Final results from the recently completed infill drill programme
at the important Zona 7 deposit have confirmed the overall
continuity of the mineralisation and have reported significantly
higher grades.
A number of the most recent results have recorded broad
intersections with grades nearly fifteen times higher than the
previously reported resource grade.
It is anticipated that these results will increase the overall
grade of the upgraded mineral resource estimate which is currently
being estimated and will be reported shortly.
Outstanding intercepts include high grade intersections recorded
from shallow depths of just four metres from surface with
thicknesses up to 52 metres:
-- 13 metres @ 8,543 ppm U(3) O(8)
-- 18 metres @ 3,658 ppm U(3) O(8)
-- 14 metres @ 2,261 ppm U(3) O(8)
-- 10 metres @ 2,118 ppm U(3) O(8)
-- 52 metres @ 1,909 ppm U(3) O(8)
-- 20 metres @ 1,565 ppm U(3) O(8)
-- 12 metres @ 1,144 ppm U(3) O(8)
-- 17 metres @ 1,354 ppm U(3) O(8)
-- 31 metres @ 1,332 ppm U(3) O(8)
-- 26 metres @ 1,327 ppm U(3) O(8)
The programme comprised ninety drill holes for 6,226 metres and
has been designed to upgrade the resource to the Indicated category
enabling the Zona 7 deposit to be incorporated into a
Pre-Feasibility Study for the 100% owned Salamanca project which
will be reported during the current quarter.
The inclusion of the deposit into the study will enable the
overall economics of the project to be reported for the first time.
The increase in the resource grade foreshadowed by these latest
results combined with the recently reported impressive
metallurgical testwork results is expected to increase the already
significant positive impact the deposit will have on the overall
economics of the project.
The deposit is located within ten kilometres of the approved
location of the proposed processing plant and currently hosts an
Inferred Mineral Resource Estimate of 23.2 million tonnes averaging
589 ppm U(3) O(8) for 30.1 million pounds of U(3) O(8) (at a 200
ppm U(3) O(8) cut-off grade).
As previously advised given the very positive impact the deposit
is expected to have on the project's economics the Board has
decided to push ahead with the permitting required to rapidly
incorporate this resource into the overall development of the
Salamanca project.
For further information contact:
Paul Atherley Hugo Schumann John Prior / Paul
Gillam
Managing Director Corporate Manager Numis Securities
Nomad & Broker
+44 207 478 3900 +44 207 478 3900 +44 207 260 1000
info@berkeleyenergy.com
Appendix A: Detailed Results
Drilling Program
The current drill program, comprising 90 RC holes for 6,226
metres, has been designed to close the broadly spaced 2014 drill
pattern down to a notional 50 metre by 50 metre grid to facilitate
the estimation of a revised Indicated Mineral Resource Estimate
('MRE') for the higher grade portion of Zona 7.
Drilling Results
Assay results from the 90 RC holes from the 2015 drilling
program at Zona 7 are presented in this report. The holes reported
have been drilled within Domain 6 area of the current MRE or
outside the resource boundary to the SE and SW.
The mineralisation intersected in the drill holes has confirmed
the continuity of thickness and grade above the 200 ppm U(3) O(8)
cut-off reported in the current MRE. Significant high grade
intersections have been recorded at shallow depths (from 4 metres
to a maximum depth of 101 metres), with thicknesses up to 52
metres. Select intercepts include:
Hole No. Down Hole Intercept From Depth
(Down Hole)
5m @ 1,800 ppm U(3)
Z7R-145 O(8) 50m
-------------------------- -------------
6m @ 1,422 ppm U(3)
Z7R-148 O(8) 54m
-------------------------- -------------
Z7R-167 9m @ 808 ppm U(3) O(8) 13m
-------------------------- -------------
6m @ 801 ppm U(3) O(8)
13m @ 940 ppm U(3) O(8) 10m
8m @ 1,173 ppm U(3) 23m
Z7R-168 O(8) 53m
-------------------------- -------------
Z7R-169 13m @ 805 ppm U(3) O(8) 27m
-------------------------- -------------
Z7R-171 37m @ 689 ppm U(3) O(8) 16m
-------------------------- -------------
22m @ 1,257 ppm U(3)
Z7R-176 O(8) 18m
-------------------------- -------------
Z7R-178 37m @ 883 ppm U(3) O(8) 10m
10m @ 2,118 ppm U(3)
O(8) 50m
13m @ 1,425 ppm U(3)
O(8) 73m
------------------------------------- -------------
26m @ 1,327 ppm U(3)
Z7R-179 O(8) 17m
-------------------------- -------------
Z7R-184 16m @ 951 ppm U(3) O(8) 42m
-------------------------- -------------
31m @ 1,332 ppm U(3)
Z7R-188 O(8) 21m
-------------------------- -------------
Z7R-194 21m @ 767 ppm U(3) O(8) 34m
-------------------------- -------------
26m @ 1,103 ppm U(3)
Z7R-197 O(8) 43m
-------------------------- -------------
20m @ 1,565 ppm U(3)
Z7R-198 O(8) 24m
-------------------------- -------------
12m @ 1,144 ppm U(3)
Z7R-199 O(8) 21m
15m @ 854 ppm U(3) O(8) 40m
------------------------------------- -------------
14m @ 2,261 ppm U(3)
Z7R-200 O(8) 5m
32m @ 867 ppm U(3) O(8) 22m
------------------------------------- -------------
21m @ 1,150 ppm U(3)
Z7R-201 O(8) 21m
-------------------------- -------------
Z7R-203 40m @ 949 ppm U(3) O(8) 7m
-------------------------- -------------
13m @ 8,543 ppm U(3)
Z7R-204 O(8) 8m
-------------------------- -------------
52m @ 1,909 ppm U(3)
Z7R-205 O(8) 9m
-------------------------- -------------
18m @ 3,658 ppm U(3)
Z7R-209 O(8) 10m
-------------------------- -------------
17m @ 1,354 ppm U(3)
Z7R-212 O(8) 29m
4m @ 1,877 ppm U(3)
O(8) 52m
------------------------------------- -------------
All significant intersections within the new drill holes, along
with the details of the collar position, drill hole orientation and
depth, are summarised in Appendix B.
