TIDMYAU 
 
Yamana Gold Provides 2012 Exploration Update 
FOR:  YAMANA GOLD INC. 
 
TSX SYMBOL:  YRI 
NYSE SYMBOL:  AUY 
LSE SYMBOL:  YAU 
 
June 5, 2012 
 
Yamana Gold Provides 2012 Exploration Update 
 
TORONTO, ONTARIO--(Marketwire - June 5, 2012) - YAMANA GOLD INC. (TSX:YRI)(NYSE:AUY)(LSE:YAU) ("Yamana" or "the 
Company") today announced mid-year highlights from its 2012 exploration program at existing operations and 
development projects. 
 
Highlights: 
 
El Penon, Chile 
 
 
 
=-  New vein has been discovered approximately 300 metres east of Fortuna - 
    Fortuna Este. 
=-  New zone of significant mineralization has been identified south of the 
    main Dorada vein and to the west between Dorada and Providencia. 
=-  Drilling has delineated a new high grade deposit at the Elizabeth vein 
    located 400 metres east of Victoria within Pampa Augusta Victoria. 
 
 
 
Significance: New discoveries are being advanced through exploration and accelerated through development as 
they represent an opportunity to significantly extend minelife and further enhance production at, or above, a 
440,000 ounce sustainable production level. 
 
Chapada, Brazil 
 
 
 
=-  Mineralization has been identified at Chapada along a strike length of 
    almost 16 kilometres with the discovery of significant gold and copper 
    mineralization encountered approximately 2,500 metres south of Corpo 
    Sul. 
=-  Alteration and mineralization at Corpo Sul are similar to Chapada but 
    may be related to a completely distinct porphyry cluster. 
 
 
 
Significance: Potential to enhance throughput through the blending of these higher grade ores and possibly 
allow further development in size and scale to potentially result in an entirely new mine. 
 
Mercedes, Mexico 
 
 
 
=-  New discovery at Barrancas where drilling has intersected mineralization 
    approximately 600 metres north of Lagunas Norte. 
=-  Infill drilling at Lupita is confirming the width and grades of 
    mineralization and is expected to continue growth of the measured and 
    indicated mineral resources. 
 
 
 
Significance: Expected to enhance mineral resource base, extend minelife and maintain higher throughput and 
sustainable production levels. 
 
Pilar, Brazil 
 
 
 
=-  Maria Lazarus, a newly identified target, located 10 kilometres west of 
    Jordino with results similar to Jordino in both grade and width. 
=-  Drilling two kilometres south east of Jordino under post mineral cover 
    intersected coarse visible gold and assayed 0.43 metres of 66.4 g/t gold 
    indicating that the system is open in that direction. 
 
 
 
Significance: Discoveries continue to confirm a cluster of mineralized zones for contribution to production at 
Pilar although the area has the potential to become a multi-mine complex. 
 
The Company's exploration budget for 2012 is approximately $125 million. Exploration will continue to focus on 
mineral resource discovery and development as well as mineral reserve growth at existing operations, 
development projects and on new discoveries to continue developing the Company's project pipeline. A total of 
390,000 metres of drilling at 16 projects will be completed as part of the 2012 program. 
 
El Penon, Chile 
 
The El Penon high grade underground gold silver mine is located in northern Chile, 160 kilometres southeast of 
Antofagasta. The $29 million 2012 exploration program includes 140,000 metres of surface and underground 
drilling. The objective of the exploration program is to replace mineral reserves and mineral resources and, in 
particular, outline new high grade ounces that will provide sustainability for long term production goals. 
 
During the first five months of 2012 a total of 34,383 metres of drilling have been completed. The drilling has 
resulted in the discovery of a new mineralized vein structure, Fortuna Este and the advancement of two new 
targets that will provide mineral reserve and mineral resource growth for 2012. 
 
Fortuna Este 
 
Exploration drilling completed in the second half of 2011 discovered a massive quartz vein structure 300 metres 
east of the Fortuna deposit. The discovery hole, SFE0001 returned 3.12 metres at 2.79 g/t gold equivalent (1.30 
g/t gold and 74.45 g/t silver.) Since the discovery, seven widely spaced surface reverse circulation and 
diamond drill holes and three underground diamond drill holes have been completed along a strike length of 800 
metres. 
 
To view the Fortuna Este Map, please visit the following link: www.yamana.com/Theme/NewYamana/files/pr/01.png. 
 
 
 
          -------------------------------------------------------- 
          Fortuna Este 
          -------------------------------------------------------- 
                          From       Width        Gold      Silver 
          Hole No.    (metres)    (metres)       (g/t)       (g/t) 
          -------------------------------------------------------- 
          SFE0001       156.00        3.12        1.30          74 
          -------------------------------------------------------- 
          SFE0002       169.00        2.16        1.83         174 
          -------------------------------------------------------- 
          SFE0008       204.00        1.53        1.10          13 
          -------------------------------------------------------- 
          SFE0009C      204.00        4.06        3.84         273 
          -------------------------------------------------------- 
          SFE0012        80.00        3.14        1.26           8 
                  ------------------------------------------------ 
                        267.00        2.21        0.40           5 
          -------------------------------------------------------- 
          SFE0013       142.00        1.45        0.00           0 
          -------------------------------------------------------- 
          SFE0015       230.00        1.43       13.00         480 
          -------------------------------------------------------- 
          UET0022       207.28        0.50       37.50        5114 
          -------------------------------------------------------- 
          UET0023       328.20        0.50       51.76        1509 
          -------------------------------------------------------- 
          UET0024       332.30        0.54        6.80           6 
          -------------------------------------------------------- 
          (i)All widths contained in this release refer to true 
          widths. 
 
