
Notice to
ASX/LSE

Mineral Resources and Ore Reserves updates
19 February 2025
Rio Tinto has today announced to the
Australian Securities Exchange (ASX) changes in Mineral Resources
and Ore Reserves to support its 2024 annual reporting[1], including:
· Increased Proved Ore Reserves and decreased Mineral Resources
at the Rio Tinto Aluminium (RTA) Pacific Operations Amrun deposit
in Queensland, Australia.
· Increased Indicated Mineral Resources at the Rio Tinto Copper
Winu project in Western Australia, Australia.
· Increased Mineral Resources at the Rio Tinto Iron and Titanium
Quebec Operations (RTITQO) in Quebec, Canada.
· Increased Ore Reserves and decreased Mineral Resources at the
RTA Atlantic Operations Porto Trombetas deposit in Brazil. Porto
Trombetas is operated by the Mineração Rio do Norte (MRN) joint
venture.
Supporting information relating to
the changes of Mineral Resources and Ore Reserves is set out in the
Table 1 Release and its appendices. This release provides a summary
of those changes. Mineral Resources and Ore Reserves are quoted in
this release on a 100 percent basis. Mineral Resources are reported
in addition to Ore Reserves. The figures used to calculate Mineral
Resources and Ore Reserves are often more precise than the rounded
numbers shown in the tables, hence small differences may result if
the calculations are repeated using the tabulated
figures.
These changes will be included in
Rio Tinto's 2024 Annual Report, to be released to the market on 19
February 2025 (London time), which will set out in full Rio Tinto's
Mineral Resources and Ore Reserves position as at 31 December 2024,
and Rio Tinto's interests.
Rio
Tinto Aluminium Pacific Operations - Amrun
Mineral Resources and Ore Reserves
for the RTA Pacific Operations[2], including the
Amrun deposit, are presented in Table
A and Table
B. The updated Ore Reserves at Amrun
reflect a material change in classification. Proved Ore Reserves
have increased by 203 million tonnes (Mt) (77%), while Probable Ore
Reserves have decreased by 176 Mt (26%). The change in Ore Reserves
classification reflects a higher level of confidence in the
modifying factors resulting from completion of an access study, and
increased confidence in the underlying Mineral Resources as a
result of updated orebody knowledge. There has been no
material change to other modifying factors, including governmental,
tenure, environmental, cultural heritage or community factors.
Mineral Resources exclusive of Ore Reserves have decreased by 41 Mt
(5%) at Amrun due to the conversion of Mineral Resources to Ore
Reserves, and updated orebody knowledge.
Rio
Tinto Copper - Winu
Mineral Resources for
Winu[3] are presented in Table C. Indicated Mineral Resources
comprise 63% of these Mineral Resources, which is a substantial
increase from the previously reported 31% of Mineral Resources.
This change is the result of the implementation of a
different classification methodology which
uses the relationship between drill hole spacing and orebody
uncertainty as determined by conditional simulation of copper
grades. The total Mineral Resources tonnage
has increased by 19 Mt (2.7%) in comparison to the previously
reported estimates.
Rio
Tinto Iron and Titanium Quebec Operations
Mineral Resources for RTITQO[4] are presented in Table D. Significant technical
work conducted from 2000 to 2024 on the Grader deposit situated 3
kilometres (km) from the main Lac Tio hemo-ilmenite deposit, with
over 4,800 metres (m) of drilling, and the development of a new
resource model, has resulted in a 26.7 Mt (100%) increase in
Mineral Resources.
Rio
Tinto Aluminium Atlantic Operations - Porto Trombetas
(MRN)
Mineral Resources and Ore Reserves
for the RTA Atlantic Operations, Porto Trombetas
deposit[5] are presented in
Table E and
Table F. Probable Ore
Reserves have increased by 167 Mt, while Proved Ore Reserves have
decreased by 4 Mt for an overall increase in Ore Reserves of
163 Mt (354%). The increase in Ore Reserves is attributed to the
issuance of the Preliminary Licence for the New Mines Project by
IBAMA (the Brazilian Federal Environmental Agency). There have been
no other significant changes in modifying factors, including
governmental, tenure, cultural heritage, community factors, or
operational aspects.
Measured Mineral Resources have decreased by
178 Mt and Inferred Mineral Resources have decreased by 112 Mt
for an overall decrease of 290 Mt (50%). The decrease in Mineral
Resources is partly due to the conversion of bauxite from Mineral
Resources to Ore Reserves, as mentioned above, as well as to the
downgrade of certain plateaus, containing only historical drilling
data, from the Inferred Resource category to non-Resource status.
