Trelawney Intersects 155.00 Metres of 1.31 g/t Gold and 115.90 Metres of 1.48 g/t Gold from Infill Drilling at Cote Lake
15 Maggio 2012 - 3:56PM
Marketwired Canada
Trelawney Mining and Exploration Inc. (the "Company" or "Trelawney") (TSX
VENTURE:TRR)(FRANKFURT:RTW) announces the results from 26 additional holes
drilled on the Cote Lake Deposit on the Chester Project located halfway between
Timmins and Sudbury in Northern Ontario. The results are from the ongoing infill
and expansion drilling on the Cote Lake Deposit. Drilling continues to intersect
significant widths of low to moderate grade gold mineralization from the infill
drilling at the Cote Lake Deposit.
The Cote Lake Deposit currently hosts an indicated resource of 35 million tonnes
averaging 0.82 g/t for contained gold of 0.93 million ounces and an inferred
resource of 204 million tonnes averaging 0.91 g/t for 5.94 million ounces of
contained gold. A cut-off grade of 0.3 g/t Au was used for the estimate as
reported in Trelawney's press release dated February 24, 2012. To date,
mineralization of the Cote Lake Deposit has been intersected over a
strike-length of 1,200 metres and remains open in several directions along
strike and at depth. The Cote Lake Deposit consists of low to moderate grade
gold +/- copper mineralization which is associated with brecciated intermediate
to felsic, and locally mafic intrusive rocks. The nature of the alteration,
style of mineralization and age-dating all indicate the deposit is an Archean
porphyry system.
The Company continues to explore its considerable land holdings in the Swayze
greenstone belt. The current drill program on the Cote Lake Deposit consists of
eleven drill rigs, five focusing on expansion drilling and six drills on infill
drilling. An additional drill rig is conducting regional exploration and
condemnation drilling.
Greg Gibson, Trelawney's President and CEO commented, "We are very pleased that
the ongoing infill drilling continues to confirm the significant widths and
grades of mineralization similar to our original wider-spaced drilling."
Cote Lake Deposit Drilling Results
----------------------------------------------------------------------------
Au cut
Gold Grade Gold
From To Length (g/t) cut to (oz/t)
Section Hole (m) (m) (m) uncut 25g/t(i) uncut Comments
----------------------------------------------------------------------------
94+50E E11-149 108.00 133.00 25.00 1.25 0.04 infill
----------------------------------------------------------------------------
162.00 172.00 10.00 0.92 0.03
----------------------------------------------------------------------------
182.00 195.00 13.00 0.87 0.03
----------------------------------------------------------------------------
205.00 219.00 14.00 0.53 0.02
----------------------------------------------------------------------------
240.00 242.00 2.00 1.80 0.05
----------------------------------------------------------------------------
255.00 256.00 1.00 11.88 0.35
----------------------------------------------------------------------------
351.00 355.00 4.00 0.98 0.03
----------------------------------------------------------------------------
----------------------------------------------------------------------------
94+50E E11-150 16.00 54.00 38.00 0.83 0.02 infill
----------------------------------------------------------------------------
135.00 137.00 2.00 4.83 0.14
----------------------------------------------------------------------------
170.00 171.00 1.00 6.63 0.19
----------------------------------------------------------------------------
94+50E E11-150 186.00 203.00 17.00 0.54 0.02
----------------------------------------------------------------------------
...(cont) ...(cont) 246.10 249.65 3.55 1.22 0.04
----------------------------------------------------------------------------
281.00 367.00 86.00 0.53 0.02
----------------------------------------------------------------------------
405.00 433.00 28.00 1.00 0.03
----------------------------------------------------------------------------
490.00 580.50 90.50 0.63 0.02
----------------------------------------------------------------------------
incl 528.25 569.85 41.60 0.91 0.03
----------------------------------------------------------------------------
662.00 802.00 140.00 0.73 0.02
----------------------------------------------------------------------------
incl 687.00 749.00 62.00 1.10 0.03
----------------------------------------------------------------------------
838.00 903.00 65.00 0.57 0.02
----------------------------------------------------------------------------
895.00 903.00 8.00 1.49 0.04
----------------------------------------------------------------------------
----------------------------------------------------------------------------
outside
83+00E E11-151 8.00 45.00 37.00 0.55 0.02 resource
----------------------------------------------------------------------------
54.00 55.00 1.00 1.03 0.03
----------------------------------------------------------------------------
74.00 80.00 6.00 0.70 0.02
----------------------------------------------------------------------------
134.00 135.00 1.00 1.43 0.04
----------------------------------------------------------------------------
149.00 150.00 1.00 1.02 0.03
----------------------------------------------------------------------------
188.00 196.00 8.00 0.71 0.02
----------------------------------------------------------------------------
----------------------------------------------------------------------------
abandoned
89+00E E11-152 57.00 58.00 1.00 1.29 0.04 at 96m
