Eloro Reports On Latest Drilling Results at Simkar Gold Project
05 Febbraio 2014 - 5:18PM
Marketwired
Eloro Reports On Latest Drilling Results at Simkar Gold Project
TORONTO, ONTARIO--(Marketwired - Feb 5, 2014) - Eloro Resources
Ltd. (TSX-VENTURE:ELO) (FRANKFURT:P2Q) ("Eloro") reports
that Monarques Resources Inc. ("Monarques") earlier today
announced the latest results from the Simkar Gold Project (the
"Property"), which is currently being explored by Monarques
pursuant to a joint venture agreement with Eloro, whereby Monarques
acquired a 50% interest in the Property (see Eloro's press release
dated September 23, 2013).
The Simkar property (the "Property") is located 20 kilometres
east of Val-d'Or, Quebec, just north of the Cadillac-Larder Lake
Break, in the Abitibi Greenstone Belt, and is host to a previously
mined, gold-bearing, fault-fill and extensional quartz vein system,
characteristic of nearby gold deposits in the Val-d'Or Gold Mining
Camp.
The latest drilling program consisted of 19 holes, totalling
8,055 metres (m), and was primarily aimed at extending the
gold-mineralized horizons previously identified as the "A", "B",
"C", "D", "East" and "South" zones, with the goal of confirming
their projected horizontal and vertical extensions. These
mineralized Zones are typical of the vein-type nature of the Simkar
deposit, having well-defined gold-bearing veins with weakly
mineralized walls. A secondary goal was to develop and test new
models of these same structures.
As reported by Monarques, the latest assay results are from
holes SK13-06 to SK13-12 (inclusive) and suggest that the gold
mineralization extends beyond the old stopes, indicating that the
current National Instrument 43-101 Mineral Resource could
potentially be augmented. The grades obtained, including a 4.5 m
interval grading 2.13 g/t Au in Hole SK13-07, are consistent with
the historical deposit grades, and reflect the variable nature of
the mineralization. Hole SK13-09 intercepted 0.58 g/t Au over 15 m
supporting the potential for a large, low-grade zone near surface.
Table 1 shows the best results for holes SK13-06 to
SK13-12.
As part of their 2013 exploration program, Monarques also
assayed 599 core-samples from holes SK13-09 and SK13-12 for silver
(Ag) content, 67 of which returned values of over 0.2 ppm silver.
The results show an average enrichment factor (EF) of 16.8 compared
to gold concentrations, with EF ratios varying between 0.1 and
100.0, and individual silver-contents ?Çï?Çïranging from 0.2 ppm to
2.4 ppm. Based on these results, Monarques plans to re-assay the
richest gold zones to determine their silver content.
The 2013 exploration program was managed by MRB & Associates
("MRB") of Val-d'Or, QC who designed the drilling campaign,
supervised the program, and logged and sampled the core.
MRB implemented QA/QC procedures to ensure best practices in
sampling and analysis of the core samples. The drill core was
logged and then split, with one-half sent for assay and the other
retained in the core box as a witness sample. Duplicates, standards
and blanks were inserted regularly into the sample stream. The
samples were delivered, in secure tagged bags, directly to the
analytical facility for analysis; in this case Technilab's
facility in Val-d'Or (Quebec).
After sample preparation (crushing, pulverizing) all samples
were, or are scheduled to be, assayed for gold-content using
conventional Fire Assaying with 30 g fusions and atomic absorption
spectrometry (AAS) finish. MRB's protocol calls for gravimetric
check-assays to be completed on the coarse crushed reject for all
samples reporting greater than 5 ppm (gpt) gold from the initial
fire assay, whereas other samples within the intersection are
re-submitted for check fire-assay using the original pulps. The
final reported gold grade for a sample is either the gravimetric
result, or the average of the fire assays.
Simkar
Project
The property hosts a gold-bearing, fault-fill and extensional
quartz vein system, characteristic of nearby gold deposits in the
Val-d'Or Gold Mining Camp. As exploration activities by Eloro on
the Property since 2009 have advanced, similarities between the
gold mineralization at Simkar and that of the shear-zone associated
gold deposit at the well-studied Sigma Mine in Val-d'Or, continue
to be recognized.
John Langton (P.Geo.), Vice President Exploration for Eloro, and
a qualified person (QP) under National Instrument 43-101, has
approved the content of this release.
