Goldshore Resources Drills 23.0m @ 2.57 g/t Au 200 Meters Beneath Southwest Zone and Further Defines Strike Extensions at the Moss Lake Project 

VANCOUVER, B.C., June 6, 2022: Goldshore Resources Inc. (TSXV: GSHR / OTCQB: GSHRF / FWB: 8X00) ("Goldshore" or the "Company"), is pleased to announce assay results from its ongoing 100,000-meter drill program at the Moss Lake Project in Northwest Ontario, Canada. Drilling is aiming to better define and expand high-grade structural zones within the Moss Lake deposit to improve the overall grade and volume beyond that of the historic Mineral Resource.

Highlights:

  • MMD-22-025 identified high-grade gold mineralization 200 meters beneath the previously modelled low grade Southwest Zone, implying significantly more potential in this area, with best intercepts of:

 

  • 1.0m @ 8.32 g/t Au from 358.5m
  • 23.0m at 2.57 g/t Au from 514.0m, including
    • 1.55m at 32.6 g/t Au from 514.0m

 

  • MMD-22-022 extended the strike extent of the southern parallel zone by 600m with mineralized intersections within a broad low grade envelope at the end of the hole;

 

  • Gold mineralization was added to the eastern and western extents of the Main Zone, with best intercepts in MMD-22-024 adding 200m to the depth extent of of the deposit:

 

  • 23.7m at 1.11 g/t Au from 472.0m, including
    • 0.7m at 27.7 g/t Au from 495.0m
  • 6.8m at 1.18 g/t Au from 571.2m

 

President and CEO Brett Richards stated: "the results we are seeing with our 100,000m drilling campaign are continuing to deliver the results that prove our thesis that the Moss Lake Project is much larger along strike and at depth, and we look forward to regular drill results through the forthcoming several months. I am also proud of the team at site who have ramped up to seven drill rigs, keeping up to the current pace of data collection and analysis required to fully understand this large deposit."


Technical Overview

Figures 1 to 3  and Table 1 summarize the significant intercepts in MMD-22-018, -022, -024 and -025. Figure 4 and Table 2 show the drill hole locations.

 

Table 1: Significant downhole gold intercepts

HOLE ID

FROM

TO

LENGTH (m)

TRUE WIDTH (m)

CUT GRADE
(g/t Au)

UNCUT GRADE
(g/t Au)

 

MMD-22-018

336.60

341.00

4.40

3

0.64

0.64

 

 

365.75

377.00

11.25

8

0.63

0.63

 

 

388.50

410.90

22.40

16

0.70

0.70

 

including

396.00

404.00

8.00

6

1.69

1.69

 

 

425.35

431.75

6.40

5

0.36

0.36

 

 

443.00

450.00

7.00

5

0.54

0.54

 

 

 

 

 

 

 

 

 

MMD-22-022

80.15

85.60

5.45

4

0.56

0.56

 

 

516.55

554.30

37.75

28

0.41

0.41

 

including

516.55

520.50

3.95

3

1.18

1.18

 

 

585.40

596.00

10.60

8

0.34

0.34

 

 

599.00

601.90

2.90

2

0.32

0.32

 

 

607.00

634.80

27.80

22

0.42

0.42

 

including

622.50

626.75

4.25

3

1.06

1.06

 

 

 

 

 

 

 

 

 

MMD-22-024

70.30

82.00

11.70

6

0.56

0.56

 

including

71.00

73.00

2.00

1

1.83

1.83

 

 

140.00

145.00

5.00

3

0.50

0.50

 

 

181.50

186.00

4.50

3

0.54

0.54

 

 

285.70

289.00

3.30

2

0.74

0.74

 

 

414.50

418.50

4.00

2

0.35

0.35

 

 

472.00

495.70

23.70

15

1.11

1.11

 

including

495.00

495.70

0.70

0.5

27.7

27.7

 

 

542.00

559.05

17.05

11

0.38

0.38

 

 

571.20

578.00

6.80

4

1.18

1.18

 

including

574.15

577.00

2.85

2

1.67

1.67

 

 

 

 

 

 

 

 

 

MMD-22-025

358.50

359.50

1.00

1

8.32

8.32

 

 

514.00

537.00

23.00

21

1.92

2.57

 

including

514.00

515.55

1.55

1

22.9

32.6

 

Intersections calculated above a 0.3 g/t Au cut off with a top cut of 30 g/t Au and a maximum internal waste interval of 10 metres. Shaded intervals are intersections calculated above a 1.0 g/t Au cut off. Intervals in bold are those with a grade thickness factor exceeding 20 gram x metres / tonne gold. True widths are approximate and assume a subvertical body.