-------------------------------------------------------------------
88.00 96.00 8.00 0.76 0.02
----------------------------------------------------------------------------
----------------------------------------------------------------------------
outside
94+00E E11-153 8.00 50.00 42.00 0.70 0.02 resource
----------------------------------------------------------------------------
77.00 78.00 1.00 4.17 0.12
----------------------------------------------------------------------------
126.00 127.00 1.00 1.14 0.03
----------------------------------------------------------------------------
135.00 136.00 1.00 1.18 0.03
----------------------------------------------------------------------------
278.00 279.00 1.00 1.73 0.05
----------------------------------------------------------------------------
331.00 332.00 1.00 6.08 0.18
----------------------------------------------------------------------------
382.00 383.00 1.00 47.25 25.00 1.38
----------------------------------------------------------------------------
486.00 487.00 1.00 1.81 0.05
----------------------------------------------------------------------------
512.00 513.00 1.00 2.15 0.06
----------------------------------------------------------------------------
547.00 548.00 1.00 1.01 0.03
----------------------------------------------------------------------------
----------------------------------------------------------------------------
outside
89+00 E11-154 75.00 76.00 1.00 17.98 0.52 resource
-------------------------------------------------------------------
113.00 131.00 18.00 0.49 0.01
----------------------------------------------------------------------------
137.00 141.00 4.00 1.19 0.03
----------------------------------------------------------------------------
170.00 176.00 6.00 1.37 0.04
----------------------------------------------------------------------------
187.00 190.00 3.00 0.93 0.03
----------------------------------------------------------------------------
205.00 210.00 5.00 1.21 0.04
----------------------------------------------------------------------------
----------------------------------------------------------------------------
88+50E E11-155 60.00 66.00 6.00 0.79 0.02 infill
----------------------------------------------------------------------------
86.00 87.00 1.00 111.41 25.00 3.25
----------------------------------------------------------------------------
87.00 90.00 3.00 0.62 0.02
----------------------------------------------------------------------------
100.00 122.00 22.00 0.42 0.01
----------------------------------------------------------------------------
190.00 317.00 127.00 0.51 0.01
----------------------------------------------------------------------------
outside
89+00 E11-156 9.00 15.00 6.00 2.10 0.06 resource
----------------------------------------------------------------------------
25.00 27.00 2.00 0.88 0.03
----------------------------------------------------------------------------
38.00 46.00 8.00 0.72 0.02
----------------------------------------------------------------------------
96.00 98.00 2.00 3.22 0.09
----------------------------------------------------------------------------
105.00 125.00 20.00 0.57 0.02
----------------------------------------------------------------------------
348.00 349.00 1.00 1.81 0.05
----------------------------------------------------------------------------
----------------------------------------------------------------------------
infill
incl 48m
of
94+50E E11-157 28.00 64.00 36.00 0.31 0.01 diabase
-------------------------------------------------------------------
112.00 740.01 628.01 0.61 0.61 0.02
----------------------------------------------------------------------------
incl 156.00 516.00 360.00 0.84 0.84 0.02
----------------------------------------------------------------------------
and incl 156.00 311.00 155.00 1.31 1.30 0.04
----------------------------------------------------------------------------
incl 587.00 635.00 48.00 diabase
----------------------------------------------------------------------------
incl 646.00 740.00 94.00 0.47 0.01
----------------------------------------------------------------------------
----------------------------------------------------------------------------
94+50E E11-158 139.00 785.00 646.00 0.61 0.02 infill
----------------------------------------------------------------------------
incl 612.00 735.00 123.00 1.18 0.03
----------------------------------------------------------------------------
----------------------------------------------------------------------------
outside
90+00E E11-159 173.00 210.00 37.00 0.47 0.01 resource
----------------------------------------------------------------------------
251.00 252.00 1.00 1.86 0.05
----------------------------------------------------------------------------
266.00 267.00 1.00 1.45 0.04
----------------------------------------------------------------------------
343.00 344.00 1.00 1.11 0.03
----------------------------------------------------------------------------
395.00 396.00 1.00 1.16 0.03
----------------------------------------------------------------------------
420.00 421.00 1.00 1.50 0.04
----------------------------------------------------------------------------
427.00 428.00 1.00 1.43 0.04
----------------------------------------------------------------------------
----------------------------------------------------------------------------
94+50E E11-160 240.10 949.00 708.90 0.54 0.02 infill
----------------------------------------------------------------------------
incl 300.00 430.00 130.00 0.65 0.02
