FIREWEED METALS CORP. (“Fireweed” or the “Company”) (TSXV: FWZ;
OTCQB: FWEDF; FSE: M0G) is pleased to report the final results from
the 2023 Boundary Zone drilling campaign at its Macmillan Pass
(“Macpass”) Project, Yukon, Canada.
Highlights
-
Hole NB23-036 intersected 45.22 m of 18.98% zinc, 2.24% lead and
114.9 g/t silver (44 m true width) including 39.22 m of 20.84%
zinc, 2.48% lead and 115.4 g/t silver.
-
Hole NB23-037 intersected 118.36 m of 11.58% zinc, 1.75% lead and
54.9 g/t silver (47 m true width) including 27.63 m of 19.06%
zinc, 0.74% lead and 58.2 g/t silver.
-
Assays are pending for 11 holes from the Tom deposit, and two holes
from the Jason deposit.
CEO Statement
Brandon Macdonald, CEO, stated, “2023 was a
pivotal year at Boundary Zone in which we discovered a high-grade
feeder system that connects the mineralization and forms a
continuous zone with increasing grade and true widths at depth.
These final results exemplify the spectacular grades that we see at
this best-in-class project, with holes from this year containing
not just the feeder zone, but also the vein mineralization halo
around it that contains some remarkably high-grade breccias. These
final holes from the 2023 season solidify Boundary Zone as a
significant addition to the Macpass project, and with a few holes
still pending from Tom and Jason, we are looking forward to
integrating all results into a mineral resource estimate in the
coming months to begin to understand the enormity of the mineral
endowment within this premier zinc district.”
Summary
The mineralization from drill holes in this
release primarily comprises stratiform (layer-parallel) and massive
(>50% sulphides) sulphides in the western and central areas of
Boundary Zone. This mineralization is sub-vertical with sharp
margins, occurring from near-surface to at least a depth of 450 m
and across a strike length of 550 m. We also report intersections
of vein and breccia mineralization that occur on both sides of the
tabular stratiform sulphide zones. The intersection in holes
NB23-036 and NB23-037 continue to demonstrate high zinc, lead, and
silver grades that are interpreted as forming from higher
temperature fluids in association with a feeder zone supplying
metals to a mineralized system.
Results
The drill holes in this release are located in
the central and western areas of Boundary Zone and targeted the
stratiform to massive sulphide body with a focus on stepping out
from known feeder-style mineralization. Holes NB23-036 and NB23-037
intersected broad, high-grade intervals of massive sulphides rich
in zinc, lead, and silver that are correlated with this interpreted
feeder zone. Stratiform massive sulphides were also intersected in
NB23-034 and NB23-038. Breccia and vein mineralization was
intersected in NB23-033, NB23-034, NB23-035 and NB23-036, NB23-037
and NB23-038.
Table 1: Assay highlights for holes
included within this release for the 2023 drilling program,
Boundary Zone
Drillhole |
Interval |
From (m) |
To (m) |
Interval Width (m) |
Est. True Width (m) † |
Zinc (%) |
Lead (%) |
Silver (g/t) |
Bulk Density
(t/m3) |
NB23-034 |
Primary |
426.78 |
479.78 |
53.00 |
21 |
12.07 |
1.05 |
53.6 |
4.05 |
NB23-034 |
Including |
436.87 |
472.38 |
35.51 |
14 |
15.61 |
0.92 |
57.0 |
4.07 |
NB23-035 |
Primary |
396.96 |
417.18 |
20.22 |
Unknown |
6.51 |
1.15 |
51.5 |
3.54 |
NB23-036 |
Primary |
95.50 |
171.32 |
75.82 |
N/A |
4.21 |
0.25 |
9.9 |
2.87 |
NB23-036 |
Including |
108.87 |
121.5 |
12.63 |
N/A |
6.97 |
0.32 |
16.6 |
3.10 |
NB23-036 |
>Including |
108.87 |
112.56 |
3.69 |
N/A |
14.41 |
0.08 |
17.4 |
3.23 |
NB23-036 |
Including |
156.00 |
171.32 |
15.32 |
N/A |
7.31 |
0.90 |
19.1 |
2.87 |
NB23-036 |
Primary |
210.33 |
255.55 |
45.22 |
44 |
18.98 |
2.24 |
114.9 |
4.13 |
NB23-036 |
Including |
235.64 |
243.74 |
8.10 |
7.9 |
28.90 |
4.75 |
142.2 |
3.95 |
NB23-036 |
Primary |
304.06 |
381.99 |
77.93 |
N/A |
2.58 |
0.31 |
9.8 |
3.25 |
NB23-036 |
Including |
328.18 |
334.21 |
6.03 |
N/A |
5.37 |
0.08 |
7.1 |
3.25 |
NB23-037 |
Primary |
352.74 |
471.1 |
118.36 |
47 |
11.58 |
1.75 |
54.9 |
3.81 |
NB23-037 |
>Including |
353.71 |
360.34 |
6.63 |
2.6 |
15.89 |
3.39 |
158.7 |
4.40 |
NB23-037 |
>Including |
405.68 |
433.31 |
27.63 |
11 |
19.06 |
0.74 |
58.2 |
3.78 |
N/A: Not Applicable due to the variable shapes
of breccia and vein mineralization.
