Sabina Gold & Silver Corp (TSX:SBB) ("Sabina" or the "Company") is pleased to provide an update on the Company's 2013 exploration program and to announce continued positive drilling results at the Umwelt deposit on the Goose property on its 100% owned Back River project in Nunavut.

"We are very pleased with the conversion drilling that has been completed at Umwelt to date," said Rob Pease, President & CEO. "The Umwelt deposit is the largest of the Back River resources. Drilling in the proposed pit shell continues to demonstrate continuity and good grade. The Umwelt deposit is also our largest underground resource to date with mineralization over 1km deep with very good grades and widths found in the G2 Zone. Work at the George property will be wrapping up for the season by early August, however, we will continue to evaluate new targets for potential new open pit discoveries at Goose, Boot and Boulder well into September."

Umwelt Conversion Drilling Program

Resource conversion drilling has been completed on a portion of the currently proposed open pit at the Umwelt deposit with the primary objective of converting indicated resources to the measured category. Assay results returned to date are very encouraging and continue to demonstrate the continuity and high grade nature of this deposit.

A total of 52 drill holes were completed at Umwelt in 2013, with final assay results being received for 29 holes. All of these holes were drilled within the proposed open pit over approximately 300m along the length of the deposit.

Assay results received to date, including 19.27 g/t Au over 18.60m in hole 13GSE337 (Section 4850N), and 24.13 g/t Au over 21.85m in hole 13GSE340 (section 4900N), are indicative of the continuity of the gold mineralization at Umwelt. The complete listing of significant results received to date is appended in the table below.

Complete assay results have been received for all holes drilled on section 5025N and this cross section is presented below as an example of the good grade distribution at Umwelt.

Llama Conversion Drilling Program

Results for all 33 holes of the Llama open pit infill drill program have now been received and continue to support the 2013 objective of converting portions of the open pit mineralization at Llama to a measured resource. Additional holes from the north portion of the deposit continue to highlight the resource quality within this area including holes 13GSE312 returning 11.93g/t over 15.20m and 13GSE309 returning 4.97g/t over 7.75m. All final assay results that have not been previously released are appended in the table below.


Llama Assay Highlights

----------------------------------------------------------------------------
                                                           Len-             
                  Sec-  East-    Nor-        From     To   gth     Au  Zone 
Hole ID    Area  tion    ing   thing Depth     (m)    (m)   (m)  (g/t) Name 
----------------------------------------------------------------------------
13GSE306     LL 5200L 428659 7272338 152.0 106.35 108.05  1.70   2.98  Main 
                                                                       East 
----------------------------------------------------------------------------
13GSE309     LL 5225L 428683 7272380 152.0  83.80  91.55  7.75   4.97  Main 
                                                                       East 
----------------------------------------------------------------------------
including                                   87.00  90.05  3.05  10.98  Main 
                                                                       East 
----------------------------------------------------------------------------
13GSE311     LL 5175L 428739 7272354  77.0  22.50  23.25  0.75 130.80  Unde-
                                                                       fined
----------------------------------------------------------------------------
                                            49.00  50.75  1.75   1.19  Main 
                                                                       East 
----------------------------------------------------------------------------
                                            51.65  54.75  3.10   1.39  Main 
                                                                       East 
----------------------------------------------------------------------------
13GSE312     LL 5175L 428721 7272344 119.0  80.30  95.50 15.20  11.93  Main 
                                                                       East 
----------------------------------------------------------------------------
including                                   80.30  82.30  2.00  23.31  Main 
                                                                       East 
----------------------------------------------------------------------------
and                                         83.40  86.30  2.90  20.27  Main 
                                                                       East 
----------------------------------------------------------------------------
True widths have not yet been determined.

Ongoing exploration

In addition to conversion holes, drilling has commenced recently on the upper portions of the Llama underground with a goal of converting resources that are currently classed as inferred to indicated. Also, exploration drilling continues to focus on defining potential at a number of target areas on the Goose property including the Echo, Resurgence and Goose Tail zones.

More regional targets outside of the Goose area include the Boot and Boulder properties where two drill rigs continue to test exploration targets. This drilling is focused on evaluating the potential for large open pit discoveries.

Bathurst Inlet Port and Road (BIPR) Update

Earlier this year, the Company and Glencore Xstrata LLP jointly submitted an updated project proposal for the BIPR project that contemplates infrastructure for the Hackett River project and region. In 2013, work has focused on completing a draft environmental impact statement (DEIS) on BIPR for filing later this year.