 
 
The best grades and widths of mineralization have been intersected in the northern part of Fortuna Este where 
SFE0009C returned 4.06 metres @ 9.3 g/t gold equivalent (3.84 g/t gold and 273 g/t silver.) UET0023 located 220 
metres further north, returned 0.50 metres @ 81.94 g/t gold equivalent (51.76 g/t gold and 1,509 g/t silver) 
and UET0024 intersected 0.54 metres at 6.9 g/t gold equivalent (6.8 g/t gold and 6.3 g/t silver). 
 
At the southern end of Fortuna Este, approximately 400 metres from SFE0009C, SFE0015 intersected 1.43 metres @ 
22.6 g/t gold equivalent (13.0 g/t gold and 480 g/t silver). 
 
In addition to the new Fortuna Este vein, UET0022 intersected 0.50 metres at 139.8 g/t gold equivalent (37.5 
g/t gold and 5,114 g/t silver) from a zone of sulfide bearing hydrothermal breccia located approximately 100 
metres east of Fortuna. This may be a splay of Fortuna vein or the discovery of a new subparallel vein system. 
 
The presence of these high grades, multiple structures and the continuity of a mineralized structure bode well 
for the upside of Fortuna Este. During the remainder of 2012, drilling will focus on expanding the high-grade 
areas in both the north and south as well as delineating the new structure identified in UET0022. 
 
Dorada South 
 
Two new mineralized structures, Dorada West 1 and Dorada West 2 have been identified along the southern 
projection of Dorada. The structures, which are separated by 20 to 30 metres of barren wall rock have been 
traced along 700 metres of strike length and remain open along strike to the south. The best intersection is in 
hole, SNX0238 which returned 2.98 metres @ 57.46 g/t gold equivalent (24.2 g/t gold and 1,663 g/t silver.) The 
average widths and grades of mineralization with the current drill results are 2.26 metres @ 13.18 g/t gold 
equivalent (5.07 g/t gold and 348 g/t silver) for Dorada West 1 and 1.06 metres @ 13.61 gold g/t equivalent 
(9.21 g/t gold and 220 g/t silver) for Dorada West 2. 
 
To view the Dorada South Map, please visit the following link: www.yamana.com/Theme/NewYamana/files/pr/02.png. 
 
 
 
         --------------------------------------------------------- 
         Dorada West 1 
         --------------------------------------------------------- 
                             From      Width       Gold     Silver 
         Hole No.        (metres)   (metres)      (g/t)      (g/t) 
         --------------------------------------------------------- 
         SNX0235           364.00       6.16       3.87        320 
         --------------------------------------------------------- 
         SNX0238           392.00       2.98      24.20       1663 
         --------------------------------------------------------- 
         SNX0239           399.00       2.38       0.02          2 
         --------------------------------------------------------- 
         UID0011           107.18       0.77       2.08        116 
         --------------------------------------------------------- 
         UID0012            98.00       1.01      14.05          6 
         --------------------------------------------------------- 
         UID0013           105.00       0.40       1.27         42 
         --------------------------------------------------------- 
         UID0014           124.52       0.95       2.38        134 
         --------------------------------------------------------- 
         UID0015           125.29       2.53       4.37        371 
         --------------------------------------------------------- 
         UID0016           114.00       1.00       2.62        241 
         --------------------------------------------------------- 
         UID0017           154.30       0.62       8.03        674 
         --------------------------------------------------------- 
         UED0001           102.43       2.76       3.98        294 
         --------------------------------------------------------- 
         UED0002           168.40       0.54       0.53         49 
         --------------------------------------------------------- 
         UED0003           124.07       4.00       1.80        146 
         --------------------------------------------------------- 
         UED0004            99.00       1.05       2.60        150 
         --------------------------------------------------------- 
         PX589             388.00       4.13       0.70         44 
         --------------------------------------------------------- 
         PX594             357.00       1.39       1.73         21 
         --------------------------------------------------------- 
         PX598             366.00       2.42       0.50         62 
         --------------------------------------------------------- 
         PX574             372.00       3.98       4.08        301 
         --------------------------------------------------------- 
         PX596             319.00       3.88      10.44        790 
         --------------------------------------------------------- 
         PX600             402.00       1.80       0.81         32 
         --------------------------------------------------------- 
 
 
 
 
         --------------------------------------------------------- 
         Dorada West 2 
         --------------------------------------------------------- 
                             From      Width       Gold     Silver 
         Hole No.        (metres)   (metres)      (g/t)      (g/t) 
         --------------------------------------------------------- 
         SNX0235           379.00       1.82       3.71        275 
         --------------------------------------------------------- 
         SNX0236           316.00       2.84       0.01          0 
         --------------------------------------------------------- 
         SNX0237           367.00       1.85       0.66         47 
         --------------------------------------------------------- 
         SNX0239           441.00       0.60       1.34        104 
         --------------------------------------------------------- 
         UID0011            67.53       1.32      14.99        807 
         --------------------------------------------------------- 
         UID0012            71.45       0.75       3.16         49 
         --------------------------------------------------------- 
         UID0013            77.50       0.61     146.29        169 
         --------------------------------------------------------- 
         UID0014            84.28       1.80       5.13        522 
         --------------------------------------------------------- 
         UID0015            91.50       0.38       3.48        287 
         --------------------------------------------------------- 
         UID0016            93.05       0.27       4.71        358 
         --------------------------------------------------------- 
         UID0017           126.50       0.49       1.19         91 
         --------------------------------------------------------- 
         UED0001            77.00       0.90       2.79        182 
         --------------------------------------------------------- 
         UED0003            90.00       0.77       1.71         36 
         --------------------------------------------------------- 
         UED0004            96.10       0.50       1.68         89 
         --------------------------------------------------------- 
 
 
 
Mineralization consists of oxidized hydrothermal breccias and quartz veins with abundant hematite and manganese 
oxides and is best developed near a sub horizontal contact between rhyolite tuffs and underlying rhyolite flows 
and intrusive rocks. The mineralization has been traced along a dip length of approximately 150 metres and 
remains open down dip. 
 