† See “Data Verification” for a description of
true width calculations
Fireweed successfully intersected extensive
pyrite-sphalerite-galena as stratiform massive sulphides, laminated
mineralization, veins, and breccias in the 2023 step-outs (Photos 1
to 3). Mineralization has been intersected in every step-out hole
that has been completed to depth. Assays have now been received for
all 2023 Boundary Zone holes (Tables 1 and 2). Summaries for new
drill results reported in this news release are as follows:
-
Hole NB23-036 intersected 45.22 m (estimated true
width of 44 m) of laminated and massive sulphides grading 18.98%
zinc, 2.24% lead, and 114.9 g/t silver, a near surface interval of
breccia and vein mineralization 75.82 m in width grading 4.21%
zinc, 0.25% lead and 9.9 g/t silver and another interval of breccia
and vein mineralization 77.93 m in width grading 2.58% zinc, 0.31%
lead and 9.8 g/t silver.
-
Hole NB23-037 intersected 118.36 m (estimated true
width of 47 m) of laminated and massive sulphides grading 11.58%
zinc, 1.75% lead and 54.9 g/t silver, as well as two near surface
intervals of breccia and vein mineralization 11.57 m in width
grading 8.05% zinc and 14.6 g/t silver and 2.95 m in width grading
10.20% zinc and 14.8 g/t silver.
-
Hole NB23-034 intersected 53.00 m (estimated true
width of 21 m) of laminated and massive sulphides grading 12.07%
zinc, 1.05% lead and 53.6 g/t silver, and also an interval of
breccia and vein mineralization 25.96 m in width grading 3.97% zinc
and 8.9 g/t silver.
-
Hole NB23-035 intersected 20.22 m of stratiform
and massive sulphide with an unknown true width grading 6.51% zinc,
1.15% lead and 51.5 g/t silver as well as three near surface
intervals of breccia and vein mineralization: 5.17 m grading 17.81%
zinc and 19.1 g/t silver; 6.36 m grading 5.94% zinc, 0.15% lead and
9.8 g/t silver; and 6.45 m grading 3.00% zinc and 4.2 g/t
silver.
-
Hole NB23-038 intersected 12.91 m (estimated true
width of 9.0 m) of stratiform and massive sulphide grading 5.00%
zinc, 0.97% lead and 44.4 g/t silver, and an interval of breccia
and vein mineralization 23.16 m in width grading 2.04% zinc
and 7.8 g/t silver.
-
Hole NB23-033 intersected three intervals of
breccia and vein mineralization: 4.76 m grading 12.10% zinc, 0.61%
lead and 27.2 g/t silver; 8.76 m grading 3.05% zinc and 5.9 g/t
silver; and 6.58 m grading 5.55% zinc and 5.8 g/t silver.
See Tables 1 to 4, Long Section M–M’, Cross
Sections C–C’, K–K’, N–N’, R–R’, S–S’ and Maps 2 and 3 below for
further details.
Out of the 39 holes that were successfully
completed to depth at Boundary Zone in 2023, only 3 were infill
holes; the remaining 36 were step-out holes that tested the vein
and breccia mineralization, laminated stratiform mineralization,
and massive sulphide zones. The geometry and stratigraphic sequence
intersected in these holes continue to support the idea that the
laminated and massive sulphide mineralization are part of the same
geological layer at Boundary Zone, forming an approximately tabular
stratiform zone. Step out drilling down-dip intersected abundant
galena, supporting the presence of the conceptual feeder zone at
least 220 m in strike. The mineralization in the massive stratiform
layer extends from surface to at least 450 m down-dip, over 550 m
in strike with a variable true thickness that is shown on Long
Section M–M’, thinning around the edges and reaching thicknesses
of up to 50 m at its widest point. The zone remains open for
extension.
Extensive vein and breccia mineralization at
Boundary Zone occurs both stratigraphically above and below the
main stratiform laminated massive sulphide zone. This
mineralization forms within a halo approximately 100 m to 150 m
wide on both sides of the stratiform laminated zone and is
interpreted as a stockwork of randomly oriented veins and breccia
zones. Many wide intervals of vein and breccia style sphalerite
mineralization have been encountered in 2023 step-out holes and
four infill holes (Table 3).
2023 Drill Program
The 2023 program achieved 22,500 m of drilling
mostly focused on Boundary, Tom, and Jason zones in addition to
five metallurgical drill holes at Mactung (Map 1). Use of
directional drilling, in which multiple secondary drill holes are
initiated at depth from one primary hole, saved an estimated 1,800
m of drilling compared to traditional drilling of multiple new
holes from surface for a total equivalent metreage of 24,300 m in
2023. This was Fireweed’s largest ever program and the biggest
drill program in Yukon in 2023.
About Fireweed Metals Corp. (TSXV: FWZ;
OTCQB: FWEDF; FSE:M0G): Fireweed Metals is a public
mineral exploration company on the leading edge of Critical
Minerals project development. Fireweed is well-funded, with a
healthy balance sheet, and has three projects located in
Canada:
-
Macpass Project
(Zinc-Lead-Silver): Fireweed owns 100% of
the district-scale 940 km2 Macmillan Pass (“Macpass”) Project in
Yukon, Canada, which is host to one of Earth’s largest undeveloped
resources of zinc*, a Critical Mineral. The Tom and Jason
zinc-lead-silver deposits have current Mineral Resources1 (11.21 Mt
Indicated Resource at 6.59% zinc, 2.48% lead, and 21.33 g/t silver;
and 39.47 Mt Inferred Resource at 5.84% zinc, 3.14% lead, and 38.15
g/t silver) and a Preliminary Economic Assessment2 (PEA). In
addition, Boundary Zone, Tom North and End Zone have significant
zinc-lead-silver mineralization drilled but not yet classified as
mineral resources. The Project also includes large blocks of
adjacent claims with known showings and significant upside
exploration potential.