Work included a geotechnical drilling program to assess the foundation material around the proposed port area. Preliminary results suggest material in the currently proposed port area is not adequate and further geotechnical drilling has been planned to assess a more suitable port area in the immediate vicinity. As a result, the DEIS will not be filed until this work has been completed.

Qualified Persons

The Qualified Person as defined by NI 43-101 as pertains to the Back River Project, is Angus Campbell, P.Geo., Vice-President, Exploration, for the Company who has read and approved the contents of this news release.

True widths for the intercepts reported in this news release have not yet been determined.

Diamond drill core was sent to TSL Laboratories in Saskatoon, Sask. Quality control is monitored on a continual basis and utilizes a system of standards, blanks and duplicates to ensure analytical accuracy. The protocols and procedures used in 2013 are the same as those used in earlier campaigns by Sabina Gold & Silver Corp. and have been deemed appropriate in the Company's 43-101 compliant resource reports.

SABINA GOLD & SILVER CORP.

Sabina Gold & Silver Corp. is an emerging gold developer with district scale, world class assets in one of the world's newest, most politically stable mining jurisdictions: Nunavut, Canada.

Sabina's primary assets, all located in Nunavut, consist of: the Back River Gold Project, currently in the pre-feasibility and permitting phase; the Wishbone Claims, a vastly prospective grass roots project; and the Hackett River Silver Royalty, a silver production royalty on Xstrata Zinc's Hackett River project comprising 22.5% of the first 190 million ounces produced and 12.5% of all the silver produced thereafter.

All news releases and further information can be found on the Company's website at www.sabinagoldsilver.com or on SEDAR at www.sedar.com.

Forward-Looking Statements

Statements relating to future operations at the Back River Project and the Hackett River Project and the expected results of this work are forward-looking statements within the meaning of securities legislation of certain Provinces in Canada. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur. Information inferred from the interpretation of drilling results may also be deemed to be forward looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from Sabina's operations and other risks and uncertainties, including those described in Sabina's Annual Report for the year ended December 31, 2012.

Forward-looking statements are based on the beliefs, estimates and opinions of Sabina's management on the date the statements are made. Sabina undertakes no obligation to update these forward-looking statements should management's beliefs, estimates or opinions, or other factors, change.

This news release has been authorized by the undersigned on behalf of Sabina Gold & Silver Corp.


Rob Pease, President & CEO
930 West 1st Street, Suite 202
North Vancouver, BC, V7P 3N4
Tel: 604 998-4175, Fax: 604 998-1051
http://www.sabinagoldsilver.com