Pampa Augusta Victoria - Elizabeth Vein 
 
Past drilling at Pampa Augusta Victoria had identified several discontinuous vein zones in the hanging wall of 
the main Victoria vein. These structures, approximately 400 metres east of Victoria, were not included in 2011 
in any mineral reserve or mineral resource estimate due to the lack of drill information. Drilling in 2012 is 
specifically focused on establishing the continuity of these sub parallel structures and to date, has 
identified a narrow but high grade deposit in the Elizabeth vein. 
 
Results are shown in the figures and table below: 
 
www.yamana.com/Theme/NewYamana/files/pr/03.png 
 
www.yamana.com/Theme/NewYamana/files/pr/04.png 
 
 
 
         --------------------------------------------------------- 
         Elizabeth Vein 
         --------------------------------------------------------- 
                             From      Width       Gold     Silver 
         Hole No.        (metres)   (metres)      (g/t)      (g/t) 
         --------------------------------------------------------- 
         SUI0133C          205.75       0.12       0.20         98 
         --------------------------------------------------------- 
         SUI0134C          205.35       0.10       1.10        281 
         --------------------------------------------------------- 
         SUI0135C          282.50       0.54      13.87       3111 
         --------------------------------------------------------- 
         SUI0136C          260.55       0.41       2.23        167 
         --------------------------------------------------------- 
         SUI0137C          182.82       0.19      47.80       5695 
         --------------------------------------------------------- 
         SUI0138C          156.05       0.22       0.22          1 
         --------------------------------------------------------- 
         SUI0139C          179.15       0.02       0.00          0 
         --------------------------------------------------------- 
         SUI0141C          231.00       0.35       0.15         52 
         --------------------------------------------------------- 
         SUI0142C          274.00       0.34       0.98        152 
         --------------------------------------------------------- 
         SUI0143C          244.30       0.19       2.83        410 
         --------------------------------------------------------- 
         SUI0144C          258.40       0.40      34.53       2572 
         --------------------------------------------------------- 
         SUI0146C          257.35       0.61       0.01          0 
         --------------------------------------------------------- 
         SUI0147C          301.00       0.11       0.04          2 
         --------------------------------------------------------- 
         SUI0155C          188.81       0.16       3.72       1262 
         --------------------------------------------------------- 
         SUI0156C          193.41       0.09       0.16          2 
         --------------------------------------------------------- 
         SUI0157C          236.45       0.42       7.55       2154 
         --------------------------------------------------------- 
         SUI0158C          232.85       0.23       0.27         20 
         --------------------------------------------------------- 
         SUI0159C          277.45       0.20       0.37         18 
         --------------------------------------------------------- 
         SUI0160C          253.28       1.15      10.71       2677 
         --------------------------------------------------------- 
         SUI0161C          276.95       0.21      16.10       1646 
         --------------------------------------------------------- 
         SUI0162C          308.02       0.50       6.72        906 
         --------------------------------------------------------- 
         SUI0163C          261.20       0.19       0.11          3 
         --------------------------------------------------------- 
         SUI0164C          259.60       0.21       0.32         90 
         --------------------------------------------------------- 
         SUI0165C          255.45       0.36       9.55       1265 
         --------------------------------------------------------- 
         SUI0166C          287.40       0.43       8.59        196 
         --------------------------------------------------------- 
         SUI0167C          272.90       0.44       1.71        281 
         --------------------------------------------------------- 
         SUI0168C          264.00       0.25       1.94        729 
         --------------------------------------------------------- 
         SUI0169C          327.96       0.27       1.22        856 
         --------------------------------------------------------- 
         SUI0170C          197.58       0.30       0.04          1 
         --------------------------------------------------------- 
         SUI0176C          166.85       0.40       2.77        597 
         --------------------------------------------------------- 
         SUI0177C          151.65       0.61      19.10       1014 
         --------------------------------------------------------- 
         SUI0178C          178.45       0.26       0.02          2 
         --------------------------------------------------------- 
 
 
 
A total of 32 holes have been completed to date at Elizabeth and have outlined mineralization along a strike 
length of 300 metres and a dip length of 150 metres and the mineralization remains open along strike and 
locally down dip. As with Victoria, the mineralization is characterized by extremely high silver values. 
 
Additional drilling in 2012 will focus on extending the mineralization at Elizabeth as well as the other sub 
parallel structures east of Victoria and establishing a mineral reserve and mineral resource for these areas. 
 
Exploration drilling will continue throughout 2012 to further extend mineralization at Victoria, both along 
strike and down dip, and will also expand and confirm the mineral resource potential of the Victoria Este and 
Elizabeth veins. 
 
Pampa Augusta Victoria is being fast tracked which will contribute to production and, along with the new 
discoveries, will give us the flexibility to consider an increase in annual production above the newly 
established sustainable level of 440,000 GEO. 
 
Chapada, Brazil 
 
The Chapada open pit gold-copper mine is located northwest of Brasilia in Goias State. The $7 million 2012 
exploration program includes 27,000 metres of diamond drilling that will principally target the southern 
extension of the Corpo Sul deposit as well as infill parts of the Corpo Sul mineral resource identified in 
2011. 
 
