Parlane Resource Corp. (TSX VENTURE:PPP) (the "Company") is pleased to report on
the progress of exploration work on its Big Bear Project, Nechako Plateau,
Central British Columbia.


Big Bear field crews have completed a property-wide stream sediment
silt-sampling program covering all of the drainage systems on the property and
have now started a significant soil-sampling program. One hundred thirty-one
line kilometres will be sampled and it is anticipated that over 2,000 samples
will be collected and analyzed. The lines are spaced one kilometre apart and
samples will be collected every 50 metres. Geological mapping and rock sampling
will continue and ground geophysical survey target areas will be identified. 


The Big Bear property is located in the Omineca Mining Division, Nechako Plateau
in central British Columbia. It is approximately 100 kilometres south of
Vanderhoof and covers 14,366 ha. The property is situated between two
mineralized systems known as the Blackwater property and the Capoose property.
The Big Bear is highly prospective for the discovery of similar high-level
epithermal to porphyry-related transitional mineralization.


Ian Webster P.Geo. is the Qualified Person as defined by National Instrument
43-101 who has reviewed and approved the contents of this release.


ON BEHALF OF THE BOARD

Robert Eadie, President, Chief Executive Officer and Director

Grafico Azioni Prospector Metals (TSXV:PPP)
Storico
Da Mag 2024 a Giu 2024 Clicca qui per i Grafici di Prospector Metals
Grafico Azioni Prospector Metals (TSXV:PPP)
Storico
Da Giu 2023 a Giu 2024 Clicca qui per i Grafici di Prospector Metals