Geological Setting
Zona 7 is a vein type deposit hosted in a sequence of fine
grained metasediments which are overlain by a conglomerate unit and
adjacent to a granite intrusive. The mineralised envelope is
generally sub-horizontal and the mineralisation is contained within
a stockwork of veins. The uranium mineralisation occurs both within
the partially weathered zone and fresh rock.
Competent Persons Statement
The information in this announcement that relates to the 2015
Exploration Results is based on information compiled by Malcolm
Titley, who is a Member of The Australasian Institute of Mining and
Metallurgy. Mr. Titley is independent of Berkeley and Director of
Maja Mining Limited, an independent consultancy based in the UK. Mr
Titley has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the
activity which he is undertaking to qualify as a Competent Person
as defined in the 2012 Edition of the 'Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore
Reserves'. Mr Titley consents to the inclusion in the report of the
matters based on his information in the form and context in which
it appears.
The information in this report that relates to 2014 Exploration
Results is extracted from the reports entitled 'Thick, High Grade
Mineralisation Intersected at Zona 7' dated 18 August 2014 and
'Further Thick, High Grade Drill Intersections at Zona 7' dated 10
November 2014 which are available to view on Berkeley's website at
www.berkeleyenergy.com. The information in the original ASX
Announcements that relate to the 2014 Exploration Results is based
on information compiled by Robert Behets, a Competent Person who is
a Fellow of The Australasian Institute of Mining and Metallurgy. Mr
Behets is a holder of shares, options and performance rights in,
and is a director of, Berkeley. Mr Behets has sufficient experience
which is relevant to the style of mineralisation and type of
deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012
Edition of the 'Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves'. The Company confirms
that it is not aware of any new information or data that materially
affects the information included in the original market
(MORE TO FOLLOW) Dow Jones Newswires
September 28, 2015 02:01 ET (06:01 GMT)
announcement. The Company confirms that the form and context in
which the Competent Person's findings are presented have not been
materially modified from the original market announcements.
The information in this report that relates to the Mineral
Resources is extracted from the report entitled 'Salamanca Project
Total Resource increased by 43% to 88.2 Mlbs U(3) O(8) following
substantial increase in Zona 7 Resource' dated 26 November 2014 and
is available to view on Berkeley's website at
www.berkeleyenergy.com. The information in the original ASX
Announcement that relates to the Mineral Resources for Zona 7 was
based on information compiled by Malcolm Titley, a Competent Person
who is a Member of The Australasian Institute of Mining and
Metallurgy. Mr. Titley is independent of Berkeley and Director of
Maja Mining Limited, an independent consultancy based in the UK. Mr
Titley has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the
activity which he is undertaking to qualify as a Competent Person
as defined in the 2012 Edition of the 'Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore
Reserves'. The Company confirms that it is not aware of any new
information or data that materially affects the information
included in the original market announcement and, in the case of
estimates of Mineral Resources that all material assumptions and
technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially
changed. The Company confirms that the form and context in which
the Competent Person's findings are presented have not been
materially modified from the original market announcement.
Forward Looking Statement
Statements regarding plans with respect to the Company's mineral
properties are forward-looking statements. There can be no
assurance that the Company's plans for development of its mineral
properties will proceed as currently expected. There can also be no
assurance that the Company will be able to confirm the presence of
additional mineral deposits, that any mineralisation will prove to
be economic or that a mine will successfully be developed on any of
the Company's mineral properties.
