Barrick Gold Corporation (NYSE:GOLD)(TSX:ABX) ("Barrick" or the
"Company") today reported preliminary Q1 production of 940 thousand
ounces of gold and 40 thousand tonnes of copper, as well as
preliminary Q1 sales of 910 thousand ounces of gold and 39 thousand
tonnes of copper. As previously guided, Barrick’s gold and copper
production in 2024 is expected to progressively increase each
quarter through the year, with the Pueblo Viejo plant expansion
ramping up from Q2 and the Porgera mine restart continuing in line
with plans. We remain on track to achieve our full year gold and
copper guidance.
The average market price for gold in Q1 was $2,070
per ounce while the average market price for copper in Q1 was $3.83
per pound.
As planned, preliminary Q1 gold production was
lower than Q4 2023 mainly as a result of planned maintenance at
Nevada Gold Mines and mine sequencing at various sites. In line
with our plans, as a result of the lower production, Q1 gold cost
of sales per ounce1 is expected to be 4% to 6% higher, total cash
costs per ounce2 are expected to be 6% to 8% higher, and all-in
sustaining costs per ounce2 are expected to be 7% to 9% higher
compared to Q4 2023. Costs are expected to drop in the successive
quarters of the year as production ramps up.
Preliminary Q1 copper production was lower than Q4
2023, driven primarily by lower grades mined at Lumwana in
accordance with the mine plan. Compared to Q4 2023, driven by the
lower production and in line with plans, Q1 copper cost of sales
per pound1 is expected to be 9% to 11% higher, C1 cash costs per
pound2 are expected to be 10% to 12% higher, while all-in
sustaining costs per pound2 are expected to be 14% to 16% higher.
Costs are expected to drop in the successive quarters of the year
as production ramps up.
Barrick will provide additional discussion and
analysis regarding its first quarter 2024 production and sales when
the Company reports its quarterly results before North American
markets open on May 1, 2024.
The following table includes preliminary gold and
copper production and sales results from Barrick's operations:
|
Three months ended |
|
March 31, 2024 |
|
Production |
Sales |
Gold (attributable ounces (000)) |
Carlin (61.5%) |
205 |
207 |
Cortez (61.5%) |
119 |
121 |
Turquoise Ridge (61.5%) |
62 |
62 |
Phoenix (61.5%) |
34 |
34 |
Nevada Gold Mines (61.5%) |
420 |
424 |
Loulo-Gounkoto (80%) |
141 |
140 |
Pueblo Viejo (60%) |
81 |
82 |
Kibali (45%) |
76 |
72 |
Veladero (50%) |
57 |
33 |
North Mara (84%) |
46 |
46 |
Bulyanhulu (84%) |
42 |
40 |
Hemlo |
37 |
38 |
Tongon (89.7%) |
36 |
35 |
Porgera (24.5%) |
4 |
0 |
Total Gold |
940 |
910 |
|
|
|
|
|
|
Copper (attributable tonnes (000)) |
Lumwana |
22 |
22 |
Zaldívar (50%) |
9 |
9 |
Jabal Sayid (50%) |
9 |
8 |
Total Copper |
40 |
39 |
First Quarter 2024 ResultsBarrick
will release its Q1 2024 results before market open on May 1, 2024.
President and CEO Mark Bristow will host a live presentation of the
results that day at 11:00 EDT, with an interactive webinar linked
to a conference call. Participants will be able to ask
questions.
Go to the webinarUS and Canada (toll-free) 1 844
763 8274UK (toll) +44 20 3795 9972International (toll) +1 647 484
8814
The Q1 2024 presentation materials will be
available on Barrick’s website at www.barrick.com.
The webinar will remain on the website for later
viewing, and the conference call will be available for replay by
telephone at 1 855 669 9658 (US and Canada toll-free) and +1 604
674 8052 (international toll), access code 0799#.
Enquiries:Kathy du Plessis
Investor and Media
Relations +44 20
7557
7738 barrick@dpapr.com
Website: www.barrick.com
Technical InformationThe
scientific and technical information contained in this news release
has been reviewed and approved by: Craig Fiddes, SME-RM, Lead,
Resource Modeling, Nevada Gold Mines; Simon Bottoms, CGeol, MGeol,
FGS, FAusIMM, Mineral Resource Management and Evaluation Executive
(in this capacity, Mr. Bottoms is responsible on an interim basis
for scientific and technical information relating to the Latin
America and Asia Pacific region); and Richard Peattie, MPhil,
FAusIMM, Mineral Resources Manager: Africa and Middle East; – each
a “Qualified Person” as defined in National Instrument 43-101 –
Standards of Disclosure for Mineral Projects.
Endnote 1Gold cost of sales per
ounce is calculated as cost of sales across our gold operations
(excluding sites in care and maintenance) divided by ounces sold
(both on an attributable basis based on Barrick’s ownership share).