Early results from current diamond drilling completed south of the Corpo Sul extension have returned very 
encouraging gold and copper values from sulphide mineralization. Hole CS-70 is the southernmost hole completed 
to date and intersected wide zones of alteration and mineralization and 154 metres of 0.17 g/t gold and 0.32% 
copper including a higher grade core of 106 metres of 0.22 g/t gold and 0.41% copper. This intersection extends 
Corpo Sul for more than 2.5 kilometres along strike to the southwest. Mineralization remains open in that 
direction and along dip in both directions. Additional drilling on sections spaced between 200 to 400 metres 
apart confirm similar grades to that in CS-70 as outlined in the tables and figure below from south to north. 
 
To view the Corpo Sul Map, please visit the following link: www.yamana.com/Theme/NewYamana/files/pr/05.png. 
 
 
 
    -------------------------------------------------------------------- 
    Corpo Sul 
    -------------------------------------------------------------------- 
                                   From      Width       Gold     Copper 
    Section         Hole No.   (metres)   (metres)      (g/t)        (%) 
    -------------------------------------------------------------------- 
    A                  CS-70        166        154       0.17       0.32 
    -------------------------------------------------------------------- 
                       incl.        182        106       0.22       0.41 
    -------------------------------------------------------------------- 
                       CS-83    pending 
    -------------------------------------------------------------------- 
    B                  CS-66        149       86.4       0.18       0.34 
    -------------------------------------------------------------------- 
                       incl.        158         29       0.23        0.4 
    -------------------------------------------------------------------- 
                       CS-85    pending 
    -------------------------------------------------------------------- 
                       CS-78    pending 
    -------------------------------------------------------------------- 
    C                  CS-59        237         58        0.1       0.28 
    -------------------------------------------------------------------- 
                       CS-64        106        124       0.15       0.26 
    -------------------------------------------------------------------- 
                       incl.        149         46       0.24       0.41 
    -------------------------------------------------------------------- 
                       CS-67        176         45       0.26       0.27 
    -------------------------------------------------------------------- 
                       incl.        178         23       0.36       0.35 
    -------------------------------------------------------------------- 
    D                  CS-55         94        179       0.13       0.25 
    -------------------------------------------------------------------- 
                       incl.        187       57.8        0.2       0.41 
    -------------------------------------------------------------------- 
                       CS-61      132.9       91.1        0.4       0.38 
    -------------------------------------------------------------------- 
                       incl.        134         72       0.49       0.44 
    -------------------------------------------------------------------- 
    E                  CS-47        109         77        NSV       0.29 
    -------------------------------------------------------------------- 
                       incl.        114          6        0.2       0.48 
    -------------------------------------------------------------------- 
                       incl.        136         25       0.13        0.4 
    -------------------------------------------------------------------- 
                       CS-51       48.8      168.2       0.13       0.25 
    -------------------------------------------------------------------- 
                       incl.        127         43       0.23       0.39 
    -------------------------------------------------------------------- 
                       incl.        199         18       0.13       0.31 
    -------------------------------------------------------------------- 
    F                  CS-46       24.1      129.1       0.14       0.27 
    -------------------------------------------------------------------- 
                       incl.         56         13       0.24       0.48 
    -------------------------------------------------------------------- 
                       CS-43        119        124        NSV       0.16 
    -------------------------------------------------------------------- 
    G                  CS-34       43.1      210.9       0.13        0.2 
    -------------------------------------------------------------------- 
                       incl.         74       31.9       0.22       0.35 
    -------------------------------------------------------------------- 
                       CS-37         80       69.2       0.37       0.28 
    -------------------------------------------------------------------- 
                       incl.        100         35       0.55       0.37 
    -------------------------------------------------------------------- 
    H                  CS-35        105        127       0.14       0.25 
    -------------------------------------------------------------------- 
                       incl.        106         31       0.21        0.4 
    -------------------------------------------------------------------- 
                       CS-36       13.3      134.3        0.4       0.41 
    -------------------------------------------------------------------- 
                       incl.         45       81.4       0.56        0.5 
    -------------------------------------------------------------------- 
                       CS-41        7.4      119.6       0.24        0.2 
    -------------------------------------------------------------------- 
                       incl.         21         41        0.4        0.3 
    -------------------------------------------------------------------- 
 
    Note: 0.1 g/t gold cutoff, 0.1% copper cutoff. Including results 
    0.3g/t Au or 0.3% Cu cutoff "incl." 
 
 
 
The results from Corpo Sul confirm similar metallurgy to the Chapada main pit ores. Based on this and the 
associated low strip ratio of the existing resource the Company is provided with the flexibility to at least 
blend ore between the main pit and Corpo Sul to increase production, particularly copper production because of 
the higher copper grade, although it may represent the opportunity for an entirely new mine. 
 
Drilling completed along strike of the Chapada southwest extension defined in 2011 has returned mixed results 
with narrow low grade values in CS-45 and CS-48 but both widths and grades improve to the northeast towards the 
Chapada pit. 
 
 
 
    -------------------------------------------------------------------- 
    Chapada Southwest 
    -------------------------------------------------------------------- 
                                   From      Width       Gold     Copper 
    Section         Hole No.   (metres)   (metres)      (g/t)        (%) 
    -------------------------------------------------------------------- 
    I                  CS-32         95         50       0.25       0.22 
                       CS-38      38.21      39.72        NSV       0.15 
    -------------------------------------------------------------------- 
    J                  CS-42         92      83.16       0.14       0.23 
                       CS-44         49      65.26       0.14       0.25 
    -------------------------------------------------------------------- 
                       CS-49         97         65       0.13       0.26 
    -------------------------------------------------------------------- 
 
    Note: 0.1 g/t gold cutoff, 0.1% Cu cutoff. 
 