Appendix B: Summary of RC Drill Intersections - Zona 7 (200 ppm
U(3) O(8) cut-off)
Drill Easting Northing Elevation Azimuth Dip Depth From To Interval U(3)
Hole O(8)
ID (ppm)
--------- ------- -------
(m) (m) (m) ((o) ((o) (m) (m) (m) (m)
) )
--------- -------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-143 713921 4526885 764 360 -90 52 23 26 3 715
29 31 2 218
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-144 713724 4527046 760 360 -90 60 25 27 2 309
34 36 2 724
incl. 35 36 1 1,164
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-145 713945 4526930 765 360 -90 64 26 27 1 336
50 55 5 1,800
incl. 51 52 1 7,003
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-146 713670 4527068 762 360 -90 59 38 43 5 224
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-147 714009 4526838 769 360 -90 50 12 13 1 241
37 38 1 226
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-148 713635 4527092 763 360 -90 72 29 31 2 405
54 60 6 1,422
incl. 56 57 1 6,720
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-149 713989 4526907 767 360 -90 55 No Significant Intercepts
-------- --------- ---------- -------- ----- ------ ----------------------------------------
Z7R-150 713614 4527160 760 360 -90 60 36 37 1 246
46 48 2 331
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-151 714052 4526703 773 360 -90 70 44 46 2 423
60 62 2 377
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-152 713831 4526820 765 360 -90 60 27 30 3 637
35 36 1 291
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-153 714035 4526995 773 360 -90 64 No Significant Intercepts
-------- --------- ---------- -------- ----- ------ ----------------------------------------
Z7R-154 713919 4526773 768 360 -90 65 No Significant Intercepts
-------- --------- ---------- -------- ----- ------ ----------------------------------------
Z7R-155 713991 4527018 771 360 -90 64 No Significant Intercepts
-------- --------- ---------- -------- ----- ------ ----------------------------------------
Z7R-156 713742 4526866 763 360 -90 58 No Significant Intercepts
-------- --------- ---------- -------- ----- ------ ----------------------------------------
Z7R-157 713993 4527131 771 360 -90 88 No Significant Intercepts
-------- --------- ---------- -------- ----- ------ ----------------------------------------
Z7R-158 713653 4526913 763 360 -90 78 No Significant Intercepts
-------- --------- ---------- -------- ----- ------ ----------------------------------------
Z7R-159 714017 4527174 772 360 -90 50 No Significant Intercepts
-------- --------- ---------- -------- ----- ------ ----------------------------------------
Z7R-161 713747 4526980 760 360 -90 50 No Significant Intercepts
-------- --------- ---------- -------- ----- ------ ----------------------------------------
Z7R-162 713656 4527024 762 360 -90 50 No Significant Intercepts
-------- --------- ---------- -------- ----- ------ ----------------------------------------
Z7R-163 713812 4526998 759 360 -90 60 19 24 5 395
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-164 713832 4526930 761 360 -90 52 23 24 1 219
28 37 9 302
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-165 713767 4527022 759 360 -90 60 No Significant Intercepts
-------- --------- ---------- -------- ----- ------ ----------------------------------------
Z7R-166 713845 4526978 759 360 -90 59 No Significant Intercepts
----------------------------------------
Z7R-167 713828 4527035 758 360 -90 60 13 22 9 808
incl. 13 16 3 1,186
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-168 713770 4527134 758 360 -90 72 10 16 6 801
incl. 14 16 2 2,084
23 36 13 940
incl. 25 28 3 1,604
(MORE TO FOLLOW) Dow Jones Newswires
September 28, 2015 02:01 ET (06:01 GMT)
incl. 30 31 1 3,230
41 42 1 2,429
47 48 1 374
53 61 8 1,173
incl. 56 61 5 1,740
64 67 3 599
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-169 713747 4527090 759 360 -90 60 27 40 13 805
incl. 30 32 2 1,633
incl. 37 39 2 1,871
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-171 713731 4527155 758 360 -90 64 16 53 37 689
incl. 21 22 1 2,358
incl. 37 41 4 1,993
incl. 45 47 2 1,488
56 58 2 791
incl. 57 58 1 1,185
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-172 713860 4527196 755 360 -90 73 23 24 1 242
45 46 1 1,036
60 61 1 930
64 65 1 1,028
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-173 713681 4527180 759 360 -90 70 21 29 8 275
32 46 14 472
incl. 34 35 1 1,851
52 54 2 272
60 61 1 271
65 66 1 518
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-174 713816 4527222 755 360 -90 75 26 28 2 230
31 37 6 237
45 50 5 311
54 59 5 424
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-175 713663 4527247 756 360 -90 70 39 45 6 216
65 66 1 275
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-176 713794 4527178 756 360 -90 67 18 40 22 1,257
incl. 18 26 8 2,136
incl. 29 30 1 2,352
incl. 32 33 1 1,497
48 49 1 258
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-177 713706 4527336 754 360 -90 52 No Significant Intercepts
-------- --------- ---------- -------- ----- ------ ----------------------------------------
Z7R-178 713773 4527246 755 360 -90 106 10 47 37 883
incl. 12 14 2 2,252
incl. 18 22 4 3,026
incl. 30 31 1 2,511
incl. 35 36 1 3,077
incl. 41 42 1 1,320
50 60 10 2,118
incl. 50 54 4 3,392
incl. 56 58 2 2,686
63 64 1 380
73 86 13 1,425
incl. 74 83 9 1,539
incl. 85 86 1 2,889
91 92 1 275
99 101 2 302
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-179 713819 4527335 752 360 -90 61 17 43 26 1,327
incl. 20 23 3 2,955
incl. 25 32 7 1,865
incl. 35 36 1 2,146
incl. 38 39 1 3,667
52 56 4 263
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-181 713776 4527357 753 360 -90 50 16 23 7 971
incl. 16 17 1 4,056
26 35 9 351
43 45 2 1,854
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-182 713735 4527270 755 360 -90 79 32 33 1 404
36 40 4 380
43 60 17 560
incl. 46 47 1 3,466
66 67 1 844
70 72 2 257
