Cream Minerals Ltd. (TSX VENTURE:CMA)(OTCBB:CRMXF)(FRANKFURT:DFL) ("Cream" or
the "Company") is pleased to provide results for seven exploration drill holes
completed on Cafetal-Veta Olvidada, The Cafetal-Veta Olvidada zone is located to
the east of Once Bocas South and trends SE/NW. This new zone is not included in
the current NI 43-101 Inferred Mineral Resource. 


Cafetal-Veta Olvidada is contained within the much larger Area Cafetal which has
dimensions of approximately 600 metres by 325 metres. Cafetal-Veta Olvidada is a
poorly exposed 10 metre wide composite zone of quartz breccia and quartz
veins-quartz stock work exhibiting intense weathering and oxidation. Detailed
geological mapping conducted in 2010 located quartz float trains, sub outcrops
and veins with associated quartz stock work. Other parallel quartz veins quartz
stock work zones have been mapped within Area Cafetal. 


Drill hole DDH 16-03 (completed in 2003 and located at the south eastern portion
Cafetal-Veta Olvidada) tested an area of quartz float shedding along a contact
between rhyolite flows and rhyolite tuffs. It intersected several well defined
quartz veins and quartz stock work zones which returned good silver and gold
values. Brecciation and oxidation observed was minimal compared to the
northwestern outcrops of Cafetal-Veta Olvidada. 


Cafetal-Veta Olvidada was drilled for a strike length of 400 metres of the 500
metres mapped on surface. The zone is open to the NW and to the SE. 


HIGHLIGHTS OF THE DRILL RESULTS 

Highlights include significant drill intersections (intersections are drill
widths, true widths are 50% to 70% of drill intersected width depending on drill
inclination).


CAF 05-11



--  2.00 metres of 72.30 g/t Ag and 0.281 g/t Au including 2.00 metres of
    87.70 g/t Ag and 0.210 and; 2.00 metres 75.10 g/t Ag and 0.160 g/t Au. 



CAF 06-11



--  2.00 metres of 139.90 g/t Ag and 0.643 g/t Au 



CAF 01-11



--  2.00 metres of 147.00 g/t Ag and 0.454 g/t Au 



ASSAY RESULTS 

Drill Hole CAF 01-11 was located in the north central portion of Cafetal-Veta
Olvidada with the goal of intersecting both the Cafetal and Veta Olvidada
structures.




----------------------------------------------------------------------------
Description            Sample      From        To    Width       Ag       Au
CAF 01-11              Number    Metres    Metres   Metres      g/t      g/t
----------------------------------------------------------------------------
Quartz breccia           1965     26.50     28.50     2.00    24.20    0.094
----------------------------------------------------------------------------
                         1966     28.50     30.50     2.00    19.50    0.110
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Breccia fault            1979     60.50     62.50     2.00   147.00    0.454
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Breccia, oxidation       1986     83.25     85.25     2.00    12.10    0.017
----------------------------------------------------------------------------
Fault                    1987     85.25     87.25     2.00     8.00    0.033
----------------------------------------------------------------------------
                         1988     87.25     89.25     2.00    27.70    0.067
----------------------------------------------------------------------------



Drill Holes CAF 02-11 and CAF 03-11 are located along the same section and were
also intended to intersect both the Cafetal and Veta Olvidada structures.




----------------------------------------------------------------------------
Description       Sample       From         To     Width        Ag        Au
CAF 02-11         Number     Metres     Metres    Metres       g/t       g/t
----------------------------------------------------------------------------
Breccia             2016      50.00      52.00      2.00     10.20     0.022
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Breccia             2027     137.75     139.75      2.00     26.00     0.068
----------------------------------------------------------------------------
                    2028     139.75     141.75      2.00      4.70     0.011
----------------------------------------------------------------------------
                    2029     141.75     143.75      2.00     19.00     0.099
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Breccia             2044     184.00     186.00      2.00      4.30     0.127
----------------------------------------------------------------------------



Drill Hole CAF 03-11 encountered intense oxidation, brecciation and faulting of
the core suggesting leaching of the values. No significant silver or gold values
were returned. 


