Black Iron Inc. ("Black Iron" or the "Company") (TSX:BKI)(FRANKFURT:BIN) is
pleased to announce the results of the Bankable Feasibility Study ("BFS")
completed on its Shymanivske Iron Ore Project located in Kryviy Rih, Ukraine
(the "Project"). The BFS outlines an operation producing 9.2 million tonnes per
year of high-grade 68% iron ore concentrate, projecting a 45.9% internal rate of
return ("IRR") and a U.S. $3.5 billion net present value ("NPV") at an 8%
discount rate.


The BFS was completed by WorleyParsons Canada Services Ltd. ("WorleyParsons"),
Watts, Griffis and McOuat Limited ("WGM"), Consulting Geologists and Engineers
of Toronto, and P&E Mining Consultants Inc. ("P&E"). Mr. Michael Kociumbas,
P.Geo., and Mr. Rick Risto, P.Geo., both with independent firm WGM, are
Qualified Persons as defined by NI 43-101. WGM has previously visited the site,
collected independent core samples and reviewed the QA/QC data received to date.
Mr. Risto has reviewed and approved the underlying sampling, analytical and test
data used for the estimate and Mr. Kociumbas is responsible for auditing the
in-house mineral resource estimate as supplied by Black Iron. The estimate is
classified as Measured, Indicated and Inferred mineral resources, consistent
with the CIM definitions referred to in National Instrument 43-101. The complete
BFS report will be filed on SEDAR and Black Iron's website within 45 days of the
publication of this news release.


The Table below summarizes the key elements of the BFS:

High-Grade 68% Concentrate (all currency is USD, pre-tax)



----------------------------------------------------------------------------
NPV at 8% discount rate                                      $  3.5 billion 
----------------------------------------------------------------------------
IRR                                                                    45.9%
----------------------------------------------------------------------------
Total Estimated Capital Costs (excluding sustaining capital) $ 1094 million 
----------------------------------------------------------------------------
Life of Mine FOB OPEX (Beneficiation, Mine & Transportation) $     43.97 /t 
Mine Gate OPEX (Beneficiation & Mine)                        $     29.67 /t 
----------------------------------------------------------------------------
High-Grade 68% Concentrate Sales Price Forecast - based on                  
 long term CFR benchmark price of $95/T @ 62% iron adjusted                 
 for Black Iron's higher iron content and shorter shipping                  
 distance to end users                                                      
  (Year 1, 2016)                                             $          125 
  (Year 2)                                                   $          117 
  (Year 3 onward; long-term)                                 $          115 
----------------------------------------------------------------------------
Average Annual Cash Flow                                     $  593 million 
----------------------------------------------------------------------------
Estimated Mine Life                                                16 years 
----------------------------------------------------------------------------
Final Product Iron Grade (Fine Iron Ore Concentrate)                 68% Fe 
----------------------------------------------------------------------------
Measured and Indicated Resource (at 31.6% iron)                    645.8 Mt 
----------------------------------------------------------------------------
Proven and Probable Reserves (at 31.1% iron)                       448.2 Mt 
----------------------------------------------------------------------------
Annual Production Rate (average life of mine, post ramp-up                  
 year)                                                               9.2 Mt 
----------------------------------------------------------------------------
Projected Plant Start-up and Commissioning                         Q4, 2015 
----------------------------------------------------------------------------
Projected Commencement of Revenue Generation                       Q1, 2016 
----------------------------------------------------------------------------
Projected Years to Payback (at 8% Discount Rate)                  2.2 years 
----------------------------------------------------------------------------



Matt Simpson, Black Iron's President and CEO, commented, "The operation outlined
by this BFS for the Shymanivske Project clearly illustrates the potential for a
high-value, low net cost iron ore development project. The projected high NPV,
net cash flows, and relatively low unit cost for concentrate arise from Black
Iron's advantages, which include an iron ore deposit with significant existing
infrastructure (railway, power lines and port) in addition to access to low-cost
skilled labour. We continue to deliver on our objective timetable and our
results to date, coupled with this engineering study, make a compelling case for
expediting the development of the Shymanivske Project."


Financial Sensitivities at Various Discount Rates



----------------------------------------------------------------------------
IRR (pre-tax)                                             45.9%             
----------------------------------------------------------------------------
                                                      Pre-Tax               
                                                      NPV USD        Payback
Discount Rate                                      (Millions)        (Years)
----------------------------------------------------------------------------
0%                                           $           8392            1.9
----------------------------------------------------------------------------
6%                                           $           4328            2.1
----------------------------------------------------------------------------
8%                                           $           3524            2.2
----------------------------------------------------------------------------
10%                                          $           2887            2.3
----------------------------------------------------------------------------



The Project has favourable economic potential across a range of discount rates.
The operations outlined in this BFS are projected to generate over U.S. $1136
million in average annual revenue over the life of mine.