-
Mactung Project (Tungsten): The
Company owns 100% interest in the 37.6 km2 Mactung Project located
adjacent to the Macpass Project. Recently announced mineral
resources for Mactung (41.5 Mt Indicated Resource at 0.73% WO3 and
12.2 Mt Inferred Resource at 0.59% WO3)3 make it the world’s
largest high-grade resource of the Critical Mineral tungsten*.
Located in Canada, it is one of the rare large tungsten resources
outside of China*.
-
Gayna Project
(Zinc-Lead-Gallium-Germanium): Fireweed
owns 100% of the 128.75 km2 Gayna Project located 180 km north of
the Macpass Project. It is host to extensive mineralization
including Critical Minerals zinc, gallium and germanium as well as
lead and silver, outlined by 28,000 m of historical drilling. A
recent reevaluation of the geology indicates the potential for
high-grade Kipushi-style massive sulphide mineralization.
Qualified Person Statement
Technical information in this news release has
been approved by Fireweed’s VP Geology, Dr. Jack Milton, P.Geo.
(BC), a ‘Qualified Person’ as defined under Canadian National
Instrument 43-101.
In Canada, Fireweed (TSXV: FWZ) trades on the
TSX Venture Exchange. In the USA, Fireweed (OTCQB: FWEDF) trades on
the OTCQB Venture Market (www.otcmarkets.com) and is DTC eligible
for enhanced electronic clearing and settlement. In Europe,
Fireweed (FSE: M0G) trades on the Frankfurt Stock Exchange.
Additional information about Fireweed and its
projects can be found on the Company’s website
at FireweedMetals.com and at www.sedarplus.com
ON BEHALF OF FIREWEED METALS
CORP.
“Brandon Macdonald”
CEO & Director
Contact: Brandon MacdonaldPhone: (604)
646-8361Email: info@fireweedmetals.com
Neither the TSX Venture Exchange nor its
Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for
the adequacy or accuracy of this release.
Data Verification
The diamond drill core logging and sampling
program was carried out under a rigorous quality assurance /
quality control program using industry best practices. Drill
intersections in this release are NQ2 size core (50.5 mm/ 1.99-inch
diameter) with recoveries typically above 85% unless otherwise
noted in the results tables. After drilling, core was cleaned,
logged for geology, structure, and geotechnical characteristics,
then marked for sampling and photographed on site. Certain cores
were selected for core scanning. The cores for analyses were marked
for sampling based on geological intervals with individual samples
2 m or less in length, with 1 m samples within mineralized zones.
Drill core was cut lengthwise in half with a core saw; half-core
was sent for assays reported in this news release, and the other
half is stored on site for reference. Bulk density was determined
on site for the entire length of each assay sample by measurement
of mass in air and mass in water. Sample duplicate bulk density
determinations and in-house bulk density standard determinations
were each made at a rate of 5%. Since 2017, four in-house bulk
density standards (mineralized drill core from the Tom deposit that
span a range of densities) have been used and show an acceptable
long-term precision. Certified standard masses are used to
calibrate the scale balance used for bulk density
determinations.
A total of 5% assay standards or blanks and 5%
core duplicates are included in the sample stream as a quality
control measure and are reviewed after analyses are received.
Standards and blanks in 2023 drill results to date have been
approved as acceptable. Duplicate data add to the long-term
estimates of precision for assay data on the project and precision
for drill results reported is deemed to be within acceptable
levels. Samples were sent to the Bureau Veritas (BV) preparation
laboratory in Whitehorse, Yukon, where the samples were crushed and
a 500 g split was sent to the BV laboratory in Vancouver, B.C to be
pulverized to 85% passing 200 mesh size pulps. Clean crush material
was passed through the crusher and clean silica was pulverized
between each sample. The pulps were analyzed by 1:1:1 Aqua Regia
digestion followed by Inductively Coupled Plasma Mass Spectrometry
(ICP-ES/ICP-MS) multi-element analyses (BV Code AQ270). All samples
were also analyzed for multiple elements by lithium borate fusion
and X-ray fluorescence analysis (XRF) finish (BV Code LF725).
Over-limit lead (>25.0%) and zinc (>24.0%) were analyzed by
lithium borate fusion with XRF finish (BV Code LF726). For BV
samples, silver is reported in this news release by method AQ270,
and zinc and lead are reported by LF725 or LF726. Bureau Veritas
(Vancouver) is an independent, international ISO/IEC 17025:2017
accredited laboratory.
Assay values may appear rounded to one decimal
place but are given in full in Table 1, Table 2, and Cross Sections
where zinc and lead grades are reported to two decimal places.
Results in this news release are length and
bulk-density weighted averages as would be used in a Mineral
Resource estimate. Length and bulk-density weighted averages have
been reported as these most accurately represent the average
metal-content of the intersections.
True widths for primary intervals are estimated
by measuring perpendicular to strike within the short axis of a
stratiform wireframe that has been constructed in 3D around the
mineralized intercepts at Boundary Zone based on assay results,
geological logging, stratigraphic correlation, and bedding
measurements from oriented core. The massive sulphide
mineralization and laminated mineralization at Boundary Zone are
mostly stratiform (oriented parallel to bedding), therefore the
true width, or thickness, of the zone is estimated perpendicular to
both the strike and dip direction of bedding. Vein and breccia
mineralization at Boundary Zone are interpreted to be stockworks
with variable shapes and true widths cannot be accurately
estimated, therefore only intersected widths are reported, and true
widths are marked as N/A in the assay tables. True widths are
rounded to the nearest metre for widths over 10 m and to the
nearest 0.1 m for widths less than 10 m, as this better reflects
the precision of the estimates. True widths should be regarded as
approximate as these are derived from an estimation that uses a
preliminary interpretation of the geological model. True widths for
nested intervals (marked as “Including” in results tables) are
estimated using a ratio of included to primary intersected widths
to attribute appropriate portions of the true width of the primary
interval to the nested intervals.