Drill Hole CAF 04-11 is located along the north side of Arroyo San Miguel. Poor
ground conditions and excess water due to sub-tropical rains made in it
impractical to continue drilling. The hole was stopped short of its intended
depth. 




----------------------------------------------------------------------------
Description                Sample     From       To    Width      Ag      Au
CAF 04-11                  Number   Metres   Metres   Metres     g/t     g/t
----------------------------------------------------------------------------
Quartz breccia oxides        2121    35.50    37.50     2.00   18.20   0.061
----------------------------------------------------------------------------
Breccia Qtz fragments,                                                      
 Tuffs                       2122    37.50    39.50     2.00   50.30   0.168
----------------------------------------------------------------------------



Drill Hole CAF 05-11 is located in Arroyo Cafetal about 100 metres SW of CAF 04-11. 



----------------------------------------------------------------------------
Description         Sample      From         To     Width       Ag        Au
CAF 05-11           Number    Metres     Metres    Metres      g/t       g/t
----------------------------------------------------------------------------
Quartz vein           2127     48.20      50.20      2.00    20.10     0.068
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Quartz vein           2135    138.50     140.50      2.00    72.30     0.281
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Breccia oxidized      2140    229.90     231.90      2.00    87.70     0.210
----------------------------------------------------------------------------
                      2141    231.90     233.90      2.00    75.10     0.160
----------------------------------------------------------------------------
                      2142    233.90     235.90      2.00     6.20     0.040
----------------------------------------------------------------------------
                      2143    235.90     237.90      2.00    21.70     0.160
----------------------------------------------------------------------------
                      2144    237.90     239.90      2.00    10.00     0.646
----------------------------------------------------------------------------



Drill Holes CAF 06-11 and CAF 07-11 were located along the same section
approximately 40 metres west of drill hole DDH 16-03




----------------------------------------------------------------------------
Description       Sample       From         To     Width       Ag         Au
CAF 06-11         Number     Metres     Metres    Metres      g/t        g/t
----------------------------------------------------------------------------
Quartz vein         2158      29.25      31.25      2.00     0.90      0.877
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Quartz vein         2168      85.00      87.00      2.00    25.20      0.102
----------------------------------------------------------------------------
                    2169      87.00      89.00      2.00    11.60      0.061
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Quartz vein         2170     101.50     103.50      2.00    14.70      0.146
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Stock work          2175     117.50     119.50      2.00     0.90      0.165
----------------------------------------------------------------------------
                    2176     119.50     121.50      2.00     1.10      0.116
----------------------------------------------------------------------------
                    2177     121.50     123.50      2.00     1.10      0.111
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Quartz breccia      2181     172.60     173.60      2.00     3.00      0.121
----------------------------------------------------------------------------
Stock work          2182     173.60     175.60      2.00     2.10      0.263
----------------------------------------------------------------------------
----------------------------------------------------------------------------
                    2188     185.60     187.60      2.00     4.50      0.199
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Quartz breccia      2200     214.10     216.70      2.60     1.40      0.126
----------------------------------------------------------------------------
                    2201     216.70     218.70      2.00     2.80 less than
                                                                       0.005
----------------------------------------------------------------------------
                    2202     218.70     220.70      2.00    139.9      0.643
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Description                Sample     From       To    Width      Ag      Au
CAF 07-11                  Number   Metres   Metres   Metres     g/t     g/t
----------------------------------------------------------------------------
Quartz vein                  2215    88.10    90.10     2.00   27.40   0.121
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Quartz breccia stock work    5508   283.10   285.10     2.00   14.40   0.078
----------------------------------------------------------------------------
                             5509   285.10   287.10     2.00   20.80   0.090
----------------------------------------------------------------------------
----------------------------------------------------------------------------
Quartz breccia               5513   325.30   327.30     2.00   81.20   0.119
----------------------------------------------------------------------------
                             5514   327.30   329.30     2.00   35.80   0.160
----------------------------------------------------------------------------
                             5515   329.30   331.30     2.00   11.40   0.288
----------------------------------------------------------------------------



Drill Hole DDH 16-03 was located 50 metres east of CAF 06-11.