----------------------------------------------------------------------------
incl 641.00 699.00 58.00 0.95 0.03
----------------------------------------------------------------------------
925.00 949.00 24.00 0.47 0.01
----------------------------------------------------------------------------
----------------------------------------------------------------------------
partial
95+00E E11-161 103.00 104.00 1.00 1.97 0.06 infill
----------------------------------------------------------------------------
155.32 178.00 22.68 0.52 0.02
----------------------------------------------------------------------------
229.00 247.00 18.00 0.34 0.01
----------------------------------------------------------------------------
453.00 619.00 166.00 0.76 0.02
----------------------------------------------------------------------------
incl 453.00 484.00 31.00 1.21 0.04
----------------------------------------------------------------------------
E11-161,
95+00E incl 550.00 619.00 69.00 0.91 0.03
----------------------------------------------------------------------------
...(cont) ...(cont) 658.00 659.00 1.00 16.86 0.49
----------------------------------------------------------------------------
680.00 685.00 5.00 2.87 0.08
----------------------------------------------------------------------------
----------------------------------------------------------------------------
outside
90+00E E11-162 12.00 56.00 44.00 1.02 0.03 resource
----------------------------------------------------------------------------
78.00 131.00 53.00 0.94 0.03
----------------------------------------------------------------------------
309.00 310.10 1.10 5.03 0.15
----------------------------------------------------------------------------
313.00 314.00 1.00 2.76 0.08
----------------------------------------------------------------------------
----------------------------------------------------------------------------
88+50E E11-163 20.00 303.00 283.00 0.93 0.91 0.03 infill
----------------------------------------------------------------------------
incl 42.00 43.30 1.30 27.66 25.00 0.81
----------------------------------------------------------------------------
incl 51.00 52.00 1.00 22.36 0.65
----------------------------------------------------------------------------
incl 168.00 225.00 57.00 1.61 0.05
----------------------------------------------------------------------------
----------------------------------------------------------------------------
outside
94+00E E11-164 32.00 33.00 1.00 1.65 0.05 resource
----------------------------------------------------------------------------
182.00 183.00 1.00 1.33 0.04
----------------------------------------------------------------------------
315.00 316.20 1.20 2.75 0.08
----------------------------------------------------------------------------
346.00 347.00 1.00 2.99 0.09
----------------------------------------------------------------------------
375.00 377.00 2.00 2.73 0.08
----------------------------------------------------------------------------
537.00 538.00 1.00 1.06 0.03
----------------------------------------------------------------------------
----------------------------------------------------------------------------
outside
90+50E E11-165 109.00 111.00 2.00 303.80 13.35 8.86 resource
----------------------------------------------------------------------------
129.00 138.00 9.00 2.40 0.07
----------------------------------------------------------------------------
155.00 156.00 1.00 1.02 0.03
----------------------------------------------------------------------------
163.00 166.00 3.00 2.64 0.08
----------------------------------------------------------------------------
185.00 230.00 45.00 1.07 0.03
----------------------------------------------------------------------------
245.00 246.00 1.00 7.70 0.22
----------------------------------------------------------------------------
261.00 262.00 1.00 2.45 0.07
----------------------------------------------------------------------------
----------------------------------------------------------------------------
95+50E E11-166 4.10 10.00 5.90 0.77 0.02 infill
----------------------------------------------------------------------------
121.00 334.00 213.00 0.92 0.03
----------------------------------------------------------------------------
351.00 386.40 35.40 0.52 0.02
----------------------------------------------------------------------------
406.00 407.00 1.00 13.08 0.38
----------------------------------------------------------------------------
449.00 450.00 1.00 6.58 0.19
----------------------------------------------------------------------------
462.00 464.00 2.00 1.13 0.03
----------------------------------------------------------------------------
518.00 519.00 1.00 4.55 0.13
----------------------------------------------------------------------------
547.00 579.00 32.00 0.61 0.02
----------------------------------------------------------------------------
621.00 622.00 1.00 5.61 0.16
----------------------------------------------------------------------------
649.00 656.00 7.00 1.04 0.03
----------------------------------------------------------------------------
----------------------------------------------------------------------------
outside
90+50E E11-167 36.00 37.00 1.00 14.21 0.41 resource
----------------------------------------------------------------------------
114.00 115.00 1.00 1.20 0.04
----------------------------------------------------------------------------
145.00 146.00 1.00 1.84 0.05
----------------------------------------------------------------------------