Cautionary Statements
Forward Looking Statements
This news release contains “forward-looking”
statements and information (“forward-looking statements”). All
statements, other than statements of historical facts, included
herein, including, without limitation, statements relating to
interpretation of drill results and projections of mineralization,
future work plans, the use of funds, and the potential of the
Company’s projects, are forward looking statements. Forward-looking
statements are frequently, but not always, identified by words such
as "expects”, "anticipates”, "believes”, "intends”, "estimates”,
"potential”, "possible”, and similar expressions, or statements
that events, conditions, or results "will”, "may”, "could”, or
"should” occur or be achieved. Forward-looking statements are based
on the beliefs of Company management, as well as assumptions made
by and information currently available to Company management and
reflect the beliefs, opinions, and projections on the date the
statements are made. Forward-looking statements involve various
risks and uncertainties and accordingly, readers are advised not to
place undue reliance on forward-looking statements. There can be no
assurance that such statements will prove to be accurate, and
actual results and future events could differ materially from those
anticipated in such statements. Important factors that could cause
actual results to differ materially from the Company's expectations
include but are not limited to, exploration and development risks,
unanticipated reclamation expenses, expenditure and financing
requirements, general economic conditions, changes in financial
markets, the ability to properly and efficiently staff the
Company’s operations, the sufficiency of working capital and
funding for continued operations, title matters, First Nations
relations, operating hazards, political and economic factors,
competitive factors, metal prices, relationships with vendors and
strategic partners, governmental regulations and oversight,
permitting, seasonality and weather, technological change, industry
practices, uncertainties involved in the interpretation of drilling
results and laboratory tests, and one-time events. The Company
assumes no obligation to update forward‐looking statements or
beliefs, opinions, projections or other factors, except as required
by law.
Footnotes and References
* References to relative size and grade of the
Mactung resources and Macpass resources in comparison to other
tungsten and zinc deposits elsewhere in the world, respectively,
are based on review of the Standard & Poor’s Global Market
Intelligence Capital IQ database.
1: For details, see https://www.sedarplus.ca/
Fireweed Technical Report titled “NI 43-101 Technical Report on the
Macmillan Pass Zinc-Lead-Silver Project, Watson Lake and Mayo
Mining Districts Yukon Territory, Canada” filed on
https://www.sedarplus.ca/ on February 23, 2018, and Fireweed News
Release dated January 10, 2018. .
2: For details, see https://www.sedarplus.ca/
Fireweed Technical Report titled “NI 43-101 Technical Report
Macmillan Pass Project Yukon Territory Canada” filed on
https://www.sedarplus.ca/ on July 9, 2018, and Fireweed News
Release dated May 23, 2018. This Technical Report includes a
Preliminary Economic Analysis disclosing an economic analysis of
mineral resources that is preliminary in nature and does not
include any mineral reserves. It is equally emphasized that the
mineral resources disclosed within this Technical Report are not
mineral reserves and do not have demonstrated economic
viability.
3: For details, see Fireweed news release dated
June 13, 2023 “Fireweed Metals Announces Mineral Resources for the
Mactung Project: the Largest High-Grade Tungsten Deposit in the
World” and the technical report entitled “NI 43-101 Technical
Report, Mactung Project, Yukon Territory, Canada,” with effective
date July 28, 2023 filed on https://www.sedarplus.ca/
Map 1: Macpass Project and
Mactung Project locations
Map 2: Location of 2023 Boundary
Zone drillholes, cross sections and long section M–M’. See below
for sections.
Map 3: Mineralized intervals in
2023 drilling and pre-2023 drilling defining a stratiform laminated
to massive sulphide zone that is connected at depth (purple
polygon) and a broader envelope of vein, breccia, and other
stratiform zinc mineralization, showing significant areal extent
(within green dashed line).
Long Section M–M’ – Estimated
true thickness interpretation and selected intersections with zinc
grades shown within the laminated to massive sulphide stratiform
zone of pyrite-sphalerite-galena mineralization at Boundary Zone.
Halo vein and breccia mineralization is not included in this long
section.
Cross Section C–C’ — Including
analytical results for hole NB23-033.
Cross Section K–K’ — Including
analytical results for hole NB23-035 and NB23-037
Cross Section N–N’ — Including
analytical results for hole NB23-036.