----------------------------------------------------------------------------
Description              Sample     From       To    Width       Ag       Au
DDH 16-03                Number   Metres   Metres   Metres      g/t      g/t
----------------------------------------------------------------------------
Quartz veins             199785    50.00    52.00     2.00    14.90    0.068
----------------------------------------------------------------------------
Stock work               199786    52.00    54.00     2.00     6.50    0.072
----------------------------------------------------------------------------
                         199787    54.00    56.00     2.00    67.00    0.327
----------------------------------------------------------------------------
                         199788    56.00    58.00     2.00    36.30    0.178
----------------------------------------------------------------------------
Weighted average    199785 - 88    50.00    58.00     8.00    31.18    0.161
----------------------------------------------------------------------------
Including            199787- 88    54.00    58.00     4.00    51.65    0.253
----------------------------------------------------------------------------
Including                199787    54.00    56.00     2.00    67.00    0.327
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Stock work veins         199801    82.00    84.00     2.00    25.30    0.070
----------------------------------------------------------------------------
                         199802    84.00    86.00     2.00    11.50    0.043
----------------------------------------------------------------------------
                         199803    86.00    88.00     2.00    17.10     0.04
----------------------------------------------------------------------------
                         199804    88.00    90.00     2.00   192.00    0.442
----------------------------------------------------------------------------
                         199805    90.00    92.00     2.00    10.70    0.038
----------------------------------------------------------------------------
Weighted average    199801 - 05    82.00    92.00    10.00    51.32    0.127
----------------------------------------------------------------------------
                         199804    88.00    90.00     2.00   192.00    0.442
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
                         199824   128.00   130.00     2.00    98.00    0.150
----------------------------------------------------------------------------



Discussion:

The seven drill holes targeting the Cafetal-Veta Olvidada zone were intended to
test for and confirm the ten metre wide composite zone of quartz breccia, quartz
veins and quartz stock work. The drill results identified three parallel heavily
oxidized and leached quartz breccia zones showing 60% quartz fragments and 40%
rhyolite fragments. Widths of the three zones range from four metres to 25
metres containing narrower sections of varying silver-gold values. The
distribution of quartz breccia and quartz veins within the drill holes suggests
Cafetal-Veta Olvidada is a composite zone of multiple quartz-breccia and quartz
stock work structures. 


CAF 06-11 and CAF 07-11 in the SE portion of the structure including drill hole
DDH 16-03 (completed in 2003) demonstrate a change in the vein composition from
quartz breccia to quartz veins and quartz stock work. In general higher values
were associated with the observed decrease of brecciation, oxidation and
leaching of the quartz vein quartz stock work zones. Leaching of silver values
produces residual grades which are lower than the primary silver grades however
it also implies the possibility of secondary enrichment below the level of
oxidation. 


Cafetal-Veta Olvidada was drilled for a strike length of 400 metres of the 500
metres mapped on surface. The zone is open to the NW and to the SE. 


The known structures within Area Cafetal are open to the NW and SE. With
additional quartz veins quartz stock work zones Area Cafetal represents another
important area of significant exploration potential at Nuevo Milenio.  




Revised NI 43 -- 101 Report, dated December 24, 2008 by F. Holcapek, P. Eng.
----------------------------------------------------------------------------
Dos Hornos Width                      Ag      Au              Ag          Au
 (U/G)         m         Tonnes      g/t     g/t              oz          oz
----------------------------------------------------------------------------
Dos Hornos                                                                  
 Segment 1  4.70   1,173,901.56   165.34   1.500    6,552,238.85   59,400.00
----------------------------------------------------------------------------
Dos Hornos                                                                  
 Segment 2  4.06     746,528.32   201.95   1.770    4,847,215.70   42,390.25
----------------------------------------------------------------------------
Veta Tomas  5.09   1,246,162.50   351.19   1.280   14,070,467.48   51,344.17
----------------------------------------------------------------------------
Once Bocas  2.42   1,921,162.50   252.59   1.920   15,602,012.74  118,347.79
----------------------------------------------------------------------------
Total              5,087,754.88   251.09   1.660   41,071,934.77  271,482.21
----------------------------------------------------------------------------
   Tonnes: 5,088,000 Ag: 251.09 g/t, Au: 1.660 g/t. Ag: 41,072,000 oz, Au:  
                                 271,500 oz.                                
 Silver Equivalent (Gold-Silver price Ratio = 50:1): 54,647,000 oz (in situ)
    Metal prices were USD$10.28 per ounce Ag and USD$816.09 per ounce Au.   
  A cut-off grade of US$ 45.00 per tonne or 131g/t Ag equivalent was used.  



