Further High-Grade Gold Intercepts From Treasury Metals' Goliath Project
22 Dicembre 2008 - 1:30PM
Marketwired
Treasury Metals Inc. ("Treasury" or the "Company") (TSX: TML), a
growth orientated gold focused exploration and development company,
today announced the results of the final 19 drill holes from its
Goliath Gold Project. The 100% owned Goliath Gold Project is
located alongside the Trans-Canada Highway near Dryden, Ontario.
These drill hole results mark the conclusion of the drill program
that started in February of this year, designed to verify and
improve the historic mineral resource estimate through in-fill and
targeted drilling and to further define multiple higher grade gold
ore shoots, primary targets of future programs. Significant
higher-grade gold intersections from the final 19 drill holes
include:
------------------------------------------------------------------------
Drill Hole From (m) To (m) Int (m) Au (g/t) Ag (g/t) Zn(%) Pb(%)
------------------------------------------------------------------------
TL0838 147.00 150.00 3.00 2.78 4.1 0.10 0.04
------------------------------------------------------------------------
including 148.00 149.00 1.00 6.59 7.9 0.28 0.08
------------------------------------------------------------------------
TL0839 254.25 258.00 3.75 4.93 4.8 0.08 0.05
------------------------------------------------------------------------
including 254.25 255.00 0.75 21.87 21.4 0.33 0.15
------------------------------------------------------------------------
TL0840 257.00 260.50 3.50 5.63 96.1 0.72 0.22
------------------------------------------------------------------------
including 259.00 259.50 0.50 28.08 567.8 4.71 1.45
------------------------------------------------------------------------
TL0841 188.00 190.00 2.00 5.00 17.0 0.36 0.09
------------------------------------------------------------------------
including 189.00 189.50 0.50 17.70 62.0 1.39 0.32
------------------------------------------------------------------------
TL0844 142.50 144.00 1.50 14.76 10.3 0.06 0.11
------------------------------------------------------------------------
including 142.50 143.00 0.50 43.11 27.1 0.16 0.27
------------------------------------------------------------------------
TL0845 97.40 97.70 0.30 7.99 0.5 0.02 0.02
------------------------------------------------------------------------
and 102.10 103.00 0.90 5.14 38.4 1.15 0.91
------------------------------------------------------------------------
including 102.10 102.35 0.25 12.98 122.8 2.90 3.02
------------------------------------------------------------------------
TL0846 110.00 111.50 1.50 4.35 16.6 0.02 0.01
------------------------------------------------------------------------
including 110.00 111.00 1.00 6.09 22.5 0.02 0.01
------------------------------------------------------------------------
TL0847 239.07 239.80 0.73 10.69 51.4 0.31 0.30
------------------------------------------------------------------------
TL0851 538.00 538.80 0.80 6.96 8.3 0.17 0.02
------------------------------------------------------------------------
A full summary of the latest drilling results (Table 1) can be
found in the accompanying Appendix and will be posted on the
Company website, along with a drill hole location map. Drill holes
TL0835 and TL0838 through TL0845 (9 holes) were included in the
Mineral Resource Estimate announced November 7(th), 2008; drill
holes TL0846 through TL0855 (10 holes) were not included in the
Mineral Resource Estimate.
"These drill results and in particular drill holes TL0839, 40,
41 and 44, along with previously reported results from the 2008
Phase I drilling program, confirm the high-grade nature of the
Thunder Lake Gold Deposit," said Scott Jobin-Bevans, Treasury
Metals President and CEO. "We are pleased with these results along
with the results of the first independent Mineral Resource Estimate
on the deposit. We are looking forward to 2009 and the work we have
planned to expand this gold resource and explore the remainder of
the property."
As recently announced, Indicated and Inferred Mineral Resources
have been determined in the Main Zone of the Thunder Lake Gold
Deposit, which was the focus of a 55 hole (13,305 m) drilling
program that began in February 2008. This very first independent
NI43-101 Mineral Resource Estimate reported an Inferred Resource of
3.27 million tonnes averaging 5.9 g/t Au and an Indicated Resource
of 560,000 tonnes averaging 5.9 g/t Au, both calculated using a
cut-off of 3.0 g/t Au. Silver, which was not considered in this
resource estimate, averaged 16 g/t Ag and will be considered in
future resource estimates.
Summary of Thunder Lake Deposit Mineral Resources(i) (undiluted) - Goliath
Property.