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-183 713754 4527424 751 360 -90 65 16 17 1 243
23 24 1 311
29 30 1 244
33 34 1 303
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-184 713874 4527247 754 360 -90 64 25 26 1 289
31 39 8 794
incl. 35 38 3 1,468
42 58 16 951
incl. 43 48 5 1,684
incl. 57 58 1 3,655
(MORE TO FOLLOW) Dow Jones Newswires
September 28, 2015 02:01 ET (06:01 GMT)
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-185 713800 4527514 748 360 -90 60 4 7 3 415
-------- --------- ---------- -------- ----- ------
Z7R-186 714040 4527227 763 360 -90 60 No Significant Intercepts
-------- --------- ---------- -------- ----- ------ ----------------------------------------
Z7R-187 714064 4527262 766 360 -90 91 40 41 1 1,291
44 45 1 343
48 50 2 903
incl. 48 49 1 1,173
54 56 2 215
59 60 1 460
65 68 3 353
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-188 713842 4527266 753 360 -90 62 21 52 31 1,332
incl. 22 24 2 2,116
incl. 35 41 6 3,611
incl. 46 49 3 2,568
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-189 713982 4527314 757 360 -90 85 18 26 8 402
31 34 3 1,272
incl. 31 33 2 1,671
38 52 14 347
incl. 50 51 1 1,279
61 64 3 648
incl. 62 63 1 1,427
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-190 713993 4527240 760 360 -90 79 No Significant Intercepts
-------- --------- ---------- -------- ----- ------ ----------------------------------------
Z7R-191 714043 4527330 764 360 -90 82 48 49 1 547
64 69 5 630
incl. 68 69 1 1,827
72 74 2 2,995
incl. 72 73 1 4,999
78 79 1 679
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-192 713951 4527264 756 360 -90 70 16 31 15 237
36 37 1 290
52 53 1 802
64 65 1 328
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-194 713995 4527347 758 360 -90 91 26 31 5 233
34 55 21 767
incl. 34 40 6 1,238
incl. 44 46 2 1,645
59 80 21 665
incl. 61 62 1 3,101
incl. 70 73 3 1,368
84 87 3 285
Z7R-195 713907 4527287 753 360 -90 60 13 16 3 261
20 21 1 259
38 52 14 436
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-196 713947 4527226 757 211 -60 62 17 20 3 273
23 48 25 528
incl. 29 30 1 1,005
incl. 33 37 4 1,118
56 57 1 572
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-197 713954 4527376 754 360 -90 75 30 40 10 635
incl. 39 40 1 2,246
43 69 26 1,103
incl. 43 47 4 3,973
incl. 56 57 1 1,256
incl. 65 66 1 4,928
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-198 713889 4527348 752 360 -90 82 11 19 8 267
24 44 20 1,565
incl. 25 35 10 2,507
incl. 37 38 1 2,181
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-199 713921 4527394 751 360 -90 64 4 18 14 408
incl. 15 16 1 1,851
incl. 17 18 1 1,034
21 33 12 1,144
incl. 23 26 3 2,906
incl. 29 30 1 1,763
40 55 15 854
incl. 42 48 6 1,477
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-200 713933 4527443 751 360 -90 70 5 19 14 2,261
incl. 5 8 3 1,878
incl. 10 19 9 2,787
22 54 32 867
incl. 22 24 2 6,591
incl. 33 34 1 1,544
incl. 36 39 3 1,541
incl. 51 52 1 1,105
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-201 713863 4527311 752 360 -90 60 21 42 21 1,150
incl. 22 27 5 1,844
incl. 30 34 4 1,755
incl. 36 38 2 1,374
incl. 40 41 1 1,309
(MORE TO FOLLOW) Dow Jones Newswires
September 28, 2015 02:01 ET (06:01 GMT)
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-203 713824 4527446 749 360 -90 69 7 47 40 950
incl. 9 14 5 1,366
incl. 16 27 11 1,552
incl. 33 35 2 2,258
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-204 713858 4527088 757 360 -90 69 8 21 13 8,543
incl. 12 20 8 13,607
35 36 1 338
39 40 1 295
42 43 1 239
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-205 713866 4527423 750 360 -90 64 9 61 52 1,909
Incl. 10 11 1 1,491
Incl. 13 14 1 1,026
Incl. 15 16 1 1,078
Incl. 19 30 11 3,817
Incl. 36 39 3 3,136
Incl. 45 60 15 2,210
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-206 713901 4526952 762 360 -90 60 8 9 1 357
13 15 2 226
28 30 2 1,622
incl. 28 29 1 2,547
46 47 1 205
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-207 713847 4527602 746 360 -90 67 50 51 1 248
54 55 1 383
58 62 4 451
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-208 713947 4527041 767 360 -90 75 27 29 2 961
32 40 8 336
49 51 2 458
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-209 714014 4527543 752 78 -60 69 10 28 18 3,658
incl. 10 24 14 4,587
33 34 1 838
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-210 713903 4527064 761 360 -90 75 21 25 4 893
incl. 23 24 1 2,488
28 29 1 1,054
32 46 14 714
incl. 32 33 1 3,372
incl. 35 36 1 2,034
incl. 40 41 1 1,527
incl. 45 46 1 1,013
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-211 714058 4527520 754 73 -59 69 9 14 5 384
17 19 2 290
25 28 3 328
36 37 1 291
41 48 7 311
58 59 1 200
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-212 713820 4527113 757 360 -90 65 5 22 17 648
incl. 12 13 1 1,592
incl. 16 18 2 1,184
incl. 21 22 1 1,757
29 46 17 1,354
incl. 29 31 2 4,050
incl. 38 39 1 2,523
incl. 42 44 2 4,224
52 56 4 1,877
incl. 52 55 3 2,398
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-213 713996 4527566 751 121 -59 62 16 34 18 397
incl. 28 29 1 1,058
incl. 33 34 1 1,250
37 47 10 877
incl. 40 44 4 1,756
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-214 713842 4527149 756 360 -90 75 15 16 1 1,916
32 33 1 411
62 63 1 350
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-215 714078 4527445 760 77 -60 75 24 29 5 583
Incl. 27 28 1 2,081
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-216 713905 4527176 756 360 -90 68 20 32 12 618
incl. 24 25 1 2,258
37 38 1 244
61 62 1 251
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-217 714094 4527423 763 77 -58 63 21 31 10 289
38 55 17 570
incl. 51 53 2 1,772
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-218 713943 4527143 764 42 -58 90 73 76 3 323
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-220 713966 4527083 769 360 -90 95 59 60 1 332
67 73 6 562
Incl. 68 69 1 1,698
(MORE TO FOLLOW) Dow Jones Newswires
September 28, 2015 02:01 ET (06:01 GMT)