Cross Section R–R’ — Including
analytical results from Holes NB23-038
Cross Section S–S’ — Including
analytical results from Hole NB23-034
Photo 1: High resolution core scanning
image of stratiform and massive to semi-massive sulphide
mineralization in NB23-036 (239.6 m to 249.2 m)
Photo 2: High resolution core scanning
image stratiform and massive to semi-massive sulphide
mineralization in NB23-037 (412.1 m to 422.1 m)
Photo 3: High resolution core scanning
image of sphalerite-pyrite-siderite vein mineralization in NB23-037
(235.1 m to 244.9 m)
Table 2: NB23-033, NB23-034, NB23-035,
NB23-036, NB23-037, NB23-038 drill results
Drillhole |
Interval |
From (m) |
To (m) |
Interval Width (m) |
Est. True Width (m) |
Zinc (%) |
Lead (%) |
Silver (g/t) |
Bulk Density
(t/m3) |
NB23-033 |
Entire Hole† |
0 |
681 |
681 |
N/A |
0.37 |
0.06 |
2.7 |
2.87 |
NB23-033 |
Primary |
77.24 |
82 |
4.76 |
N/A |
12.10 |
0.61 |
27.2 |
3.10 |
NB23-033 |
Including |
77.24 |
81.16 |
3.92 |
N/A |
14.25 |
0.49 |
29.3 |
3.19 |
NB23-033 |
>Including |
77.24 |
81.16 |
3.92 |
N/A |
14.25 |
0.49 |
29.3 |
3.19 |
NB23-033 |
Primary |
277.36 |
286.12 |
8.76 |
N/A |
3.05 |
0.01 |
5.9 |
2.76 |
NB23-033 |
Primary |
635.50 |
642.08 |
6.58 |
N/A |
5.55 |
0.02 |
5.8 |
3.22 |
NB23-034 |
Entire Hole† |
0 |
580.00 |
580.00 |
N/A |
1.82 |
0.16 |
9.4 |
3.01 |
NB23-034 |
Primary |
426.78 |
479.78 |
53.00 |
21 |
12.07 |
1.05 |
53.6 |
4.05 |
NB23-034 |
Including |
432.41 |
478.78 |
46.37 |
18 |
13.28 |
1.12 |
57.3 |
4.12 |
NB23-034 |
>Including |
435.41 |
475.38 |
39.97 |
16 |
14.76 |
1.10 |
59.5 |
4.11 |
NB23-034 |
>>Including |
436.87 |
472.38 |
35.51 |
14 |
15.61 |
0.92 |
57.0 |
4.07 |
NB23-034 |
Primary |
550.29 |
576.25 |
25.96 |
N/A |
3.97 |
0.05 |
8.9 |
3.53 |
NB23-034 |
Including |
550.29 |
554.55 |
4.26 |
N/A |
10.00 |
0.09 |
20.0 |
4.19 |
NB23-035 |
Entire Hole† |
0 |
552.28 |
552.28 |
N/A |
0.68 |
0.07 |
4.3 |
2.87 |
NB23-035 |
Primary |
76.12 |
81.29 |
5.17 |
N/A |
17.81 |
0.07 |
19.1 |
3.19 |
NB23-035 |
Primary |
276.00 |
282.36 |
6.36 |
N/A |
5.94 |
0.15 |
9.8 |
2.93 |
NB23-035 |
Primary |
342.67 |
349.12 |
6.45 |
N/A |
3.00 |
0.01 |
4.2 |
2.79 |
NB23-035 |
Primary |
396.96 |
417.18 |
20.22 |
Unknown |
6.51 |
1.15 |
51.5 |
3.54 |
NB23-036 |
Entire Hole† |
0 |
397.20 |
397.20 |
N/A |
4.40 |
0.47 |
22.9 |
3.12 |
NB23-036 |
Primary |
95.50 |
171.32 |
75.82 |
N/A |
4.21 |
0.25 |
9.9 |
2.87 |
NB23-036 |
Including |
108.87 |
121.5 |
12.63 |
N/A |
6.97 |
0.32 |
16.6 |
3.10 |
NB23-036 |
>Including |
108.87 |
112.56 |
3.69 |
N/A |
14.41 |
0.08 |
17.4 |
3.23 |
NB23-036 |
Including |
156.00 |
171.32 |
15.32 |
N/A |
7.31 |
0.90 |
19.1 |
2.87 |
NB23-036 |
Primary |
210.33 |
255.55 |
45.22 |
44 |
18.98 |
2.24 |
114.9 |
4.13 |
NB23-036 |
Including |
211.33 |
255.55 |
44.22 |
43 |
19.35 |
2.28 |
115.5 |
4.12 |
NB23-036 |
>Including |
216.33 |
255.55 |
39.22 |
38 |
20.84 |
2.48 |
115.4 |
4.05 |
NB23-036 |
>>Including |
235.64 |
243.74 |
8.10 |
7.9 |
28.90 |
4.75 |
142.2 |
3.95 |
NB23-036 |
Primary |
304.06 |
381.99 |
77.93 |
N/A |
2.58 |
0.31 |
9.8 |
3.25 |
NB23-036 |
Including |
328.18 |
334.21 |
6.03 |
N/A |
5.37 |
0.08 |
7.1 |
3.25 |
NB23-036 |
Including |
365.85 |
381.99 |
16.14 |
N/A |
3.52 |
0.81 |
15.3 |
3.34 |
NB23-037 |
Entire Hole† |
0 |
544 |
544 |
N/A |
3.46 |
0.49 |
17.2 |
3.09 |
NB23-037 |
Primary |
70.05 |
73.00 |
2.95 |
N/A |
10.20 |
0.09 |
14.8 |
3.14 |
NB23-037 |
Primary |
235.73 |
247.30 |
11.57 |
N/A |
8.05 |
0.03 |
14.6 |
2.89 |
NB23-037 |
Including |
235.73 |
242.30 |
6.57 |
N/A |
11.38 |
0.05 |
21.3 |
2.94 |
NB23-037 |
>Including* |
237.61 |
242.30 |
4.69 |
N/A |
13.93 |
0.06 |
24.8 |
2.98 |
NB23-037 |
Primary |
352.74 |
471.10 |
118.36 |
47 |
11.58 |
1.75 |
54.9 |
3.81 |
NB23-037 |
Including |
353.71 |
463.47 |
109.76 |
44 |
12.05 |
1.76 |
55.4 |
3.87 |
NB23-037 |
>Including |
353.71 |
360.34 |
6.63 |
2.6 |
15.89 |
3.39 |
158.7 |
4.40 |
NB23-037 |
>Including |
405.68 |
433.31 |
27.63 |
11 |
19.06 |
0.74 |
58.2 |
3.78 |
NB23-038 |
Entire Hole† |
0 |
426.5 |
426.5 |
N/A |
0.52 |
0.07 |
5.9 |
2.97 |
NB23-038 |
Primary |
299.38 |
312.29 |
12.91 |
9.0 |
5.00 |
0.97 |
44.4 |
4.06 |
NB23-038 |
Including |
299.38 |
304.20 |
4.82 |
3.4 |
10.87 |
2.33 |
78.9 |
4.12 |
NB23-038 |
>Including |
299.38 |
301.32 |
1.94 |
1.4 |
17.89 |
5.12 |
156.4 |
4.37 |
NB23-038 |
Primary |
367.00 |
390.16 |
23.16 |
N/A |
2.04 |
0.09 |
7.8 |
3.74 |
* Denotes intervals with recovery of less than
85%; N/A: Not Applicable due to the variable shapes of breccia and
vein mineralization.