The methodology for determining Mineral Resources remains
unchanged.
Table
A
Rio Tinto Aluminium Pacific Operations Mineral Resources as at 31
December 2024
|
Likely
mining
method(1)
|
Measured Mineral Resources
|
Indicated Mineral
Resources
|
Total Measured and Indicated
Mineral
|
|
as at 31 December 2024
|
as at 31 December 2024
|
Resources as at 31 December
2024
|
|
Tonnage
|
Grade
|
|
Tonnage
|
Grade
|
|
Tonnage
|
Grade
|
|
Bauxite
|
|
Mt
|
%
Al2O3
|
%
SiO2
|
Mt
|
%
Al2O3
|
%
SiO2
|
Mt
|
%
Al2O3
|
%
SiO2
|
Rio Tinto Aluminium
(Australia)(2)
|
|
|
|
|
|
|
|
|
|
|
- Amrun
|
O/P
|
129
|
49.1
|
11.7
|
380
|
49.7
|
11.8
|
509
|
49.5
|
11.8
|
- East Weipa and Andoom
|
O/P
|
36
|
48.0
|
8.9
|
-
|
-
|
-
|
36
|
48.0
|
8.9
|
- Gove
|
O/P
|
10
|
47.7
|
9.0
|
0.1
|
49.5
|
8.4
|
10
|
47.7
|
9.0
|
- North of Weipa
|
O/P
|
-
|
-
|
-
|
202
|
52.0
|
11.1
|
202
|
52.0
|
11.1
|
Total (Australia)
|
|
175
|
48.8
|
11.0
|
583
|
50.5
|
11.6
|
758
|
50.1
|
11.4
|
|
Inferred Mineral Resources
|
Total Mineral Resources
|
Rio
Tinto
interest
|
Total Mineral Resources
|
|
as at 31 December 2024
|
as
at 31 December 2024
|
as at 31 December 2023
|
|
Tonnage
|
Grade
|
|
Tonnage
|
Grade
|
|
|
Tonnage
|
Grade
|
|
Bauxite
|
Mt
|
%
Al2O3
|
%
SiO2
|
Mt
|
%
Al2O3
|
%
SiO2
|
%
|
Mt
|
%
Al2O3
|
%
SiO2
|
Rio Tinto Aluminium
(Australia)(2)
|
|
|
|
|
|
|
|
|
|
|
- Amrun
|
238
|
51.4
|
12.4
|
747
|
50.1
|
12.0
|
100.0
|
788
|
50.4
|
11.9
|
- East Weipa and Andoom
|
-
|
-
|
-
|
36
|
48.0
|
8.9
|
100.0
|
43
|
49.9
|
8.8
|
- Gove
|
-
|
-
|
-
|
10
|
47.7
|
9.0
|
100.0
|
9
|
48.1
|
8.9
|
- North of Weipa
|
1,248
|
51.8
|
11.4
|
1,451
|
51.9
|
11.4
|
100.0
|
1,451
|
51.9
|
11.4
|
Total (Australia)
|
1,486
|
51.8
|
11.6
|
2,244
|
51.2
|
11.5
|
|
2,291
|
51.3
|
11.5
|
1. Likely mining method:
O/P = open pit/surface.
2. Rio Tinto Aluminium
bauxite Mineral Resources are stated as dry product tonnes and
total alumina and silica grades.
Table
B
Rio Tinto Aluminium Pacific Operations Ore Reserves as at 31
December 2024
|
Type
of
mine(1)
|
Proved Ore Reserves
|
Probable Ore Reserves
|
Total Ore Reserves
|
|
as at 31 December 2024
|
as at 31 December 2024
|
as
at 31 December 2024
|
|
Tonnage
|
Grade
|
|
Tonnage
|
Grade
|
|
Tonnage
|
Grade
|
|
Bauxite(2)
|
|
Mt
|
%
Al2O3
|
%
SiO2
|
Mt
|
%
Al2O3
|
%
SiO2
|
Mt
|
%
Al2O3
|
%
SiO2
|
Rio Tinto Aluminium
(Australia)(3)
|
|
|
|
|
|
|
|
|
|
|
- Amrun
|
O/P
|
466
|
54.6
|
8.8
|
512
|
54.3
|
9.1
|
978
|
54.4
|
9.0
|
- East Weipa and Andoom
|
O/P
|
55
|
50.6
|
8.1
|
2
|
48.9
|
8.5
|
56
|
50.5
|
8.1
|
- Gove
|
O/P
|
44
|
50.0
|
6.4
|
4
|
50.3
|
6.7
|
48
|
50.0
|
6.4
|
Total (Australia)
|
|
565
|
53.8
|
8.6
|
518
|
54.2
|
9.1
|
1,083
|
54.0
|
8.8
|
|
Rio Tinto interest
|
Rio
Tinto share recoverable mineral
|
|
Total Ore Reserves as at 31 December
2023
|
|
|
Tonnage
|
Grade
|
|
Bauxite(2)
|
%
|
Mt
|
|
Mt
|
%
Al2O3
|
%
SiO2
|
Rio Tinto Aluminium
(Australia)(3)
|
|
|
|
|
|
|
- Amrun
|
100.0
|
978
|
|
950
|
54.3
|
9.1
|
- East Weipa and Andoom
|
100.0
|
56
|
|
72
|
50.5
|
8.0
|
- Gove
|
100.0
|
48
|
|
58
|
50.2
|
6.4
|
Total (Australia)
|
100.0
|
1,083
|
|
1,080
|
53.8
|
8.8
|
1. Type of
Mine: O/P = open pit/surface.