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-221 714257 4527470 763 257 -62 57 51 52 1 2,806
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-222 714333 4527517 768 360 -90 55 No Significant Intercepts
-------- --------- ---------- -------- ----- ------ ----------------------------------------
Z7R-223 714241 4527523 761 257 -60 60 29 30 1 217
35 36 1 1,521
51 52 1 1,332
Z7R-224 714317 4527637 762 360 -90 50 No Significant Intercepts
-------- --------- -------- ----------------------------------------
Z7R-225 714187 4527706 754 360 -90 65 10 11 1 274
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-226 714348 4527568 768 360 -90 50 No Significant Intercepts
-------- --------- ---------- -------- ----- ------ ----------------------------------------
Z7R-227 714270 4527551 762 360 -90 55 17 21 4 326
27 28 1 1,020
34 35 1 233
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-228 714252 4527617 759 360 -90 80 17 26 9 237
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-229 714246 4527574 760 236 -58 69 27 32 5 456
incl. 31 32 1 1,098
48 49 1 380
60 62 2 243
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-230 714261 4527659 758 115 -60 60 33 34 1 225
38 41 3 535
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-231 714161 4527663 755 214 -60 92 24 27 3 310
32 66 34 601
incl. 33 36 3 1,425
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-233 714229 4527683 756 360 -90 80 22 30 8 410
incl. 27 28 1 1,332
33 34 1 619
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-234 714096 4527754 751 360 -90 65 14 17 3 237
31 33 2 1,119
incl. 31 32 1 1,987
44 51 7 426
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-235 714139 4527730 752 360 -90 58 22 23 1 381
35 46 11 224
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-236 714069 4527713 751 211 -59 69 47 48 1 203
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-237 714018 4527766 749 215 -60 75 39 40 1 442
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-238 714050 4527775 750 360 -90 65 26 27 1 219
-------- --------- ---------- -------- ----- ------ ------- ----- ---- --------- -------
Z7R-239 714008 4527799 748 360 -90 60 No Significant Intercepts
-------- --------- ---------- -------- ----- ------ ----------------------------------------
Appendix C: JORC Code, 2012 Edition - Table 1 report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
-------------------------------------------
Sampling Nature and quality of sampling All results reported are from Reverse
techniques (eg cut channels, random chips, Circulation (RC) drill samples collected
or specific specialised industry over one metre (1m) intervals. Multiple
standard measurement tools appropriate methods were used to determine uranium
to the minerals under investigation, mineralisation intervals including
such as down hole gamma sondes, down hole gamma analysis, hand held
or handheld XRF instruments, scintillometer measurements and
etc). These examples should portable XRF analysis. Intervals
not be taken as limiting the containing uranium mineralisation
broad meaning of sampling. were selected and submitted for
laboratory assay analysis.
------------------------------------------- -------------------------------------------------
Include reference to measures Standards and blanks are inserted
taken to ensure sample representivity into the sample stream to assess
and the appropriate calibration the accuracy, precision and methodology
of any measurement tools or of the external laboratories used.
systems used. In addition, field duplicate samples
are inserted to assess the variability
of the uranium mineralisation. Approximately
15-20% of all samples relate to
quality control. In addition, the
laboratories undertake their own
duplicate sampling as part of their
internal QA/QC processes. Examination
of the QA/QC sample data indicates
satisfactory performance of field
sampling protocols and assay laboratories
providing acceptable levels of precision
and accuracy.
Drill hole collar locations are
surveyed by qualified surveyors
(Cubica Ingeniería Metrica
S.L) using standard differential
GPS (DGPS) equipment achieving sub
decimetre accuracy in horizontal
and vertical position. Down-hole
surveys are undertaken using a Geovista
down-hole deviation probe. Measurements
are taken every 1cm down hole and
averaged every 10m. No strongly
(MORE TO FOLLOW) Dow Jones Newswires
September 28, 2015 02:01 ET (06:01 GMT)
magnetic rocks are present within
the deposit which may affect magnetic
based readings.
------------------------------------------- -------------------------------------------------
Aspects of the determination RC drill samples are collected over
of mineralisation that are Material 1m intervals, manually homogenised
to the Public Report. In cases before being split on site using
where 'industry standard' work a three tier riffle splitter to
has been done this would be provide an approximate 3-5kg sample.
relatively simple (eg 'reverse In rare cases, wet samples are split
circulation drilling was used using a cone and quarter method.
to obtain 1 m samples from which
3 kg was pulverised to produce Scintillometer measurements are
a 30 g charge for fire assay'). taken on all samples and this data
In other cases more explanation is used to select the samples to
may be required, such as where be sent to external laboratories
there is coarse gold that has for sample preparation and analysis.
inherent sampling problems. Indicative mineralised intervals
Unusual commodities or mineralisation are determined from this data and
types (eg submarine nodules) the sampling extended up and down
may warrant disclosure of detailed hole by at least 2-5m.
information.
Samples are further split in the
core shed using a scoop such that
0.7-1kg samples are sent to the
preparation laboratories of ALS
and AGQ (Seville, Spain) and analytical
laboratory of ALS (Loughrea, Ireland).
