Kinbauri Gold Corp. ("Kinbauri") (TSX VENTURE: KNB)(FRANKFURT: 3KG.DE) has completed its successful in-fill drilling program at El Valle (two holes that were initiated during the in-fill program will be completed during the 2nd half of 2008). The results received to date will form the basis for a new 43-101 compliant technical report and Scoping Study, both of which are presently underway.

Six of the 11 holes reported in this release are in Area 107 zone and are highlighted by the following intercepts:

- 8.6 g Au/t, 45.5 g Ag/t and 2% Cu over 14.25 m in 08KV1160,

- 26.6 g Au/t, 9.9 g Ag/t and 0.5% Cu over 7.4 m as well as 41.9 g Au/t, 0.2 g Ag/t and 0.3% Cu over 3.5 m in 08KV1161.

The remaining five holes complete the in-fill drilling of the Black Skarn North zone.

Recent drill results

Assays for the latest 11 in-fill holes are summarized as follows:


HOLE (DDH)(1)  From     To Interval   %     Au     Ag      Cu  Zone/Section
                 (m)    (m)      (m) (2)  (g/t)  (g/t)     (%)           (3)
--------------------------------------------------------------------------
08KV1166      80.20  81.55     1.35  34  15.75  86.30    1.98     BSN/12.5
                                                         less
                                                         than
08KV1166      86.10  87.70     1.60   "   2.55   0.32    0.01
--------------------------------------------------------------------------
08KV1165     255.85 259.00     3.15  89   2.18   4.00    0.05     A107/9.5
--------------------------------------------------------------------------
08KV1164      62.25  65.45     3.20  80   2.54   6.76    0.13     BSN/1025
08KV1164      67.20  72.80     5.60   "   3.73   7.24    0.19
--------------------------------------------------------------------------
08KV1163     118.40 127.50     9.10  23   1.00   9.50    0.96     BSN/12.5
08KV1163     133.40 135.60     2.20   "   2.53  13.22    0.36
08KV1163     140.00 142.50     2.50   "   6.11  65.50    2.61
08KV1163     207.00 219.60    12.60   "   3.83  33.18    1.46
--------------------------------------------------------------------------
08KV1161     191.00 209.10    18.10  97  13.74   5.22    0.37     A107/9.5
including    201.70 209.10     7.40   "  26.59   9.92    0.51
08KV1161     224.30 238.40    14.10   "  11.76   0.20    0.09
including    234.90 238.40     3.50   "  41.85   0.24    0.29
08KV1161     243.60 245.10     1.50   "   1.47   0.49    0.25
--------------------------------------------------------------------------
08KV1160      64.95  88.40    23.45  67   5.81  30.29    1.36     A107/9.5
including     70.40  84.65    14.25   "   8.60  45.46    2.02
--------------------------------------------------------------------------
08KV1158       No Au intercepts greater than 2g/t                 BSN/11.5
--------------------------------------------------------------------------
08KV1155      48.00  50.40     2.40  72   2.33  22.83    1.19       BSN/10
including     49.30  50.40     1.10   "   2.88  30.20    1.85
08KV1155      58.30  68.10     9.80   "   1.05   8.12    0.58
08KV1155      80.05  81.50     1.45   "   0.77  11.30    0.58
08KV1155      82.90  84.30     1.40   "   2.06  13.00    0.66
--------------------------------------------------------------------------
08KV1151     174.45 176.25     1.80  88   2.15   1.60    0.17    A 107/8.5
08KV1151     193.20 196.10     2.90   "   7.51   6.98    0.04
including    194.70 196.10     1.40   "  12.65   7.60    0.06
--------------------------------------------------------------------------
08KV1150      61.35  63.20     1.85  67   3.60  19.60    0.80   A 107/1175
--------------------------------------------------------------------------
08KV1146     298.60 303.45     4.85  99   2.81   4.07    0.75     A 107/10
including    301.45 303.45     2.00   "   4.08   6.40    1.09
--------------------------------------------------------------------------
(1) See Schedules A and B for Location. (2) Percentage estimate of True
Thicknesses. (3) BSN - Black Skarn North, A107 -Area 107;

The underground drill program at El Valle and Carles is being supervised by Mr. Santiago Gonzalez-Nistal, Kinbauri Espana's senior geologist, with quality control being provided by Dr. C. F. Gleeson, P. Eng., Kinbauri's Vice-President of Exploration: both are qualified persons as defined by N.I. 43-101. Details of Kinbauri's Assay and Quality Assurance Programs are reported in a press release of February 27th, 2008.

This press release was prepared by Drs V. N. Rampton, P. Eng and C. F. Gleeson, P. Eng. in their capacity as qualified persons.

Schedules are available at the following address: http://media3.marketwire.com/docs/KNB-0916.pdf

About Kinbauri

Kinbauri is a TSXV - Tier 1 Mineral Exploration Company focused on the development of mineral properties, primarily precious metal prospects in northwestern Spain, Nevada and Canada. Its immediate focus is to expand and upgrade resources to reserves at the El Valle property in Asturias, Spain in order to start operations at the mine and existing mill complex there in 2010. It currently has 48,752,695 common shares issued and outstanding.

THIS PRESS RELEASE WAS PREPARED BY KINBAURI GOLD CORP. THE TSX VENTURE EXCHANGE DOES NOT ACCEPT RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

This press release contains certain forward-looking statements, which are based on the opinions and estimates of management at the date the statements are made, and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected. Kinbauri undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change. The reader is cautioned not to place undue reliance on forward-looking statements.

OR VISIT:

Kinbauri Gold's Hub at http://www.agoracom.com/IR/kinbauri where investors can post questions and receive answers or review questions and answers already posted by other investors.

Contacts: North America: Kinbauri Gold Corp. Darrell Munro, BB.A, LL.B Manager Corporate Communications 613-836-0198 dmunro@kinbauri-gold.com Dr. Vern Rampton, P. Eng. President 613-836-2594 vrampton@kinbauri-gold.com kinbauri@kinbauri-gold.com Dr. Chris Gleeson, P. Eng. Vice-President Exploration 613-652-4594 cgleeson@kinbauri-gold.com www.kinbauri-gold.com Europe INVESTEL Ruediger (Rudy) Hnyk, CEO Investor Relations ceo@investel.de

Grafico Azioni Kinbauri Gold Corp Com Npv (TSXV:KNB)
Storico
Da Giu 2024 a Lug 2024 Clicca qui per i Grafici di Kinbauri Gold Corp Com Npv
Grafico Azioni Kinbauri Gold Corp Com Npv (TSXV:KNB)
Storico
Da Lug 2023 a Lug 2024 Clicca qui per i Grafici di Kinbauri Gold Corp Com Npv