† Entire hole intervals contain large continuous
sections of very low grade or not mineralized material (below 2%
zinc)—intersections of continuous higher-grade material (>2%
zinc) are listed as Primary and Included intervals and represent
mineralized material.
‡ See “Data Verification” for a description of
true width calculations
Table 3: 2023 Drilling
Summary
Drillhole |
Length (m) |
Zone |
Significant Intersection |
Type |
NB23-001 |
460 |
Boundary |
Results disclosed Jul 26 2023 |
Step Out |
NB23-002 |
351 |
Boundary |
Results disclosed Jul 26 2023 |
Step Out |
NB23-003 |
418 |
Boundary |
Results disclosed Jul 26 2023 |
Step Out |
NB23-004 |
432 |
Boundary |
Results disclosed Aug 22 2023 |
Step Out |
NB23-005 |
234 |
Boundary |
Results disclosed Aug 22 2023 |
Step Out |
NB23-006 |
373 |
Boundary |
Results disclosed Aug 22 2023 |
Step Out |
NB23-007 |
461 |
Boundary |
Results disclosed Aug 22 2023 |
Step Out |
NB23-008 |
385 |
Boundary |
Results disclosed Aug 22 2023 |
Step Out |
NB23-009 |
67 |
Boundary |
Hole abandoned and redrilled as NB23-011 |
Step Out |
NB23-010 |
96 |
Boundary |
Results disclosed Oct 24 2023 |
Step Out |
NB23-011 |
289 |
Boundary |
Results disclosed Oct 24 2023 |
Step Out |
NB23-012 |
452 |
Boundary |
Results disclosed Oct 24 2023 |
Step Out |
NB23-013 |
551 |
Boundary |
Results disclosed Oct 24 2023 |
Step Out |
NB23-014 |
223 |
Boundary |
Results disclosed Oct 24 2023 |
Step Out |
NB23-015 |
339 |
Boundary |
Results disclosed Oct 24 2023 |
Step Out |
NB23-016 |
460 |
Boundary |
Results disclosed Oct 24 2023 |
Step Out |
NB23-017 |
96 |
Boundary |
Results disclosed Nov 30 2023 |
Step Out |
NB23-018 |
195 |
Boundary |
Results disclosed Nov 30 2023 |
Step Out |
NB23-019 |
560 |
Boundary |
Results disclosed Nov 30 2023 |
Step Out |
NB23-020 |
414 |
Boundary |
Results disclosed Nov 30 2023 |
Step Out |
NB23-021 |
442 |
Boundary |
Results disclosed Nov 30 2023 |
Infill |
NB23-022 |
386 |
Boundary |
Results disclosed Jan 9 2024 |
Step Out |
NB23-022D1 |
448 |
Boundary |
Results disclosed Jan 9 2024 |
Step Out |
NB23-023 |
181 |
Boundary |
Results disclosed Nov 30 2023 |
Step Out |
NB23-024 |
402 |
Boundary |
Results disclosed Nov 30 2023 |
Infill |
NB23-025 |
580 |
Boundary |
Results disclosed Nov 30 2023 |
Step Out |
NB23-026 |
111 |
Boundary |
Results disclosed Nov 30 2023 |
Step Out |
NB23-027 |
396 |
Boundary |
Results disclosed Nov 30 2023 |
Infill |
NB23-028 |
477 |
Boundary |
Results disclosed Jan 9 2024 |
Step Out |
NB23-029 |
640 |
Boundary |
Results disclosed Jan 9 2024 |
Step Out |
NB23-029D1 |
689 |
Boundary |
Results disclosed Jan 9 2024 |
Step Out |
NB23-030 |
526 |
Boundary |
Results disclosed Nov 30 2023 |
Step Out |
NB23-031 |
574 |
Boundary |
Results disclosed Jan 9 2024 |
Step Out |
NB23-032 |
495 |
Boundary |
Results disclosed Jan 9 2024 |
Step Out |
NB23-033 |
681 |
Boundary |
Results disclosed in this release |
Step Out |
NB23-034 |
580 |
Boundary |
Results disclosed in this release |
Step Out |
NB23-035 |
552 |
Boundary |
Results disclosed in this release |
Step Out |
NB23-036 |
397 |
Boundary |
Results disclosed in this release |
Step Out |
NB23-037 |
544 |
Boundary |
Results disclosed in this release |
Step Out |
NB23-038 |
427 |
Boundary |
Results disclosed in this release |
Step Out |
TS23-001 |
143 |
Tom North |
Minor Mineralization Encountered |
Step Out |
TS23-002 |
182 |
Tom North |