Samples are dried, fine crushed
down to 70% below 2mm, split to
obtain 250g and pulverised with
at least 85% of the sample passing
75um. 10g of sample is used for
uranium analysis by pressed powder
X-ray fluorescence (XRF) method.
------------------ ------------------------------------------- -------------------------------------------------
Drilling Drill type (eg core, reverse Drilling was by the RC method drilling
techniques circulation, open-hole hammer, using a 140mm diameter face sampling
rotary air blast, auger, Bangka, hammer.
sonic, etc) and details (eg
core diameter, triple or standard
tube, depth of diamond tails,
face-sampling bit or other type,
whether core is oriented and
if so, by what method, etc).
------------------ ------------------------------------------- -------------------------------------------------
Drill sample Method of recording and assessing RC drill samples are collected over
recovery core and chip sample recoveries 1m intervals through a cyclone.
and results assessed. Plastic sample bags are strapped
to the cyclone to maximise sample
recovery. Individual sample bags
are not weighed to assess sample
recovery but a visual inspection
is made by the Company geologist
to ensure all samples are of approximately
equivalent size.
------------------------------------------- -------------------------------------------------
Measures taken to maximise sample The RC drilling rigs utilised suitably
recovery and ensure representative sized compressors to ensure dry
nature of the samples. samples where possible. Plastic
sample bags are strapped to the
cyclone to maximise sample recovery.
Sample logs record whether the sample
is dry, moist or wet.
------------------------------------------- -------------------------------------------------
Whether a relationship exists There is no known relationship between
between sample recovery and sample recovery and grade. The RC
grade and whether sample bias sample recoveries are of an acceptable
may have occurred due to preferential level and no bias is expected from
loss/gain of fine/coarse material. any sample losses.
------------------ ------------------------------------------- -------------------------------------------------
Logging Whether core and chip samples Geological logging of RC chip samples
have been geologically and geotechnically includes recording descriptions
logged to a level of detail of lithology, weathering, alteration
to support appropriate Mineral and mineralisation. A scintillometer
Resource estimation, mining reading of counts per second (cps)
studies and metallurgical studies. is recorded for each 1m sample (quantitative).
------------------------------------------- -------------------------------------------------
Whether logging is qualitative Geological logging is qualitative
or quantitative in nature. Core in nature. RC samples and chip trays
(or costean, channel, etc) photography. are photographed.
------------------------------------------- -------------------------------------------------
The total length and percentage All RC drill holes are logged in
of the relevant intersections full by Company geologists.
logged.
------------------ ------------------------------------------- -------------------------------------------------
Sub-sampling If core, whether cut or sawn Not Applicable - RC drilling only.
techniques and whether quarter, half or
all core taken.
------------------------------------------- -------------------------------------------------
and sample If non-core, whether riffled, RC drill samples are collected at
preparation tube sampled, rotary split, 1m intervals. RC intervals are sampled
etc and whether sampled wet by splitting dry samples in the
or dry. field to 3-5kg using a three tier
riffle splitter and further split
in the core shed to 0.7-1kg using
a scoop. Where samples are wet they
are dried prior to spitting. In
rare cases, wet samples are split
using a cone and quarter method.
------------------------------------------- -------------------------------------------------
For all sample types, the nature, Samples are sent to ALS and AGQ
quality and appropriateness laboratories for preparation. Samples
of the sample preparation technique. are dried, fine crushed down to
(MORE TO FOLLOW) Dow Jones Newswires
September 28, 2015 02:01 ET (06:01 GMT)
70% below 2mm and pulverised with
at least 85% of the sample passing
75um. 10g of sample is used for
uranium analysis by pressed powder
XRF method. This is considered appropriate
for this style of uranium mineralisation.
------------------------------------------- -------------------------------------------------
Quality control procedures adopted Previous field tests have determined
for all sub-sampling stages that the sample size and method
to maximise representivity of of sampling produce representative
samples. RC samples. QA/QC procedures involve
the use of standards, duplicates
and blanks which are inserted into
sample batches at a frequency of
approximately 15-20%.
------------------------------------------- -------------------------------------------------
Measures taken to ensure that Duplicate splits of RC samples are
the sampling is representative taken every 10m down hole within
of the in situ material collected, the sampled intervals. The results
including for instance results from these duplicates generally
for field duplicate/second-half show acceptable repeatability, however
sampling. indications of inhomogeneity were
observed in a number of duplicates.
------------------------------------------- -------------------------------------------------
Whether sample sizes are appropriate The uranium is typically very fine
to the grain size of the material grained. Previous test work carried
being sampled. out by Berkeley using different
sample sizes has demonstrated that
the selected sample size is appropriate.
------------------ ------------------------------------------- -------------------------------------------------
Quality The nature, quality and appropriateness Uranium analysis by pressed powder
of assay of the assaying and laboratory XRF method. This analytical method
data and procedures used and whether reports total uranium content.
laboratory the technique is considered
tests partial or total.
------------------------------------------- -------------------------------------------------
For geophysical tools, spectrometers, Down-hole gamma logging is undertaken
handheld XRF instruments, etc, for all probe accessible drill holes
the parameters used in determining to provide eU(3) O(8) ("equivalent"
the analysis including instrument U(3) O(8) grade) data however, it
make and model, reading times, is not currently considered of sufficient
calibrations factors applied quality to replace chemical assay
and their derivation, etc. data for the purposes of reporting
drilling results at Zona 7. The
drill intersections reported in
this release are calculated using
only chemical assay data.