               

 

Figure 1: Drill section through MMD-22-024 showing mineralized intercepts relative to the 2013 grade model

 

Figure 2: Drill section through MMD-22-022 showing mineralized intercepts relative to the 2013 grade model

 

Figure 3: Drill section through MMD-22-025 showing mineralized intercepts relative to the 2013 grade model

 

Figure 4: Drill plan showing the drill holes relative to the 2013 resource model and the new parallel zones

 

 

Table 2: Location of drill holes in this press release

HOLE

EAST

NORTH

RL

AZIMUTH

DIP

EOH

MMD-22-018

668584

5378992

427

155°

-60°

749.0m

MMD-22-022

668363

5378756

433

135°

-50°

644.0m

MMD-22-024

669411

5379553

427

155°

-60°

611.0m

MMD-22-025

668213

5378601

440

135°

-50°

542.0m

Approximate collar coordinates in NAD 83, Zone 15N

 

Drilling has focused in the most accessible areas as we seek to protect long term road access during a very wet Spring Break Up following the coldest and snowiest winter in the last decade.

MMD-22-022 and -025 tested the 500 meter gap between the Main Zone and Southwest Zone, and highlighted the potential to increase both the grade and volume of mineralization in this previously untested area. The intercept in MMD-22-024 is believed to represent a 600 meter strike extension of the southern parallel structure, high grade zone at the end of MMD-22-025 represents a 200 meter down dip extension of the Southwest Zone.

Both MMD-22-022 and -025 were drilled by a smaller drill rig with limited depth capacity and holes were ended prior to exiting the altered diorite sequence. Follow up drilling is underway to trace mineralization both along strike and up dip and to test the full thickness of the altered diorite body.

MMD-22-018 and MMD-22-024 drilled the western and eastern margin of the Main Zone, respectively. MMD-22-024, in particular, targeted the previously untested volume below the 200mRL and extended the depth extent of the model by 200m to the 400mRL.

Pete Flindell, VP Exploration for Goldshore, said "these mineralized intercepts highlight the potential to expand the volume of +1 gt Au mineralization in the area between the Main and Southwest Zones, which will benefit the Mineral Resource and open pit economics. Ongoing drilling is testing this zone at shallower levels and will more completely test the width of the zones. Results are expected by July. Meanwhile, we are pleased that with seven rigs on site, we are achieving our targeted monthly drill rate of over 10,000 meters per month, which will help us to complete the infill and step out drill program this year."

Analytical and QA/QC Procedures

All samples were sent to ALS Geochemistry in Thunder Bay for preparation and analysis was performed in the ALS Vancouver analytical facility. ALS is accredited by the Standards Council of Canada (SCC) for the Accreditation of Mineral Analysis Testing Laboratories and CAN-P-4E ISO/IEC 17025. Samples were analyzed for gold via fire assay with an AA finish ("Au-AA23") and 48 pathfinder elements via ICP-MS after four-acid digestion ("ME-MS61"). Samples that assayed over 10 ppm Au were re-run via fire assay with a gravimetric finish ("Au-GRA21"). 

In addition to ALS quality assurance / quality control ("QA/QC") protocols, Goldshore has implemented a quality control program for all samples collected through the drilling program.  The quality control program was designed by a qualified and independent third party, with a focus on the quality of analytical results for gold. Analytical results are received, imported to our secure on-line database and evaluated to meet our established guidelines to ensure that all sample batches pass industry best practice for analytical quality control. Certified reference materials are considered acceptable if values returned are within three standard deviations of the certified value reported by the manufacture of the material. In addition to the certified reference material, certified blank material is included in the sample stream to monitor contamination during sample preparation. Blank material results are assessed based on the returned gold result being less than ten times the quoted lower detection limit of the analytical method. The results of the on-going analytical quality control program are evaluated and reported to Goldshore by Orix Geoscience Inc.

Wesdome Share Issuance

Goldshore announces it has issued 8,333,333 milestone shares to Wesdome Gold Mines Ltd. ("Wesdome") at a deemed price of C$0.60 per share pursuant the asset purchase agreement dated January 26, 2021 whereby Goldshore acquired a 100% interest in the Moss Lake gold project located in Ontario, Canada.