Minor Mineralization Encountered |
Step Out |
TS23-003 |
299 |
Tom West |
Wide Zone Encountered |
Step Out |
TS23-004 |
369 |
Tom West |
Moderate Zone Encountered |
Step Out |
TS23-005 |
407 |
Tom West |
Moderate Zone Encountered |
Step Out |
TS23-006 |
137 |
Tom West |
Moderate Zone Encountered |
Step Out |
TS23-007 |
215 |
Tom West |
Moderate Zone Encountered |
Step Out |
TS23-008 |
428 |
Tom West |
Moderate Zone Encountered |
Step Out |
TS23-009 |
749 |
Tom South |
Wide Zone Encountered |
Step Out |
TS23-009D1 |
747 |
Tom South |
Wide Zone Encountered |
Redrill |
TS23-009D2 |
821 |
Tom South |
Wide Zone Encountered |
Step Out |
JS23-001 |
631 |
Jason South |
Narrow Zone Encountered |
Step Out |
JS23-001D1 |
665 |
Jason South |
Wide Zone Encountered |
Step Out |
BX23-001 |
219 |
Boundary South |
No significant mineralization |
Exploration |
BX23-002 |
144 |
Boundary South |
No significant mineralization |
Exploration |
KB23-001 |
368 |
Kobuk |
No significant mineralization |
Exploration |
KB23-002 |
284 |
Kobuk |
No significant mineralization |
Exploration |
Table 4: Drill Hole Collar
Information
Drillhole |
Zone |
Length (m) |
Easting |
Northing |
Elevation (m.s.l) |
Azimuth (°) |
Dip (°) |
NB23-001 |
Boundary |
460 |
422297 |
7010471 |
1185.86 |
211.99 |
-76.42 |
NB23-002 |
Boundary |
351 |
422235 |
7010525 |
1194.57 |
214.06 |
-70.22 |
NB23-003 |
Boundary |
418 |
422235 |
7010525 |
1194.57 |
213.40 |
-78.00 |
NB23-004 |
Boundary |
432 |
422171 |
7010556 |
1203.00 |
213.91 |
-78.08 |
NB23-005 |
Boundary |
234 |
422058 |
7010589 |
1207.95 |
199.63 |
-49.74 |
NB23-006 |
Boundary |
373 |
422171 |
7010556 |
1203.00 |
215.44 |
-70.02 |
NB23-007 |
Boundary |
461 |
422058 |
7010589 |
1207.95 |
206.37 |
-86.43 |
NB23-008 |
Boundary |
385 |
422171 |
7010556 |
1203.00 |
215.83 |
-60.07 |
NB23-009 |
Boundary |
67 |
422058 |
7010589 |
1208.67 |
198.54 |
-75.41 |
NB23-010 |
Boundary |
96 |
422241 |
7010385 |
1150.41 |
212.28 |
-45.00 |
NB23-011 |
Boundary |
289 |
422058 |
7010589 |
1208.67 |
201.59 |
-75.40 |
NB23-012 |
Boundary |
452 |
422289 |
7010534 |
1200.90 |
211.75 |
-69.90 |
NB23-013 |
Boundary |
551 |
422072 |
7010666 |
1233.59 |
214.94 |
-77.68 |
NB23-014 |
Boundary |
223 |
422241 |
7010384 |
1150.86 |
213.68 |
-70.83 |
NB23-015 |
Boundary |
339 |
422241 |
7010385 |
1150.41 |
213.36 |
-84.00 |
NB23-016 |
Boundary |
461 |
422274 |
7010600 |
1216. 70 |
209.88 |
-72.96 |
NB23-017 |
Boundary |
96 |
422279 |
7010359 |
1142.67 |
191.27 |
-46.90 |
NB23-018 |
Boundary |
195 |
422279 |
7010359 |
1142.67 |
190.21 |
-65.21 |
NB23-019 |
Boundary |
561 |
422289 |
7010534 |
1200.90 |
209.95 |
-81.31 |
NB23-020 |
Boundary |
414 |
422465 |
7010510 |
1191.44 |
204.85 |
-63.35 |
NB23-021 |
Boundary |
442 |
422391 |
7010500 |
1190.07 |
201.97 |
-77.01 |
NB23-022 |
Boundary |
386 |
421948 |
7010672 |
1232.44 |
178.85 |
-74.18 |
NB23-022D1 |
Boundary |
448 |
421948 |
7010672 |
1232.44 |
177.78 |
-74.00 |
NB23-023 |
Boundary |
181 |
422449 |
7010351 |
1145.42 |
211.82 |
-49.18 |
NB23-024 |
Boundary |
405 |
422348 |
7010550 |
1203.82 |
199.65 |
-50.18 |
NB23-025 |
Boundary |
582 |
422343 |
7010620 |
1219.03 |
196.94 |
-74.05 |
NB23-026 |
Boundary |
111 |
422449 |
7010351 |
1145.42 |
210.02 |
-65.44 |
NB23-027 |
Boundary |
451 |
422348 |
7010550 |
1203.82 |
197.18 |
-72.46 |
NB23-028 |
Boundary |
467 |
422222 |
7010587 |
1209.75 |
211.38 |
-65.44 |
NB23-029 |
Boundary |
630 |