------------------------------------------- -------------------------------------------------
Nature of quality control procedures Standards, blanks and duplicates
adopted (eg standards, blanks, are regularly inserted into the
duplicates, external laboratory sample stream with approximately
checks) and whether acceptable 15-20% of all samples related to
levels of accuracy (ie lack quality control. The external laboratories
of bias) and precision have used also maintain their own process
been established. of QA/QC utilising standards, pulp
repeats, sample duplicates and blanks.
Review of the Berkeley quality control
samples, as well as the external
laboratory quality QA/QC reports,
has shown no sample preparation
issues, acceptable levels of accuracy
and precision and no bias in the
analytical datasets.
------------------ ------------------------------------------- -------------------------------------------------
Verification The verification of significant Reported significant intersections
of sampling intersections by either independent have been checked and verified by
and assaying or alternative company personnel. Senior Geological management.
------------------------------------------- -------------------------------------------------
The use of twinned holes. No twinned holes were drilled in
the current RC drilling program.
------------------------------------------- -------------------------------------------------
Documentation of primary data, All primary data is recorded in
data entry procedures, data templates designed by Berkeley.
verification, data storage (physical Assay data from the external laboratory
and electronic) protocols. is received in spreadsheets and
downloaded directly into an Access
Database managed by the Company.
Data is entered into controlled
excel templates for validation.
The validated data is then loaded
into a password secured relational
database by a designated Company
geologist. Daily backups of all
digital data are undertaken. These
procedures are documented in the
Berkeley Technical Procedures and
Protocols manual.
------------------------------------------- -------------------------------------------------
Discuss any adjustment to assay Uranium (ppm) assays received from
data. the external laboratory are converted
to U(3) O(8) (ppm) using the stoichiometric
factor of 1.179.
------------------ ------------------------------------------- -------------------------------------------------
Location Accuracy and quality of surveys Drill hole collar locations are
of data used to locate drill holes (collar surveyed by qualified surveyors
points and down-hole surveys), trenches, (Cubica Ingeniería Metrica
mine workings and other locations S.L) using standard differential
used in Mineral Resource estimation. GPS (DGPS) equipment achieving sub
decimetre accuracy in horizontal
(MORE TO FOLLOW) Dow Jones Newswires
September 28, 2015 02:01 ET (06:01 GMT)
and vertical position.
Down-hole surveys are undertaken
using a Geovista down-hole deviation
probe. Measurements are taken every
1cm down hole and averaged every
10m. No strongly magnetic rocks
are present within the deposit which
may affect magnetic based readings.
------------------ ------------------------------------------- -------------------------------------------------
Specification of the grid system The grid system is ETRS 1989 UTM
used. Zone 29N.
------------------------------------------- -------------------------------------------------
Quality and adequacy of topographic Topographic control is based on
control. a digital terrain model with sub
metric accuracy sourced from the
Spanish Geographical Institute (Instituto
Geográfico Nacional) and is
verified through detailed drill
hole collar surveys by a qualified
surveyor using a DGPS.
------------------ ------------------------------------------- -------------------------------------------------
Data spacing Data spacing for reporting of This RC drilling program has been
and distribution Exploration Results. designed to close the current broadly
spaced drill pattern down to a notional
50m by 50m grid.
Whether the data spacing and The data spacing (notionally 50m
distribution is sufficient to by 50m) is considered sufficient
establish the degree of geological to assume geological and grade continuity,
and grade continuity appropriate and will allow the estimation of
for the Mineral Resource and Indicated Mineral Resources.
Ore Reserve estimation procedure(s)
and classifications applied.
------------------------------------------- -------------------------------------------------
Whether sample compositing has No compositing of RC samples in
been applied. the field has been undertaken.
------------------ ------------------------------------------- -------------------------------------------------
Orientation Whether the orientation of sampling The mineralised zone strikes northeast-southwest
of data achieves unbiased sampling of and is interpreted to be sub-horizontal
in relation possible structures and the (due to post mineralisation supergene
to geological extent to which this is known, processes) to shallowly dipping.
structure considering the deposit type.
------------------------------------------- -------------------------------------------------
If the relationship between All of the RC drill holes reported
the drilling orientation and in this release are vertical. Due
the orientation of key mineralised to the interpreted flat lying nature
structures is considered to of the mineralisation, no sampling
have introduced a sampling bias, bias is considered to have been
this should be assessed and introduced by the orientation of
reported if material. the drilling.
------------------ ------------------------------------------- -------------------------------------------------
Sample The measures taken to ensure Chain of custody is managed by Berkeley.
security sample security. Samples are transported from the
drill site by Company vehicle to
a sample preparation shed where
samples are prepared for dispatch.
Samples are sent directly from the
sample preparation shed to the laboratory
using a certified courier or a Berkeley
owned vehicle authorised for radioactive
materials transport. No other freight
is transported with the samples
which are taken directly from the
Berkeley facility to the external
laboratory. Sample submission forms
are sent in paper form with the
samples as well as electronically
to the laboratory. Reconciliation
of samples occurs prior to commencement
of sample preparation for assaying.
------------------ ------------------------------------------- -------------------------------------------------
Audits The results of any audits or Sampling techniques and procedures,
or reviews reviews of sampling techniques as well as QA/QC data, are reviewed
and data. internally an ongoing basis. Mr
Malcolm Titley (Geology Consultant,
Maja Mining Limited) has independently
reviewed the sampling techniques,
procedures and data. He has undertaken
a site visit to review and inspect
the application of procedures. These
reviews have concluded that the
sampling and analytical results
have resulted in data suitable for
incorporation into Mineral Resource
estimation.