2. Bauxite
Ore Reserves are stated as recoverable Ore Reserves of marketable
product after accounting for all mining and processing losses. Mill
recoveries are therefore not shown.
3.
Australian bauxite Ore Reserves are stated as dry tonnes and total
alumina and silica grade.
Table
C
Rio Tinto Copper Winu Mineral Resources as at 31 December
2024
|
Likely
mining
method(1)
|
Measured Mineral Resources
|
Indicated Mineral
Resources
|
Total Measured and Indicated
Mineral
|
|
as at 31 December 2024
|
as at 31 December 2024
|
Resources as at 31 December
2024
|
|
Tonnage
|
Grade
|
|
|
Tonnage
|
Grade
|
|
|
Tonnage
|
Grade
|
|
|
Copper(2)
|
|
Mt
|
%
Cu
|
g/t
Au
|
g/t
Ag
|
Mt
|
%
Cu
|
g/t
Au
|
g/t
Ag
|
Mt
|
%
Cu
|
g/t
Au
|
g/t
Ag
|
Winu
|
O/P
|
-
|
-
|
-
|
-
|
464
|
0.39
|
0.32
|
2.24
|
464
|
0.39
|
0.32
|
2.24
|
|
Inferred Mineral Resources
|
Total Mineral Resources
|
Rio
Tinto
interest
|
Total Mineral Resources
|
|
as at 31 December 2024
|
as
at 31 December 2024
|
as at 31 December 2023
|
|
Tonnage
|
Grade
|
|
|
Tonnage
|
Grade
|
|
|
Tonnage
|
Grade
|
|
|
Copper(2)
|
Mt
|
%
Cu
|
g/t
Au
|
g/t
Ag
|
Mt
|
% Cu
|
g/t Au
|
g/t Ag
|
%
|
Mt
|
%
Cu
|
g/t
Au
|
g/t
Ag
|
Winu
|
277
|
0.41
|
0.36
|
2.12
|
741
|
0.40
|
0.33
|
2.20
|
100.0
|
721
|
0.40
|
0.34
|
2.21
|
1. Likely mining method:
O/P = open pit/surface.
2. Copper Mineral
Resources are stated on a dry in situ weight basis.
Table
D
Rio Tinto Iron and Titanium Quebec Operations Mineral Resources as
at 31 December 2024
|
Likely mining
method(1)
|
Measured Mineral Resources as at 31
December 2024
|
Indicated Mineral
Resources
as at 31 December 2024
|
Total Measured and Indicated
Mineral
Resources as at 31 December
2024
|
|
|
Tonnage
|
Grade
|
Tonnage
|
Grade
|
Tonnage
|
Grade
|
Titanium dioxide feedstock(2)
|
Mt
|
Mt
|
% Ti Minerals
|
Mt
|
% Ti Minerals
|
Mt
|
% Ti Minerals
|
Rio Tinto Iron and Titanium (RTIT)
Quebec Operations (Canada))
|
|
|
|
|
|
|
|
- Grader
|
O/P
|
19
|
82.0
|
9
|
81.8
|
28
|
82.0
|
- Beaver
|
O/P
|
-
|
-
|
-
|
-
|
-
|
-
|
- Tio
|
O/P
|
-
|
-
|
-
|
-
|
-
|
-
|
Total
|
|
19
|
82.0
|
9
|
81.8
|
28
|
82.0
|
|
Inferred Mineral Resources
as at 31 December 2024
|
Total Mineral Resources
as
at 31 December 2024
|
Rio Tinto
interest
|
Total Mineral Resources
as at 31 December 2023
|
|
Tonnage
|
Grade
|
Tonnage
|
Grade
|
Tonnage
|
Grade
|
Titanium dioxide feedstock(2)
|
Mt
|
% Ti Minerals
|
Mt
|
% Ti
Minerals
|
%
|
Mt
|
% Ti Minerals
|
Rio Tinto Iron and Titanium (RTIT)
Quebec Operations (Canada))
|
|
|
|
|
|
|
|
- Grader
|
10
|
80.4
|
38
|
81.6
|
100.0
|
11
|
84.9
|
- Beaver
|
16
|
79.2
|
16
|
79.2
|
100.0
|
16
|
79.2
|
- Tio
|
-
|
-
|
-
|
-
|
100.0
|
-
|
-
|
Total
|
25
|
79.7
|
53
|
80.9
|
|
27
|
81.6
|
1. Likely mining method:
O/P = open pit/surface.
