encountered in the mining and metals industry. Although adequate precautions to minimize risk will be taken, operations are subject to hazards that could have an adverse effect on the business,
results of operations and financial position of Equinox Gold.
Such risks include, without limitation, actual ore mined varying from estimates of grade or
tonnage, metallurgical or other characteristics, environmental hazards, tailings risks, industrial accidents, labour disputes, changes in laws, technical difficulties or failures, late delivery of supplies or equipment, unusual or unexpected
geological formations or pressures, cave-ins, pit-wall failures, rock falls, unanticipated ground, grade or water conditions, climate change related events such as
flooding and droughts, interruptions in or shortages of electrical power or water, periodic or extended interruptions due to the unavailability of materials and force majeure events.
Additionally, Equinox Golds operations are subject to seasonal weather conditions. As a result of potentially heavy rainfall, pit access and the ability
to mine ore may be lower at certain times of the year and may increase the cost of mining. In addition, a prolonged dry season may result in drought conditions, which may also impact production due insufficient water for processing.
Such risks could result in reduced production, damage to, or destruction of, mineral properties or producing facilities, damage to or loss of life or
property, environmental damage, delays in mining or processing, economic losses and possible legal liability.
Construction Risks
Construction of Greenstone commenced in late 2021. In addition, the Company is progressing studies and engineering for expansion projects at Castle Mountain,
Aurizona and Los Filos. Construction of a project requires substantial expenditures and could have material cost overruns versus budget. The capital expenditures and time required for any expansion project, or to develop a new mine are considerable
and changes in cost or construction schedules can significantly increase both the time and capital required to expand or build the project.
Construction
costs and timelines can be impacted by a wide variety of factors, many of which are beyond the control of Equinox Gold. These include, but are not limited to, inflation, weather conditions, ground conditions, availability of appropriate rock and
other material required for construction, availability and performance of employees, contractors and suppliers, supply chain constraints, shipping risks and delays, delivery and installation of equipment, design changes, accuracy of construction
quantities and cost estimates and social acceptance by communities. Project development schedules are also dependent on obtaining and maintaining governmental approvals and the timeline to obtain such approvals is often beyond the control of Equinox
Gold. A delay in start-up of commercial production would increase capital costs and delay generating revenues. Given the inherent risks and uncertainties associated with construction and development of
projects, there can be no assurance that a construction or expansion project will continue in accordance with current expectations or at all, that construction or expansion costs will be consistent with the budget, that production will be achieved
on schedule, or that the mine will operate as planned.
Permitting
Equinox Golds operating, development and exploration activities are subject to receiving and maintaining licenses, permits and approvals (collectively,
permits) from appropriate governmental authorities. Before commencing any operations, development or exploration on any of its properties, Equinox Gold must receive numerous permits. As the timing of receiving permits can vary and is largely out of
the Companys control, Equinox Gold may be unable to obtain on a timely basis or maintain in the future all necessary permits to explore and develop its properties, commence construction or operation of mining facilities and properties or
maintain continued operations. Delays may occur in connection with obtaining necessary renewals of permits for Equinox Golds existing operations and activities, additional permits for existing or future operations or activities, or