278.00 281.00 3.00 7.46 0.22
----------------------------------------------------------------------------
299.00 301.00 2.00 5.43 0.16
----------------------------------------------------------------------------
----------------------------------------------------------------------------
90+50E E11-168 pending
----------------------------------------------------------------------------
----------------------------------------------------------------------------
88+50E E11-169 131.00 144.00 13.00 1.42 0.04 infill
----------------------------------------------------------------------------
188.58 205.00 16.42 0.65 0.02
----------------------------------------------------------------------------
246.00 286.00 40.00 1.14 0.03
----------------------------------------------------------------------------
331.00 333.00 2.00 5.423 0.16
----------------------------------------------------------------------------
395.00 398.00 3.00 1.35 0.04
----------------------------------------------------------------------------
418.00 419.00 1.00 2.225 0.06
----------------------------------------------------------------------------
96+50E E11-170 No significant values
----------------------------------------------------------------------------
----------------------------------------------------------------------------
95+50E E11-171 14.85 16.00 1.15 45.99 25 1.34 infill
----------------------------------------------------------------------------
45.80 82.00 36.20 0.76 0.02
----------------------------------------------------------------------------
134.00 249.90 115.90 1.48 1.03 0.04
----------------------------------------------------------------------------
incl 216.00 217.20 1.20 68.45 25 2.00
----------------------------------------------------------------------------
296.00 415.00 119.00 0.54 0.02
----------------------------------------------------------------------------
incl 397.40 399.60 2.20 1.87 0.05
----------------------------------------------------------------------------
incl 410.00 415.00 5.00 3.46 0.10
----------------------------------------------------------------------------
440.00 504.00 64.00 1.25 1.09 0.04
----------------------------------------------------------------------------
incl 452.60 454.00 1.40 22.51 15.35 0.66
----------------------------------------------------------------------------
----------------------------------------------------------------------------
95+50E E11-172 18.00 20.00 2.00 1.89 0.06 infill
----------------------------------------------------------------------------
89.00 162.00 73.00 0.58 0.02
----------------------------------------------------------------------------
229.00 230.00 1.00 6.67 0.19
----------------------------------------------------------------------------
359.00 360.00 1.00 2.22 0.06
----------------------------------------------------------------------------
370.00 372.00 2.00 2.55 0.07
----------------------------------------------------------------------------
516.00 520.00 4.00 1.1 0.03
----------------------------------------------------------------------------
----------------------------------------------------------------------------
95+50E E11-173 25.55 32.60 7.05 1.42 0.04 infill
----------------------------------------------------------------------------
81.75 127.00 45.25 1.05 0.03
----------------------------------------------------------------------------
211.00 222.00 11.00 0.96 0.03
----------------------------------------------------------------------------
261.70 262.30 0.60 23.75 0.69
----------------------------------------------------------------------------
373.59 375.00 1.41 14.02 0.41
----------------------------------------------------------------------------
382.00 383.00 1.00 14.04 0.41
----------------------------------------------------------------------------
E11-173
95+00E ...(cont) 549.00 550.00 1.00 4.91 0.14
----------------------------------------------------------------------------
----------------------------------------------------------------------------
outside
95+00E E11-174 366.00 393.00 27.00 0.87 0.03 resource
----------------------------------------------------------------------------
Notes:
- True widths of intersections are unknown at this time.
- (i)Only intervals with assays cut to 25 g/t gold are shown.
- Intervals are graded with a lower cut of 0.30 g/t with internal waste and
low grade material within graded zones of up to 20 metres in length.
Trelawney has implemented a quality-control, quality assurance program to ensure
best practice principles are being applied in the sampling and analysis of the
drill core. Samples are crushed to -8 mesh then a 1,000 gram subset of each
sample is pulverized to 90% passing -150 mesh. Assays have been completed using
a standard fire assay with a 30 gram aliquot and an AA finish. For samples that
return values of between two to five grams per tonne gold, another pulp is taken
and fire assayed with a gravimetric finish. Samples returning values greater
than 5 grams per tonne are re-analyzed by pulp metallic analysis, NQ size drill
core is saw cut, and half the drill core is sampled in standard intervals. The
remaining half of the core is stored in a secure location. The drill core is
transported in security-sealed bags to the Accurassay prep lab in Sudbury,
Ontario by Trelawney personnel. Accurassay is an ISO/IEC 17025 certified
Laboratory by the Standards Council of Canada. In addition to quality assurance
controls at the laboratory, blanks and certified standards have been inserted
into the sample stream at random intervals.
