Rio Alto Increases Mineral Resources at La Arena
05 Gennaio 2012 - 12:30PM
Marketwired Canada
Rio Alto Mining Limited ("Rio Alto" or the "Company") (TSX
VENTURE:RIO)(OTCQX:RIOAF)(LMA:RIO)(DBFrankfurt:MS2) is pleased to announce that
it has received updated mineral resource estimates for its 100% owned La Arena
Project. The updated oxide mineral resource estimate is limited to the Calaorco
and Ethel deposits and a zone of oxide material containing 300ppm - 1000ppm
copper to the east of Calaorco. The updated mineral resource estimate for the La
Arena sulphide project incorporates an additional 3,879 meters of diamond
drilling ("DD") and 21,904 meters of reverse circulation ("RC") drilling when
compared to the previous resource estimate. As part of the feasibility study for
the La Arena sulphide deposit, the Company expects to drill an additional 28,122
meters of DD and 11,412 meters of RC drilling that will complete the database
for the sulphide feasibility study resource estimate which is due to be updated
in Q3, 2012.
Both oxide and sulphide mineral resource estimates significantly increase the
gold and copper resources previously described in the Company's La Arena Project
Technical Report with an effective date of July 31, 2010 prepared on behalf of
the Company by Coffey Mining Pty Ltd (the "July 2010 Report"). The July 2010
Report may be referenced within Rio Alto's SEDAR profile at www.sedar.com.
Highlights of the updated mineral resource estimates are as follows:
Oxide Mineral Resource (0.1 g/t gold cut-off)
-- 100.7 million tonnes grading 0.46 g/t gold in the measured and indicated
categories containing 1,484,000 ounces of gold representing an increase
of 434,000 gold ounces (41.33%) from the oxide mineral resource estimate
in the July 2010 Report.
-- 10.4 million tonnes grading 0.27 g/t gold in the inferred category
containing 90,000 ounces of gold representing an increase of 33,000 gold
ounces (57.89%) from the oxide mineral resource estimate in the July
2010 Report.
The updated oxide mineral resource is based on drilling completed by Cambior and
IAMGOLD (the "Previous Owners") and drilling completed by Rio Alto during 2011.
The oxide mineral resource remains open to the north-west and at depth. The
Company intends to further explore the oxide mineralization with an RC drill
program during 2012.
Sulphide Mineral Resource (0. 18% copper equivalent cut-off)
-- 312.7 million tonnes grading 0.29% copper per tonne and 0.24 g/t gold in
the indicated category containing 2.0 billion pounds of copper and
2,422,000 ounces of gold representing an increase of 285 million pounds
of copper (16.55%) and 490,000 gold ounces (25.36%) from the sulphide
mineral resource estimate in the July 2010 Report.
-- 319.7 million tonnes grading 0.30% copper per tonne and 0.20 g/t gold in
the inferred category containing 2.1 billion pounds of copper and
2,075,000 ounces of gold representing an increase of 963 million pounds
of copper (82.24%) and 859,000 gold ounces (70.64%) from the sulphide
mineral resource estimate in the July 2010 Report.
Drilling in the sulphide resource completed by the Previous Owners prior to 2006
was to an average depth of 450 meters. During the past 6 months, Rio Alto has
drilled 12 DD holes to a depth of 800 meters and has received assay results for
5 of these deep DD holes, which are incorporated in the updated sulphide mineral
resource estimate. A total of 40 RC holes drilled in the gap zone between the
Calaorco oxide resource and the La Arena sulphide mineral resource and an
additional 22 RC holes drilled in sulphides were also incorporated in the
updated sulphide mineral resource estimate.
