has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a Competent Person as
defined in the 2004 Edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (The JORC Code).
The information in this report that relates to Exploration Results, Mineral
Resources or Ore Reserves is based on information compiled by Mr. Ross Corben,
who is a Member of The Australian Institute of Mining and Metallurgy and an
employee of Berkeley Resources Limited. Mr. Corben has sufficient experience
which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a
Competent Person as defined in the 2004 Edition of the 'Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr.
Corben consents to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
This information is provided by RNS
The company news service from the London Stock Exchange
END
MSCLIFEDIELAFII
Grafico Azioni Berkeley Energia (LSE:BKY)
Storico
Da Set 2024 a Ott 2024
Grafico Azioni Berkeley Energia (LSE:BKY)
Storico
Da Ott 2023 a Ott 2024