TAD Mineral Exploration Inc. ("TAD" or "the Company") (TSX VENTURE:TJ) wishes to
announce that it has been informed by the operator that six NQ diameter diamond
drill holes totaling 804 meters (2,637.1 ft) have been completed on the Hazelton
North (Sidina) Project. Five holes (SD10DDH-1 to5) were directed at the Camp
Zone quartz-sulphide veins. One drill hole (SD10DDH-6), was targeted towards the
West Creek Zone. All six holes intersected mineralization.


The program was successful in outlining previously mapped surface mineralization
at depth. A total of 325 core samples have been submitted to Acme Labs of
Vancouver, BC. A total of 17 blank rock chip samples (non-mineralized monzonite)
were inserted for data verification purposes. Results from these samples are
expected to be returned within 4-8 weeks.


Jason Gigliotti, a director of TAD stated, "We are pleased that the drilling
intersected mineralization in each hole. We look forward to the results from
this drill program which is TAD's primary drill project."


Andris Kikauka, P.Geo. has reviewed the technical data in this news release.

If you would like to be added to TAD's update list please send an email to
tadcapital@gmail.com


ON BEHALF OF THE BOARD

TAD MINERAL EXPLORATION INC.

Jason Gigliotti, Director

Grafico Azioni TAD Mineral Exploration Inc. (TSXV:TJ)
Storico
Da Giu 2024 a Lug 2024 Clicca qui per i Grafici di TAD Mineral Exploration Inc.
Grafico Azioni TAD Mineral Exploration Inc. (TSXV:TJ)
Storico
Da Lug 2023 a Lug 2024 Clicca qui per i Grafici di TAD Mineral Exploration Inc.