Significant sulphide drill hole intercepts are as follows:
-----------------------------------------------------------------------
Hole_ID Interval Au g/t Cu % Ag g/t Mo ppm
-----------------------------------------------------------------------
LA-D11-001A 328 0.26 0.41 0.34 71
-----------------------------------------------------------------------
LA-D11-004 623 0.22 0.45 0.71 85
-----------------------------------------------------------------------
Including 135 0.38 0.82 2.23 287
-----------------------------------------------------------------------
LA-D11-008 635 0.30 0.48 0.54 82
-----------------------------------------------------------------------
Including 101 0.42 0.63 0.53 56
-----------------------------------------------------------------------
LA-D11-013 416 0.20 0.35 0.83 103
-----------------------------------------------------------------------
LA-D11-013 126 0.23 0.52 1.20 90
-----------------------------------------------------------------------
LA-D11-014 576 0.22 0.38 0.39 38
-----------------------------------------------------------------------
GAP-R11-015 360 0.23 0.26 0.30 40
-----------------------------------------------------------------------
GAP-R11-022 156 0.20 0.37 0.25 109
-----------------------------------------------------------------------
GAP-R11-030 334 0.35 0.31 0.46 22
-----------------------------------------------------------------------
GAP-R11-033 382 0.19 0.23 0.58 69
-----------------------------------------------------------------------
LA-R11-002 388 0.22 0.26 0.27 26
-----------------------------------------------------------------------
LA-R11-003 360 0.30 0.29 0.72 33
-----------------------------------------------------------------------
LA-R11-004 380 0.22 0.26 0.73 40
-----------------------------------------------------------------------
LA-R11-005 322 0.19 0.21 0.59 71
-----------------------------------------------------------------------
LA-R11-011 204 0.19 0.35 0.50 35
-----------------------------------------------------------------------
LA-R11-015 264 0.15 0.23 0.02 85
-----------------------------------------------------------------------
LA-R11-016 346 0.21 0.27 0.21 23
-----------------------------------------------------------------------
LA-R11-017 266 0.44 0.39 0.98 30
-----------------------------------------------------------------------
Including 98 0.88 0.78 1.69 18
-----------------------------------------------------------------------
LA-R11-020 190 0.39 0.52 0.41 43
-----------------------------------------------------------------------
LA-R11-022 302 0.23 0.34 0.31 37
-----------------------------------------------------------------------
Sulphide Drilling Results
The results of the additional 3,879 meters of DD holes and 21,904 meters of RC
drilling completed by Rio Alto prior to the September 30, 2011 effective date
for the updated sulphide mineral resource are as follows:
----------------------------------------------------------------------------
Hole_ID From To Interval Au g/t Cu % Ag g/t Mo ppm
----------------------------------------------------------------------------
LA-D11-001A 86 414 328 0.26 0.41 0.34 71
----------------------------------------------------------------------------
Including 120 192 72 0.35 0.49 0.15 21
----------------------------------------------------------------------------
Including 240 356 116 0.28 0.50 0.69 126
----------------------------------------------------------------------------
LA-D11-001A 452 508 56 0.14 0.29 0.56 33
----------------------------------------------------------------------------
LA-D11-001A 570 785 215 0.17 0.40 0.77 85
----------------------------------------------------------------------------
Including 576 680 104 0.24 0.55 1.19 64
----------------------------------------------------------------------------
Including 764 785 21 0.22 0.54 0.42 73
----------------------------------------------------------------------------
LA-D11-004 188 811 623 0.22 0.45 0.71 85
----------------------------------------------------------------------------
Including 419 470 51 0.36 0.56 0.54 112
----------------------------------------------------------------------------
Including 590 724 135 0.38 0.82 2.23 287
----------------------------------------------------------------------------
LA-D11-008 20 36 16 0.28 0.27 0.28 54
----------------------------------------------------------------------------
LA-D11-008 94 125 31 0.24 0.24 1.17 54