2. Titanium dioxide
feedstock Mineral Resources are reported as dry in situ
tonnes.
Table
E
Rio Tinto Aluminium Atlantic Operations Porto Trombetas (MRN)
Mineral Resources as at 31 December 2024
|
Likely
mining
method(1)
|
Measured Mineral Resources
|
Indicated Mineral
Resources
|
Total Measured and Indicated
Mineral
|
|
as at 31 December 2024
|
as at 31 December 2024
|
Resources as at 31 December
2024
|
|
Tonnage
|
Grade
|
|
Tonnage
|
Grade
|
|
Tonnage
|
Grade
|
|
Bauxite
|
|
Mt
|
%
Al2O3
|
%
SiO2
|
Mt
|
%
Al2O3
|
%
SiO2
|
Mt
|
%
Al2O3
|
%
SiO2
|
Porto Trombetas (MRN)
(Brazil)(2)
|
O/P
|
244
|
46.8
|
5.9
|
3
|
49.1
|
2.5
|
247
|
46.8
|
5.9
|
|
Inferred Mineral Resources
|
Total Mineral Resources
|
Rio
Tinto
interest
|
Total Mineral Resources
|
|
as at 31 December 2024
|
as
at 31 December 2024
|
as at 31 December 2023
|
|
Tonnage
|
Grade
|
|
Tonnage
|
Grade
|
|
|
Tonnage
|
Grade
|
|
Bauxite
|
Mt
|
%
Al2O3
|
%
SiO2
|
Mt
|
%
Al2O3
|
%
SiO2
|
%
|
Mt
|
%
Al2O3
|
%
SiO2
|
Porto Trombetas (MRN)
(Brazil)(2)
|
34
|
47.3
|
5.2
|
282
|
46.9
|
5.8
|
22.0
|
571
|
47.9
|
5.0
|
1. Likely mining method:
O/P = open pit/surface.
2. Porto Trombetas (MRN)
Mineral Resources are stated as dry in situ tonnes, available
alumina grade and total reactive silica grade.
Table
F
Rio Tinto Aluminium Atlantic Operations Porto Trombetas (MRN) Ore
Reserves as at 31 December 2024
|
Type
of
mine(1)
|
Proved Ore Reserves
|
Probable Ore Reserves
|
Total Ore Reserves
|
|
as at 31 December 2024
|
as at 31 December 2024
|
as
at 31 December 2024
|
|
Tonnage
|
Grade
|
|
Tonnage
|
Grade
|
|
Tonnage
|
Grade
|
|
Bauxite(2)
|
|
Mt
|
%
Al2O3
|
%
SiO2
|
Mt
|
%
Al2O3
|
%
SiO2
|
Mt
|
%
Al2O3
|
%
SiO2
|
Porto Trombetas (MRN)
(Brazil)(3)
|
O/P
|
39
|
48.0
|
5.2
|
170
|
49.1
|
4.6
|
209
|
48.9
|
4.7
|
|
Rio Tinto interest
|
Rio Tinto share recoverable
mineral
|
|
Total Ore Reserves
as at 31 December 2023
|
|
|
|
Tonnage
|
Grade
|
|
Bauxite(2)
|
%
|
Mt
|
|
Mt
|
%
Al2O3
|
%
SiO2
|
Porto Trombetas (MRN)
(Brazil)(3)
|
22.0
|
46
|
|
46
|
48.9
|
4.9
|
1. Type of
Mine: O/P = open pit/surface.
2. Bauxite
Ore Reserves are stated as recoverable Ore Reserves of marketable
product after accounting for all mining and processing losses. Mill
recoveries are therefore not shown.
3. Porto
Trombetas (MRN) Ore Reserves are stated as dry tonnes, available
alumina grade and reactive silica grade.