Mr. Ferdinand Holcapek, P. Eng., Director and Administrator General, Cream
Minerals De Mexico, SA de CV, supervises exploration programs on the Nuevo
Milenio Project. He is responsible for all technical reporting and is the
Company's "Qualified Person" for the purpose of National Instrument NI 43-101.


Cream Minerals is a silver-gold exploration company. The Company's flag ship
project is the Nuevo Milenio silver - gold project in Nayarit State Mexico. To
learn more about Cream Minerals please click here www.creamminerals.com.


This news release contains "forward-looking information" within the meaning of
applicable Canadian securities regulations and including "forwarding-looking
statements" within the meaning of the United States Private Securities
Litigation Reform Act of 1995. This forward-looking information is made as of
the date of this News Release and except as required under applicable securities
legislation, the Company does not intend and does not assume any obligation to
update this forward-looking information. Forward looking information is based on
management's current expectations and beliefs and is subject to a number of
risks and uncertainties that could cause actual results to differ materially
from those described in the forward-looking statements. Forward-looking
information in this News Release includes, but is not limited to the planned
drilling program on the Nuevo Milenio project and the Nuevo Milenio project's
estimated mineral resource. Forward-looking information is based on a number of
assumptions which management believes are reasonable including that equipment,
personnel and approvals will be available when required to complete the planned
drilling program, that no disruption to the program will occur as a result of
breakdown, labour disputes, or natural hazards, that the assumptions underlying
the inferred resources estimate are valid, including but not limited to the
projected future prices of silver and gold, continuity of mineralization and
grades, and expected recovery methods and rates. Factors which could cause
actual results to differ materially from current expectations include, but are
not limited to: the risk that actual results of exploration activities will be
different than anticipated, that cost of labour, equipment or materials are more
than expected, that the future price of silver and/ or gold will differ
materially from those implied or estimated, that Canadian / US dollar exchange
rates vary in a manner that has a negative effect on the resource estimate,
unanticipated delays in obtaining governmental approvals or required financing;
that changes in project parameters result in increased costs, of unexpected
variations in mineralization, grade or recovery rate and other factors on which
the mineral resource estimate is based, of failure of equipment or processes to
operate as anticipated, of accidents, labour disputes and other risks generally
associated with mineral exploration and development; a deterioration in general
economic conditions; and changes in laws, rules and regulations applicable to
Cream and the Nuevo Milenio project. 


CAUTIONARY NOTE TO U.S. READERS REGARDING MINERAL RESOURCES

The United States Securities and Exchange Commission ("SEC") allows mining
companies, in their filings with the SEC, to disclose only those mineral
deposits they can economically and legally extract or produce. The Company uses
certain terms in this document, such as "mineral resources", and "inferred
resources" that are recognized and mandated by Canadian securities regulators
but are not recognized by the SEC. U.S readers are cautioned that while the term
'inferred resource' is recognized and required by Canadian regulations, the SEC
does not recognize it. "Inferred resources" have a great amount of uncertainty
as to their existence, and great uncertainty as to their economic and legal
feasibility. It cannot be assumed that all or any part of an inferred mineral
resource will ever be upgraded to a higher category. Under Canadian rules,
estimates of inferred mineral resources may not form the basis of feasibility or
pre-feasibility studies, except in rare cases. U.S. readers are cautioned not to
assume that part or all of an inferred resource exists, or is economically or
legally mineable.


View the Map associated with this release at:
http://media3.marketwire.com/docs/cma216_F1.pdf.


U.S. 20-F Registration: 000-29870

Grafico Azioni Cream Minerals Ltd. (TSXV:CMA)
Storico
Da Nov 2024 a Dic 2024 Clicca qui per i Grafici di Cream Minerals Ltd.
Grafico Azioni Cream Minerals Ltd. (TSXV:CMA)
Storico
Da Dic 2023 a Dic 2024 Clicca qui per i Grafici di Cream Minerals Ltd.