David Beilhartz, Vice-President, Exploration of Trelawney, a Qualified Person
under National Instrument 43-101 ("NI 43-101"), has prepared or supervised the
scientific and/or technical information for the property and verified and
approved the data disclosed in this press release.
For complete disclosure of the mineral resource estimate discussed in this press
release, please refer to the Technical Report on the Cote Lake Resource Update,
Chester Property, Ontario, Canada reported in accordance with NI 43-101
requirements, signed by W. Roscoe and B. Cook, Roscoe Postle Associates Inc.,
effective February 24, 2012. Investors are cautioned that mineral resources are
not mineral reserves and do not have demonstrated economic viability.
On April 27, 2012, Trelawney announced that they entered into a definitive
agreement with IAMGOLD Corporation ("IAMGOLD") pursuant to which IAMGOLD,
through a wholly-owned subsidiary, has agreed to acquire all of the issued and
outstanding common shares of Trelawney. Under the terms of the Agreement, each
Trelawney shareholder will receive $3.30 in cash for each Trelawney share held.
The transaction price represents a 36.6% premium based on Trelawney's 20-day
volume weighted average price ("VWAP") for the period ending April 26, 2012. The
transaction will be carried out pursuant to a statutory plan of arrangement.
Completion of the transaction is subject to customary conditions, including
court and shareholder approvals and the receipt of all necessary regulatory
approvals. Assuming Trelawney shareholders approve the transaction at the
special meeting of shareholders and final court approvals are obtained, the
transaction is expected to close by the end of June.
Trelawney is a Canadian junior mining and exploration company with a focus on
Archean gold deposits. The Company's current focus is directed towards the
continued exploration and development of the Cote Lake Deposit, located in
Chester Township, 20 kilometres southwest of Gogama, Ontario.
This news release may contain forward-looking information (referred to herein as
"forward-looking statements"). Generally, forward-looking statements can be
identified by the use of forward-looking terminology such as "plans", "expects",
"budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or
"believes" or variations and negative variations of such words and phrases or
statements that certain actions, events or results "may", "could", "would",
"might" or "will be taken", "occur" or "be achieved". Forward-looking statements
are based on reasonable assumptions that have been made by the Company as at the
date of such information and are subject to known and unknown risks,
uncertainties and other factors that may cause the actual results, level of
activity, performance or achievements of the Company to be materially different
from those expressed or implied by such forward-looking statements including,
but not limited to, the completion of the announced transaction involving
IAMGOLD Corporation, actual results of current exploration activities, access to
capital and future prices of gold and other commodities and those factors
discussed in the section entitled "Risk Factors" in the Company's annual
information form for the financial year ended December 31, 2010 as well as those
risk factors discussed in the Company's other continuous disclosure documents
filed on and available on SEDAR at www.sedar.com.
Forward-looking statements are based on assumptions management believes to be
reasonable including, but not limited to: general business and economic
conditions; the supply and demand for, deliveries of, and the level and
volatility of prices of gold; the timing of the receipt of regulatory and
governmental approvals for the Company's projects; the availability of financing
for the Company's development of its properties on reasonable terms; the ability
to procure equipment and operating supplies in sufficient quantities and on a
timely basis; the ability to attract and retain skilled staff; exploration
timetables; market competition; the accuracy of the Company's mineral resource
estimate (including with respect to size, grade and recoverability) and the
geological, operational and price assumptions on which it is based; and such
other assumptions and factors as are set out herein. Although the Company has
attempted to identify important factors that could cause actual results to
differ materially from those contained in forward-looking statements, there may
be other factors that cause results not to be as anticipated, estimated or
intended. There can be no assurance that such information will prove to be
accurate, as actual results and future events could differ materially from those
anticipated in such information. Accordingly, readers should not place undue
reliance on forward-looking statements. The forward-looking statements contained
herein are made as of the date hereof, or such other date or dates specified in
such statements. The Company undertakes no obligation to update publicly or
otherwise revise any forward-looking statements contained herein whether as a
result of new information or future events or otherwise, except as may be
required by law.
Grafico Azioni Trelawney Mining And Exploration (TSXV:TRR)
Storico
Da Ott 2024 a Nov 2024
Grafico Azioni Trelawney Mining And Exploration (TSXV:TRR)
Storico
Da Nov 2023 a Nov 2024