----------------------------------------------------------------------------
LA-D11-008 174 809 635 0.30 0.48 0.54 82
----------------------------------------------------------------------------
Including 424 474 50 0.48 0.64 0.63 65
----------------------------------------------------------------------------
Including 570 670 101 0.42 0.63 0.53 56
----------------------------------------------------------------------------
Including 686 750 64 0.32 0.55 0.32 171
----------------------------------------------------------------------------
LA-D11-013 164 580 416 0.20 0.35 0.83 103
----------------------------------------------------------------------------
Including 500 569 70 0.49 0.77 2.30 109
----------------------------------------------------------------------------
LA-D11-013 614 740 126 0.23 0.52 1.20 90
----------------------------------------------------------------------------
Including 672 726 54 0.30 0.65 1.39 83
----------------------------------------------------------------------------
LA-D11-013 768 794 26 0.38 0.73 1.29 52
----------------------------------------------------------------------------
LA-D11-014 19 88 70 0.20 0.22 0.09 68
----------------------------------------------------------------------------
LA-D11-014 104 680 576 0.22 0.38 0.39 38
----------------------------------------------------------------------------
Including 218 248 30 0.40 0.55 0.75 17
----------------------------------------------------------------------------
Including 495 572 77 0.29 0.60 0.71 27
----------------------------------------------------------------------------
GAP-R11-006 316 354 38 0.09 0.16 0.01 36
----------------------------------------------------------------------------
GAP-R11-010 188 366 178 0.15 0.16 1.00 22
----------------------------------------------------------------------------
GAP-R11-011 44 122 78 0.22 0.10 0.38 23
----------------------------------------------------------------------------
GAP-R11-011 150 362 212 0.19 0.19 0.57 23
----------------------------------------------------------------------------
GAP-R11-014 60 258 198 0.14 0.17 0.31 66
----------------------------------------------------------------------------
Including 174 204 30 0.30 0.33 0.60 49
----------------------------------------------------------------------------
GAP-R11-014 302 334 32 0.11 0.14 0.18 54
----------------------------------------------------------------------------
GAP-R11-015 48 408 360 0.23 0.26 0.30 40
----------------------------------------------------------------------------
Including 112 262 150 0.29 0.32 0.37 32
----------------------------------------------------------------------------
GAP-R11-016 20 402 382 0.21 0.18 0.43 26
----------------------------------------------------------------------------
Including 66 90 24 0.34 0.44 0.63 33
----------------------------------------------------------------------------
GAP-R11-017 322 402 80 0.21 0.21 0.53 34
----------------------------------------------------------------------------
GAP-R11-020 314 360 46 0.09 0.14 0.01 31
----------------------------------------------------------------------------
GAP-R11-021 8 310 302 0.14 0.21 0.14 31
----------------------------------------------------------------------------
Including 50 80 30 0.20 0.53 0.07 20
----------------------------------------------------------------------------
GAP-R11-022 0 156 156 0.20 0.37 0.25 109
----------------------------------------------------------------------------
Including 36 138 102 0.22 0.47 0.30 118
----------------------------------------------------------------------------
GAP-R11-026 32 146 114 0.17 0.23 0.01 71
----------------------------------------------------------------------------
GAP-R11-027 0 150 150 0.12 0.17 0.22 72
----------------------------------------------------------------------------
Including 28 56 28 0.14 0.26 0.41 83
----------------------------------------------------------------------------
GAP-R11-028 50 76 26 0.17 0.21 0.42 42
----------------------------------------------------------------------------
GAP-R11-030 22 60 38 0.24 0.18 0.51 56
----------------------------------------------------------------------------
GAP-R11-030 68 402 334 0.35 0.31 0.46 22
----------------------------------------------------------------------------
Including 140 234 94 0.39 0.36 0.05 26
----------------------------------------------------------------------------