Copper cost of sales per pound is calculated as cost of sales
across our copper operations divided by pounds sold (both on an
attributable basis based on Barrick’s ownership share).
References to attributable basis means our 100%
share of Hemlo and Lumwana, our 89.7% share of Tongon, our 84%
share of North Mara and Bulyanhulu, our 80% share of
Loulo-Gounkoto, our 61.5% share of Nevada Gold Mines, our 60% share
of Pueblo Viejo, our 50% share of Veladero, Zaldívar and Jabal
Sayid and our 45% share of Kibali.
Endnote 2Total cash costs per
ounce and all-in sustaining costs per ounce are non-GAAP financial
measures which are calculated based on the definition published by
the World Gold Council (“WGC”) (a market development organization
for the gold industry comprised of and funded by gold mining
companies from around the world, including Barrick). The WGC is not
a regulatory organization. Management uses these measures to
monitor the performance of our gold mining operations and its
ability to generate positive cash flow, both on an individual site
basis and an overall company basis.
Total cash costs start with our cost of sales
related to gold production and removes depreciation, the
non-controlling interest of cost of sales and includes by-product
credits. All-in sustaining costs start with total cash costs and
include sustaining capital expenditures, sustaining leases, general
and administrative costs, minesite exploration and evaluation costs
and reclamation cost accretion and amortization. These additional
costs reflect the expenditures made to maintain current production
levels.
We believe that our use of total cash costs and
all-in sustaining costs will assist analysts, investors and other
stakeholders of Barrick in understanding the costs associated with
producing gold, understanding the economics of gold mining,
assessing our operating performance and also our ability to
generate free cash flow from current operations and to generate
free cash flow on an overall company basis. Due to the
capital-intensive nature of the industry and the long useful lives
over which these items are depreciated, there can be a significant
timing difference between net earnings calculated in accordance
with IFRS and the amount of free cash flow that is being generated
by a mine and therefore we believe these measures are useful
non-GAAP operating metrics and supplement our IFRS disclosures.
These measures are not representative of all of our cash
expenditures as they do not include income tax payments, interest
costs or dividend payments. These measures do not include
depreciation or amortization.
Total cash costs per ounce and all-in sustaining
costs per ounce are intended to provide additional information only
and do not have standardized definitions under IFRS and should not
be considered in isolation or as a substitute for measures of
performance prepared in accordance with IFRS. These measures are
not equivalent to net income or cash flow from operations as
determined under IFRS. Although the WGC has published a
standardized definition, other companies may calculate these
measures differently.
C1 cash costs per pound and all-in sustaining costs
per pound are non-GAAP financial measures related to our copper
mine operations. We believe that C1 cash costs per pound enables
investors to better understand the performance of our copper
operations in comparison to other copper producers who present
results on a similar basis. C1 cash costs per pound excludes
royalties and production taxes and non-routine charges as they are
not direct production costs. All-in sustaining costs per pound is
similar to the gold all-in sustaining costs metric and management
uses this to better evaluate the costs of copper production. We
believe this measure enables investors to better understand the
operating performance of our copper mines as this measure reflects
all of the sustaining expenditures incurred in order to produce
copper. All-in sustaining costs per pound includes C1 cash costs,
sustaining capital expenditures, sustaining leases, general and
administrative costs, minesite exploration and evaluation costs,
royalties and production taxes, reclamation cost accretion and
amortization and write-downs taken on inventory to net realizable
value.
Barrick will provide a full reconciliation of these
non-GAAP financial measures when the Company reports its quarterly
results on May 1, 2024.
Cautionary Statements Regarding Preliminary
First Quarter Production, Sales and Costs for 2024, and
Forward-Looking InformationBarrick cautions that, whether
or not expressly stated, all first quarter figures contained in
this press release including, without limitation, production
levels, sales and associated costs are preliminary, and reflect our
expected first quarter results as of the date of this press
release. Actual reported first quarter production levels, sales and
associated costs are subject to management’s final review, as well
as review by the Company’s independent accounting firm, and may
vary significantly from those expectations because of a number of
factors, including, without limitation, additional or revised
information, and changes in accounting standards or policies, or in
how those standards are applied. Barrick will provide additional
discussion and analysis and other important information about its
first quarter production levels, sales and associated costs when it
reports actual results on May 1, 2024. For a complete picture of
the Company’s financial performance, it will be necessary to review
all of the information in the Company’s first quarter financial
report and related MD&A. Accordingly, readers are cautioned not
to rely solely on the information contained herein.
Finally, Barrick cautions that this press release
contains forward-looking statements with respect to: (i) Barrick’s
production and full year gold and copper guidance; and (ii) costs
per ounce for gold and per pound for copper.