---------------------------------------------------------------------------
Cut-off Grade Tonnes Above Average Grade
Category Zone (g/tonne Au) Cut-off (g/tonne Au) Ounces Au
---------------------------------------------------------------------------
Indicated Main 3.0 560,000 5.9 110,000
---------------------------------------------------------------------------
---------------------------------------------------------------------------
Inferred H 3.0 480,000 4.7 70,000
---------------------------------------------------------------------------
Main 3.0 2,520,000 6.4 520,000
---------------------------------------------------------------------------
B 3.0 130,000 4.2 18,000
---------------------------------------------------------------------------
C 3.0 90,000 4 12,000
---------------------------------------------------------------------------
D 3.0 50,000 3.1 5,000
---------------------------------------------------------------------------
Total Inferred 3.0 3,270,000 5.9 625,000
---------------------------------------------------------------------------
(i)details of the Mineral Resource Estimate can be found in
November 7(th), 2008 press release
The Company is planning further diamond drilling and an
exploration program aimed towards expanding the gold resource at
the Thunder Lake Gold Deposit along with assessing other areas
within the Goliath Project's large land package which have
potential to host additional gold resources. Treasury also intends
to initiate a Preliminary Economic Assessment on the Thunder Lake
Deposit in early 2009 along with baseline environmental studies and
continuing community engagement.
Treasury's exploration programs and pertinent disclosure of a
scientific nature are prepared and/or designed and carried out
under the overall supervision of Scott Jobin-Bevans, Ph.D., P.Geo.,
Treasury's President and CEO, who serves as the Qualified Person as
defined by National Instrument 43-101 and has reviewed approved
this press release. Details regarding Treasury's QA/QC procedures
have been specified in an earlier press release.
About Treasury Metals Inc.
Treasury Metals Inc. is a mineral exploration and development
company with a growth-orientated strategy to acquire and develop
quality precious and base metals assets in Canada. The Company's
flagship asset is the 100% owned Goliath Project, an
advanced-stage, high-grade gold deposit with the potential for
additional silver, lead and zinc credits. The 100% owned Lara
Project is an advanced stage, high-grade base and precious metals
project with significant potential for additional resources in its
Lara Deposit. The Company also has an existing royalty revenue from
Sierra Minerals' (TSX: SIM) Cerro Colorado Mine in Mexico and other
monetizable assets. The management team and board are seasoned
mining industry veterans with proven track records. As a spin-off
company of Laramide Resources (TSX: LAM), Treasury benefits from a
strong existing shareholder base. The Company web site is:
www.treasurymetals.com.
Forward-looking Information
Securities regulators encourage companies to disclose
forward-looking information to help investors understand a
company's future prospects. This press release contains statements
about our future financial condition, results of operations and
business. These are "forward-looking" because we have used what we
know and expect today to make a statement about the future.
Forward-looking statements usually include words such as may,
expect, anticipate, believe or other similar words. We believe the
expectations reflected in these forward-looking statements are
reasonable. However, actual events and results could be
substantially different because of the risks and uncertainties
associated with our business or events that happen after the date
of this press release. You should not place undue reliance on
forward-looking statements. As a general policy, we do not update
forward-looking statements except as required by securities laws
and regulations.
Table 1. Summary of Drill Hole Intercepts.
---------------------------------------------------------------------------
---------------------------------------------------------------------------
Drill Hole From (m) To (m) Int (m) Au (g/t) Ag (g/t) Zn(%) Pb(%)
---------------------------------------------------------------------------
---------------------------------------------------------------------------
TL0835 315.00 316.00 1.00 3.69 0.5 0.00 0.01
---------------------------------------------------------------------------
and 511.60 511.80 0.20 5.85 1.6 0.01 0.02
---------------------------------------------------------------------------
and 647.93 648.13 0.20 6.49 113.5 1.39 0.81
---------------------------------------------------------------------------
and 650.10 650.30 0.20 6.71 47.8 0.71 0.61
---------------------------------------------------------------------------
---------------------------------------------------------------------------
TL0838 147.00 150.00 3.00 2.78 4.1 0.10 0.04
---------------------------------------------------------------------------
including 148.00 149.00 1.00 6.59 7.9 0.28 0.08
---------------------------------------------------------------------------
---------------------------------------------------------------------------
TL0839 243.00 246.00 3.00 1.59 5.8 0.09 0.04
---------------------------------------------------------------------------
including 245.00 246.00 1.00 3.02 3.7 0.11 0.02
---------------------------------------------------------------------------
TL0839 254.25 258.00 3.75 4.93 4.8 0.08 0.05
---------------------------------------------------------------------------