This issuance increases Wesdome's holding in Goldshore to 38,418,333 shares or approximately 27% of the Company's total outstanding share capital of 142,276,603 shares. The shares issued to Wesdome are subject to escrow in accordance with the policies of the TSX Venture Exchange.

About Goldshore

Goldshore is an emerging junior gold development company, and owns the Moss Lake Gold Project located in Ontario. Wesdome is currently a strategic shareholder of Goldshore with an approximate 27% equity position in the Company. Well-financed and supported by an industry-leading management group, board of directors and advisory board, Goldshore is positioned to advance the Moss Lake Gold Project through the next stages of exploration and development.

About the Moss Lake Gold Project

The Moss Lake Gold Project is located approximately 100 km west of the city of Thunder Bay, Ontario. It is accessed via Highway 11 which passes within 1 km of the property boundary to the north. The Moss Lake Gold Project covers 14,292 hectares and consists of 282 unpatented and patented mining claims. 

Moss Lake hosts a number of gold and base metal rich deposits including the Moss Lake Deposit, the East Coldstream Deposit (Table 3), the historically producing North Coldstream Mine (Table 4), and the Hamlin Zone, all of which occur over a mineralized trend exceeding 20 km in length. A historical preliminary economic assessment was completed on Moss Lake in 2013 and published by Moss Lake Gold1. A historical mineral resource estimate was completed on the East Coldstream Deposit in 2011 by Foundation Resources Inc2,3. In addition to these zones, the Moss Lake Gold Project also hosts a number of under-explored mineral occurrences which are reported to exist both at surface and in historically drilled holes. The Moss Lake Deposit is a shear-hosted disseminated-style gold deposit which outcrops at surface. It has been drilled over a 2.5 km length and to depths of 300 m with 376 holes completed between 1983 and 2017. The last drilling program conducted in 2016 and 2017 by Wesdome, which consisted of widely spaced holes along the strike extension of the deposit was successful in expanding the mineralized footprint and hydrothermal system 1.6 km to the northeast. Additionally, the deposit remains largely open to depth. In 2017, Wesdome completed an induced polarization survey which traced the potential extensions of pyrite mineralization associated with the Moss Lake Deposit over a total strike length of 8 km and spanning the entire extent of the survey grids. 

The East Coldstream Deposit is a shear-hosted disseminated-style gold deposit which locally outcrops at surface. It has been drilled over a 1.3 km length and to depths of 200 m with 138 holes completed between 1988 and 2017. The deposit remains largely open at depth and may have the potential for expansion along strike. Historic drill hole highlights from the East Coldstream Deposit include 4.86 g/t Au over 27.3 m in C-10-15.

The historically producing North Coldstream Mine is reported to have produced significant amounts of copper, gold and silver4 from mineralization with potential iron-oxide-copper-gold deposit style affinity. The exploration potential immediately surrounding the historic mining area is not currently well understood and historic data compilation is required.

The Hamlin Zone is a significant occurrence of copper and gold mineralization, and also of potential iron-oxide-copper-gold deposit style affinity. Between 2008 and 2011, Glencore tested Hamlin with 24 drill holes which successfully outlined a broad and intermittently mineralized zone over a strike length of 900 m. Historic drill hole highlights from the Hamlin Zone include 0.9 g/t Au and 0.35% Cu over 150.7 m in HAM-11-75.

The Moss Lake, East Coldstream and North Coldstream deposits sit on a mineral trend marked by a regionally significant deformation zone locally referred to as the Wawiag Fault Zone in the area of the Moss Lake Deposit. This deformation zone occurs over a length of approximately 20 km on the Moss Lake Gold Project and there is an area spanning approximately 7 km between the Moss Lake and East Coldstream deposits that is significantly underexplored. 