Umwelt Assay Results

----------------------------------------------------------------------------
                            From      To  Length      Au                    
Hole ID    Area  Section      (m)     (m)     (m)   (g/t)   Zone Name       
----------------------------------------------------------------------------
13GSE313     UM     5025   49.00   60.20   11.20    9.46    Main Zone Centre
----------------------------------------------------------------------------
including                  51.30   52.20    0.90   32.77    Main Zone Centre
----------------------------------------------------------------------------
and                        53.50   54.40    0.90   21.73    Main Zone Centre
----------------------------------------------------------------------------
and                        56.00   57.00    1.00   16.98    Main Zone Centre
----------------------------------------------------------------------------
13GSE317     UM     5025   35.45   52.40   16.95    6.51    Main Zone Centre
----------------------------------------------------------------------------
including                  41.90   44.30    2.40   23.06    Main Zone Centre
----------------------------------------------------------------------------
                           65.00   68.10    3.10   78.52    Main Zone Centre
----------------------------------------------------------------------------
Including                  66.05   67.00    0.95  146.50    Main Zone Centre
----------------------------------------------------------------------------
13GSE318     UM     5025   39.40   40.90    1.50    1.13    Main Zone East  
----------------------------------------------------------------------------
                           61.10   73.50   12.40    4.51    Main Zone East  
----------------------------------------------------------------------------
including                  61.10   62.95    1.85   11.56    Main Zone East  
----------------------------------------------------------------------------
and                        71.50   73.50    2.00   12.82    Main Zone East  
----------------------------------------------------------------------------
13GSE322     UM     5025   72.00   73.70    1.70    1.50    Main Zone East  
----------------------------------------------------------------------------
                           76.35   77.50    1.15    1.01    Main Zone East  
----------------------------------------------------------------------------
13GSE324     UM     5025   26.00   51.00   25.00    8.47    Main Zone East  
----------------------------------------------------------------------------
including                  32.15   33.00    0.85   49.57    Main Zone East  
----------------------------------------------------------------------------
and                        45.00   47.00    2.00   20.65    Main Zone East  
----------------------------------------------------------------------------
                           53.80   54.50    0.70    1.80    Main Zone East  
----------------------------------------------------------------------------
13GSE325     UM     5025    5.00   56.25   51.25    4.93    Main Zone Centre
----------------------------------------------------------------------------
including                  13.45   14.00    0.55   30.57    Main Zone Centre
----------------------------------------------------------------------------
and                        15.75   17.00    1.25   16.15    Main Zone Centre
----------------------------------------------------------------------------
and                        18.50   21.00    2.50   48.29    Main Zone Centre
----------------------------------------------------------------------------
                           63.95   81.70   17.75    4.16    Main Zone Centre
----------------------------------------------------------------------------
including                  77.00   80.00    3.00   12.39    Main Zone Centre
----------------------------------------------------------------------------
13GSE329     UM     5050     NSV                                            
----------------------------------------------------------------------------
13GSE330     UM     5050    7.90   32.15   24.25    6.76    Main Zone Centre
----------------------------------------------------------------------------
including                  22.00   28.45    6.45   15.13    Main Zone Centre
----------------------------------------------------------------------------
and                        31.40   32.15    0.75   45.73    Main Zone Centre
----------------------------------------------------------------------------
13GSE331     UM     4850  114.60  115.25    0.65    9.60    Main Zone Centre
----------------------------------------------------------------------------
                          119.25  120.25    1.00    6.41    Main Zone Centre
----------------------------------------------------------------------------
                          134.20  156.10   21.90   10.10    Main Zone Centre
----------------------------------------------------------------------------
including                 136.20  136.85    0.65   31.19    Main Zone Centre
----------------------------------------------------------------------------
and                       151.60  155.10    3.50   35.55    Main Zone Centre
----------------------------------------------------------------------------
                          159.10  160.10    1.00    1.05    Main Zone Centre
----------------------------------------------------------------------------
                          167.10  169.10    2.00    2.39    Main Zone Centre
----------------------------------------------------------------------------
                          179.15  180.20    1.05    3.16    Main Zone Centre
----------------------------------------------------------------------------
                          186.35  187.50    1.15    1.39    Main Zone Centre
----------------------------------------------------------------------------
                          202.15  204.35    2.20    1.23    Main Zone Centre
----------------------------------------------------------------------------
                          208.75  209.80    1.05    6.24    Main Zone Centre
----------------------------------------------------------------------------
                          210.35  211.55    1.20    1.65    Main Zone Centre
----------------------------------------------------------------------------
                          222.30  223.25    0.95    8.08    Main Zone Centre
----------------------------------------------------------------------------
13GSE333     UM     5050   18.00   19.25    1.25    1.42    Main Zone Centre
----------------------------------------------------------------------------
                           26.25   36.60   10.35   12.33    Main Zone Centre
----------------------------------------------------------------------------
including                  29.75   33.00    3.25   30.99    Main Zone Centre
----------------------------------------------------------------------------
                           43.00   44.00    1.00    1.51    Main Zone Centre
----------------------------------------------------------------------------
13GSE334     UM     5050     NSV                            Main Zone Centre
