NORTHERN GOLD MINING INC. (TSX VENTURE:NGM) ("Northern Gold" or the "Company")
is pleased to announce results from 20 diamond drill holes from its surface
diamond drilling program carried out on its wholly-owned Jonpol Deposit of the
Golden Bear Project, 100 km east of Timmins, Ontario. The 20 drill holes totaled
5,984 metres. 


Drill assay highlights for the drill holes include:



--  47.02 g/t Au over 0.75 m (108.60 to 109.35m) GGT-01 
--  6.37 g/t Au over 3.00 m (328.0 to 331.0m) JP-13-09 
--  5.23 g/t Au over 5.40 m (129.8 to 135.2m) JP-13-27 
--  5.47 g/t Au over 17.30 m (84.0 to 101.3m) JP-13-28 



Martin Shefsky, President and CEO of Northern Gold, comments: "These results
continue to confirm the continuity and grades of the mineralized structures
comprising the Jonpol Deposit. Eighteen of the 20 drill holes reported
intersected significant gold mineralization, highlighted by a 17-metre interval
grading over 5 g/t gold. Also, the potential for resource expansion exists with
both the RP and JD Zones remaining open at depth."


Table 1 - Jonpol Assay Results (i) - These results are significant drill assays
from 20 drill holes on the Jonpol Deposit. JP series drill holes are either
infill into or step out from the known Jonpol Deposit resources while GT series
drill holes are geotechnical holes designed to test ground or crown pillar
stability.




----------------------------------------------------------------------------
                                        Inc      To  Interval  Au g/t Au g/t
Hole          Zone  Section From (m)    (m)     (m)       (m)  Un-Cut    Cut
----------------------------------------------------------------------------
GGT-01     JP Zone      N/A    95.00         116.00     21.00    2.99   2.53
                           -------------------------------------------------
                                     108.60  109.35      0.75   47.02  34.28
                           -------------------------------------------------
                              193.00         203.00     10.00    1.08       
----------------------------------------------------------------------------
GGT-02   East Zone      N/A   117.00         126.00      9.00    3.66       
                           -------------------------------------------------
                                     125.00  126.00      1.00    9.01       
                           -------------------------------------------------
                              197.00         198.00      1.00    3.48       
----------------------------------------------------------------------------
JDGT-02    JD Zone   27+50W    83.00          87.00      4.00    1.70       
----------------------------------------------------------------------------
JP-12-03   JD Zone   26+00W                        NSV                      
----------------------------------------------------------------------------
JP-13-07   JD Zone   25+50W   281.00         284.00      3.00    4.46       
----------------------------------------------------------------------------
JP-13-08   JD Zone   25+50W   107.00         108.00      1.00    2.30       
----------------------------------------------------------------------------
JP-13-09   JP Zone   23+50W   249.00         252.50      3.50    2.60       
                           -------------------------------------------------
                              328.00         331.00      3.00    6.37       
----------------------------------------------------------------------------
JP-13-12   RP Zone   20+75W   180.00         181.50      1.50    2.82       
----------------------------------------------------------------------------
JP-13-13   RP Zone   20+25W                        NSV                      
----------------------------------------------------------------------------
JP-13-14   RP Zone   20+25W    45.00          46.00      1.00    8.56       
----------------------------------------------------------------------------
JP-13-15   JD Zone   26+00W   166.00         166.50      0.50    7.27       
                           -------------------------------------------------
                              280.70         286.00      5.30    1.89       
                           -------------------------------------------------
                                     280.70  282.20      1.50    3.25       
----------------------------------------------------------------------------
JP-13-16  SEDIMENT   24+00W   158.00         159.00      1.00    1.79       
----------------------------------------------------------------------------
JP-13-16A SEDIMENT   24+00W   475.00         476.00      1.00    2.49       
         -----------       -------------------------------------------------
             JD HW            741.00         741.70      0.70    2.66       
----------------------------------------------------------------------------
JP-13-17   JD Zone   22+50W    62.00          68.00      6.00    3.21       
                           -------------------------------------------------
                                      66.00   68.00      2.00    5.79       
----------------------------------------------------------------------------
JP-13-20   RP Zone   18+25W   329.00          331.3      2.30    1.16       
                           -------------------------------------------------
                              442.50         444.00      1.50    3.53       
----------------------------------------------------------------------------
JP-13-21   RP Zone   18+25W    242.7          243.1      0.40    4.80       
                           -------------------------------------------------
                              251.00         252.00      1.00    3.17       
----------------------------------------------------------------------------
JP-13-25   RP Zone   18+75W   333.00         335.00      2.00    2.98       
----------------------------------------------------------------------------
JP-13-26   RP Zone   19+75W   174.00         174.50      0.50    1.53       
----------------------------------------------------------------------------
JP-13-27   RP Zone   19+75W   109.00         139.00     30.00    2.24       
                           -------------------------------------------------
                                     129.80  135.20      5.40    5.23       
                           -------------------------------------------------
                              255.00         258.00      3.00    4.06       
----------------------------------------------------------------------------
JP-13-28   RP Zone   20+75W    32.50          39.00      6.50    2.10       
                           -------------------------------------------------
                               84.00         101.30     17.30    5.47       
                           -------------------------------------------------
                                      99.30  101.30      2.00   21.59       
----------------------------------------------------------------------------
(i)reported intervals are downhole lengths and not true widths. High grade  
assays are cut to 34.28 g/t                                                 
NSV - no significant values                                                 