On the basis of the metallurgical test work completed for this BFS, it is
estimated that the process weight recovery of 32.7% would yield a project life
of 16 years at an average strip ratio of 1.63:1, according to the current
estimated resource. The Company believes that additional exploration and
definition drilling work have the potential to expand the existing resource and
upgrade the 188.3 Mt of Inferred mineral resource to the Measured and Indicated
classification, potentially adding up to 5 years to the Project life. With
successful exploration in the North end of Shymanivske and the addition of
resources from the nearly adjacent Zelenivske Project, Black Iron expects to be
able to support an even higher annual production rate, which would further
increase the already favourable Project NPV. 


George Mover, Black Iron's Chief Operating Officer, added, "We are pleased with
the level of engineering expertise and rigour behind this BFS. Through the
process, we implemented several improvements to the work completed last year for
our Preliminary Economic Assessment. We have found and verified solutions to
optimize the process flow sheet, to reduce the stripping ratio through mine
phasing, and to increase our weight recoveries. As a result, we are now
considering an initial operation with 26% higher annual production and 16% lower
operating costs than in our previous study. The relatively low-unit operating
cost of production, coupled with close proximity to Turkish, European, and
Middle East customers, means that this operation has the potential to remain
profitable despite fluctuations in the iron ore price."


Details and Assumptions

Total initial capital expenditures are estimated at U.S. $1094 million to
produce a high-grade 68% iron ore concentrate. The capital cost estimate
excludes the sustaining capital cost of U.S. $689 million. The initial
assessment of the preferred port facility indicates that sufficient capacity
currently exists for the planned production.




----------------------------------------------------------------------------
Summary of Estimated Initial Capital Costs                    USD (millions)
----------------------------------------------------------------------------
Mining Capitalized Pre-Stripping Costs                                    61
----------------------------------------------------------------------------
Mine Fleet Lease Costs                                                    62
----------------------------------------------------------------------------
Concentrator and Site Infrastructure                                     654
----------------------------------------------------------------------------
Environmental and Tailings Management                                     20
----------------------------------------------------------------------------
Rail Spur                                                                  9
----------------------------------------------------------------------------
Port Facilities                                                          nil
----------------------------------------------------------------------------
Indirect Costs and Land Acquisition                                      189
----------------------------------------------------------------------------
Contingency (10%)                                                         99
----------------------------------------------------------------------------
TOTAL                                                                   1094
----------------------------------------------------------------------------



The total average operating costs over 16 years are estimated at U.S. $43.97 per
tonne of high grade 68% iron ore concentrate.




----------------------------------------------------------------------------
                                                                USD/tonne of
                                                                 Concentrate
                                                                    (Average
Summary of Estimated Operating Costs                              Mine Life)
----------------------------------------------------------------------------
Mining                                                     $           13.51
----------------------------------------------------------------------------
Concentrator                                               $           14.30
----------------------------------------------------------------------------
Site Infrastructure                                        $            0.75
----------------------------------------------------------------------------
Sales and General Administration                           $            0.75
----------------------------------------------------------------------------
Environmental and Tailings Management                      $            0.37
----------------------------------------------------------------------------
Rail Transportation                                        $            7.39
----------------------------------------------------------------------------
Port Facility                                              $            6.90
----------------------------------------------------------------------------
TOTAL                                                      $           43.97
----------------------------------------------------------------------------



Consistent with practice in the industry, this BFS has been prepared with an
engineering accuracy of +/-15%.


Currency Sensitivity

For the purpose of the BFS an exchange rate of 8.1 UAH per USD has been used for
the CAPEX (up to Jan. 2016) and 9.0 UAH per USD for the OPEX and Sustaining
Capital (2016 and beyond). Variations in the exchange rates from year 2016 and
beyond impact the financial analysis as follows. 


Impact of Ukraine Hryvna Exposure - BFS Currency Sensitivity 



----------------------------------------------------------------------------
                                                      (UAH/USD)             
                                        ------------------------------------
Exchange Rate as of year 2016 onward          8:1      9:1     10:1     11:1
----------------------------------------------------------------------------
NPV @ 8% discount U.S. $ (millions)          3334     3524     3677     3800
----------------------------------------------------------------------------
Total Estimated Capital Cost                 1094     1094     1094     1094
----------------------------------------------------------------------------
Estimated Operating Cost ($/tonne)          46.73    43.97    41.75    39.96
----------------------------------------------------------------------------
Average Annual Cash Flow U.S. $                                             
 (millions)                                   568      593      613      629
----------------------------------------------------------------------------



Bankable Feasibility Study Report

The BFS has been prepared in accordance with the guidelines of National
Instrument 43-101, by the independent firms of WorleyParsons Canada Services
Ltd., Watts, Griffis and McOuat Limited and P&E Mining Consultants Inc.
WorleyParsons is a leading full-service engineering firm and has experience in
the sector that includes the design and construction supervision of many
components of some of the world's leading iron ore assets. The final BFS
technical report, which will also include the current mineral resource estimate,
will be filed on SEDAR within 45 days of the publication of this news release.