Including 322 392 70 0.64 0.53 1.30 13
----------------------------------------------------------------------------
GAP-R11-031 6 120 114 0.22 0.28 0.35 115
----------------------------------------------------------------------------
Including 76 120 44 0.27 0.45 0.09 164
----------------------------------------------------------------------------
GAP-R11-031 176 300 124 0.25 0.33 0.87 69
----------------------------------------------------------------------------
GAP-R11-032 190 300 110 0.20 0.20 0.01 40
----------------------------------------------------------------------------
GAP-R11-033 20 402 382 0.19 0.23 0.58 69
----------------------------------------------------------------------------
Including 42 72 30 0.19 0.47 0.14 44
----------------------------------------------------------------------------
GAP-R11-034 108 276 168 0.12 0.18 0.61 66
----------------------------------------------------------------------------
GAP-R11-035 272 286 14 0.52 0.49 13.61 25
----------------------------------------------------------------------------
GAP-R11-035 250 402 152 0.23 0.22 3.36 27
----------------------------------------------------------------------------
GAP-R11-036 256 300 44 0.12 0.14 0.65 26
----------------------------------------------------------------------------
GAP-R11-040 170 234 64 0.13 0.29 0.31 34
----------------------------------------------------------------------------
Including 202 224 22 0.15 0.47 0.18 33
----------------------------------------------------------------------------
LA-R11-002 14 402 388 0.22 0.26 0.27 26
----------------------------------------------------------------------------
Including 20 54 34 0.50 0.58 0.26 17
----------------------------------------------------------------------------
Including 306 342 36 0.44 0.54 1.06 39
----------------------------------------------------------------------------
LA-R11-003 42 402 360 0.30 0.29 0.72 33
----------------------------------------------------------------------------
Including 328 374 46 0.50 0.58 1.12 37
----------------------------------------------------------------------------
LA-R11-004 22 402 380 0.22 0.26 0.73 40
----------------------------------------------------------------------------
LA-R11-005 80 402 322 0.19 0.21 0.59 71
----------------------------------------------------------------------------
LA-R11-006 4 44 40 0.16 0.21 0.34 50
----------------------------------------------------------------------------
LA-R11-006 120 300 180 0.17 0.20 0.45 46
----------------------------------------------------------------------------
LA-R11-007 0 76 76 0.20 0.25 0.61 43
----------------------------------------------------------------------------
LA-R11-007 124 168 44 0.15 0.18 0.21 13
----------------------------------------------------------------------------
LA-R11-007 196 300 104 0.14 0.14 0.04 14
----------------------------------------------------------------------------
LA-R11-008 6 82 76 0.18 0.16 0.05 42
----------------------------------------------------------------------------
LA-R11-008 154 296 142 0.15 0.17 0.46 28
----------------------------------------------------------------------------
LA-R11-009 140 282 142 0.16 0.20 0.31 64
----------------------------------------------------------------------------
LA-R11-010 184 300 116 0.18 0.20 0.34 42
----------------------------------------------------------------------------
LA-R11-011 24 228 204 0.19 0.35 0.50 35
----------------------------------------------------------------------------
Including 52 120 68 0.26 0.46 0.58 48
----------------------------------------------------------------------------
LA-R11-012 48 136 88 0.20 0.29 0.66 78
----------------------------------------------------------------------------
LA-R11-012 228 402 174 0.12 0.17 0.66 53
----------------------------------------------------------------------------
LA-R11-013 76 124 48 0.24 0.33 0.13 353
----------------------------------------------------------------------------
LA-R11-014 34 104 70 0.32 0.57 0.48 17
----------------------------------------------------------------------------
LA-R11-015 124 388 264 0.15 0.23 0.02 85
----------------------------------------------------------------------------
Including 276 388 112 0.26 0.35 0.01 77
----------------------------------------------------------------------------
LA-R11-016 26 372 346 0.21 0.27 0.21 23
----------------------------------------------------------------------------