Geotechnical Drilling 

Drill Holes GGT-01 and GGT-02 were geotechnical holes drilled along strike of
the mineralization to test the ground stability of several cross faults that
intersect the Jonpol zones. Both holes successfully intersected mineralization
and the interpreted cross faulting. Drill hole JDGT-02 was drilled as part of a
crown pillar support assessment in the JD zone west of the Jonpol mine shaft and
portal. The geotechnical program was conducted in support of an ongoing closure
plan development for the Jonpol mine. All geotechnical holes were drilled with
HQ triple tube oriented core and geotechnical core logging was completed by Tony
Gilman, M.Sc., P.Eng., of Terrane Geoscience of Halifax, NS.


JD Zone 

JP-12-03, JP-13-07, and JP-13-08 were infill drill holes in the upper portion of
the JD zone. JP-13-15 was drilled 50m below high grade intercepts in JP-12-04
(released March 26, 2013) and successfully intersected a broad zone of albite
vein type mineralization along with minor visible gold similar to that
intersected in JP-12-04. Exploration remains open down dip from this intercept. 


JP Zone 

JP-13-09 and JP-13-17 were drilled as infill holes in the JP Zone close to the
existing underground workings; both holes intersected mineralization consistent
with surrounding intercepts. JP-13-16 and 16a were designed to test the deeper
extension of the JP zone but due to complications intersecting several strong
fault structures the hole did not reach target depth. 


RP Zone 

Drill holes JP-13-12, 13, 14, 20, 21, 25, 26, 27, and 28 were all drilled to
infill the upper portions of the RP zone to the east of the Jonpol mine shaft
and portal. Several of the holes intersected significant values and demonstrated
good continuity with historical drilling on the RP zone. The RP zone is now
being interpreted as the eastern continuation of the JP zone showing similar
mineralogical characteristics. Exploration within the RP zone remains open to
depth. 




          Table 2 - Location and Initial Orientation of Drill Holes         
 --------------------------------------------------------------------------
               Section Line   Section Line            Azimuth   Inclination
 Hole ID               West          North   Length    (True)     (degrees)
 --------------------------------------------------------------------------
 GGT-01                 N/A            N/A      204       263           -65
 --------------------------------------------------------------------------
 GGT-02                 N/A            N/A      198       267           -65
 --------------------------------------------------------------------------
 JDGT-02             27+50W         15+50N      117       330           -50
 --------------------------------------------------------------------------
 JP-12-03            26+00W         14+85N      249       340           -45
 --------------------------------------------------------------------------
 JP-13-07            25+50W         14+45N      303       340           -45
 --------------------------------------------------------------------------
 JP-13-08            25+50W         14+90N      273       340           -45
 --------------------------------------------------------------------------
 JP-13-09            23+50W         14+05N      357       340           -60
 --------------------------------------------------------------------------
 JP-13-12            20+75W         15+05N      333       340           -60
 --------------------------------------------------------------------------
 JP-13-13            20+25W         15+10N      354       340           -60
 --------------------------------------------------------------------------
 JP-13-14            20+25W         15+70N      249       340           -60
 --------------------------------------------------------------------------
 JP-13-15            26+00W         13+95N      330       340           -60
 --------------------------------------------------------------------------
 JP-13-16            24+00W         12+25N      460       340           -70
 --------------------------------------------------------------------------
 JP-13-16A(i)        24+00W         12+25N      330       340           -70
 --------------------------------------------------------------------------
 JP-13-17            22+50W         15+45N      123       340           -45
 --------------------------------------------------------------------------
 JP-13-20            18+25W         13+50N      444       340           -45
 --------------------------------------------------------------------------
 JP-13-21            18+25W         14+00N      345       340           -45
 --------------------------------------------------------------------------
 JP-13-25            18+75W         13+95N      445       340           -45
 --------------------------------------------------------------------------
 JP-13-26            19+75W         15+75N      270       340           -60
 --------------------------------------------------------------------------
 JP-13-27            19+75W         15+40N      336       340           -60
 --------------------------------------------------------------------------
 JP-13-28            20+75W         15+65N      264       340           -60
 --------------------------------------------------------------------------