----------------------------------------------------------------------------
13GSE337     UM     4850   64.75   65.70    0.95    1.23    Undefined       
----------------------------------------------------------------------------
                           66.65   67.60    0.95    1.70    Undefined       
----------------------------------------------------------------------------
                           80.45   81.45    1.00    1.49    Undefined       
----------------------------------------------------------------------------
                           98.00   98.65    0.65    2.06    Main Zone Centre
----------------------------------------------------------------------------
                          104.70  110.25    5.55   13.31    Main Zone Centre
----------------------------------------------------------------------------
including                 104.70  106.05    1.35   14.27    Main Zone Centre
----------------------------------------------------------------------------
and                       109.25  110.25    1.00   54.18    Main Zone Centre
----------------------------------------------------------------------------
                          124.20  125.35    1.15    6.55    Main Zone Centre
----------------------------------------------------------------------------
                          129.85  131.10    1.25    4.65    Main Zone Centre
----------------------------------------------------------------------------
                          133.90  152.50   18.60   19.27    Main Zone Centre
----------------------------------------------------------------------------
including                 136.90  137.45    0.55   59.40    Main Zone Centre
----------------------------------------------------------------------------
and                       140.35  141.40    1.05  139.90    Main Zone Centre
----------------------------------------------------------------------------
13GSE339     UM     5075   10.85   30.50   19.65    1.97    Main Zone Centre
----------------------------------------------------------------------------
Including                  11.70   12.30    0.60   18.83    Main Zone Centre
----------------------------------------------------------------------------
and                        20.90   21.50    0.60    6.41    Main Zone Centre
----------------------------------------------------------------------------
13GSE340     UM     4900  102.20  124.05   21.85   24.13    Main Zone East  
----------------------------------------------------------------------------
including                 115.00  124.05    9.05   48.45    Main Zone East  
----------------------------------------------------------------------------
which includes            121.00  122.00    1.00  183.80    Main Zone East  
----------------------------------------------------------------------------
                          128.95  131.00    2.05    2.89    Main Zone East  
----------------------------------------------------------------------------
                          194.20  195.25    1.05    2.40    Main Zone West  
----------------------------------------------------------------------------
13GSE341     UM     4850   64.90   65.55    0.65    1.05    Upper IF        
----------------------------------------------------------------------------
                           73.35   74.30    0.95    1.17    Upper IF        
----------------------------------------------------------------------------
                           79.40   80.15    0.75    1.59    Upper IF        
----------------------------------------------------------------------------
                           86.25   87.05    0.80    6.72    Upper IF        
----------------------------------------------------------------------------
                          101.25  125.20   23.95   14.95    Main Zone Centre
----------------------------------------------------------------------------
including                 113.50  114.35    0.85   46.07    Main Zone Centre
----------------------------------------------------------------------------
and                       115.20  121.05    5.85   30.96    Main Zone Centre
----------------------------------------------------------------------------
                          131.95  137.40    5.45   30.28    Main Zone Centre
----------------------------------------------------------------------------
including                 134.85  135.35    0.50   98.23    Main Zone Centre
----------------------------------------------------------------------------
13GSE342     UM     5075   12.90   24.00   11.10    5.29    Main Zone Centre
----------------------------------------------------------------------------
including                  15.65   16.35    0.70   36.45    Main Zone Centre
----------------------------------------------------------------------------
13GSE343     UM     5075    3.90   17.45   13.55    7.10    Main Zone Centre
----------------------------------------------------------------------------
including                   5.50    6.20    0.70   15.88    Main Zone Centre
----------------------------------------------------------------------------
13GSE344     UM     5075    7.00   23.70   16.70   11.51    Main Zone Centre
----------------------------------------------------------------------------
including                  11.00   12.00    1.00  103.90    Main Zone Centre
----------------------------------------------------------------------------
                           36.00   38.35    2.35    1.39    Central GW      
----------------------------------------------------------------------------
13GSE345     UM     4900   55.50   56.45    0.95    1.22    Main Zone East  
----------------------------------------------------------------------------
                          106.45  125.65   19.20    3.59    Main Zone East  
----------------------------------------------------------------------------
including                 120.65  122.80    2.15    8.81    Main Zone East  
----------------------------------------------------------------------------
and                       124.70  125.65    0.95   11.16    Main Zone East  
----------------------------------------------------------------------------
                          129.50  131.00    1.50    1.37    Main Zone East  
----------------------------------------------------------------------------
                          207.70  215.90    8.20    9.98    Main Zone West  
----------------------------------------------------------------------------
including                 212.85  213.85    1.00   17.59    Main Zone West  
----------------------------------------------------------------------------
13GSE346     UM     4875   99.80  105.45    5.65    1.33    Main Zone East  
----------------------------------------------------------------------------
                          116.00  125.00    9.00    3.38    Main Zone East  
----------------------------------------------------------------------------
                          128.00  130.00    2.00    1.70    Main Zone East  
----------------------------------------------------------------------------
                          231.85  236.20    4.35   48.77    Main Zone West  
----------------------------------------------------------------------------
including                 233.70  234.45    0.75  112.50    Main Zone West  