Including 26 82 56 0.28 0.44 0.08 55
----------------------------------------------------------------------------
Including 260 300 40 0.36 0.46 0.40 29
----------------------------------------------------------------------------
Including 330 346 16 0.41 0.55 0.91 14
----------------------------------------------------------------------------
LA-R11-017 34 300 266 0.44 0.39 0.98 30
----------------------------------------------------------------------------
Including 60 158 98 0.88 0.78 1.69 18
----------------------------------------------------------------------------
LA-R11-018 36 122 86 0.25 0.29 0.51 65
----------------------------------------------------------------------------
LA-R11-019 50 132 82 0.33 0.38 0.10 19
----------------------------------------------------------------------------
LA-R11-019 320 348 28 0.11 0.13 0.01 47
----------------------------------------------------------------------------
LA-R11-020 0 190 190 0.39 0.52 0.41 43
----------------------------------------------------------------------------
Including 8 134 126 0.48 0.69 0.35 55
----------------------------------------------------------------------------
LA-R11-020 250 402 152 0.12 0.19 0.45 36
----------------------------------------------------------------------------
LA-R11-021 14 154 140 0.37 0.42 0.55 38
----------------------------------------------------------------------------
Including 52 104 52 0.59 0.62 0.68 48
----------------------------------------------------------------------------
LA-R11-021 174 214 40 0.20 0.46 1.10 10
----------------------------------------------------------------------------
LA-R11-022 48 350 302 0.23 0.34 0.31 37
----------------------------------------------------------------------------
A map of drill hole locations and selected drill hole cross sections related to
this press release maybe viewed at
http://media3.marketwire.com/docs/Resource_Update_Graphics.pdf.
The Company will release assay results for the additional and future drill holes
once the results have been compiled. The 5 deep DD holes drilled, by Rio Alto,
to date have all ended in mineralization. The sulphide mineral resource is open
at depth and in all directions. In addition to completing the sulphide
feasibility study drill program, the Company intends to begin testing the
extension of the sulphide mineralization during 2012.
Resource Development Drilling
There are 2 RC and 4 DD rigs operating at the La Arena Project. The current work
program is to complete an additional 21,904 meters of DD drilling and 11,412
meters of RC drilling in the sulphide, for an estimated total of 32,000 DD
meters and 34,000 RC meters related to the ongoing sulphide feasibility study. A
total of 22,612 meters of RC drilling within the oxide mineral resource was
completed during 2011 and results of that drilling were announced during the
year.
Oxide Mineral Resource Estimate
The following tables outline the updated oxide mineral resource estimate for the
La Arena Project.
Oxide Mineral Resource - Low Copper (Cu less than 300ppm ; Au greater than = 0.1
g/t)
Ag Mo Au
Resource Classification Mt Au (g/t) Cu (%) (ppm) (ppm) ('000 Oz)
----------------------------------------------------------------------------
Measured 9.8 0.67 0.01 0.6 6.9 210
Indicated 76.9 0.46 0.01 0.5 6.5 1,136
Measured + Indicated 86.7 0.48 0.01 0.5 6.6 1,346
Inferred 9.0 0.28 0.01 0.5 6.7 82
Oxide Mineral Resource - High Copper (Cu 300ppm - 1000ppm ; Au greater than =
0.1 g/t)
Ag Mo Au
Resource Classification Mt Au (g/t) Cu (%) (ppm) (ppm) ('000 Oz)
----------------------------------------------------------------------------
Measured 0.5 0.66 0.06 0.7 36.0 11
Indicated 13.5 0.29 0.06 0.6 41.4 127
Measured + Indicated 14.0 0.31 0.06 0.6 41.2 138
Inferred 1.4 0.18 0.06 0.6 55.7 8
Oxide Mineral Resource - Total
Ag Mo Au
Resource Classification Mt Au (g/t) Cu (%) (ppm) (ppm) ('000 Oz)
----------------------------------------------------------------------------
Measured 10.3 0.67 0.01 0.6 8.3 221
Indicated 90.4 0.43 0.02 0.5 11.7 1,263
Measured + Indicated 100.7 0.46 0.02 0.5 11.4 1,484
Inferred 10.4 0.27 0.01 0.5 13.1 90
The updated oxide mineral resource estimate was based on a total of 22,612
meters of RC drilling and 24,658 meters of DD holes in a total of 427 holes. The
Previous Owners completed 183 DD holes totalling to 24,658 meters. Rio Alto
completed the balance of 22,612 meters of RC drilling during 2011.