 
 
The drilling at Corpo Sul has identified gold and copper mineralization along a minimum strike length of 4.5 
kilometres, to a depth of almost 300 metres and mineralization remains open along strike and down dip. With the 
discovery of Suruca in late 2009, Corpo Sul in 2011 and the continued positive results at Corpo Sul this year, 
economic copper and gold mineralization has now been identified along a strike length of almost 16 kilometres 
including the main Chapada deposit. 
 
Corpo Sul will provide the opportunity to further evaluate whether it will be more than just a higher grade ore 
contribution to an ore blend, or as it begins to show sufficient size and continuity to either represent a 
larger portion of ore contribution or an entirely new mine adjacent to Chapada. 
 
During the remainder of 2012, diamond drilling will continue to focus on the expansion and delineation of 
mineralization at the Corpo Sul extension and on confirming grade continuity of the Corpo Sul mineral resource 
through infill drilling. 
 
Mercedes, Mexico 
 
Mercedes is a gold and silver project located in Sonora Mexico and is Yamana's newest mine. The $7 million 2012 
exploration program includes approximately 33,000 metres of diamond drilling focused on the expansion of 
mineral reserves and mineral resources, particularly at the Lagunas Norte extensions within the Barrancas zone 
and at the Lupita vein zone. Three core rigs are currently on site and a total of 16,034 metres have been 
drilled in 55 holes year-to-date. 
 
Annual production from the mine is estimated to be up to 120,000 gold equivalent ounces in 2012, growing to 
140,000 gold equivalent ounces in 2014. Mercedes is a gold-silver vein/stockwork system with mineralization 
contained in four areas: Mercedes, Barrancas, Klondike and Lupita. 
 
To view the Barrancas 2012 Drillholes Map: www.yamana.com/Theme/NewYamana/files/pr/06.png. 
 
Barrancas Vein- Marianas Zone extension 
 
A total of 12 holes have been completed as part of a widely-spaced drilling program that has tested nearly 
1,000 metres of strike length to the north west of the Lagunas Norte ore body on the Barrancas structural 
trend. Almost all holes have intersected broad zones of fractured, iron stained and argillized andesite. 
However, associated quartz-carbonate-adularia stockwork/brecciated vein zones are highly variable in 
distribution and width. 
 
Ore grade values have been intersected in six holes located nearly 600 metres north west of Lagunas Norte and 
are highlighted by M12-639D which intersected two vein zones with 3.04 metres of 12.69 g/t gold and 11.5 g/t 
silver and an additional 1.24 metres of 74.7 g/t gold and 4.0 g/t silver. Additional drilling completed in 2012 
will be focused on establishing the continuity and extensions of this newly discovered "Marianas" zone. 
 
Results from recent drilling are highlighted in the table and figure below: 
 
 
 
  ----------------------------------------------------------------------- 
  Barrancas Vein - Marianas Zone 
  ----------------------------------------------------------------------- 
                         From         To   Interval       Gold     Silver 
  Hole No.           (metres)   (metres)   (metres)      (g/t)      (g/t) 
  ----------------------------------------------------------------------- 
  M12-637D             239.27     240.79       1.52       4.69       27.0 
  ----------------------------------------------------------------------- 
  M12-638D             323.75     325.55       1.80       4.35       13.3 
  ----------------------------------------------------------------------- 
  M12-638D     and     335.28     339.85       4.57       3.12        8.2 
  ----------------------------------------------------------------------- 
  M12-639D             454.77     457.81       3.04      12.69       11.5 
  ----------------------------------------------------------------------- 
  M12-639D     and     468.48     470.01       1.53       3.57        8.0 
  ----------------------------------------------------------------------- 
  M12-639D     and     476.38     477.62       1.24      74.70        4.0 
  ----------------------------------------------------------------------- 
  M12-640D             334.67     335.99       1.32       2.53        4.0 
  ----------------------------------------------------------------------- 
  M12-640D     and     397.60     401.73       4.13       2.68       15.6 
  ----------------------------------------------------------------------- 
  M12-640D     and     411.32     412.92       1.61      14.50       17.0 
  ----------------------------------------------------------------------- 
  M12-640D     and     480.20     481.86       1.66       3.32       23.0 
  ----------------------------------------------------------------------- 
  M12-641D             448.97     450.49       1.52       3.94        6.0 
  ----------------------------------------------------------------------- 
  M12-643D             401.73     402.28       0.55       4.21        6.0 
  ----------------------------------------------------------------------- 
  M12-644D             445.40     448.37       2.97      11.33       15.7 
  ----------------------------------------------------------------------- 
 
  Note: 2.0 g/t gold equivalent cutoff 
 
 
 
www.yamana.com/Theme/NewYamana/files/pr/07.png 
 
This new discovery at Marianas is currently not reflected in Mercedes' mineral reserves and mineral resources 
and it is expected that continued exploration success will contribute to mineral resources growth in 2012. 
 
Lupita 
 
Thirty metre in-fill drilling at Lupita continues to demonstrate that the quartz-carbonate vein/stockwork zone 
at the lower andesite/upper tuff contact is very continuous. Vein width varies from 0.5 to nearly 15.0 metres 
although the amount of greenish ore stage quartz varies greatly from hole to hole. Forty-one holes have been 
completed to date and assays returned from the first 37 holes indicate that most holes within the 2011 inferred 
grade shell contain at least narrow intervals with grades over 2.0 g/t gold equivalent. 
 