Table 3: Historical Mineral Resources1,2,3

 

INDICATED

INFERRED

Deposit

Tonnes

Au g/t

Au oz

Tonnes

Au g/t

Au oz

Moss Lake Deposit1  (2013 resource estimate)

Open Pit Potential

39,795,000

1.1

1,377,300

48,904,000

1.0

1,616,300

Underground Potential

-

-

-

1,461,100

2.9

135,400

Moss Lake Total

39,795,000

1.1

1,377,300

50,364,000

1.1

1,751,600

 

East Coldstream Deposit2  (2011 resource estimate)

East Coldstream Total

3,516,700

0.85

96,400

30,533,000

0.78

763,276

 

Combined Total

43,311,700

1.08

1,473,700

80,897,000

0.98

2,514,876

Notes:

(1)  Source: Poirier, S., Patrick, G.A., Richard, P.L., and Palich, J., 2013. Technical Report and Preliminary Economic Assessment for the Moss Lake Project, 43-101 technical report prepared for Moss Lake Gold Mines Ltd. Moss Lake Deposit resource estimate is based on 0.5 g/t Au cut-off grade for open pit and 2.0 g/t Au cut-off grade for underground resources.

 

(2) Source: McCracken, T., 2011. Technical Report and Resource Estimate on the Osmani Gold Deposit, Coldstream Property, Northwestern Ontario, 43-101 technical report prepared for Foundation Resources Inc. and Alto Ventures Ltd.   East Coldstream Deposit resource estimate is based on a 0.4 g/t Au cut-off grade.

(3) The reader is cautioned that the above referenced "historical mineral resource" estimates are considered historical in nature and as such is based on prior data and reports prepared by previous property owners. A qualified person has not done sufficient work to classify the historical estimates as current resources and Goldshore is not treating the historical estimates as current resources.  Significant data compilation, re-drilling, re-sampling and data verification may be required by a qualified person before the historical estimate on the Moss Lake Gold Project can be classified as a current resource.  There can be no assurance that any of the historical mineral resources, in whole or in part, will ever become economically viable. In addition, mineral resources are not mineral reserves and do not have demonstrated economic viability.  Even if classified as a current resource, there is no certainty as to whether further exploration will result in any inferred mineral resources being upgraded to an indicated or measured mineral resource category. 

Table 4: Reported Historical Production from the North Coldstream Deposit4

Deposit

Tonnes

Cu %

Au g/t

Ag

Cu lbs

Au oz

Ag oz

Historical Production

2,700,0000

1.89

0.56

5.59

102,000,000

44,000

440,000

 

Note::

(4) Source: Schlanka, R., 1969. Copper, Nickel, Lead and Zinc Deposits of Ontario, Mineral Resources Circular No. 12, Ontario Geological Survey, pp. 314-316.

Peter Flindell, MAusIMM, MAIG, Vice President - Exploration of the Company, a qualified person under NI 43-101 has approved the scientific and technical information contained in this news release.

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release.

For More Information - Please Contact:

 

Brett A. Richards

President, Chief Executive Officer and Director

Goldshore Resources Inc.

 

P. +1 604 288 4416   M. +1 905 449 1500

E.  brichards@goldshoreresources.com

W. www.goldshoreresources.com

Facebook: GoldShoreRes  |   Twitter: GoldShoreRes | LinkedIn: goldshoreres

 

Cautionary Note Regarding Forward-Looking Statements

This news release contains statements that constitute "forward-looking statements." Such forward looking statements involve known and unknown risks, uncertainties and other factors that may cause the Company's actual results, performance or achievements, or developments to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements.  Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur.

Forward-looking statements in this news release include, among others, statements relating to expectations regarding the exploration and development of the Moss Lake Gold Project, and other statements that are not historical facts. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors and risks include, among others: the Company may require additional financing from time to time in order to continue its operations which may not be available when needed or on acceptable terms and conditions acceptable; compliance with extensive government regulation; domestic and foreign laws and regulations could adversely affect the Company's business and results of operations; the stock markets have experienced volatility that often has been unrelated to the performance of companies and these fluctuations may adversely affect the price of the Company's securities, regardless of its operating performance; and the impact of COVID-19.

The forward-looking information contained in this news release represents the expectations of the Company as of the date of this news release and, accordingly, is subject to change after such date. Readers should not place undue importance on forward-looking information and should not rely upon this information as of any other date. The Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

This news release does not constitute an offer to sell, or a solicitation of an offer to buy, any securities in the United States. The securities have not been and will not be registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act") or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.

Grafico Azioni Goldshore Resources (QB) (USOTC:GSHRF)
Storico
Da Nov 2024 a Dic 2024 Clicca qui per i Grafici di Goldshore Resources (QB)
Grafico Azioni Goldshore Resources (QB) (USOTC:GSHRF)
Storico
Da Dic 2023 a Dic 2024 Clicca qui per i Grafici di Goldshore Resources (QB)