The updated oxide mineral resource estimate was generated from drill hole sample
assay results and the interpretation of a geological model that relates to the
spatial distribution of gold, copper and silver within the deposit. Mineralized
oxide material containing copper amounts in excess of 1000 ppm per tonne was
considered to be waste material. As a result of limited test work conducted
during 2011, Rio Alto believes there is potential to either blend or separately
leach the Oxide - High Copper material with Oxide - Low Copper resource
material. A metallurgical laboratory is under construction at the La Arena mine
site and once completed will test the viability and economics of leaching the
Oxide - High Copper material.
Grade estimates for the oxide mineral resource were made using ordinary kriging
with parental block sizes measuring 20 meters long, 10 meters wide and 6 meters
in height. The resource is confined within an optimized undiscounted pit shell
based on US$ 1,600/oz gold, US$ 3.00/lb copper and US$ 30/oz silver and also
constrained by anticipated metallurgical recovery, costs to produce and sell
potential metal production as well as estimated leach pad expansion costs.
Sulphide Mineral Resource Estimate
The following table outlines the updated sulphide resource estimate for the La
Arena Project.
Resource Au
Classific Mt Au Cu CuEq(1) Ag Mo ('000 Cu
-ation (millions) (g/t) (%) (%) (ppm) (ppm) Oz) (000's lbs)
----------------------------------------------------------------------------
Indicated 312.7 0.24 0.29 0.48 0.7 42.9 2,422 2,007,000
Inferred 319.7 0.20 0.30 0.46 0.6 46.1 2,075 2,134,000
Note:
1. Copper equivalent calculated using US$ 1600/oz Au and US$ 3.00/lb Cu and
is not adjusted for metallurgical recoveries.
The updated sulphide mineral resource estimate was based on 148 DD holes
totalling 34,688 meters and 62 RC holes totalling 21,904 meters, including 72
holes totalling 25,783 meters drilled by Rio Alto and 143 DD holes totalling
30,737 meters drilled by the Previous Owners. Prior to the generation of the
updated sulphide mineral resource estimate, Rio Alto's geologists re-logged all
the holes drilled by the Previous Owners and revised the geological model for
the sulphide deposit.
The sulphide mineral resource estimate was generated from drill hole sample
assay results and the interpretation of a geological model relating to the
spatial distribution of copper and gold mineralization within the deposit. Grade
estimates were made using ordinary kriging with a parental block size of 20
meters long, 10 meters wide and 6 meters in height. The resource is confined
within an optimized undiscounted pit shell based on US$ 1,600/oz gold, US$
3.00/lb copper, US$ 30/oz silver and US$ 12.00/lb molybdenum and also
constrained by estimated metallurgical recoveries, costs to mine, process and
sell copper and gold in the form of copper concentrate.
The updated oxide and sulphide mineral resource estimates were prepared and
classified in accordance with the guidelines set out in the Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves of
December 2004 as prepared by the Joint Ore Reserves Committee of the
Australasian Institute of Mining and Metallurgy, Australian Institute of
Geoscientists and Minerals Council of Australia ("JORC"). The resource
classification is also in accordance with the classification standards of
National Instrument 43-101 Standards for Disclosure for Mineral Projects ("NI
43-101") and the reporting classification standards on Mineral Resources and
Reserves of The Canadian Institute of Mining, Metallurgy and Petroleum. These
estimates will be incorporated in a National Instrument 43-101 Technical Report
with an effective date of September 30, 2011 to be filed on the Company's SEDAR
profile within 45 days.