Results are shown in the figure and table below: 
 
www.yamana.com/Theme/NewYamana/files/pr/08.png 
 
 
 
=-------------------------------------------------------------------------- 
Mercedes Drill Results - Lupita 
=-------------------------------------------------------------------------- 
                                                                       Gold 
                                                                 Equivalent 
                     From        To  Interval     Gold   Silver (AuEq)(g/t) 
Hole No.         (metres)  (metres)  (metres)    (g/t)    (g/t)     (150:1) 
=-------------------------------------------------------------------------- 
L12-157D            72.54     79.25      6.71     4.03     23.2        4.18 
=-------------------------------------------------------------------------- 
L12-162D           205.64    210.88      5.24     2.45     48.3        3.01 
=-------------------------------------------------------------------------- 
L12-164D           226.77    228.30      1.53    11.35      8.0       11.49 
=-------------------------------------------------------------------------- 
L12-165D           252.07    253.51      1.44     3.72     30.0        3.92 
=-------------------------------------------------------------------------- 
L12-168D           194.46    197.51      3.05     3.83     14.5        3.93 
=-------------------------------------------------------------------------- 
L12-169D           212.75    213.06      0.31     2.44      8.0        2.49 
=-------------------------------------------------------------------------- 
L12-169D     and   216.71    217.32      0.61     1.97     12.0        1.97 
=-------------------------------------------------------------------------- 
L12-170D           284.38    286.37      1.99     5.02     22.4        5.03 
=-------------------------------------------------------------------------- 
L12-171D           126.19    127.41      1.22     2.21     33.5        2.43 
=-------------------------------------------------------------------------- 
L12-173D           144.07    145.39      1.32     5.37     82.0        5.91 
=-------------------------------------------------------------------------- 
L12-173D     and   146.81    147.52      0.71     2.36     34.0        2.58 
=-------------------------------------------------------------------------- 
L12-174D           178.64    182.58      3.94     4.65     58.0        5.03 
=-------------------------------------------------------------------------- 
L12-175D           178.17    182.11      3.94     4.25     40.3        4.54 
=-------------------------------------------------------------------------- 
L12-176D           201.17    203.00      1.83     5.28     50.9        5.62 
=-------------------------------------------------------------------------- 
L12-176D     and   219.46    220.99      1.53     4.93     30.0        5.13 
=-------------------------------------------------------------------------- 
L12-178D            47.85     48.46      0.61     3.48      5.0        3.51 
=-------------------------------------------------------------------------- 
L12-179D           162.76    166.15      3.39     6.88     33.0        7.10 
=-------------------------------------------------------------------------- 
L12-182D            31.39     32.00      0.61   101.50     52.0      101.85 
=-------------------------------------------------------------------------- 
L12-183D           177.70    179.22      1.52     3.89     18.5        4.02 
=-------------------------------------------------------------------------- 
L12-184D           175.50    177.39      1.89     2.96     33.8        3.19 
=-------------------------------------------------------------------------- 
L12-185D           197.07    198.12      1.05     3.11      7.0        3.15 
=-------------------------------------------------------------------------- 
L12-186D           197.21    199.64      2.43     9.81     74.3       10.31 
=-------------------------------------------------------------------------- 
L12-187D           183.18    183.79      0.61     2.95     13.0        3.03 
=-------------------------------------------------------------------------- 
L12-187D     and   184.21    186.54      2.33     2.74     18.8        2.87 
=-------------------------------------------------------------------------- 
L12-189D           281.03    283.40      2.43     2.97     40.3        3.24 
=-------------------------------------------------------------------------- 
L12-190D           231.34    231.70      0.36     2.01     20.0        2.14 
=-------------------------------------------------------------------------- 
L12-190D     and   233.05    234.65      1.60     3.11     27.5        3.29 
=-------------------------------------------------------------------------- 
L12-191D           277.95    280.72      2.77     5.79     77.8        6.31 
=-------------------------------------------------------------------------- 
L12-192D           202.08    203.91      1.83     5.73     70.3        6.19 
=-------------------------------------------------------------------------- 
L12-194D           182.58    184.40      1.82     6.19     53.1        6.55 
=-------------------------------------------------------------------------- 
 
Note: Cutoff 2.0 g/t gold equivalent 
 
 
 
The drill program currently being completed at Lupita will increase the confidence in mineral resources from 
inferred to indicated and enable a mineral reserve analysis to be completed. 
 
The continued exploration success and growing mineral resources at Mercedes will contribute to sustainability 
of higher throughput levels of 1,800 tonnes per day, higher production level of 140,000 ounces of annual 
production expected beginning in 2014 and the potential increase extension of mine life. 
 
Pilar, Brazil 
 
Pilar is a development stage project located in Goias, Brazil approximately 80 kilometres from the Company's 
Chapada mine. The $10 million 2012 exploration program includes 36,000 metres of diamond drilling. 
 
The drilling is focused on the expansion of the Jordino resource both down dip, which has been shown to be open 
for more than two kilometres of dip length, and along strike to the south under younger cover rocks. In 
addition, exploration drilling will be completed at Maria Lazarus located approximately ten kilometres west of 
Jordino. Year-to-date, 24 drill holes have been completed totaling 11,227 metres and drill results confirm that 
growth in mineral reserves and mineral resources will continue in 2012. 
 
The project is currently in development with production expected to begin in mid-2013. Annual production from 
the mine is estimated to be 140,000-150,000 ounces of gold. 
 
Jordino 
 
JD-540 intersected 0.43 metres of 66.4 g/t gold almost two kilometres south east of the current Jordino mineral 
resource under younger cover rocks. This is the only drill hole to test the potential strike extension to the 
south east and although the geology is not directly correlatable to Jordino, it indicates that the mineralized 
system continues over more than 2,000 metres along strike. 
 