Forward-looking statements are necessarily based
upon a number of estimates and assumptions including material
estimates and assumptions related to the factors set forth below
that, while considered reasonable by the Company as at the date of
this press release in light of management’s experience and
perception of current conditions and expected developments, are
inherently subject to significant business, economic, and
competitive uncertainties and contingencies. Known or unknown
factors could cause actual results to differ materially from those
projected in the forward-looking statements, and undue reliance
should not be placed on such statements and information.
Such factors include, but are not limited to:
fluctuations in the spot and forward price of gold, copper, or
certain other commodities (such as silver, diesel fuel, natural
gas, and electricity); the speculative nature of mineral
exploration and development; changes in mineral production
performance, exploitation, and exploration successes; the
resumption of operations at the Porgera mine and expected ramp up
of mining and processing in 2024; risks associated with projects in
the early stages of evaluation, and for which additional
engineering and other analysis is required; disruption of supply
routes which may cause delays in construction and mining
activities, including disruptions in the supply of key mining
inputs due to the invasion of Ukraine by Russia and conflicts in
the Middle East; whether benefits expected from recent transactions
are realized; quantities or grades of reserves will be diminished,
and that resources may not be converted to reserves; increased
costs, delays, suspensions and technical challenges associated with
the construction of capital projects; operating or technical
difficulties in connection with mining or development activities,
including geotechnical challenges, tailings dam and storage
facilities failures, and disruptions in the maintenance or
provision of required infrastructure and information technology
systems; risks that exploration data may be incomplete and
considerable additional work may be required to complete further
evaluation, including but not limited to drilling, engineering and
socioeconomic studies and investment; failure to comply with
environmental and health and safety laws and regulations; increased
costs and physical risks, including extreme weather events and
resource shortages, related to climate change; timing of, receipt
of, or failure to comply with, necessary permits and approvals;
non-renewal of key licenses by governmental authorities;
uncertainty whether some or all of targeted investments and
projects will meet the Company’s capital allocation objectives and
internal hurdle rate; the impact of inflation, including global
inflationary pressures driven by supply chain disruptions, global
energy cost increases following the invasion of Ukraine by Russia
and country-specific political and economic factors in Argentina;
the impact of global liquidity and credit availability on the
timing of cash flows and the values of assets and liabilities based
on projected future cash flows; fluctuations in the currency
markets; changes in national and local government legislation,
taxation, controls or regulations and/or changes in the
administration of laws, policies and practices; expropriation or
nationalization of property and political or economic developments
in Canada, the United States, and other jurisdictions in which the
Company or its affiliates do or may carry on business in the
future; lack of certainty with respect to foreign legal systems,
corruption and other factors that are inconsistent with the rule of
law; damage to the Company’s reputation due to the actual or
perceived occurrence of any number of events, including negative
publicity with respect to the Company’s handling of environmental
matters or dealings with community groups, whether true or not; the
possibility that future exploration results will not be consistent
with the Company’s expectations; risk of loss due to acts of war,
terrorism, sabotage and civil disturbances; risks associated with
artisanal and illegal mining; risks associated with diseases,
epidemics and pandemics, including the effects and potential
effects of the global Covid-19 pandemic; litigation and legal and
administrative proceedings; contests over title to properties,
particularly title to undeveloped properties, or over access to
water, power and other required infrastructure; business
opportunities that may be presented to, or pursued by, the Company;
our ability to successfully integrate acquisitions or complete
divestitures; risks associated with working with partners in
jointly controlled assets; employee relations including loss of key
employees; and availability and increased costs associated with
mining inputs and labor. In addition, there are risks and hazards
associated with the business of mineral exploration, development
and mining, including environmental hazards, industrial accidents,
unusual or unexpected formations, pressures, cave-ins, flooding and
gold bullion, copper cathode or gold or copper concentrate losses
(and the risk of inadequate insurance, or inability to obtain
insurance, to cover these risks).
Many of these uncertainties and contingencies can
affect our actual results and could cause actual results to differ
materially from those expressed or implied in any forward-looking
statements made by, or on behalf of, us. Readers are cautioned that
forward-looking statements are not guarantees of future
performance. All of the forward-looking statements made in this
press release are qualified by these cautionary statements.
Specific reference is made to the most recent Form 40-F/Annual
Information Form on file with the SEC and Canadian provincial
securities regulatory authorities for a more detailed discussion of
some of the factors underlying forward-looking statements and the
risks that may affect Barrick’s ability to achieve the expectations
set forth in the forward-looking statements contained in this press
release.
Barrick disclaims any intention or obligation to
update or revise any forward-looking statements whether as a result
of new information, future events or otherwise, except as required
by applicable law.
Grafico Azioni Barrick Gold (NYSE:GOLD)
Storico
Da Dic 2024 a Gen 2025
Grafico Azioni Barrick Gold (NYSE:GOLD)
Storico
Da Gen 2024 a Gen 2025