Note (i) - hole JP-13-16A was wedged off hole JP-13-16 starting at a drill
length of 441 metres, and extended 330 metres to a total length of 771 metres.


Jonpol Deposit drill plan and long section will be posted on the Company's
website at: http://northerngold.ca/golden-bear-project/jonpol-deposit.


Quality Assurance/Quality Control 

Northern Gold has implemented comprehensive, industry standard
quality-assurance, quality-control protocols for diamond drilling, core
recovery, handling, sampling, shipping and assaying. Details of these best
practice principals can be viewed on the Company's website at:
http://www.northerngold.ca/QA-QC.php.


The technical aspects of this press release have been reviewed and approved by
Gary Nassif, M.Sc., P.Geo., Manager Exploration Services of Northern Gold and
the "Qualified Person" as defined by National Instrument 43-101 for the Golden
Bear Project. 


About Northern Gold 

Northern Gold is a TSXV-listed gold company based in Toronto, Ontario. The
Company's main focus is the exploration and development of its prospective
mineral properties at the Golden Bear Project in the Larder Lake Mining
Division, northeastern Ontario. Northern Gold has a portfolio of advanced
exploration projects, including the Jonpol and Garrcon Deposits and the Buffonta
Property. Recent transactions, including the Harker-Holloway Property
acquisition and the amalgamation with Victory Gold Mines Inc., add to the
Company's regional consolidation strategy along the Destor-Porcupine Fault Zone.


CAUTIONARY STATEMENT: Neither the TSX Venture Exchange nor its Regulation
Services Provider (as that term is defined in the policies of the TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of this release.
No stock exchange, securities commission or other regulatory authority has
approved or disapproved of the information contained herein. This news release
contains forward-looking information which is not comprised of historical facts.
Forward-looking statements are characterized by words such as "plan", "expect",
"project", "intend", "believe", "anticipate", "estimate" and other similar
words, or statements that certain events or conditions "may" or "will" occur.
Forward-looking information involves risks, uncertainties and other factors that
could cause actual events, results, performance, prospects and opportunities to
differ materially from those expressed or implied by such forward-looking
information. Forward-looking information in this news release includes, but is
not limited to, Northern Gold's strategic partnership and issuances of
securities, and is based on, among other things, the opinions and assumptions of
management considered reasonable as of the date of this news release. Factors
that could cause actual results to differ materially from such forward-looking
information include, but are not limited to, delays in obtaining or failures to
obtain required regulatory approvals, changes in equity markets, fluctuations in
commodity prices, and other risks involved in the mineral exploration and
development industry, including those risks set out in Northern Gold's public
documents filed on SEDAR. Although Northern Gold believes that the assumptions
and factors used in preparing the forward-looking information in this news
release are reasonable, undue reliance should not be placed on such information,
which only applies as of the date of this news release, and no assurance can be
given that such events will occur in the disclosed time frames or at all.
Northern Gold disclaims any intention or obligation to update or revise any
forward-looking information, whether as a result of new information, future
events or otherwise, other than as required by law.


FOR FURTHER INFORMATION PLEASE CONTACT: 
Northern Gold Mining Inc.
Martin Shefsky
President & Chief Executive Officer
647.297.8793
mshefsky@northerngold.ca


Northern Gold Mining Inc.
Eric Szustak
Manager, Business Development
905.330.7948
eszustak@northerngold.ca
www.northerngold.ca

Grafico Azioni Northern Gold Mining Inc. (TSXV:NGM)
Storico
Da Giu 2024 a Lug 2024 Clicca qui per i Grafici di Northern Gold Mining Inc.
Grafico Azioni Northern Gold Mining Inc. (TSXV:NGM)
Storico
Da Lug 2023 a Lug 2024 Clicca qui per i Grafici di Northern Gold Mining Inc.