Pellet Plant Alternative

Black Iron has investigated an alternative production scenario, which would
include the production of high-grade iron ore pellets. The pellet production
alternative is not included as part of the BFS.


Analyst and Shareholder Conference Call 

Black Iron will host a conference call today at 8:00 a.m., EST (November 15,
2012) to discuss the BFS results. To participate in the call please dial the
following:


International: +1 416 340 8527

Toll Free North America: 1 877 240 9772

To register and listen to the webcast of the call, please go to Black Iron's
website at www.blackiron.com.


Qualified Persons

The contents of this press release have been prepared under the supervision of
and reviewed and approved by Qualified Persons, as follows:




--  Rob Spiering, P.Eng., Project Manager, WorleyParsons QP for the Process
    Plant and Infrastructure;

--  Michael Kociumbas, P.Geo. and Rick Risto, P.Geo., Watts, Griffis and
    McOuat Limited, QPs for mineral resources and QA/QC and data
    verification;

--  Eugene Puritch, P.Eng., P&E Mining Consultants Inc., QP for the mine
    engineering aspects.



These persons are Qualified Persons as defined by NI 43-101, are independent of
Black Iron, and have reviewed the content of this press release. For further
information, please see the technical report of the Company, which is available
on SEDAR at www.sedar.com.


Additional information about the Project can be found in the technical report
filed on SEDAR at www.sedar.com, entitled "Resource Estimate - Shymanivske
Deposit in Ukraine," and dated January 31, 2011.


About Black Iron

Black Iron is an iron ore exploration and development company, advancing its 100
percent-owned Shymanivske project located in Kryviy Rih, Ukraine. This project
contains an NI 43-101 compliant resource, with 645.8 Mt Measured and Indicated
mineral resources, consisting of 355.1 Mt Measured mineral resources grading
32.0% Total iron and 19.5% Magnetic iron, and Indicated mineral resources of
290.7 Mt grading 31.1% Total iron and 17.9% Magnetic iron, using a cut-off grade
of 10% Magnetic iron. Additionally, the project contains 188.3 Mt of Inferred
mineral resources grading 30.1% Total iron and 18.4% Magnetic iron. The project
is surrounded by five other operating mines, including ArcelorMittal's iron ore
complex. The Company believes that existing infrastructure, including access to
power, rail and port facilities, will allow for a quick development timeline to
production. Further, the Company holds an exploration permit for the adjacent
Zelenivske project, which it intends to further explore to determine its
potential. Please visit the Company's website at www.blackiron.com or write us
at info@blackiron.com for more information.


Forward-Looking Information

This press release contains forward-looking information which may include, but
is not limited to, statements about the results of the FS and the development
potential of the Company and its project; the timing and amount of future
exploration and development of the project; and the future financial or
operating performance of the Company and its projects. Often, but not always,
forward-looking information can be identified by the use of words such as
"plans," "expects," "is expected," "budget," "scheduled," "estimates,"
"forecasts," "intends," "anticipates" or "believes" or variations (including
negative variations) of such words and phrases, or by the use of words or
phrases that state that certain actions, events or results "may," "could,"
"would," "might" or "will" be taken, occur or be achieved.


Forward-looking information is based on certain assumptions and analyses made by
the Company and based on known facts at the time. Forward-looking information
involves known and unknown risks, uncertainties and other factors which may
cause the actual results, performance or achievements of the Company and/or its
subsidiaries to be materially different from any future results, performance or
achievements expressed or implied by the forward-looking information contained
in this press release, including, without limitation, those described in the
Company's public disclosure documents which may be found under the Company's
profile on SEDAR. Although the Company has attempted to identify important
factors that could cause actual actions, events or results to differ materially
from those described in such forward-looking information, there may be other
factors that may cause actions, events or results to differ from those
anticipated, estimated or intended. Should one or more of these risks or
uncertainties materialize, or should assumptions underlying such forward-looking
information prove incorrect, actual results, performance or achievements may
vary materially from those expressed or implied by the forward-looking
information contained in this press release. The forward-looking information
contained herein is made as of the date of this press release and the Company
disclaims any obligation to update or review such information or statements,
whether as a result of new information, future events or results or otherwise,
except as required by law.


FOR FURTHER INFORMATION PLEASE CONTACT: 
Black Iron Inc.
Michael McAllister
Manager, Investor Relations
+1 (416) 309-2950


Black Iron Inc.
Matt Simpson
President & Chief Executive Officer
+1 (416) 309-2138
info@blackiron.com
www.blackiron.com

Grafico Azioni BFS Entertainment & Multimedia (TSXV:BFS)
Storico
Da Mag 2024 a Giu 2024 Clicca qui per i Grafici di BFS Entertainment & Multimedia
Grafico Azioni BFS Entertainment & Multimedia (TSXV:BFS)
Storico
Da Giu 2023 a Giu 2024 Clicca qui per i Grafici di BFS Entertainment & Multimedia