About Eloro Resources Ltd.
Eloro Resources is an exploration and mine development company
with a portfolio of gold and base-metal properties in northern and
western Quebec. The Company is focused on expanding the historic
gold resources at the past-producing Simkar Mine with the objective
to outline quality gold resources in the established Val-d'Or Gold
Mining Camp.
Information in this news release may contain forward-looking
information. Statements containing forward-looking information
express, as at the date of this news release, the Company's plans,
estimates, forecasts, projections, expectations, or beliefs as to
future events or results and are believed to be reasonable based on
information currently available to the Company. There can be no
assurance that forward-looking statements will prove to be
accurate. Actual results and future events could differ materially
from those anticipated in such statements. Readers should not place
undue reliance on forward-looking information.
Neither the TSXV nor its Regulation Services Provider (as
that term is defined in the policies of the TSXV) accepts
responsibility for the adequacy or accuracy of this
release.
Table 1: Selected best results for holes SK13-06 to
SK13-12.
Hole # |
Azimuth (º) |
Dip (º) |
Length (m) |
From (m) |
To (m) |
|
Interval (m)* |
Au (g/t) |
SK13-06 |
344 |
65 |
270.0 |
154.5 |
159.0 |
|
4.5 |
0.46 |
|
|
|
|
211.5 |
216.0 |
|
4.5 |
2.13 |
|
|
|
|
258.0 |
260.0 |
|
2.0 |
2.08 |
SK13-07 |
360 |
49 |
336.0 |
106.5 |
108.0 |
|
1.5 |
0.25 |
|
|
|
|
141.0 |
164.3 |
|
23.3 |
0.19 |
including |
|
|
|
157.5 |
159.0 |
|
1.5 |
1.14 |
|
|
|
|
297.5 |
298.0 |
|
0.5 |
0.95 |
|
|
|
|
319.1 |
321.0 |
|
1.9 |
0.26 |
|
|
|
|
326.3 |
327.0 |
|
0.7 |
0.24 |
SK13-08 |
360 |
55 |
405.0 |
37.5 |
40.5 |
|
3.0 |
1.12 |
|
|
|
|
238.6 |
240.0 |
|
1.4 |
0.37 |
|
|
|
|
279.0 |
286.0 |
|
7.0 |
0.62 |
|
|
|
|
351.5 |
353.0 |
|
1.5 |
0.41 |
|
|
|
|
385.5 |
387.0 |
|
1.5 |
0.27 |
SK13-09 |
360 |
52 |
645.2 |
67.3 |
67.6 |
|
0.3 |
1.63 |
|
|
|
|
76.5 |
91.5 |
|
15.0 |
0.58 |
including |
|
|
|
85.5 |
87.0 |
|
1.5 |
3.64 |
|
|
|
|
108.0 |
111.5 |
|
3.5 |
0.46 |
|
|
|
|
115.5 |
117.5 |
|
2.0 |
0.26 |
|
|
|
|
231.0 |
234.0 |
|
3.0 |
1.58 |
|
|
|
|
515.0 |
516.0 |
|
1.0 |
0.25 |
SK13-10 |
180 |
48 |
308.0 |
72.0 |
73.5 |
|
1.5 |
0.34 |
|
|
|
|
283.0 |
289.0 |
|
6.0 |
0.58 |
including |
|
|
|
285.0 |
285.5 |
|
0.5 |
1.13 |
|
and |
|
|
|
288.0 |
289.0 |
|
1.0 |
2.19 |
SK13-11 |
360 |
56 |
279.0 |
189.0 |
190.0 |
|
1.0 |
0.41 |
SK13-12 |
180 |
56 |
483.0 |
138.3 |
139.0 |
|
0.7 |
1.74 |
|
|
|
|
358.5 |
361.5 |
|
3.0 |
0.24 |
|
|
|
|
|
|
|
|
|
* |
core length, not necessarily the same as the true
width |
Eloro Resources Ltd.Jorge EstepaVice-President(416)
868-9168(416) 361-1333www.elororesources.com
Grafico Azioni Eloro Resources (TSXV:ELO)
Storico
Da Gen 2025 a Feb 2025
Grafico Azioni Eloro Resources (TSXV:ELO)
Storico
Da Feb 2024 a Feb 2025