To view the Pilar Exploration JD 540 Hole Location Map, please visit the following link: 
www.yamana.com/Theme/NewYamana/files/pr/09.png. 
 
Maria Lazarus 
 
This target is located approximately ten kilometres west of the Jordino ore body and is similar in geology and 
style of mineralization to Jordino. A series of historic garimpo activities have exposed a well mineralized 
structure along a strike length of at least three kilometres. Initial wide space exploratory drilling commenced 
in late 2011 and to date 18 diamond drill holes have been completed testing a strike length of 1,200 metres and 
a dip length in excess of 400 metres. Assay results from holes ML-005 through ML-013 have identified a main 
core of mineralization of 700 metres in strike length that has grades and widths similar to Jordino with widths 
of between 0.5-1.0 metre and grades between 3.61 and 18.25 g/t gold. 
 
Results are shown in the table and figure below: 
 
 
 
     ------------------------------------------------------------------ 
     Maria Lazarus & Jordino Southeast 
     ------------------------------------------------------------------ 
                       From         To     Length       Gold       Gold 
     Hole No.      (metres)   (metres)   (metres)   (g/t)(1)   (g/t)(2) 
     ------------------------------------------------------------------ 
     ML-001           55.00      56.00       1.00       4.25 
     ------------------------------------------------------------------ 
     ML-002           93.00      95.00       2.00       4.47 
     ------------------------------------------------------------------ 
     ML-003           41.00      42.00       1.00       2.89 
     ------------------------------------------------------------------ 
     ML-004                                              NSV 
     ------------------------------------------------------------------ 
     ML-005          474.47     475.34       0.87       4.04       4.16 
     ------------------------------------------------------------------ 
     ML-006          185.00     186.03       1.03       3.61       4.27 
     ------------------------------------------------------------------ 
     ML-007          146.68     148.32       1.64       1.55       1.41 
     ------------------------------------------------------------------ 
     ML-008                    Abandon 
     ------------------------------------------------------------------ 
     ML-008A          23.63      24.95       1.32       3.44       4.50 
     ------------------------------------------------------------------ 
     Incl.            24.19      24.95       0.76       4.80       6.26 
     ------------------------------------------------------------------ 
     ML-008A          29.95      31.00       1.05       6.38       9.98 
     ------------------------------------------------------------------ 
     Incl.            30.46      31.00       0.54      11.40      18.90 
     ------------------------------------------------------------------ 
     ML-009          593.00     594.97       1.97       2.06       2.44 
     ------------------------------------------------------------------ 
     Incl.           594.47     594.97       0.50       4.09       4.71 
     ------------------------------------------------------------------ 
     ML-009          598.00     598.50       0.50      10.35      12.80 
     ------------------------------------------------------------------ 
     ML-009          601.35     601.87       0.52       4.30       4.77 
     ------------------------------------------------------------------ 
     ML-010          968.15     969.85       1.70       2.03       3.16 
     ------------------------------------------------------------------ 
     Incl.           969.25     969.85       0.60       3.57       7.05 
     ------------------------------------------------------------------ 
     ML-011          740.43     741.00       0.57      21.10      18.25 
     ------------------------------------------------------------------ 
     ML-012          303.61     304.78       1.17       4.15       4.56 
     ------------------------------------------------------------------ 
     Incl.           304.25     304.78       0.53       8.45       9.40 
     ------------------------------------------------------------------ 
     ML-013          120.26     120.80       0.54       4.62       4.25 
     ------------------------------------------------------------------ 
     ML-014                                              NSV 
     ------------------------------------------------------------------ 
     ML-015                                              NSV 
     ------------------------------------------------------------------ 
     ML-017          617.00     617.67       0.67       2.92       2.21 
     ------------------------------------------------------------------ 
     JD-540          767.89     768.32       0.43       66.4 
     ------------------------------------------------------------------ 
     Cutoff: 1.5g/t Gold NSV: Not significant value 
(1)   Based on gold fire assay 
(2)   Based on gold screen fire assay 
 
 
 
The success of this early stage drilling effort at Maria Lazarus continues to confirm that the area surrounding 
Pilar is a cluster of mineralized zones which will contribute to Pilar's ore feed or potentially could be 
developed as a multiple mine complex. 
 
The Company has already increased the capacity of the mill by 30 percent from the feasibility study level and 
continues to assess potential increases to production and mine life with a strategic plan to fully utilize the 
increased capacity beginning in 2014. 
 
2012 Exploration Program 
 
Exploration continues to be a vital component of organic value creation. In 2012 the Company is expecting to 
spend $125 million to continue with the previous exploration successes. The focus of the exploration program is 
to discover additional ounces with the potential to be brought quickly to production, enhancing asset values 
and to discover ounces which can be brought into the Company's project pipeline, enhancing future value. 
 
Quality Assurance and Quality Control 
 
Yamana incorporates a rigorous Quality Assurance and Quality Control program for all of its mines and 
exploration projects which conforms to industry Best Practices as outlined by the CSE and National Instrument 
43-101. This includes the use of independent third party laboratories and the use of professionally prepared 
standards and blanks and analysis of sample duplicates with a second independent laboratory. For additional 
information on these programs for Chapada and El Penon please refer to the following two technical reports: 
Chapada Mine and Suruca Project, Goias State, Brazil Technical Report pursuant to National Instrument 43-101 of 
the Canadian Securities Administrators dated March 7, 2011 and Technical Report on the El Penon mine, Northern 
Chile dated December 7, 2010 found at www.sedar.com. 
 
Qualified Persons 
 
Sergio Brandao, P. Geo., Director of Exploration, Brazil for Yamana Gold Inc. has reviewed and approved the 
scientific and technical information contained within this press release relating to Chapada and Pilar and 
serves as the Qualified Person as defined in National Instrument 43-101. 
 