----------------------------------------------------------------------------
13GSE347     UM     5075   23.90   25.90    2.00    3.73    Main Zone East  
----------------------------------------------------------------------------
                           30.90   31.90    1.00    6.57    Main Zone East  
----------------------------------------------------------------------------
13GSE349     UM     4900   10.15   11.95    1.80   37.20    Undefined       
----------------------------------------------------------------------------
including                  10.15   10.70    0.55  116.30    Undefined       
----------------------------------------------------------------------------
                           16.00   16.65    0.65    3.33    Undefined       
----------------------------------------------------------------------------
                           39.60   41.00    1.40    1.34    Undefined       
----------------------------------------------------------------------------
                           50.20   51.55    1.35    2.54    Undefined       
----------------------------------------------------------------------------
                          101.75  104.20    2.45   26.52    Main Zone Centre
----------------------------------------------------------------------------
                          108.15  134.30   26.15   15.83    Main Zone Centre
----------------------------------------------------------------------------
including                 108.15  111.10    2.95   29.03    Main Zone Centre
----------------------------------------------------------------------------
and                       116.60  117.55    0.95  112.90    Main Zone Centre
----------------------------------------------------------------------------
and                       122.70  123.70    1.00   53.55    Main Zone Centre
----------------------------------------------------------------------------
13GSE350     UM     5075   43.40   44.40    1.00    1.06    Undefined       
----------------------------------------------------------------------------
                           53.25   54.25    1.00    1.97    Main Zone East  
----------------------------------------------------------------------------
13GSE351     UM     5100   39.60   40.60    1.00    2.61    Main Zone East  
----------------------------------------------------------------------------
                           49.80   50.80    1.00   12.86    Main Zone East  
----------------------------------------------------------------------------
13GSE352     UM     4875  105.15  105.65    0.50    2.62    Undefined       
----------------------------------------------------------------------------
                          107.05  109.75    2.70    1.13    Undefined       
----------------------------------------------------------------------------
                          122.90  123.80    0.90   10.58    Main Zone East  
----------------------------------------------------------------------------
                          141.50  143.00    1.50   11.32    Main Zone East  
----------------------------------------------------------------------------
                          264.50  266.00    1.50    1.66    Undefined       
----------------------------------------------------------------------------
                          284.05  293.30    9.25    9.27    Main Zone West  
----------------------------------------------------------------------------
including                 292.60  293.30    2.80   26.65    Main Zone West  
----------------------------------------------------------------------------
13GSE353     UM     4925  133.35  137.70    4.35   23.92    Main Zone East  
----------------------------------------------------------------------------
including                 135.25  136.40    1.15   53.09    Main Zone East  
----------------------------------------------------------------------------
                          141.50  143.00    1.50    1.83    Undefined       
----------------------------------------------------------------------------
13GSE355     UM     5125   38.40   38.90    0.50    6.10    Main Zone East  
----------------------------------------------------------------------------
                           41.45   42.45    1.00    2.13    Main Zone East  
----------------------------------------------------------------------------
                           44.10   50.25    6.15    5.46    Main Zone East  
----------------------------------------------------------------------------
including                  47.10   48.00    0.90   17.39    Main Zone East  
----------------------------------------------------------------------------
13GSE356     UM     5125   12.15   12.95    0.80    1.06    Undefined       
----------------------------------------------------------------------------
                           27.00   28.00    1.00    1.29    Main Zone East  
----------------------------------------------------------------------------
                           30.30   31.30    1.00    3.16    Main Zone East  
----------------------------------------------------------------------------
                           33.30   34.30    1.00    1.94    Main Zone East  
----------------------------------------------------------------------------
13GSE357     UM     4875   85.90   87.15    1.25    2.43    Undefined       
----------------------------------------------------------------------------
                           98.50   99.50    1.00    2.21    Main Zone Centre
----------------------------------------------------------------------------
                          103.50  127.45   23.95   10.37    Main Zone Centre
----------------------------------------------------------------------------
including                 107.65  112.50    4.85   32.60    Main Zone Centre
----------------------------------------------------------------------------
and                       121.00  123.00    2.00   21.08    Main Zone Centre
----------------------------------------------------------------------------
                          143.00  144.50    1.50    1.10    Central GW      
----------------------------------------------------------------------------
                          149.00  150.50    1.50    1.01    Central GW      
----------------------------------------------------------------------------
                          158.00  159.50    1.50    1.15    Central GW      
----------------------------------------------------------------------------
                          195.10  201.30    6.20   25.39    Main Zone West  
----------------------------------------------------------------------------
including                 197.45  198.55    1.10   48.59    Main Zone West  
----------------------------------------------------------------------------

To view the images accompanying this press release, please visit the following link: http://media3.marketwire.com/docs/888131.pdf

Contacts: Sabina Gold & Silver Corp. Nicole Hoeller Vice-President, Communications 1-888-648-4218nhoeller@sabinagoldsilver.com www.sabinagoldsilver.com

Grafico Azioni Sabina Gold and Silver (TSX:SBB)
Storico
Da Mag 2024 a Giu 2024 Clicca qui per i Grafici di Sabina Gold and Silver
Grafico Azioni Sabina Gold and Silver (TSX:SBB)
Storico
Da Giu 2023 a Giu 2024 Clicca qui per i Grafici di Sabina Gold and Silver