Total energy capacity under
management 1 |
926 MW |
839 MW |
Total deployed miners under
management 2 |
258.2k |
214.7K |
Total hashrate under management
3 |
27.0 EH/s |
22.3 EH/s |
Self-Mining4 |
|
|
Deployed miners5 |
74.1k |
73.1K |
Deployed hashrate6 |
7.2 EH/s |
7.2 EH/s |
Bitcoin produced |
292 BTC |
339 BTC |
Bitcoin on balance sheet7 |
9,110 BTC |
9,116 BTC |
|
|
|
Managed
Services8 |
|
|
Energy capacity under
management |
767 MW |
680 MW |
Deployed miners under management
9 |
218.6k |
178.7K |
Hashrate under management |
23.4 EH/s |
19.0 EH/s |
|
|
|
Hosting |
|
|
Deployed miners under management
9 |
76.7k |
73.9K |
Hashrate under management |
8.7 EH/s |
8.4 EH/s |
|
|
|
Notes:(1) Includes all Self-Mining, Managed Services, and
Hosting infrastructure, including 100% of the energy capacity at
the Echo site (King Mountain, TX).(2) Includes all miners that are
racked with power and networking, rounded to the nearest 100, in
Self-Mining, Managed Services, and Hosting infrastructure with
power and networking, including all miners at the Echo site (King
Mountain, TX).(3) Includes all Self-Mining, Managed Services, and
Hosting hashrate, including 100% of the hashrate at the Echo site
(King Mountain, TX).(4) Self-Mining operations for Hut 8 Corp.
include all operations at the Echo site (King Mountain, TX).(5)
Deployed miners are defined as those physically racked with power
and networking, rounded to the nearest 100. (6) Indicates the
target hashrate of all deployed miners.(7) As of month-end. (8) The
Managed Services figures reflected in this table include the
Self-Mining and Hosting metrics from the sites where Hut 8’s
Managed Services business is an additional service layer in the
operation of the site (at Charlie, Delta, Echo, and Hotel – site
details below). As a result, the sum of the Self-Mining, Managed
Services, and Hosting numbers will not add up to the “Total energy
capacity under management”, “Total deployed miners under
management”, and “Total hashrate under management” figures that are
also reflected in the table.(9) Miners are rounded to the nearest
100.
“With the goal of best positioning Hut 8 to create shareholder
value ahead of and following the halving, we advanced a number of
strategic initiatives designed to increase our operating scale and
optimize our metrics in February,” said Asher Genoot, CEO of Hut 8.
“We made excellent progress in building out our new 63 MW
self-mining site in Culberson County, Texas and at Ionic Digital’s
240 MW Cedarvale site in Ward County, Texas. We also announced a
new treasury strategy that will allow us to deploy our stack to
strategically grow the business and we relentlessly focused on
improving our operations.”
Highlights:
- Hut 8 began providing managed services to Ionic Digital in
February and is installing its purpose-built software and
transition systems from the current third-party provider at Ionic’s
four sites in Texas totaling 87 MW. The contract is reflected in
the operations results above.
- At Ionic Digital’s Cedarvale site in Ward County, Texas, the
Hut 8 team has received the first eight vertical exhaust units at
site and is making progress on electrical work for the initial 35
MW phase of construction.
- The operations and asset management teams continued to conduct
preventative maintenance at the Echo site at King Mountain, Texas
and optimize the fleets at the Foxtrot and Golf sites in Alberta by
moving and conducting targeted repairs on miners to ensure maximum
efficiency ahead of the halving.
- A go-forward plan for the Golf site in Drumheller, Alberta will
be finalized and communicated shortly.
- Grading is complete at Hut 8’s new 63 MW site in Culberson
County, Texas and the team has finalized the electrical engineering
package and begun taking delivery of containers and transformers at
the site.
- Despite volatility in energy prices in February, the team
utilized mutually beneficial terms in the Electric Service
Agreement covering its Medicine Hat site, which provides the
opportunity for both parties to benefit from high prices in the
Alberta power market while helping to stabilize the electrical
grid.
- Hut 8’s digital asset mining geographical footprint includes
the following sites as of March 1, 2024:
|
|
Owner |
EnergyCapacity |
Self-Mining |
ManagedServices |
Hosting |
Alpha |
Niagara Falls, NY |
Hut 8 |
50 MW |
Yes |
|
Yes |
Charlie |
Kearney, NB |
Managed1 |
100 MW |
Yes |
Yes |
|
Delta |
Granbury, TX |
Managed1 |
300 MW |
Yes |
Yes |
|
Echo |
King Mountain, TX |
Joint Venture2 |
280 MW |
Yes |
Yes |
Yes |
Foxtrot |
Medicine Hat, AB |
Hut 8 |
67 MW |
Yes |
|
|
Golf |
Drumheller, AB |
Hut 8 |
42 MW |
Yes |
|
|
Hotel 1 |
Midland, TX |
Managed1 |
25 MW |
|
Yes |
|
Hotel 2 |
Midland, TX |
Managed1 |
20 MW |
|
Yes |
|
Hotel 3 |
Midland, TX |
Managed1 |
30 MW |
|
Yes |
|
Hotel 4 |
Midland, TX |
Managed1 |
12 MW |
|
Yes |
|
|
|
|
|
|
|
|
Notes:(1) Hut 8’s Managed Services subsidiaries lead all aspects
of site operations, including accounting, curtailment, and customer
relations at the Charlie and Delta sites, which are owned by a
third party, and the Hotel 1-4 sites, which are owned by Ionic
Digital. The Managed Services subsidiaries also lead all aspects of
site operations at the Echo site.(2) The Company has a 50%
membership interest in the Echo site. The remaining 50% membership
interest is held by a Fortune 200 renewable energy producer.