Quality Control and Assurance
Sampling of RC drilling and sample preparation for holes drilled by the Company
were performed by Rio Alto personnel and carried out under strict protocols
recommended in the July 2010 Report. Samples were taken every two meters and
split in half to yield seven to ten kilogram samples. Drill sample recovery was
generally in excess of 90%.
Sampling of DD holes and sample preparation for holes drilled by the Company
were performed by Rio Alto personnel. In the case of each DD hole, an average
depth of 450 to 500 meters was drilled with a HQ bit (63.5 mm core size), and
the remainder of the hole drilled with a NQ bit (47.6 mm core size). Drill core
sample recovery was generally in excess of 90%. The core boxes were washed and
photographed. The sample intervals are every two meters, except where sampling
is broken up on specific geological contacts. The core is split in half using a
rock saw with half of the core sent for laboratory analysis and half of the core
remaining in storage.
The QA/QC procedures employed for sampling and assaying of holes drilled by the
Previous Owners is described in the July 2010 Report and was considered
satisfactory. There is a rigorous QA/QC program over the chain-of-custody of
samples and the insertion of blanks, duplicates and certified reference
standards in each batch of samples. This procedure was implemented based on a
recommended protocol from Coffey Mining in 2011.
Samples were shipped to CIMM-Peru, in Lima, where they were processed and
assayed. All gold assays were obtained by standard 50g fire assaying with AAS
finish. All silver assays were obtained by Aqua-Regia dissolution followed by
ICP measurement. All Cu and Mo assays were obtained by Aqua-Regia dissolution
followed by ICP. Cu values over 10,000 ppm are assayed by Atomic Absorption. The
Induced Coupled Plasma (ICP) technique provides assays for 35 elements.
CIMM-Peru is an ISO 9001:2000 certified laboratory.
Mr. Enrique Garay, M Sc., P. Geo (AIG Member), Vice President Geology of Rio
Alto, is the Qualified Person (as defined by NI 43-101) responsible for managing
the Company's exploration programs and disclosure of drilling results. Mr. Ian
Dreyer, B.App. Sc.(AUSIMM 305241,CP), a Qualified Person (as defined by NI
43-101), formerly of Coffey Mining Pty Ltd, designed and reviewed the Quality
Control and Assurance Program of the Company and prepared the resource
estimates. Mr. Garay and Mr. Dreyer have read and verified the scientific and
technical information in this press release.
For additional information regarding La Arena Project please refer to the July
2010 Report prepared by Coffey Mining Pty Ltd, a copy of which is available on
the Company's SEDAR profile at www.sedar.com.
Certain statements contained herein constitute forward-looking statements, most
particularly the estimated mineral resources, the viability of leaching the
oxide-high copper material, metal prices and metal production for the La Arena
Project and the timing for the completion of a feasibility study for the La
Arena copper/gold sulphide project. All statements included herein, other than
statements of historical fact, are forward-looking information and such
information involves various risks and uncertainties. Rio Alto believes the
expectations reflected in these forward looking statements are reasonable but no
assurance can be given that these expectations will prove to be correct and such
forward-looking statements in this press release should not be unduly relied
upon. A description of assumptions used to develop such forward-looking
information and a description of risk factors that may cause actual results to
differ materially from forward-looking information can be found in Rio Alto's
disclosure documents on the SEDAR website at www.sedar.com. Forward-looking
statements included in this press release are made as of the date of this press
release and Rio Alto disclaims any intention or obligation to update or revise
any forward-looking statements, whether as a result of new information, future
events or otherwise, except as expressly required by applicable securities
legislation.
To learn more about Rio Alto Mining Limited, please visit: www.rioaltomining.com
or Rio Alto's SEDAR profile atwww.sedar.com.
ON BEHALF OF THE BOARD OF RIO ALTO MINING LIMITED
Alex Black, President & COO
Grafico Azioni Rio2 (TSXV:RIO)
Storico
Da Nov 2024 a Dic 2024
Grafico Azioni Rio2 (TSXV:RIO)
Storico
Da Dic 2023 a Dic 2024