422124 |
7010731 |
1250.31 |
196.21 |
-75.67 |
NB23-029D1 |
Boundary |
690 |
422124 |
7010731 |
1250.31 |
196.21 |
-75.67 |
NB23-030 |
Boundary |
526 |
422535 |
7010614 |
1214.65 |
211.44 |
-62.01 |
NB23-031 |
Boundary |
574 |
422329 |
7010671 |
1235.88 |
207.69 |
-69.87 |
NB23-032 |
Boundary |
493 |
422165 |
7010640 |
1224.09 |
210.08 |
-62.01 |
NB23-033 |
Boundary |
681 |
422228 |
7010663 |
1233.01 |
211.31 |
-73.88 |
NB23-034 |
Boundary |
580 |
422138 |
7010674 |
1237.24 |
199.07 |
-72.40 |
NB23-035 |
Boundary |
552 |
422228 |
7010663 |
1232.97 |
199.00 |
-72.02 |
NB23-036 |
Boundary |
398 |
422289 |
7010534 |
1200.89 |
212.26 |
-59.46 |
NB23-037 |
Boundary |
544 |
422228 |
7010663 |
1232.94 |
204.73 |
-66.10 |
NB23-038 |
Boundary |
427 |
422001 |
7010675 |
1233.60 |
179.75 |
-68.10 |
TS23-001 |
Tom North |
143 |
441761 |
7004226 |
1492.16 |
075.08 |
-49.66 |
TS23-002 |
Tom North |
182 |
441761 |
7004226 |
1492.16 |
074.97 |
-80.38 |
TS23-003 |
Tom West |
299 |
441676 |
7004024 |
1445.00 |
074.17 |
-68.51 |
TS23-004 |
Tom West |
369 |
441694 |
7003884 |
1463.34 |
067.38 |
-71.48 |
TS23-005 |
Tom West |
407 |
441761 |
7003770 |
1510.00 |
063.25 |
-75.35 |
TS23-006 |
Tom West |
137 |
441779 |
7004076 |
1485.36 |
065.15 |
-50.08 |
TS23-007 |
Tom West |
215 |
441779 |
7004076 |
1485.36 |
065.23 |
-78.04 |
TS23-008 |
Tom West |
428 |
441816 |
7003717 |
1538.00 |
089.53 |
-88.95 |
TS23-009 |
Tom South |
749 |
442363 |
7003106 |
1747.29 |
351.97 |
-82.00 |
TS23-009D1 |
Tom South |
748 |
442363 |
7003106 |
1747.29 |
351.97 |
-82.00 |
TS23-009D2 |
Tom South |
821 |
442363 |
7003106 |
1747.29 |
351.97 |
-82.00 |
JS23-001 |
Jason South |
631 |
436722 |
7002304 |
1185.00 |
228.15 |
-83.90 |
JS23-001D1 |
Jason South |
665 |
436722 |
7002304 |
1185.00 |
228.15 |
-83.90 |
BX23-001 |
Boundary Expl. |
219 |
421752 |
7010127 |
1114.70 |
035.16 |
-50.19 |
BX23-002 |
Boundary Expl. |
144 |
421637 |
7010243 |
1137.50 |
014.78 |
-49.83 |
KB23-001 |
Kobuk |
368 |
418651 |
7012138 |
1311.00 |
006.19 |
-51.12 |
KB23-002 |
Kobuk |
284 |
418754 |
7011620 |
1225.00 |
006.00 |
-65.24 |
Coordinates listed in NAD83 UTM Zone 9N.
Photos accompanying this announcement are available at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/a3d2ebc1-3604-4ad1-8174-25e087dbe69b
https://www.globenewswire.com/NewsRoom/AttachmentNg/d4d15648-8bb7-4703-af47-0500ac5f4fd0
https://www.globenewswire.com/NewsRoom/AttachmentNg/1f6c8a0e-76e2-40cb-90eb-d664513a0e4f
https://www.globenewswire.com/NewsRoom/AttachmentNg/9dc31ce1-b1b8-44ac-8de5-d05f0b5b4e5f
https://www.globenewswire.com/NewsRoom/AttachmentNg/66b0c6a5-222c-4e24-976a-bfcfd3630421
https://www.globenewswire.com/NewsRoom/AttachmentNg/56c58aa2-055c-42db-a607-e1c580c5484d
https://www.globenewswire.com/NewsRoom/AttachmentNg/b2f6a2b8-4874-482f-860e-b8d4291f0a50
https://www.globenewswire.com/NewsRoom/AttachmentNg/cce53c5b-a46b-4930-9881-69f26e4f7783
https://www.globenewswire.com/NewsRoom/AttachmentNg/e1d0f28d-dadd-483f-b7a6-66ba21fe7036
https://www.globenewswire.com/NewsRoom/AttachmentNg/46879f08-efc3-4b76-a7e4-b74745ec1086
https://www.globenewswire.com/NewsRoom/AttachmentNg/6ca0043f-8dad-4e30-8472-a15d4983bbfe
https://www.globenewswire.com/NewsRoom/AttachmentNg/71d1604b-c7fb-442a-b488-496396ac7310
Grafico Azioni Fireweed Metals (TSXV:FWZ)
Storico
Da Dic 2024 a Gen 2025
Grafico Azioni Fireweed Metals (TSXV:FWZ)
Storico
Da Gen 2024 a Gen 2025