About Hut 8 Hut 8 Corp. is a Bitcoin miner
and energy infrastructure operator with self-mining, hosting,
managed services, and traditional data center operations spanning
eleven sites across North America. Headquartered in Miami, Florida,
Hut 8 Corp. operates six Bitcoin mining, hosting, and Managed
Services sites in Alberta, New York, Nebraska, and Texas and
five high performance computing data centers in British
Columbia and Ontario. For more information, visit www.hut8.com
and follow us on X (formerly known as Twitter) at
@Hut8Corp.
Cautionary Note Regarding Forward–Looking
InformationThis press release includes “forward-looking
information” and “forward-looking statements” within the meaning of
Canadian securities laws and United States securities laws,
respectively (collectively, “forward-looking information”). All
information, other than statements of historical facts, included in
this press release that address activities, events or developments
that Hut 8 and New Hut expect or anticipate will or may occur in
the future, including such things as future business strategy,
competitive strengths, goals, expansion and growth of the business,
operations, plans and other such matters is forward-looking
information. Forward-looking information is often identified by the
words “may”, “would”, “could”, “should”, “will”, “intend”, “plan”,
“anticipate”, “allow”, “believe”, “estimate”, “expect”, “predict”,
“can”, “might”, “potential”, “predict”, “is designed to”, “likely”
or similar expressions. Specifically, such forward-looking
information included in this press release includes statements
relating to the Company’s increasing operating scale, restructuring
and optimization initiatives, new treasury strategy, projects with
Ionic Digital, and plans to monetize the four power generation
facilities in Ontario.
Statements containing forward-looking information are not
historical facts, but instead represent management's expectations,
estimates and projections regarding future events based on certain
material factors and assumptions at the time the statement was
made. While considered reasonable by Hut 8 as of the date of this
press release, such statements are subject to known and unknown
risks, uncertainties, assumptions and other factors that may cause
the actual results, level of activity, performance or achievements
to be materially different from those expressed or implied by such
forward-looking information, including but not limited to, security
and cybersecurity threats and hacks; malicious actors or botnet
obtaining control of processing power on the Bitcoin network;
further development and acceptance of the Bitcoin network; changes
to Bitcoin mining difficulty; loss or destruction of private keys;
increases in fees for recording transactions in the Blockchain;
erroneous transactions; reliance on a limited number of key
employees; reliance on third party mining pool service providers;
regulatory changes; classification and tax changes; momentum
pricing risk; fraud and failure related to digital asset exchanges;
difficulty in obtaining banking services and financing; difficulty
in obtaining insurance, permits and licenses; internet and power
disruptions; geopolitical events; uncertainty in the development of
cryptographic and algorithmic protocols; uncertainty about the
acceptance or widespread use of digital assets; failure to
anticipate technology innovations; the COVID19 pandemic, climate
change; currency risk; lending risk and recovery of potential
losses; litigation risk; business integration risk; changes in
market demand; changes in network and infrastructure; system
interruption; changes in leasing arrangements; failure to achieve
intended benefits of power purchase agreements; potential for
interrupted delivery, or suspension of the delivery, of energy to
mining sites and other risks related to the digital asset mining
and data centre business. For a complete list of the factors that
could affect Hut 8, please see the “Risk Factors” section of Hut
8’s Registration Statement on Form S-4 dated November 7, 2023,
available under the Company’s EDGAR profile at www.sec.gov, and Hut
8’s other continuous disclosure documents which are available under
the Company’s SEDAR+ profile at www.sedarplus.ca and
EDGAR profile at www.sec.gov.
Hut 8 Corp. Investor RelationsSue
Ennissue@hut8.io
Hut 8 Corp. Media RelationsErin
Dermererin.dermer@hut8.io
The Hut 8 team is making progress building out Ionic Digital’s
Cedarvale site in Ward County, Texas, which is designed to reach
approximately 240 MW of operating capacity.
The Hut 8 team is making progress building out Ionic Digital’s
Cedarvale site in Ward County, Texas, which is designed to reach
approximately 240 MW of operating capacity.
Photos accompanying this announcement are available at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/734d5df6-5b22-469f-bae5-33a1f0071c8f
https://www.globenewswire.com/NewsRoom/AttachmentNg/4ae848c4-4609-4796-9009-531e50bb1f2d
Grafico Azioni Hut 8 (TSX:HUT)
Storico
Da Nov 2024 a Dic 2024
Grafico Azioni Hut 8 (TSX:HUT)
Storico
Da Dic 2023 a Dic 2024