------------------ ------------------------------------------- -------------------------------------------------
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this
section.)
Criteria JORC Code explanation Commentary
-------------------------------
Mineral Type, reference name/number, The Zona 7 Prospect lies on the
tenement location and ownership including Alisos Investigation Permit PI
and land agreements or material issues 6605-20 which is 100% owned by
tenure with third parties such as joint Minera de Río Alagón,
status ventures, partnerships, overriding a wholly owned subsidiary of Berkeley
royalties, native title interests, Energy Limited.
historical sites, wilderness
or national park and environmental The Alisos Investigation Permit
settings. is currently in the second year
of its second three year term and
will expire on 4 January 2017.
No historical sites, wilderness
or national parks are located within
(MORE TO FOLLOW) Dow Jones Newswires
September 28, 2015 02:01 ET (06:01 GMT)
the Permit. The Zona 7 Prospect
is located adjacent to the village
of Villavieja de Yeltes.
------------------------------------------- ---------------------------------------------
The security of the tenure held Tenure in the form of an Investigation
at the time of reporting along Permit has been granted and is
with any known impediments to considered secure. There are no
obtaining a licence to operate known impediments to obtaining
in the area. a licence to operate in this area.
------------------ ------------------------------------------- ---------------------------------------------
Exploration Acknowledgment and appraisal Previous exploration at Zona 7
done by of exploration by other parties. was completed initially by Junta
other parties de Energía Nuclear (JEN) and
then Empresa Nacional de Uranio
S.A. (ENUSA), both Spanish state
run companies, from the late 1950's
through to the mid 1980's. Work
completed by JEN and ENUSA included
mapping, radiometric surveys, trenching
and diamond (DD) and open-hole
(OH) drilling.
A detailed data assessment and
verification of the historic data
supplied by ENUSA has been undertaken.
No significant issues with the
data were detected.
------------------ ------------------------------------------- ---------------------------------------------
Geology Deposit type, geological setting The uranium mineralisation is hosted
and style of mineralisation. within Ordovician metasediments
adjacent to granite. The mineralisation
typically occurs as a sub-horizontal
to shallowly dipping layer occurring
between surface and 100m depth.
The style of the uranium mineralisation
includes veins, stockwork and disseminated
mineralisation in joint/fracture
filling associated with brittle
deformation. Uraninite and coffinite
are the primary uranium minerals.
Secondary uranium mineralisation
is developed in "supergene-like"
tabular zones corresponding to
the depth of weathering. Most of
the mineralisation is hosted within
partially weathered and unweathered
metasediment. This deposit falls
into the category defined by the
International Atomic Energy Association
(IAEA) as Vein Type, Sub Type Iberian
Type.
------------------ ------------------------------------------- ---------------------------------------------
Drill hole A summary of all information Details of all reported drill holes
Information material to the understanding are provided in Appendix A of this
of the exploration results including release.
a tabulation of the following
information for all Material
drill holes:
o easting and northing of the
drill hole collar
o elevation or RL (Reduced Level
- elevation above sea level
in metres) of the drill hole
collar
o dip and azimuth of the hole
o down hole length and interception
depth
o hole length.
------------------------------------------- ---------------------------------------------
If the exclusion of this information All of this information is Material
is justified on the basis that and has been included in Appendix
the information is not Material A of this release.
and this exclusion does not
detract from the understanding
of the report, the Competent
Person should clearly explain
why this is the case.
------------------ ------------------------------------------- ---------------------------------------------
Data aggregation In reporting Exploration Results, Reported drill intersections are
methods weighting averaging techniques, based on chemical assay data and
maximum and/or minimum grade are calculated using a 200ppm U(3)
truncations (eg cutting of high O(8) cut-off, no high grade cut,
grades) and cut-off grades are and may include up to 2m of internal
usually Material and should dilution.
be stated.
------------------------------------------- ---------------------------------------------
Where aggregate intercepts incorporate High grade intervals that are internal
short lengths of high grade to broader zones of uranium mineralisation
results and longer lengths of are reported as included intervals.
low grade results, the procedure
used for such aggregation should
be stated and some typical examples
of such aggregations should
be shown in detail.
------------------------------------------- ---------------------------------------------
The assumptions used for any No metal equivalent values are
reporting of metal equivalent used.
values should be clearly stated.
------------------ ------------------------------------------- ---------------------------------------------
Relationship These relationships are particularly All drilling is planned in such
between important in the reporting of a way as to intersect expected
mineralisation Exploration Results. If the mineralisation in a perpendicular
widths geometry of the mineralisation manner. The uranium mineralisation
and intercept with respect to the drill hole is interpreted to be flat lying
lengths angle is known, its nature should to shallowly dipping so the majority
be reported. of the RC holes have been drilled
vertically. The reported down-hole
intervals are therefore interpreted
to approximate true widths.
------------------------------------------- ---------------------------------------------
If it is not known and only The reported down-hole intervals
the down hole lengths are reported, are interpreted to approximate
there should be a clear statement true widths.
to this effect (eg 'down hole
length, true width not known').
(MORE TO FOLLOW) Dow Jones Newswires
September 28, 2015 02:01 ET (06:01 GMT)
Grafico Azioni Berkeley Energia (LSE:BKY)
Storico
Da Giu 2024 a Lug 2024
Grafico Azioni Berkeley Energia (LSE:BKY)
Storico
Da Lug 2023 a Lug 2024