Darcy Marud, P. Geo., SVP Exploration for Yamana Gold Inc. has reviewed and approved the scientific and 
technical information contained within this press release relating to El Penon and Mercedes and serves as the 
Qualified Person as defined in National Instrument 43-101. 
 
About Yamana 
 
Yamana is a Canadian-based gold producer with significant gold production, gold development stage properties, 
exploration properties, and land positions in Brazil, Argentina, Chile, Mexico and Colombia. Yamana plans to 
continue to build on this base through existing operating mine expansions, throughput increases, development of 
new mines, the advancement of its exploration properties and by targeting other gold consolidation 
opportunities with a primary focus in the Americas. 
 
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS: This news release contains "forward-looking statements" 
within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable 
Canadian securities legislation. Except for statements of historical fact relating to the Company, information 
contained herein constitutes forward-looking statements, including any information as to the Company's 
strategy, plans or future financial or operating performance. Forward-looking statements are characterized by 
words such as "plan," "expect", "budget", "target", "project", "intend," "believe", "anticipate", "estimate" 
and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking 
statements are based on the opinions, assumptions and estimates of management considered reasonable at the date 
the statements are made, and are inherently subject to a variety of risks and uncertainties and other known and 
unknown factors that could cause actual events or results to differ materially from those projected in the 
forward-looking statements. 
 
These factors include the Company's expectations in connection with the projects and exploration programs 
discussed herein being met, the impact of general business and economic conditions, global liquidity and credit 
availability on the timing of cash flows and the values of assets and liabilities based on projected future 
conditions, fluctuating metal prices (such as gold, copper, silver and zinc), currency exchange rates (such as 
the Brazilian Real, the Chilean Peso, the Argentine Peso, and the Mexican Peso versus the United States 
Dollar), possible variations in ore grade or recovery rates, changes in the Company's hedging program, changes 
in accounting policies, changes in the Company's corporate mineral resources, risk related to non-core mine 
dispositions, changes in project parametres as plans continue to be refined, changes in project development, 
construction, production and commissioning time frames, risk related to joint venture operations, the 
possibility of project cost overruns or unanticipated costs and expenses, higher prices for fuel, steel, power, 
labour and other consumables contributing to higher costs and general risks of the mining industry, failure of 
plant, equipment or processes to operate as anticipated, unexpected changes in mine life, final pricing for 
concentrate sales, unanticipated results of future studies, seasonality and unanticipated weather changes, 
costs and timing of the development of new deposits, success of exploration activities, permitting time lines, 
government regulation and the risk of government expropriation or nationalization of mining operations, 
environmental risks, unanticipated reclamation expenses, title disputes or claims, limitations on insurance 
coverage and timing and possible outcome of pending litigation and labour disputes, as well as those risk 
factors discussed or referred to in the Company's annual Management's Discussion and Analysis and Annual 
Information Form for the year ended December 31, 2011 filed with the securities regulatory authorities in all 
provinces of Canada and available at www.sedar.com, and the Company's Annual Report on Form 40-F filed with the 
United States Securities and Exchange Commission. Although the Company has attempted to identify important 
factors that could cause actual actions, events or results to differ materially from those described in forward- 
looking statements, there may be other factors that cause actions, events or results not to be anticipated, 
estimated or intended. 
 
There can be no assurance that forward-looking statements will prove to be accurate, as actual results and 
future events could differ materially from those anticipated in such statements. The Company undertakes no 
obligation to update forward-looking statements if circumstances or management's estimates, assumptions or 
opinions should change, except as required by applicable law. The reader is cautioned not to place undue 
reliance on forward-looking statements. The forward-looking information contained herein is presented for the 
purpose of assisting investors in understanding the Company's expected financial and operational performance 
and results as at and for the periods ended on the dates presented in the Company's plans and objectives and 
may not be appropriate for other purposes. 
 
CAUTIONARY NOTE TO U.S. INVESTORS CONCERNING ESTIMATES OF MEASURED, INDICATED AND INFERRED MINERAL RESOURCES 
 
This news release uses the terms "Measured", "Indicated" and "Inferred" Mineral Resources. United States 
investors are advised that while such terms are recognized and required by Canadian regulations, the United 
States Securities and Exchange Commission does not recognize them. "Inferred Mineral Resources" have a great 
amount of uncertainty as to their existence, and as to their economic and legal feasibility. It cannot be 
assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher category. Under 
Canadian rules, estimates of Inferred Mineral Resources may not form the basis of feasibility or other economic 
studies. United States investors are cautioned not to assume that all or any part of Measured or Indicated 
Mineral Resources will ever be converted into Mineral Reserves. United States investors are also cautioned not 
to assume that all or any part of an Inferred Mineral Resource exists, or is economically or legally mineable. 
 
(All dollar amounts are expressed in United States dollars unless otherwise specified) 
 
 
 
 
FOR FURTHER INFORMATION PLEASE CONTACT: 
 
Yamana Gold Inc. 
Lisa Doddridge, Vice President, 
Corporate Communications and Investor Relations 
416-945-7362 or 1-888-809-0925 
lisa.doddridge@yamana.com 
www.yamana.com 
 
 
Yamana Gold Inc. 
 

Grafico Azioni Yamana Gold (LSE:YAU)
Storico
Da Mag 2024 a Giu 2024 Clicca qui per i Grafici di Yamana Gold
Grafico Azioni Yamana Gold (LSE:YAU)
Storico
Da Giu 2023 a Giu 2024 Clicca qui per i Grafici di Yamana Gold