including 254.25 255.00 0.75 21.87 21.4 0.33 0.15
---------------------------------------------------------------------------
---------------------------------------------------------------------------
TL0840 257.00 260.50 3.50 5.63 96.1 0.72 0.22
---------------------------------------------------------------------------
including 259.00 259.50 0.50 28.08 567.8 4.71 1.45
---------------------------------------------------------------------------
---------------------------------------------------------------------------
TL0841 188.00 190.00 2.00 5.00 17.0 0.36 0.09
---------------------------------------------------------------------------
including 189.00 189.50 0.50 17.70 62.0 1.39 0.32
---------------------------------------------------------------------------
---------------------------------------------------------------------------
TL0842 anomalous gold concentrations
---------------------------------------------------------------------------
---------------------------------------------------------------------------
TL0843 49.00 50.00 1.00 4.80 6.3 0.43 0.17
---------------------------------------------------------------------------
and 100.50 101.50 1.00 4.82 6.5 1.30 0.14
---------------------------------------------------------------------------
including 101.00 101.50 0.50 6.85 10.0 2.06 0.22
---------------------------------------------------------------------------
---------------------------------------------------------------------------
TL0844 80.00 82.00 2.00 4.06 7.6 0.15 0.14
---------------------------------------------------------------------------
including 81.00 82.00 1.00 6.90 3.3 0.03 0.03
---------------------------------------------------------------------------
TL0844 142.50 144.00 1.50 14.76 10.3 0.06 0.11
---------------------------------------------------------------------------
including 142.50 143.00 0.50 43.11 27.1 0.16 0.27
---------------------------------------------------------------------------
---------------------------------------------------------------------------
TL0845 97.40 97.70 0.30 7.99 0.5 0.02 0.02
---------------------------------------------------------------------------
and 102.10 103.00 0.90 5.14 38.4 1.15 0.91
---------------------------------------------------------------------------
including 102.10 102.35 0.25 12.98 122.8 2.90 3.02
---------------------------------------------------------------------------
and 110.00 111.00 1.00 3.61 1.7 0.04 0.02
---------------------------------------------------------------------------
and 120.60 120.90 0.30 3.48 8.8 0.14 0.15
---------------------------------------------------------------------------
and 128.90 129.10 0.20 7.04 46.8 1.53 1.36
---------------------------------------------------------------------------
and 150.00 151.00 1.00 4.65 3.4 0.10 0.03
---------------------------------------------------------------------------
---------------------------------------------------------------------------
TL0846 103.00 105.00 2.00 2.28 8.0 0.50 0.16
---------------------------------------------------------------------------
including 103.00 104.00 1.00 3.10 10.0 0.47 0.19
---------------------------------------------------------------------------
TL0846 110.00 111.50 1.50 4.35 16.6 0.02 0.01
---------------------------------------------------------------------------
including 110.00 111.00 1.00 6.09 22.5 0.02 0.01
---------------------------------------------------------------------------
---------------------------------------------------------------------------
TL0847 239.07 239.80 0.73 10.69 51.4 0.31 0.30
---------------------------------------------------------------------------
---------------------------------------------------------------------------
TL0848 175.00 176.00 1.00 3.76 4.1 0.06 0.02
---------------------------------------------------------------------------
---------------------------------------------------------------------------
TL0849 anomalous gold concentrations
---------------------------------------------------------------------------
---------------------------------------------------------------------------
TL0850 anomalous gold concentrations
---------------------------------------------------------------------------
---------------------------------------------------------------------------
TL0851 538.00 538.80 0.80 6.96 8.3 0.17 0.02
---------------------------------------------------------------------------
---------------------------------------------------------------------------
TL0852 anomalous gold concentrations
---------------------------------------------------------------------------
---------------------------------------------------------------------------
TL0853 anomalous gold concentrations
---------------------------------------------------------------------------
---------------------------------------------------------------------------
TL0854 anomalous gold concentrations
---------------------------------------------------------------------------
---------------------------------------------------------------------------
TL0855 472.00 472.50 0.50 2.86 12.6 0.19 0.13
---------------------------------------------------------------------------
---------------------------------------------------------------------------
Contacts: Treasury Metals Inc. Scott Jobin-Bevans President and
CEO (416) 599-4133 Email: scott@treasurymetals.com Treasury Metals
Inc. Linda Montgomery VP Investor Relations (416) 214-4654 Email:
linda@treasurymetals.com Website: www.treasurymetals.com
Grafico Azioni Treasury Metals (TSX:TML)
Storico
Da Giu 2024 a Lug 2024
Grafico Azioni Treasury Metals (TSX:TML)
Storico
Da Lug 2023 a Lug 2024